You are on page 1of 5

Name and ID No: DURAN, FRENCES LOIS V 2019-3015

Subject and Section: ABE137-CD113


Date submitted: January 17, 2022
ABE 137: Hydrometeorology
Laboratory Exercise No. 9

STREAM CLASSIFICATION
A. Given the rainfall-runoff data of three different catchments from three different Southeast
Asian countries:

1. Determine the equivalent rainfall intensity in mm/hr and the equivalent runoff
discharge in m3/s of the different catchments.

2. Compute the annual runoff coefficient (Mapawa & Babon Catchments) and annual
total and direct runoff coefficients (Gong Cao Catchment).

*For Babon Catchment, compute the average rainfall and total runoff from the
given three sub-catchments. Then, compute the average monthly values of rainfall
and runoff – and use these values to compute the runoff coefficient.

Table 1. Weekly Rainfall at Mapawa Catchment, Brgy. Songco, Lantapa Bukidnon for
Year 2002 (Catchment Area: 84.5 ha)

Month Week Rainfall Runoff Rainfall Runoff


Number (MM) (MM) Intensity Discharge
(MM/HR) (M3/S)
January 1 56.0 0.00 0.3333 0.0000
2 22.0 0.00 0.1310 0.0000
3 17.5 0.00 0.1042 0.0000
4 1.5 0.00 0.0089 0.0000
February 5 40.5 0.00 0.2411 0.0000
6 3.8 0.00 0.0226 0.0000
7 101.7 0.00 0.6054 0.0000
8 12.7 0.00 0.0756 0.0000
March 9 46.1 1.01 0.2744 0.0014
10 18.6 0.00 0.1107 0.0000
11 44.0 0.00 0.2619 0.0000
12 22.0 0.00 0.1310 0.0000
13 87.9 0.00 0.5232 0.0000
April 14 4.0 0.00 0.0238 0.0000
15 7.4 0.00 0.0440 0.0000
16 89.7 0.00 0.5339 0.0000
17 117.2 0.00 0.6976 0.0000
May 18 10.6 0.00 0.0631 0.0000
19 88.4 0.00 0.5262 0.0000
20 112.8 0.00 0.6714 0.0000
21 93.8 0.00 0.5583 0.0000
22 44.8 0.00 0.2667 0.0000
June 23 62.5 0.77 0.3720 0.0011
24 15.9 0.00 0.0946 0.0000
25 54.9 0.48 0.3268 0.0007
26 56.8 0.00 0.3381 0.0000
July 27 21.4 0.00 0.1274 0.0000
28 28.0 0.00 0.1667 0.0000
29 83.0 1.61 0.4940 0.0022
30 207.7 14.40 1.2363 0.0201
August 31 41.7 1.42 0.2482 0.0020
32 26.6 2.14 0.1583 0.0030
33 77.8 0.09 0.4631 0.0001
34 25.8 0.00 0.1536 0.0000
September 35 36.1 0.00 0.2149 0.0000
36 81.2 1.17 0.4833 0.0016
37 95.7 3.23 0.5696 0.0045
38 63.3 1.12 0.3768 0.0016
39 84.9 2.65 0.5054 0.0037
October 40 182.5 14.81 1.0863 0.0207
41 41.0 4.56 0.2440 0.0064
42 53.3 0.00 0.3173 0.0000
43 45.3 0.62 0.2696 0.0009
November 44 39.4 0.00 0.2345 0.0000
45 100.2 0.00 0.5964 0.0000
46 57.0 0.00 0.3393 0.0000
47 66.8 0.00 0.3976 0.0000
December 48 55.8 0.00 0.3321 0.0000
49 32.3 0.00 0.1923 0.0000
50 19.7 0.00 0.1173 0.0000
51 17.2 0.00 0.1024 0.0000
52 2.5 0.00 0.0149 0.0000
TOTAL 2819.3 50.08

Annual Runoff Coefficient:

Table 2. Rainfall Data of Gong Cao Catchment, Vietnam for Year 2000-2002
(Catchment Area: 45.5 ha)
Month Average Direct Total Rainfall Runoff
Rainfall Runoff Runoff Intensity Discharge
(MM ) (MM ) (MM ) (MM/HR ) (M3 /S)
YEAR
2000 -
2002
January 19.33 9.45 20.99 0.0260 0.00357
February 23.30 3.65 12.58 0.0343 0.00234
March 52.43 5.17 16.09 0.0705 0.00273
April 94.93 6.77 18.29 0.1276 0.00321
May 280.83 49.72 67.09 0.3775 0.01140
June 243.73 129.26 152.18 0.3276 0.02671
July 367.27 180.08 205.84 0.4936 0.03497
August 218.03 111.19 135.20 0.2931 0.02297
September 122.07 58.20 79.37 0.1641 0.01393
October 172.67 125.60 146.67 0.2321 0.02492
November 34.23 21.41 37.14 0.0460 0.00652
December 15.40 8.35 18.25 0.0207 0.00310

Annual 1644.23 708.85 909.68


Total
Annual Direct Runoff Coefficient: Annual Total Runoff
Coefficient:

Table 3. Rainfall-Runoff data at Babon Catchment, Indonesia. (Catchment Area: 15 ha.)

Time(months) Average Total Runoff Rainfall Runoff


Rainfall (MM) Intensity Discharge
(MM) (MM/HR) (M3/S)
January 538.683 90.251 0.724 0.0051
February 499.917 212.152 0.735 0.0130
March 574.067 84.736 0.772 0.0047
April 365.000 29.019 0.491 0.0017
May 0.000 0.000 0.000 0.0000
June 0.000 0.000 0.000 0.0000
July 0.000 0.000 0.000 0.0000
August 0.000 0.000 0.000 0.0000
September 0.000 0.000 0.000 0.0000
October 243.517 4.515 0.327 0.0003
November 375.467 12.728 0.505 0.0007
December 441.383 41.123 0.593 0.0023
TOTAL 3038.033 474.523
3. Plot the runoff discharge vs. time and rainfall vs. time on the same graph. Place
Runoff discharge in the primary vertical axis and rainfall (as falling lines from top
line) in the secondary vertical axis.

BABON CATCHMENT

RAINFALL INTENSITY, MM/HR


0.0140 0.0000
RUNOFF DISCHARGE, M3/S

0.0120 0.1000
0.2000
0.0100 0.3000
0.0080 0.4000
0.0060 0.5000
0.0040 0.6000
0.7000
0.0020 0.8000
0.0000 0.9000

TIME (MONTH)

Runoff Discharge Rainfall Intensity

MAPAWA MAIN CATCHMENT

RAINFALL INTENSITY, MM/HR


0.0080 0.0000
RUNOFF DISCHARGE, M3/S

0.0070 0.1000
0.0060
0.0050 0.2000
0.0040 0.3000
0.0030 0.4000
0.0020
0.0010 0.5000
0.0000 0.6000

TIME (MONTH)

Runoff Discharge Rainfall Intensity

GONG CAO CATCHMENT


RAINFALL INTENSITY, MM/HR

0.0400 0.0000
RUNOFF DISCHARGE, M3/S

0.0350 0.1000
0.0300
0.0250 0.2000
0.0200 0.3000
0.0150 0.4000
0.0100
0.0050 0.5000
0.0000 0.6000

TIME (MONTH)

Runoff Discharge Rainfall Intensity


4. Place the generated graphs in the same page/sheet. Determine and discuss whether
the resulting graphs indicate a perennial, intermittent, or an ephemeral stream.

B. Discuss the importance of determining the classification of a particular stream and/or


watershed.