Professional Documents
Culture Documents
C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PRE-COMMISSIONING CHECK SHEET-PIPING
ITR No :P-0005B
SYSTEM LEAK TEST
*120001000817*
Project No.: KNPC JI-2025 Record No: *120001000817*
Tag No: 02-065-01-P238-01-SLT
Sub-System No: 02-065-01-P238-01
Drawing No: Data Sheet:
From:
Service: Unit 065 IRT Pipeline-Bunker Fuel Oil Location
To:
Calibration Records
Description Identification No. Calibration date Calibration Due
REMARKS / OBSERVATIONS:
Marked up P&ID showing Test limit.
List of joints found leaking attached with Before & After rectification leakage results.
Chart recorder attached.
Page 1 of 1
P-0005B
Rev. A1