You are on page 1of 8

INDIVIDUAL TEST R

Rheinland

( Running Test ) R
Rheinland

Project Name :
Konsorsium PT. Encona Inti PLTU Baruta 2x7 MW PT. Harmoni Energy
Baharu - Harco Industri Bau-bau Indonesia
Date : Title : Running Test Page : 1 of 2
Location : Of Revision :0
Equipment Specification
Motor Pump/Fan/Blower/Others Gear Box
Type : Type : Type :
Speed : RPM Merk : Merk :
Power : kW Power : Power :
Current : A Speed : Torque :
Voltage : V Suct. Press. : In speed :
Freq. : Hz Disch. Press. : Out speed :
Conn. : Capacity : Gear ratio :
Cos Q :
Insul. :
Duty :
Mfg. : Mfg. : Mfg. :

Visual Inspection Before Test Result


Check is there no any split or damage on equipments
Check all measuring devices or gauges already installed properly
Check all valves, fittings and others accessories already installed properly
Check no any leakage on sealing and cooling water lines
Check the casing, frame, couple shaft protector and surface is good or not
Check the all fixing bolts and nuts is good or not
Check level of lubricant oil or grease for all bearing was enought or no
Measuring And
Acceptance
No. Test Item Unit Limit Value Test Duration Time
Point Start 30min. 60min. 90min. Stop Yes No
A
B
V C
D
1. Bearing vibration level mm A
B
H C
D
A
B
A C
D
A
B
2. Bearing temperature C
o
< 80 C
D
a
3. Body motor temperature C
o
< 75 b
c
4. Motor starting current A < 8 x In
5. Motor operating current A < 90% x In
6. Suction pressure (if any) MPa
7. Discharge pressure (if any) MPa
8. Discharge flow (if any) T/H
9. Noise level (1 meter away) dB < 90
Note :

Tested By, Aknowledged by, Check & Approved by, Witnessed by,
Operation Supervisor Project Manager Consultant Owner
INDIVIDUAL TEST R
Rheinland

( Running Test ) R
Rheinland

Project Name :
Konsorsium PT. Encona Inti PLTU Baruta 2x7 MW PT. Harmoni Energy
Baharu - Harco Industri Bau-bau Indonesia
Date : Title : Running Test Page : 2 of 2
Location : Of Revision :0

Measuring Point of Pump Operating Parameter

c b a

D C B A
INDIVIDUAL TEST R
Rheinland

( Running Test ) R
Rheinland

Project Name :
Konsorsium PT. Encona Inti PLTU Baruta 2x7 MW PT. Harmoni Energy
Baharu - Harco Industri Bau-bau Indonesia
Date : Title : Running Test Page : 2 of 2
Location : Of Revision :0

Measuring Point of Fan Operating Parameter

c b a

FA
N

D C B A
INDIVIDUAL TEST R
Rheinland

( Running Test ) R
Rheinland

Project Name :
Konsorsium PT. Encona Inti PLTU Baruta 2x7 MW PT. Harmoni Energy
Baharu - Harco Industri Bau-bau Indonesia
Date : Title : Running Test Page : 2 of 2
Location : Of Revision :0

Measuring Point of BFP Operating Parameter

a b c

A B C D
INDIVIDUAL TEST R
Rheinland

( Running Test ) R
Rheinland

Project Name :
Konsorsium PT. Encona Inti PLTU Baruta 2x7 MW PT. Harmoni Energy
Baharu - Harco Industri Bau-bau Indonesia
Date : Title : Running Test Page : 2 of 2
Location : Of Revision :0

Measuring Point of Crusher Operating Parameter

a b c

A B C D
INDIVIDUAL TEST R
Rheinland

( Running Test ) R
Rheinland

Project Name :
Konsorsium PT. Encona Inti PLTU Baruta 2x7 MW PT. Harmoni Energy
Baharu - Harco Industri Bau-bau Indonesia
Date : Title : Running Test Page : 2 of 2
Location : Of Revision :0

Measuring Point of Equipment With Gear Reducer

a b c

A B C D
INDIVIDUAL TEST R
Rheinland

( Running Test ) R
Rheinland

Project Name :
Konsorsium PT. Encona Inti PLTU Baruta 2x7 MW PT. Harmoni Energy
Baharu - Harco Industri Bau-bau Indonesia
Date : Title : Running Test Page : 2 of 2
Location : Of Revision :0

Measuring Point of Vertical Pump Operating Parameter

a b c