You are on page 1of 1

D:\2021-06-10\PROGRESS LAYOUT\midtown-nc.

jpg

ZONE E-1

1
1

01 01
01

OWNER

P3-3
P3-4

P3
P3-2
P3-1
E=683947.7970
N=807411.3145

DET.1 DET.1

Amoon company

P2-4

P2-3
P2

P2-1

P2-2
DET.2

P4/T7
OWNER CONSULTANT

P6/T7
P3/T8
E=683933.6566
N=807391.4076

ROAD 01
E=683898.3425
N=807419.6486

E=683818.2502
N=807488.3875 E=683881.1116
N=807434.0041

E=683848.4726
N=807461.8387
E=683791.0902
E=683835.1415
N=807512.9299
N=807473.3491 E=683914.0052
N=807406.9606

E=683805.8531
N=807499.4429
E=683772.0885

- 02
N=807524.5659

RG
E=683867.6832 P2-3
P2-4
N=807445.3382 P2

P2-2
- 03 P2-1

RG

P3-3
P3-4

P3

P3-2
P3-1
- 04

P5/T7
RG P4-3

P4-4

P4

P4-2
BETTERHOME

P3/T7
P4-1

P6/T8
FOR REAL STATE DEVELOPMENT

P04-4
P04-1

P04

P04-3
P04-2

P5/T6
E=683749.7277
N=807524.6123

P1-3

P1-4
P1

P1-2
P1-1
- 01
RG

E=683705.0561
N=807550.2812

E=683705.6179
N=807549.7983

E=683704.2738
N=807549.3712
E=683704.8805
N=807548.8497

P5-1
P5-4

Main Contractor
P5

P5-3

P5-2

P2/T8
E=683700.4527
N=807540.7707

E=683714.0824 E=683727.6644
N=807526.5689 N=807512.4336

ZONE A
PROSERVICE
P1/T8

P4/T6
TRTR
RMU
RMU

E=683718.8390
Y

N=807482.1069
BATTER
BATTERY
ER R
CHARGE
Y AND

DET.1
AND
CHARG
BATTER

E=683673.8920
BATTERY

N=807517.6857

ZONE E-1
E=683675.0912
N=807517.6434

E=683677.7611
N=807517.2918

E=683675.0631
N=807516.8439
TIONTION
DISTRIBU
DISTRIBU

P5/T8
Color code ITEMS
E=683673.8638

Planned Actual This Week Next Week

P2/T7
N=807516.8862

P1/T7
ROAD 02
E=683727.8283
N=807457.2815

E=683757.9175
- 05 N=807429.7167

- 07
RG

- -
E=683771.0512

P7-4
RG
P5-3

P7-1
P5-4 N=807418.0697

P5

P7
- 06

P7-3
P5-2
100% 100%

P7-2
E=683704.4114 P5-1
RG

P6-4
P6-3

Excavation
N=807470.6604
E=683744.8243

P6
N=807441.4997 P6-2

P6-1

P6/T6
P2/T6
P1/T6
E=683642.8271
N=807519.0147

E=683641.6558
P6-3

N=807519.2758
P6-4

P6-2
P6

E=683641.4818
P6-1

N=807518.4949

E=683642.6530
N=807518.2339

E=683646.0854

- -
N=807508.6019

E=683644.9141
N=807508.8630

E=683644.7401
N=807508.0821
E=683647.7381
N=807507.3772

RG
- 08
Pipe Installation 100% 50%

P8-3
P8-4
E=683645.9114 P8
N=807507.8211

P8-2
E=683677.4760 P8-1

N=807471.9218

Testing&Backfilling 100% 50% - -

SDP-S-1
ZONE B ZONE E-2
Color code
P4/T8

Planned Actual This Week Next Week


E=683621.1659
N=807495.3442
P7/T8

MCC-LS-5
Excavation 100% 100% - -
ROAD 07

- -
P7-3

100% 100%
P7

P7-4
P7-2

Pipe Installation
P7-1

P2/T5
Testing&Backfilling 100% 100% - -

P3/T6
P5/T5

ZONE E-2
DET.1

ROAD 06
- 12

ROAD 03 - 10

ZONE E-3
P12-3

P10-4
P12-4
RG RG P10-1
P12

P10
P12-1

- 11

P10-3
P12-2

P10-2
RG P11-1
P11-4

P11

P11-3
P11-2

P1/T5
P6/T5
P4/T5
P3/T5
P4/T1

Color code Planned Actual This Week Next Week


RG
- 09

Excavation 100% 100% - -

P1-4
P1-1

P1

P1-3
P1-2

Pipe Installation 100% 100% - -


ZONE E-4

ZONE C Testing&Backfilling 100% 100% - -

SDP-S-2
MCC-LS-4
ZONE E-4
P8-3

P8-4 P8
P8-2
P8-1

Color code Planned Actual This Week Next Week


Excavation 100% - - -

P4/T4
- - -

P1/T4
Pipe Installation 100%
P5/T4
P5/T1

P2/T4
P3/T1

ROAD 04
- 13
RG

P13-4
P13-3
P13

- 15
P13-1
P13-2
- 14
RG
RG
P15-4
P15-1

- - -
P14-4

P14-3
P15

P15-3
P14

P15-2
P14-2

100%
P14-1

Testing&Backfilling

P6/T4
P5/T3
P4/T2
P5/T2

Planned Actual
OVERALL PROGRESS

P3/T4
DET.1
80% 37%
ZONE D
P2/T1

LP-LS8
MCC-LS-3

- 16
RG

P16-3
P16-4
P16

P16-2
P16-1

P9-3
P9-4

P9-2

P9
P9-1

P21-4
- 21 P21-3
P21

RG P21-1
P21-2

P17-4
P4/T3

P17-3
P17

P17-1

- 17 P17-2

RG
P3/T3
P1/T2

P3/T2
P1/T1

DRAWING TITLE:
P19-3
P19-4

P19
P20-4

P19-2

P20-3
P19-1

- 19
P20

P20-2

P10-3

ROAD 05
RG
P20-1

- 20
P10-4

P10
P10-2
RG
P10-1

P2/T3
P1/T3

P6/T3
P2/T2

P18-4
RG

P18-3
- 18

MAIN IRRIGATION NETWORK STATUS


P18

P18-2
P18-1

P11-3
P11

P11-4
P11-2
P11-1

P1-4 P1-3
P1

P1-1 P1-2

1
1

DATE: SCALE:
DET.1 DET.1

ZONE E-3 DET.1

24-10-2021 N.T.S