RESOURCE SCHEDULING OF

RESIDENTIAL PROJECT USING


PRIMAVERA
AIM OF PROJECT

 The main aim of this project is to study the plan


of a residential building project (G+4) and
scheduling of construction activities and
budgeting by Using suitable method of Project
management techniques (CPM,PERT) with help
of primavera software.
Schedule of project

 Study the basics of primavera


 Selection of project and preparation of typical plan for (G+4)
Residential building.
 Estimation of quantities
 Preparation of activity layout and calculating duration of each
activity.
 Scheduling the activities
 Preparation of WBS layout.
 Budgeting the project.
 Preparation of reports &document
Concept of primavera
&Oracle corporation review

 1. Primavera is a tool for planner, project managers and


any person needs to plan - control a project.
 2.It is a product of primavera system in since 1982-
oracle corporation -2008(p6)
 Oracle's Primavera P6 Enterprise Project Management
is the most powerful and easy-to-use solution for
globally prioritizing, planning, managing, and executing
projects, programs.
Specified & method of working

 p6 is specified in managing all types of projects


small, medium & large
 Methods of Working:-
Pm is using critical path method (CPM) in
calculating project duration and floats of the activities

 It has types of charts (view/display)


Gantt Bar chart
Key words& their definitions
&uses

 Construction management
 Scheduling
 Tracking
 Resources
 Man-day
 Budget
 Project: Any undertaken work is called project, it requires
resources and fund to complete. We can get some out put by
doing project.
 Ex: catering, wedding planning, construction of building,
software development.
Project Planning Components&
Parameters

 The components that may be measured and controlled using


planning and scheduling software
Time
Resource
Cost
Planning the project by means

 Thinking & documenting what needs to be done to complete the


project
 Defining Responsibilities(AR,OW,CONTRACTER)
 Defining the phases (DP, EP, FP)
 Calculating Activity duration
 Adding the logic links between activities
 Assigning resources and cost to activities
 Define calendars
 Create a work break down structure
 Preparing work schedules
 Developing an acceptable budget
 Provide a base line which progresses is measured
Monitoring and controlling means:-

 Ensuring the project is being executed according to


the plan measuring performance
 Compare the projects progress with the original plan
 Suggesting correction action when needed
 Inform the team about progress
 Identifying the improvement of performance of team
 Forecast Problems
Project life cycle (Plc.)

 The time span between the start and competition of


project. Represents the project
 life cycle which varies from few months to few years
The life cycle of project can be broadly divided into the
following:-
 a) Formation stage / inception stage
. Feasibility studies
.Invest appraisal(budget)
.project definition
 b) Mobilization / preparation Stage
.Project Preliminary plan
.Design & drawing
.Specification and tendering(contract finalization)
.resource Mobilization
 C) Construction stage / Execution stage
. Planning & controlling execution
.Inducting Resources
.Construction
.Final handing over to the client
Project updating cycle
cre
THE PROGRAM CAN BE SEE IN
PRIMAVERA SOFTWARE IN
PRACTICALY