Professional Documents
Culture Documents
Serial No. _____________ Reg. No._______________ Right Eng. Gas Gen. S/N _______________________
Last Inspection ____________ Phase_____________ Right Eng. Power Module S/N ___________________
Left Eng. Gas Gen. S/N ________________________ Right Prop Total Time ___________ TSOH _________
Note: If two inspection intervals are shown (i.e. 2,400 HOURS or 30 MONTHS), this indicates the inspection requirement is
due at whichever time occurs first.
A. Special Inspections
(2) LEFT SIDE STARTER-GENERATOR - Inspect QAD attachment flange. ANYTIME S-G IS
REMOVED
(4) LEFT SIDE MAIN LANDING GEAR DRAG BRACE ASSEMBLY - Inspect
for cracks, wear and interior and exterior corrosion (Disassembly required).
(a) IF OPERATED FROM A PAVED RUNWAY 8,000 CYCLES OR 6
(b) IF OPERATED ON OR FROM UNPAVED (GRASS/GRAVEL) RUNWAYS YEARS
20% OR MORE OF THE TIME 8,000 CYCLES OR 3
NOTE YEARS
One unpaved runway landing (URL) = Three paved runway landings
(PRL) EXAMPLE: 1,000 URL plus 5,000 PRL equals 8,000 cycles.
(5) LEFT SIDE MAIN LANDING GEAR AXLE ASSEMBLY and TORQUE
KNEES - Inspect for cracks, wear and interior and exterior corrosion
(Disassembly required).
(a) IF OPERATED FROM A PAVED RUNWAY 8,000 CYCLES OR 6
(b) IF OPERATED ON OR FROM UNPAVED (GRASS/GRAVEL) RUNWAYS YEARS
20% OR MORE OF THE TIME 8,000 CYCLES OR 3
YEARS
NOTE
One unpaved runway landing (URL) = Three paved runway landings
(PRL) EXAMPLE: 1,000 URL plus 5,000 PRL equals 8,000 cycles.
(6) LEFT SIDE MAIN LANDING GEAR ACTUATOR CLEVIS - Inspect clevis
1,000 CYCLES
hole (Ref. 32-30-05, 601).
(7) LEFT SIDE MAIN LANDING GEAR WHEELS - Inspect main wheels in CMM
accordance with manufacturer's instructions.
(8) LEFT SIDE FLAP FLEXIBLE SHAFT - Inspect for wear and freedom of
operation with both ends disconnected (Ref. 27-50-01, 401 and 27-50-13, 5,000 CYCLES
801).
(9) LEFT SIDE WING FRONT SPAR CAP - Inspect and check for corrosion 5 YEARS INITIAL/1 YEAR
(Ref. Structural Inspection and Repair Manual, Chapter 57). RECURRING
(14) RIGHT SIDE MAIN LANDING GEAR AXLE ASSEMBLY and TORQUE
KNEES - Inspect for cracks, wear and interior and exterior corrosion
(Disassembly required).
(a) IF OPERATED FROM A PAVED RUNWAY 8,000 CYCLES OR 6
(b) IF OPERATED ON OR FROM UNPAVED (GRASS/GRAVEL) RUNWAYS YEARS
20% OR MORE OF THE TIME 8,000 CYCLES OR 3
YEARS
NOTE
One unpaved runway landing (URL) = Three paved runway landings
(PRL) EXAMPLE: 1,000 URL plus 5,000 PRL equals 8,000 cycles.
(15) RIGHT SIDE MAIN LANDING GEAR ACTUATOR CLEVIS - Inspect 1,000 CYCLES
clevis hole (Ref. 32-30-05, 601).
(16) RIGHT SIDE MAIN LANDING GEAR WHEELS - Inspect main wheels in CMM
accordance with manufacturer's instructions.
(17) RIGHT SIDE FLAP FLEXIBLE SHAFT - Inspect for wear and freedom of
operation with both ends disconnected (Ref. 27-50-01, 401 and 27-50-13, 5,000 CYCLES
801).
(18) RIGHT SIDE WING FRONT SPAR CAP - Inspect and check for 5 YEARS INITIAL/1 YEAR
corrosion (Ref. Structural Inspection and Repair Manual, Chapter 57). RECURRING
(21) EDGELIGHTED PANEL ASSEMBLIES (FL-1 thru FL-380, FL-382; FM- 2,000 HOURS OR 4
1 thru FM-11) - Inspect for condition (Ref. 33-10-01, 601). YEARS
(22) AIR-CONDITIONER COMPRESSOR DRIVE BELTS - Check for proper 50 HOURS AFTER
tension (Ref. 21-50-09, 501 or 21-51-05, 501). INSTALLATION
(25) NOSE LANDING GEAR DRAG BRACE ASSEMBLY - Inspect for cracks,
wear and interior and exterior corrosion (Disassembly required).
(a) IF OPERATED FROM A PAVED RUNWAY 8,000 CYCLES OR 6
(b) IF OPERATED ON OR FROM UNPAVED (GRASS/GRAVEL) RUNWAYS YEARS
20% OR MORE OF THE TIME 8,000 CYCLES OR 3
NOTE YEARS
One unpaved runway landing (URL) = Three paved runway landings
(PRL) EXAMPLE: 1,000 URL plus 5,000 PRL equals 8,000 cycles.
(27) NOSE LANDING GEAR ACTUATOR CLEVIS - Inspect clevis hole (Ref. 1,000 CYCLES
32-30-11, 601).
(28) NOSE LANDING GEAR WHEEL - Inspect nose wheel in accordance CMM
with manufacturer's instructions.
(30) COMMUNICATIONS and NAVIGATION - Inspect and calibrate per FAA AS REQUIRED
regulations (Ref. Chapter 34).
(31) POWER LEVER STOP PIN PEDESTAL - Inspect for wear. Maximum 1,200 HOURS
allowable wear is 1/3 of pin diameter (Ref. 76-10-17, 501).
(36) CARGO DOOR LOWER ATTACHMENT LUG (FM-1 and After) - After
each heavy equipment loading and unloading, inspect for cracks, AS REQUIRED
breakage, proper alignment and security of attachment (Ref. 52-30-05,
601).
(37) WING ATTACHMENT BOLTS - Inspect the eight bolts as outlined in the 5 YEARS
Structural Inspection and Repair Manual (Ref. 57-00-00, 201).
(40) WINDSHIELD SCREWS - Check windshield screws for 20 inch-pounds 200 HOURS INITIAL/
of torque. 800 HOURS RECURRING
(47) FLIGHT CONTROLS - (PRIORITY AREA INSPECTION) - Inspect all 10,000 CYCLES INITIAL/
flight control pulley brackets and castings for cracks, corrosion, wear and
5,000 CYCLES
attachment (Ref. CONTROL CABLE PULLEY INSPECTION procedure RECURRING
Standard Practices - Airframe, 20-04-00, 201).
(49) WING CENTER SECTION UPPER SURFACE BONDED PANEL SKIN - 600 HOURS INITIAL/18
Inspect bonded panel (Ref. 51-00-00, 601). MONTHS RECURRING
(50) BATTERY, EMERGENCY CAPACITY TEST (FL-215 and After; FM-10 12 MONTHS OR 600
and After) - Perform initial test at 12 months or 600 hours which ever comes HOURS INITIAL/ 12
first and subsequent test at 12 months or 200 hours which ever comes first.MONTHS OR 200 HOURS
Replace Battery which does not pass capacity test. RECURRING
(51) LEAD ACID BATTERY (FL-215 and After; FM-10 and After) - A Battery
90 DAYS
stored in an airplane must be boost charged every 90 days.
(57) NOSE AND MAIN LANDING GEAR TRUNNION BOLT HOLES AND
DRAG BRACE ATTACH HOLES - Inspect for cracks, corrosion, damage,
and elongation of holes.
(a) IF OPERATED FROM A PAVED RUNWAY 8,000 CYCLES OR 6
(b) IF OPERATED ON OR FROM UNPAVED (GRASS/GRAVEL) RUNWAYS YEARS
20% OR MORE OF THE TIME 8,000 CYCLES OR 3
YEARS
NOTE
One unpaved runway landing (URL) = Three paved runway landings
(PRL) EXAMPLE: 1,000 URL plus 5,000 PRL equals 8,000 cycles.
(62) EXTENDED RANGE FUEL TANK - Remove fuel tank access panels
EVERY 1,200 HOURS
and inspect sealant for proper adhesion and general condition.
(63) BOB WEIGHT LINK ASSEMBLY - Perform the BOB WEIGHT LINK
EVERY 5,000 HOURS
ASSEMBLY INSPECTION procedure (Ref. 27-30-23, 601).
(64) FLAPS - Remove flaps and inspect flap attach brackets, flap structure, EVERY 3,000 CYCLES
tracks, roller bearings, and attachment hardware for wear (Ref. Chapter OR THREE YEARS,
27). WHICHEVER OCCURS
FIRST
(65) LANDING GEAR HYDRAULIC FILL RESERVOIR SCREEN - Clean and 200 HOURS INITIAL/
inspect the fill reservoir screen (Ref. 32-30-35, 401). 1,200 HOURS
RECURRING OR ANY
TIME SYSTEM IS
CONTAMINATED
(66) NACELLE SPLICE PLATES - Inspect the splice plates for condition and6 YEARS INITIAL/ 1 YEAR
corrosion. RECURRING
(68) Control Lock - Inspect the Control Lock to determine that it is the
12 MONTHS
correct part number for the airplane (Ref. 230, Table 201, 20-14-00, 201).
2. INSPECTION COMPLETED
I certify that the Special Inspection was performed in accordance with the Model B300/B300C Inspection Program and that the
airplane is approved for return to service:
DATE: ________________________________________________________________________________
MECHANIC: ___________________________________________________________________________
CREW CHIEF: _________________________________________________________________________
QUALITY CONTROL INSPECTOR: _________________________________________________________