(SURABAYA)
INSPECTION FIELD REPORT
GENERAL DATA
Owner : Location of Installation :
Item Number : Year of Installation :
TECHNICAL DATA
ENGINE Manufacturer : Power / Daya : HP
Type / Model : Speed : RPM
Serial No. Buatan / Tahun :
PERFORMANCE TEST
UNIT PARAMETER JAM
Time
Daya (KW)
Daya (KVA)
GENER Cos Phi
ATOR Arus (A)
Tegangan(Volt)
Frekuensi (Hz)
Tegangan Batrai (Vdc)
Tekanan Oli (Bar/Kpa)
Temp. Oli (OC)
ENGINE Kecepatan (Rpm)
Temp. Radiator (OC)
Temp Exhaust ( OC)
Temp. Altenator (OC
NOTE : Maximum Power...............................................................................KW, Warming Up Time............................................................
RESULT
Body
GenSet.................................Ω..,
Panel...........................................
Ω
Comment A
c
c
e
p
t
e
d
/
N
o
t
A
c
c
PT SURVEYOR INDONESIA
(SURABAYA)
INSPECTION FIELD REPORT
AUXILLARY TEST
Type of Inspection Equipment
Type : ...........CO2......................., Pressure : ....-......................, Validation :.......................
Fire Protection equipment
Type : ..............Powder...................., Pressure : ................................., Validation :.......................
Emergency Stop test Accepted / Not Accepted Note :
Sound Level Test Area power plant/Open :..............DB
Area power plant/Closed :..............DB
kWH awal:...................., kWH akhir : ........................ Consumption of fuel tank :.............................Liter
Operator Room :..............DB
Area Boundryline :.......................DB
Voltage test Batrai (Vdc)
Titik Koordinat S: E:
Finding Memo :