2021.01.07 Date: 2021.01.07 Date: 2021.01.07 16:59:54 +05'30' 17:05:34 +05'30' 17:07:23 +05'30' RAIN WATER HARVESTING PIT AND Document Title CDU/VDU WITH HOT WELL OFF GAS TREATMENT UNIT & SATURATED LPG TREATING UNIT DETAILS
Document No. B224-CDU-TPL-000-CV-DW-0160
Discipline CSA TPL COMMENT RESOLUTION SHEET CRS Rev. No. 0 Date 07/01/2021 S.No. HRRL/PMC Comments TPL RESPONSE REMARKS Status Mention the Catchment Area for which the Rain water Harvesting Pit has been Catchment area considered for Rain water harvesting pit design for Substation building is 2220 SQM. Designed. Catchment area considered for Rain water harvesting pit design for SRR building is 1500 SQM. 1 Both the Rain water harvesting pits have been sized for catchment area <=3000SQM. Follow EIL Standard for design based on the Catchment Area of Rain water. Incorporated. 2