RAIN WATER HARVESTING PIT AND
Document Title
CDU/VDU WITH HOT WELL OFF GAS TREATMENT UNIT & SATURATED LPG TREATING UNIT DETAILS

Document No. B224-CDU-TPL-000-CV-DW-0160


Discipline CSA
TPL COMMENT RESOLUTION SHEET CRS Rev. No. 0
Date 07/01/2021
S.No. HRRL/PMC Comments TPL RESPONSE REMARKS Status
Mention the Catchment Area for which the Rain water Harvesting Pit has been Catchment area considered for Rain water harvesting pit design for Substation building is 2220 SQM.
Designed. Catchment area considered for Rain water harvesting pit design for SRR building is 1500 SQM.
1
Both the Rain water harvesting pits have been sized for catchment area <=3000SQM.
Follow EIL Standard for design based on the Catchment Area of Rain water. Incorporated.
2