You are on page 1of 2

Mr.

Raymond El Murr
SEC QURAYYAH OPEN CYCLE POWER PROJECT
Unicorp contract B.O.Q. As Per Cost Type Productivity Total
Rates Manhours
Un-Priced Items With IFC Design DEC 31,08

Item Item Remaining Quantities ( Based On


Description Unit Quantities as per IFC Drawings Quantities Completed Till 25th Dec.08
No. No. IFC Drawings) Production Total
Sub-Item No. Rates Manhours
Amount % Amount Amount
Quantity Unit Price Amount (SR) Quantity Unit Price Quantity Unit Price Quantity Unit Price
(SR) Completed (SR) (SR)

Un-Priced Items

2.2.A SITE PREPARATION


2.2.A.01 Dewatering Day 0.00 0.00 0.00 6,571.37 0.00 #DIV/0! 0.00 6,571.37 0.00 0.00 6,571.37 0.00
2.3.A EARTHWORK
2.3.A.01 Rip Rap M2 0.00 0.00 0.00 120 0.00 #DIV/0! 0.00 120 0.00 0.00 120 0.00 6.00 -
2.3.A.02 Gravel Fill M3 0.00 0.00 0.00 55 0.00 #DIV/0! 0.00 55 0.00 0.00 55 0.00 6.00 -

2.7.A ASPHALT WORKS & WALKWAY


2.7.A.01 Base Course 230 mm thk. M2 0.00 0.00 0.00 26.83 0.00 #DIV/0! 0.00 26.83 0.00 0.00 26.83 0.00 0.70 -
2.8.A FENCING & LANDSCAPING
2.8.A.01 Landscaping Item 0.00 0.00 0.00 800,000 0.00 #DIV/0! 0.00 800,000 0.00 0.00 800,000 0.00 -

3.3.A CONCRETE WORKS


3.3.A.01 Screed Concrete for Gout M3 0.00 0.00 322.74 400 129,096.00 45.0% 145.23 400 58,093.20 177.51 400 71,002.80 8.00 1,420
3.3.A.02 Screed (Non reinforced) M3 0.00 0.00 0.00 400 0.00 #DIV/0! 0.00 400 0.00 0.00 400 0.00 3.00 -

3.4.A PRE-CAST WORKS


3.4.A.01 Precast Concrete Columns M3 0.00 0.00 0.00 5,200.00 0.00 #DIV/0! 0.00 5,200.00 0.00 0.00 5,200.00 0.00
3.4.A.02 Precast Concrete Beams M3 0.00 0.00 36.04 5,400.00 194,616.00 100.0% 36.04 5,400.00 194,616.00 0.00 5,400.00 0.00

3.4.A.03 Precast Concrete Panels, Grey cement 20 cm M2 0.00 0.00 2,506.00 800.00 2,004,800.00 100.0% 2,506.00 800.00 2,004,800.00 0.00 800.00 0.00 3.00 -
3.4.A.04 Precast Concrete Panels, White cement 25 cm M2 0.00 0.00 0.00 1,100.00 0.00 #DIV/0! 0.00 1,100.00 0.00 0.00 1,100.00 0.00

3.4.A.05 Precast Concrete Panels, White cement 20 cm M2 0.00 0.00 9,921.00 880.00 8,730,480.00 96.6% 9,580.60 880.00 8,430,928.00 340.40 880.00 299,552.00 3.00 1,021
3.4.A.06 Hollow Core Slabs (200 mm) M2 0.00 0.00 8,091.00 179.00 1,448,289.00 100.0% 8,091.00 179.00 1,448,289.00 0.00 179.00 0.00
3.4.A.07 Hollow Core Slabs (300 mm) M2 0.00 0.00 0.00 236.00 0.00 #DIV/0! 0.00 236.00 0.00 0.00 236.00 0.00

4.A MASONARY WORKS


4.A.01 200x200x150 Concrete Block No. 0.00 0.00 0.00 93 0.00 #DIV/0! 0.00 93 0.00 0.00 93 0.00 3.10 -
4.A.02 200 mm thk. Insulated Block Wall M2 0.00 0.00 0.00 195 0.00 #DIV/0! 0.00 195 0.00 0.00 195 0.00 3.50 -

5.1.A STEEL STRUCTURE


5.1.A.01 Steel structure w/ Fabric Awning M2 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 0.00 0.00

5.2.A MISCELLANEOUS METAL WORKS


5.2.A.01 Steel Ladder LM 0.00 0.00 0.00 4,000 0.00 #DIV/0! 0.00 4,000 0.00 0.00 4,000 0.00
5.2.A.02 Steel Platform M2 0.00 0.00 0.00 3,000 0.00 #DIV/0! 0.00 3,000 0.00 0.00 3,000 0.00
5.2.A.03 Cage Ladder(3-8) m H No. 0.00 0.00 0.00 18,500 0.00 #DIV/0! 0.00 18,500 0.00 0.00 18,500 0.00
5.2.A.04 Ladder with Cage (3-4) m H No. 0.00 0.00 0.00 12,500 0.00 #DIV/0! 0.00 12,500 0.00 0.00 12,500 0.00

6.A WOODEN WORKS


6.A.01 Wooden Pulpit Lot 0.00 0.00 0.00 70,000 0.00 #DIV/0! 0.00 70,000 0.00 0.00 70,000 0.00
6.A.02 Wooden Bookshelf Lot 0.00 0.00 0.00 20,000 0.00 #DIV/0! 0.00 20,000 0.00 0.00 20,000 0.00
6.A.03 Wooden Shoe Rack Lot 0.00 0.00 0.00 5,000 0.00 #DIV/0! 0.00 5,000 0.00 0.00 5,000 0.00

7.1.A THERMAL & MOISTURE PROTECTION


7.1.A.01 Dressing arround Pipe No. 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 0.00 0.00
7.1.A.02 Fire Sealant LM 0.00 0.00 0.00 68 0.00 #DIV/0! 0.00 68 0.00 0.00 68 0.00 0.80 -

Page 1 of 2
Mr. Raymond El Murr
SEC QURAYYAH OPEN CYCLE POWER PROJECT
Unicorp contract B.O.Q. As Per Cost Type Productivity Total
Rates Manhours
Un-Priced Items With IFC Design DEC 31,08

Item Item Remaining Quantities ( Based On


Description Unit Quantities as per IFC Drawings Quantities Completed Till 25th Dec.08
No. No. IFC Drawings) Production Total
Sub-Item No. Rates Manhours
Amount % Amount Amount
Quantity Unit Price Amount (SR) Quantity Unit Price Quantity Unit Price Quantity Unit Price
(SR) Completed (SR) (SR)
7.1.A.03 Sealant LM 0.00 0.00 0.00 29 0.00 #DIV/0! 0.00 29 0.00 0.00 29 0.00 0.80 -

7.2.A ROOFING SYSTEM


7.2.A.01 Dressing Arround Pipes No. 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 0.00 0.00

8.1.A DOORS
8.1.A.01 Double Leaf Wooden Door Size 1.6x 2.2 m No. 0.00 0.00 0.00 5,000 0.00 #DIV/0! 0.00 5,000 0.00 0.00 5,000 0.00
8.1.A.02 Automatic Sliding Door No. 0.00 0.00 0.00 20,000 0.00 #DIV/0! 0.00 20,000 0.00 0.00 20,000 0.00
8.1.A.03 Double Leaf Frameless Door No. 0.00 0.00 0.00 5,000 0.00 #DIV/0! 0.00 5,000 0.00 0.00 5,000 0.00
8.1.A.04 Steel Door size 3.0 x 5.0 m No. 0.00 0.00 0.00 30,000 0.00 #DIV/0! 0.00 30,000 0.00 0.00 30,000 0.00

8.2.A WINDOWS & CURTAIN WALLS


8.2.A.01 Internal Glass Partition LM 0.00 0.00 0.00 750 0.00 #DIV/0! 0.00 750 0.00 0.00 750 0.00
8.2.A.02 Demountable Security Shield No. 0.00 0.00 0.00 10,000 0.00 #DIV/0! 0.00 10,000 0.00 0.00 10,000 0.00

9.1.A FLOOR FINISHING


9.1.A.01 Metal Epoxy Paint ( Insert Plates ) M2 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 0.00 0.00
9.1.A.02 Concrete Tiles M2 0.00 0.00 0.00 45 0.00 #DIV/0! 0.00 45 0.00 0.00 45 0.00 3.00 -
9.1.A.03 Granite Tiles M2 0.00 0.00 1,522.00 150 228,300.00 0.0% 0.00 150 0.00 1,522.00 150 228,300.00 3.00 4,566
9.1.A.04 Granite Treads & Riser LM 100.00 0.00 1,024.00 95 97,280.00 0.0% 0.00 95 0.00 1,024.00 95 97,280.00 3.00 3,072
9.1.A.05 Porcelain Tiles M2 0.00 0.00 5,445.00 75 408,375.00 0.0% 0.00 75 0.00 5,445.00 75 408,375.00 Moved to S/C List
9.1.A.06 Red Terracota Tiles M2 0.00 0.00 461.00 250 115,250.00 0.0% 0.00 250 0.00 461.00 250 115,250.00 3.00 1,383

9.2.A INTERNAL WALLS FINISHING


9.2.A.01 Granite Skirting LM 0.00 0.00 188.00 45 8,460.00 0.0% 0.00 45 0.00 188.00 45 8,460.00 1.20 226
9.2.A.02 PVC skirting LM 0.00 0.00 0.00 30 0.00 #DIV/0! 0.00 30 0.00 0.00 30 0.00 1.20 -
9.2.A.03 Ceramic Skirting LM 0.00 0.00 0.00 35 0.00 #DIV/0! 0.00 35 0.00 0.00 35 0.00 1.20 -
9.2.A.04 Porcelain Skirting LM 0.00 0.00 1,976.00 35 69,160.00 0.0% 0.00 35 0.00 1,976.00 35 69,160.00 1.20 2,371
9.2.A.05 Red Terracota Skirting LM 0.00 0.00 418.00 50 20,900.00 0.0% 0.00 50 0.00 418.00 50 20,900.00 1.20 502
9.2.A.06 Wood Skirting LM 0.00 0.00 1,121.00 40 44,840.00 0.0% 0.00 40 0.00 1,121.00 40 44,840.00 1.20 1,345
9.2.A.07 Sealant LM 0.00 0.00 0.00 29 0.00 #DIV/0! 0.00 29 0.00 0.00 29 0.00 0.90 -
9.2.A.08 Gypsum Board (2 Layers) M2 0.00 0.00 0.00 175 0.00 #DIV/0! 0.00 175 0.00 0.00 175 0.00 2.50 -
9.2.A.09 Gypsum Board Single Face M2 0.00 0.00 0.00 85 0.00 #DIV/0! 0.00 85 0.00 0.00 85 0.00 2.00 -
9.2.A.10 Claustra Block No. 0.00 0.00 650.00 919 597,350.00 0.0% 0.00 919 0.00 650.00 919 597,350.00

9.3.A CEILING FINISHING


9.3.A.01 Plaster Board M2 0.00 0.00 100.00 130 13,000.00 0.0% 0.00 130 0.00 100.00 130 13,000.00

10.A SPECIALTIES
10.A.01 Steel Canopy No. 0.00 0.00 10.00 50,000 500,000.00 0.0% 0.00 50,000 0.00 10.00 50,000 500,000.00
10.A.02 GRC Canopy No. 0.00 0.00 130.00 500 65,000.00 0.0% 0.00 500 0.00 130.00 500 65,000.00

Grand Total (SR) - 14,675,196 12,136,726 2,538,470


15,906

Page 2 of 2