You are on page 1of 5

Business Case

LINEA DE CREDITO PARA ADQUIRIR VIS

CONSTRUTORAS ALIADAS Y BANCOS

Please support our commitment to sustainability and do not print


this document unless it is absolutely necessary to do so.

This document was designed by GPM for users of its PRiSM Project Lifecycle. The design of this
document is licensed to others under the Creative Commons Attribution 4.0 International License. For
a copy of this license, visit: http://creativecommons.org/licenses/by/4.0/
Content added by the user is not covered by the license.

Organization Name i version 2.1


This page should be deleted before issuing the Business Case.

Instructions for Use


Application All projects should have a Business Case, but the depth and detail of the Business Case should
be appropriate for the size and complexity of the project. For example:
 Development of an internal accounting system would not need a Market Analysis.
 A two-page Business Case would not need Contents or an Executive Summary.
Timing The design of this document assumes that the feasibility of the recommended solution has
already been established. If that is not true, the Business Case should address the need for a
feasibility study instead.
Use within PRiSM The PRiSM project lifecycle calls for a high-level Business Case to be developed in the Pre-
Project Phase. That document should include as much reliable information as is available to the
team. Any content that is mostly guesswork should be flagged as such.
Document Title To use a title for the document other than Business Case, you will need to modify the cover
page, the contents page, and the headers in all of the document’s sections.
Project Name and Before issuing the document, you should replace “Project Name” and “Organization Name”
Organization Name throughout the document. Those phrases occur on the title page, the contents page, and in the
headers and footers of all of the document’s sections.
Table of Contents Use <Update Field> to generate a revised table of contents before issuing the document.
In-line Guidance Several sections have in-line guidance in red. These entries should be deleted along with this
page before issuing the Business Case.
Version Control There are three version control tables at the end of the document:
 Version control for the Business Case. Update this table if you make changes to your
Business Case. Assign the version number based on your organizational standards.
 Distribution control for the Business Case. Record who has received a copy of the Business
Case. “Format” would normally be either “Print” or “Electronic.”
 Version control for the template. Update this table if you make changes to the template.
Note: the starting version number in the document is the version number of the template. That
should be changed to the Business Case version number before the document is issued.
Approvals  The approval tables can be modified to comply with your internal practices. If so, those
changes should be recorded as a change to the Template version.
 Approvals for the current version are expected on the Contents page and the Version
Control page. Approvals for prior versions would only show on the Version Control page.
 Approval signatures can be electronic if organizational policy allows it.

Post-Approval Post-approval actions should be based on your organization’s policies and procedures.
Actions
Format All of the content in this document has been formatted using <Format/ Style …>. If you want
to modify any aspect of the document design (typefaces, font sizes, heading colors, etc.), you
can do it quickly and easily by modifying the relevant style(s).

Organization Name ii version 2.1


Business Case

LINEA DE CREDITO PARA ADQUIRIR VIS

CONSTRUTORAS ALIADAS Y BANCOS

Contents

1 Executive Summary.........................................................................4
2 Statement of Need............................................................................6
3 Recommended Solution...................................................................6
4 Expected Outcomes (Benefits and Dis-Benefits)............................7
5 Cost and Schedule Estimates...........................................................9
6 Major Risks....................................................................................10
7 Business Case Development Team................................................10

Current Version Approval (version 1.0)


Role Name Signature Date
Project Sponsor
Project Manager

Organization Name iii version 2.1


Business Case Project Name

1 Executive Summary
La creciente globalización ha hecho que problemas y amenazas, tales como desigualdad, pobreza, entre
otros, se conviertan cada vez más en asuntos que afectan a todos los países y no solo a los más pobres
sino también a las personas con bajos recursos.  “Kofi Annan , ex-Secretario General de Naciones
Unidas, denominó el fenómeno como “Problems without Passports”, lo que sitúa en una relación de
corresponsabilidad a países en desarrollo y desarrollados cambiando la lógica de la Cooperación
Internacional para el Desarrollo.” [ CITATION Ann17 \l 9226 ]
Por eso hemos planteado una línea de crédito en alianza con bancos y constructoras en Colombia para
desarrollar la construcción de viviendas vis1 en el territorio nacional, lo que buscamos con esto es
promover la adquisición de vivienda para personas de bajos recursos que busquen un inmueble para
mejorar su calidad de vida y la de sus familia.

En el desarrollo de este caso de estudio encontraran las razones por la cual aplican unos ODS2 con su
respectiva meta a impulsar
Objetivo 1. Poner fin a la pobreza en todas sus formas y en todo el mundo (aplica)
1.b Crear marcos normativos sólidos en los planos nacional, regional e internacional, sobre la base
de estrategias de desarrollo en favor de los pobres que tengan en cuenta las cuestiones de género, a
fin de apoyar la inversión acelerada en medidas para erradicar la pobreza
Objetivo 3. Garantizar una vida sana y promover el bienestar de todos a todas las edades
(APLICA)
Objetivo 6. Garantizar la disponibilidad y la gestión sostenible del agua y el saneamiento para
todos(APLICA)
6.2 De aquí a 2030, lograr el acceso a servicios de saneamiento e higiene adecuados y equitativos
para todos y poner fin a la defecación al aire libre, prestando especial atención a las necesidades de
las mujeres y las niñas y las personas en situaciones de vulnerabilidad
Objetivo 7. Garantizar el acceso a una energía asequible, fiable, sostenible y moderna para todos
(APLICA)
7.1 De aquí a 2030, garantizar el acceso universal a servicios energéticos asequibles, fiables y
modernos
7.1.1 Proporción de la población que tiene acceso a la electricidad

1
Vis: vivienda de interés social

Organization Name 4 version 2.1


Business Case Project Name

Objetivo 8. Promover el crecimiento económico sostenido, inclusivo y sostenible, el empleo pleno


y productivo y el trabajo decente para todos

Objetivo 9. Construir infraestructuras resilientes, promover la industrialización inclusiva y


sostenible y fomentar la innovación(APLICA)
9.1 Desarrollar infraestructuras fiables, sostenibles, resilientes y de calidad, incluidas
infraestructuras regionales y transfronterizas, para apoyar el desarrollo económico y el bienestar
humano, haciendo especial hincapié en el acceso asequible y equitativo para todos

Objetivo 10. Reducir la desigualdad en los países y entre ellos (APLICA)


10.4 Adoptar políticas, especialmente fiscales, salariales y de protección social, y lograr
progresivamente una mayor igualdad.
10.3 Garantizar la igualdad de oportunidades y reducir la desigualdad de resultados, incluso
eliminando las leyes, políticas y prácticas discriminatorias y promoviendo legislaciones, políticas y
medidas adecuadas a ese respecto

Objetivo 11. Lograr que las ciudades y los asentamientos humanos sean inclusivos, seguros,
resilientes y sostenibles(APLICA)
11.1 De aquí a 2030, asegurar el acceso de todas las personas a viviendas y servicios básicos
adecuados
11.3 De aquí a 2030, aumentar la urbanización inclusiva y sostenible y la capacidad para la
planificación y la gestión participativas, integradas y sostenibles de los asentamientos humanos en
todos los países

Organization Name 5 version 2.1

You might also like