List of Drawings Project Specific List of Drawing
List of Drawings Project Specific List of Drawing
LIST OF DRAWINGS
SL. No. DRAWING NO. TITLE
I PROJECT SPECIFIC LIST OF DRAWING
1.0 Drawings for 400/132kV Surjamaninagar s/s (Upgradation)
1.1 C/ENGG-SS/NER/TRP/SURJ/SLD/01, Rev-00 Single Line Diagram
1.2 C/ENGG-SS/NER/TRP/SURJ/LAY/01, Rev-00 Electrical Layout Paln Drawing
1.3 C/ENGG-SS/NER/TRP/132KV SURJ/GA/01, Rev-00 General Arrangement of Existing 132kV Switchyard
II COMMON DRAWINGS
A COMMON ELECTRICAL DRAWINGS
1. C/ENGG/STD/LT/SLD/01, R-4 Standard SLD for AC & DC System
2. 0000-000-T-E-L-28 Wiring Diagram for Marshalling Box for 400kV Current Transformer,
Sheet 1 of 2 & 2 of 2
B COMMON DRAWINGS (CIVIL & STRUCTURE)
3. C/ENGG/STD/ ROAD CULVERTS-01, R-0 Detail of road culverts
4. C/ENGG/STD/DRAIN/01, R-1 Details of drain
5. C:ENGG/CVL/SYD/FENCE/101, R-1 Standard details for switch yard chain link fencing
6. C/ENGG/STD/ROAD/411, R-2 Details of Concrete road (Rigid Pavement) in Switchyard Area
7. C/ENGG/CVL/STD/RR/1, R-0 Details of Rail cum Road
8. C/ENGG/STD/CT-3, R-1 G.A & R.C.C details of Sump Pit
9. C/ENGG/STD/CT-4,R-0& Details of Cable Trench Crossing
C/ENGG/STD/CT-5 R-2
10. C/ENGG/STD/CT-1, R-0 Details of Cable Trench section, Sheet No- 1 & 2
11. C/ENGG/STD/CT-2,R-0 RCC detail for cable trench sections
12. C:ENGG/CVL/SYD/GATE/002.R-0 Details of switchyard gate
13. C-ENGG-STD-PR-ARCH-3000,R-1 Standard Switchyard Panel Room Architectural Drawing of Panel
Room-(3 Sheets)
C FIRE FIGHTING PUMP HOUSE DRAWING
14. C/ENGG/STD/M25/FFPH-1 Ground floor plan for fire fighting pump house & water tank.
15. C/ENGG/STD/ M25/FFPH-2 Elevation for fire fighting pump house & water tank
16. Front & rear elevation & terrace plan for fire fighting pump house &
C/ENGG/STD/ M25/FFPH-3
water tank
17. C/ENGG/STD/ M25/FFPH-4 Section for fire fighting pump house & water tank
18. Details of doors, windows & ventilators (steel) for fire fighting pump
C/ENGG/STD/ M25/FFPH-5
house & water tank
19. C/ENGG/STD/ M25/FFPH-6 Foundation layout & details for fire fighting pump house.
20. C/ENGG/STD/ M25/FFPH-7 Plinth level layout & details of plinth beam for FFPH.
21. C/ENGG/STD/ M25/FFPH-8 Lintel level layout & details of lintel beam for FFPH.
22. C/ENGG/STD/ M25/FFPH-9 Roof level layout & details of beams & slab for FFPH.
23. C/ENGG/STD/ M25/FFPH-10 RCC detail of on ground water storage tank for fire fighting pump house
24. C/ENGG/STD/ M25/FFPH-11 RCC detail of on ground water storage tank for fire fighting pump house
25. C/ENGG/STD/ M25/FFPH-12 A.C. Roof level plan & details for fire water water tank
26. C/ENGG/STD/ M25/FFPH-13 Details of pump/motor foundation at plinth level for FFPH
27. C/ENGG/STD/ M25/FFPH-14 Details of pump/motor foundation at plinth level for FFPH
28. C/ENGG/STD/ M25/FFPH-15 General notes for fire fighting pump house & water tank
29. C-ENGG-STD-SPR-STR-3012 Standard Switchyard Panel Room (3 Sheets)
30. C/ENGG/STD/BW-01 (SH-03 OF 07) LAYOUT & PLAN SECURITY ROOM &GATE
31. C/ENGG/STD/BW-01 (SH-04 OF 07) SECURITY ROOM & GATE DETAILS
32. C/ENGG/STD/BW-01 (SH-05 OF 07) SECURITY ROOM & GATE DETAILS
33. C/ENGG/STD/BW-01 (SH-06 OF 07) SECURITY ROOM & GATE DETAILS
34. C/ENGG/STD/BW-01 (SH-07 OF 07) SECURITY ROOM & GATE DETAILS
D CONTROL ROOM BUILDING DRAWING
35. C-ENGG-STD-CRB-SINGLE-ARCH-
Control Room Building Single Storied Ground Floor Plan
400,Rev-01
Page 1 of 2
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV Surjamaninagar
Substation of TSECL to 400/132kV (Rev-02)
ANNEXURE-I
LIST OF DRAWINGS
36. C-ENGG-STD-CRB-SINGLE-ARCH-
Control Room Building Single Storied Terrace Plan
401A,Rev-0
37. C-ENGG-STD-CRB-SINGLE-ARCH-
Control Room Building Single Storied Front and Rear side Elevation
402A,Rev-0
38. C-ENGG-STD-CRB-SINGLE-ARCH-
Control Room Building Single Storied Section
403A,Rev-0
Page 2 of 2
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV Surjamaninagar
Substation of TSECL to 400/132kV (Rev-02)
Annexure-II
Technical Specification
SECTION – PROJECT
No. of Core Application Current Output Accuracy Min Max. CT Max. Excitation
Cores no. Ratio Burden class as knee sec. Wdg current at VK (in
(VA) per IEC point resistance mA)
voltage ( ohms)
VK
5 1 BUS DIFF 1600- - PX 1600- 8/4 25 on 1600/1 Tap;
CHECK 800/1 800/1 50 on 800/1 Tap,
SECTION-PROJECT
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation
Page 1 of 1
Annexure-III
Section –Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV
Annexure-III
LV kA 25
ii) Lightning Impulse withstand Voltage
HV kVp 1300
IV kVp 550
LV kVp 250
Neutral kVp 95
iii) Switching Impulse withstand Voltage
HV kVp 1050
iv) One Minute Power Frequency
withstand Voltage
HV kVrms 570
IV kVrms 230
LV kVrms 95
Neutral kVrms 38
v) Neutral Grounding Solidly grounded
vi) Insulation
HV Graded
IV Graded
LV Uniform
vii) Tertiary Connection Ungrounded Delta
viii) Tan delta of winding % < 0.5
ix) Vector Group (3 –ph) YNaOd11
(unless specified differently elsewhere)
1.14 Tap Changer OLTC
i) Tap Range & No. of steps 10% of HV variation in the step of
1.25%, 16 steps
ii) Location of Tap changer On the 132 kV side of the series
winding
iii) Design Constant flux voltage variation type
as per cl. 6.2 of IEC 60076 part-I
iv) Tap control Full capacity - on load tap changer
suitable for group / independent,
remote /local electrical and local
manual operation and bi-directional
power flow
1.15 Bushing
i) Rated voltage
HV kV 420
IV kV 145
LV kV 52
Neutral kV 36
ii) Rated current (Min.)
HV A 1250
IV A 2000
LV A 3150
Section –Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV
Annexure-III
Neutral A 2000
iii) Lightning Impulse withstand Voltage
HV kVp 1425
IV kVp 650
LV kVp 250
Neutral kVp 170
iv) Switching Impulse withstand Voltage
HV kVp 1050
v) One Minute Power Frequency
withstand Voltage
HV kVrms 695
IV kVrms 305
LV kVrms 105
Neutral kVrms 77
vi) Minimum total creepage distances
HV mm 10500
IV mm 3625
LV mm 1300
Neutral mm 900
vii) Tan delta of bushings
HV % < 0.4
IV % < 0.4
LV % < 0.4
viii) Max Partial discharge level at Um
HV pC 10
IV pC 10
LV pC 10
1.16 Max Partial discharge level at 1.58 * Ur pC 100
/ √3
1.17 Max Noise level at rated voltage and at dB 80
principal tap on full load and all
cooling active
1.18 Maximum Permissible Losses of
Transformer
i) Max. No Load Loss at rated voltage and kW 30
frequency
ii) Max. Load Loss at rated current and at kW 190
75O C
iii) Max. Auxiliary Loss at rated voltage and kW 8
frequency
Notes:
3. The criteria for Transformer losses shall be “Copper Loss (Load Loss) > Iron Loss (No
Load Loss) > Cooler Loss (Auxiliary Loss)”.
Section –Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
Employer has standardized its Specific Requirement for various equipments and works for different voltage levels.
Items or clauses, which are not applicable for the scope of this package as per schedule of quantities described in BPS
or as per scope defined elsewhere in Section Project, the technical specification/clauses for the items specified below
should not be referred to.
Further, the sub-contractor shall also meet the requirement specified at Clause No.
24.23 of this section.
4. Section GTR Technical Requirement of Sub-contractor for 220/132/66 kV* level GIS/Hybrid
Rev 14 GIS/MTS packages:
New In case of Indian GIS manufacturer, the erection, testing & commissioning including civil
works shall be executed either by the bidder himself or by the Subcontractor meeting the
Clause No.
following technical requirement:
24.22
The bidder/Subcontractor must have erected, tested and commissioned at least two (2)
nos. GIS/Hybrid GIS/MTS/AIS Circuit breaker equipped bays@ of 220/110/66kV* or
above voltage level in one (1) substation or switchyard during the last seven (7) years and
these bays must be in satisfactory operation# as on the date of NOA.
Further, the sub-contractor shall also meet the requirement specified at Clause No.
24.23 of this section.
Note:
1. (*) voltage class of respective equipment as applicable
Page 1 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
2. (@) For the purpose of technical requirement, one no. of circuit breaker bay shall
be considered as a bay used for controlling a line or a transformer or a reactor or a
bus section or a bus coupler and comprising of at least one circuit breaker, one
disconnector and three nos. of single phase CTs / Bushing CTs. GIS means SF6
Gas insulated Switchgear, Hybrid GIS means outdoor SF6 Gas insulated
switchgear connected to outdoor Air insulated bus-bar System (AIS bus-bars
System), MTS means outdoor SF6 Gas insulated Mixed Technology Switchgear
connected to outdoor AIS bus bar system.
3. Combination of GIS CB bay, Hybrid GIS CB Bay & MTS CB Bay is also acceptable
5. Section GTR Technical Requirement of Sub-contractor:
Rev 14
1. The sub-contractor must have either of the following experience of having
New successfully completed similar works during last 7 years as on the last day of
Clause No. month previous to the one in which the sub-contractor is proposed to be engaged:
24.23
a) Three similar works costing not less than the amount equal to 40% of the
cost of the work to be sub-contracted.
OR
b) Two similar works costing not less than the amount equal to 50% of the cost
of the work to be sub-contracted.
OR
c) One similar work costing not less than the amount equal to 80% of the cost
of the work to be sub-contracted.
2. Minimum Average Annual Turnover **(MAAT) for best three years i.e. 36
months out of last five financial years of the sub-contractor should be……….:
Note:
a) Similar work shall mean the work which are of similar in nature to the
work to be sub-contracted e.g. for the scope of civil work to be sub-
contracted, the experience should be of civil work.
Page 2 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
a) Atleast one no. 345kV or above voltage class GIS Circuit Breaker bay@ must have
been manufactured in the above Indian works based on the technological support
of the Collaborator(s) and either supplied or type tested the above CB bay (as per
IEC or equivalent standard) as on the date of NOA.
Note :-
(**) Type test reports of the collaborator/ parent company/ subsidiary company/ group
company shall also be acceptable.
Page 3 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
7. Section GTR Rev Technical Requirement for 220/132/66 kV* level GIS/Hybrid GIS/MTS Equipment:
14
New (i) The manufacturer whose 220/132/66 kV* level GIS/Hybrid GIS/MTS bays
are offered must have designed, manufactured, type tested** (as per IEC or
Clause No. 24.25
equivalent standard), supplied and supervised erection & commissioning of
at least two (2) nos. Gas Insulated Switchgear (GIS)/Hybrid GIS/MTS
circuit breaker bays@ of 220/110/66kV* or above voltage class in one (1)
Substation or Switchyard during the last seven (7) years and these bays
must be in satisfactory operation# for at least two (2) years as on the date of
NOA.
Note:
1. (*) voltage class of respective equipment as applicable
2. (@) For the purpose of technical requirement, one no. of circuit breaker bay
shall be considered as a bay used for controlling a line or a transformer or a
reactor or a bus section or a bus coupler and comprising of at least one circuit
breaker, one disconnector and three nos. of single phase CTs / Bushing CTs.
GIS means SF6 Gas insulated Switchgear, Hybrid GIS means outdoor SF6 Gas
insulated switchgear connected to outdoor Air insulated bus-bar System (AIS
bus-bars System), MTS means outdoor SF6 Gas insulated Mixed Technology
Switchgear connected to outdoor AIS bus bar system.
3. Combination of GIS CB bay, Hybrid GIS CB Bay & MTS CB Bay is also
acceptable
Page 4 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
d) 715 kV or higher voltage class either One (1) no. 1-phase Transformer of at least
166 MVA capacity or One (1) no. 1-phase Reactor of at least 80 MVAR capacity
must have been manufactured in the above Indian works based on technological
support of collaborator, type tested (as per IEC/IS standard) and same should
have been supplied as on the date of NOA.
OR
Page 5 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
a) 715 kV or higher voltage class either One (1) no. 1-phase Reactor of at least 80
MVAR capacity or One (1) no. 1-phase Transformer of at least 166 MVA
capacity must have been manufactured in the above Indian works based on
technological support of collaborator, type tested (as per IEC/IS standard) and
same should have been supplied as on the date of NOA.
13. Section GTR Rev Tests witnessed by agencies certified by National Accreditation Board for Certification
14 Bodies (NABCB) shall also be acceptable.
15. Section GTR Rev “The seismic withstanding test on the complete equipment (for 400kV and above) shall
14 be carried out along with supporting structure. Seismic Withstand Test carried out
using either lattice or pipe structure is acceptable.”
Page 6 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
Para-1 at Annexure-
B
16. Section GTR Rev Band colour is required for Emulsifier system detection line only if both water and air
14 detection lines are present at the same substation. Further, band colour shall be applied
at an interval of 2 meters approx. along the length and minimum width of band shall be
New para added 25mm.
under Clause no.
12.3.6
17. Section GTR Rev Pickup value of binary input modules of Intelligent Electronic Devices, Digital
14 protection couplers, Analog protection couplers shall not be less than 50% of the
specified rated station auxiliary DC supply voltage level.
New Clause no.
15.2
18. Section GTR In case, different designs of lattice and pipe structures other than Employer supplied
Rev 14 structures are required to be adopted in view of higher creepage (31mm/kV) of the
switchgear/equipments, insulator strings, bushings & bus post insulators etc., Design,
New Clause No. supply & erection of such structures shall be in the scope of contractor against
16.3 respective standard structure. However dimensional details (except height) shall not be
less than that specified in standard structure drawing of respective equipments.
19. Section GTR RTV coating shall be done at site on all porcelain insulators including mandatory spares
Rev 14 (i.e. bushings, hollow and solid insulators, disc insulators etc.) for substation(s) in
coastal area as defined elsewhere. The cost of RTV coating shall be deemed to be
Clause No. 22.9 included in the respective equipment/items’ erection cost. The technical details of RTV
coating is attached in Annexure-H (Rev 1).
20. Section GTR Erection, testing and commissioning of Transformers, Reactors, Circuit breakers,
Rev 14 Isolators, Substation automation system, Control & protection panels, PLCC, PMU,
Telecommunication Equipments, etc. shall be done by the contractor under the
New Clause No. supervision of respective equipment manufacturers. Charges for the above supervision
13.14 shall be included by the bidder in the erection charges for the respective equipment in
the BPS.
21. Section Switchgear- Outer insulator of surge arrester shall be porcelain/polymer conforming to
SA Rev 11 requirements stipulated in Section-GTR. Terminal connectors shall conform to
requirements stipulated under Section-GTR.
Clause No. 3.0 (e)
The outer insulator housing shall be so coordinated that external flashover will not
occur due to application of any impulse or switching surge voltage upto the maximum
design value for arrester.
22. Section Switchgear- Technical Parameters for 765kV, 400kV, 220kV and 132kV Surge Arresters (with
SA Rev 11 Polymer/Porcelain Housing)
Annexure-l
Table 1.0
23. Section Switchgear- CTs must have adequate provision for taking oil samples from the bottom of the CT
INST Rev 11 without exposure to atmosphere. Manufacturer shall recommend the frequency at
which oil samples should be taken and norms for various gases in oil after being in
Clause No. 9.2 operation for different durations. Manufacturer should also indicate the total quantity of
Page 7 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
Para 3 & 4 oil which can be withdrawn from CT for gas analysis before refilling or further
treatment of CT becomes necessary.
Manufacturer/Contractor shall supply 2 nos. of oil sampling device for every 20 nos. of
oil filled CT supplied with a minimum of 2 nos. of oil sampling device for each
substation.
24. Section Switchgear- Voltage Transformers
INST Rev 11
a) Insulation Resistance test for primary (if applicable) and secondary winding
Clause No. 9.3 b) Polarity test
c) Ratio test
d) Dielectric test of oil (wherever applicable)
e) Tan delta and capacitance measurement of individual capacitor stacks
f) Secondary winding resistance measurement
g) DGA of oil (for IVT/PT)
Dissolved Gas Analysis (DGA) shall be carried out twice within the first year of service,
first within the first month of commissioning/charging and second between six months
to one year from the date of commissioning/charging.
IVTs/PTs must have adequate provision for taking oil samples from the bottom of the
IVT/PT without exposure to atmosphere. Manufacturer shall recommend the frequency
at which oil samples should be taken and norms for various gases in oil after being in
operation for different durations. Manufacturer should also indicate the total quantity of
oil which can be withdrawn from IVT/PT for gas analysis before refilling or further
treatment of IVT becomes necessary.
Manufacturer/Contractor shall supply 2 nos. of oil sampling device for every 20 nos. of
oil filled IVT/PT supplied with a minimum of 2 nos. of oil sampling device for each
substation.
Page 8 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
28. Section Separate cables shall be used for AC, DC-I, DC-II and selected DC. Each control cable
Switchgear – CB shall include minimum 10% spare cores (subject to minimum 1 no. of spare core).
Rev 11
31. Section GIS Rev 5A The CSD shall be provided in 765kV/400kV Circuit breakers for controlling
transformers (required for 765/400kV transformers only) and reactors (ie for breakers of
Clause no. switchable line reactor and in Main& Tie circuit breakers of Transformers, Transmission
6.8.2 lines with non-switchable line reactors and Bus reactors). The requirement of CSD shall
be explicitly specified in price schedule
32. Section GIS Rev 5A For 400kV & above voltage class GIS bay module, CT cores shall be duly distributed on
both side of circuit breaker. For 220 kV and below voltage level GIS bay module, CT on
New Clause no. one side of the circuit breaker is also acceptable.
10.1.3(n)
33. Section GIS Rev 5A During detailed engineering, the type test reports of GIS equipment of the parent
company/subsidiary company/group company shall also be acceptable provided that
New Para added the design of offered GIS is same as that of type tested GIS equipment.
under Clause no.20
34. Section GIS Rev 5A All 765kV & 400kV Circuit Breaker control schematics shall be finalized in such a way,
that it may operate with or without CSD by using a suitable selector switch irrespective
New Clause no. of whether circuit breakers to be supplied are envisaged along with CSD or not as per
15.2.14 bid price schedules.
35. Section GIS Rev 5A The price of Bus-duct inside the GIS hall shall be integral part of the respective bay
module and it will not be paid separately. However, the payment of bus-duct for
New Clause no. outside the GIS hall along with support structure shall be paid as per running meters in
5.41(10) line with provision of Bid Price schedule.
36. Section Air Annexure S3 – Air Conditioning & Ventilation System for GIS Building
Conditioner
Rev 04
New
Annexure-S3
37. Section CRP Rev 09 Back-up Impedance protection function shall be provided for 765kV & 400kV sides of
765/400/33kV ICT and for 400kV side of 400kV class ICT. This protection function and
New Clause No. Differential Protection function shall not be combined in the same IED.
21.8
Page 9 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
38. Section CRP Rev 09 Line Differential relays used as both Main –I & Main-II protection of a line, shall be of
either different make & model or shall be on different hardware platform.
New para added
under Clause
no.18.8
39. Section CRP Rev 09 Requirement of Shrouding shall not be applicable to TB’s where live parts are concealed.
44. Section: Power & Standard lengths for each size of power and control cables shall be 500/1000 meters.
Control Cable Rev However, to avoid cable wastage and cable jointing at site, non-standard lengths of each
06 size of Power & Control cable may also be acceptable subject to maximum length of
1000meters (+ 5% tolerance)
Clause No. 4.2
45. Section Fire Appendix-I (Rev 4) stand replaced by following Appendix-I (Rev 5)
Protection Rev 06
Appendix-I
Page 10 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
Clause No.9.01.00(c)
&
Appendix-V
47. Section Fire Fire detection and alarm system shall also be provided in the GIS Hall using beam type
Protection Rev 06 smoke detectors to be installed at suitable mounting height, and in the Relay Panel room
with ionization/optical type smoke detectors to be installed on the ceiling.
New para added at
Clause no.2.03.00
48. Section Fire Adequate no. of Hydrant posts and Fire extinguishers (CO2 and DCP type) shall also be
Protection Rev 06 provided for GIS Building.
New Clause
no.2.01.02
49. Section Fire Mechanical foam type fire extinguishers wherever specified as 50 litre capacity,
Protection Rev 06 conforming to IS:13386, shall be read as 60 litre capacity conforming to IS 16018
Clause No. 2.04.02 Further in case of non-availability of any type of fire extinguisher (i.e. water, CO2, DPC,
& 10.00.00 foam type) of a particular size as specified in BPS or technical specification, next
available higher size conforming to IS shall be supplied.
50. Section Fire Alternatively, bidder may offer Nitrogen Injection based fire prevention & extinguishing
Protection Rev 06 system for transformer/reactor instead of HVW Spray System. Nitrogen Injection Fire
Prevention & Extinguishing system shall be as per Appendix – VII.
New Clause No.
2.02.06
51. Section DG Set Rev Alternatively, AMF Panel for DG Set may be installed outside the acoustic enclosure
05 near the DG Set. In such cases, AMF panel with or without additional enclosure shall
New para added meet IP-55 degree of protection.
under Clause no.
7.1(a)
52. Section: Lighting All Outdoor Lighting Panels shall be Stainless sheet steel of Grade 304 and shall be dust,
System Rev 07 weather and vermin proof. Panels shall be of thickness not less than 1.5 mm smoothly
finished, leveled and free from flaws. Stiffeners shall be provided wherever necessary.
Clause no. 6.2.1(ii)
Alternatively, outdoor lighting panels of Aluminum shall also be acceptable as per
provisions stipulated in Section GTR.
53. Section: Lighting The outdoor junction boxes shall be complete with conduit knockouts/threaded nuts
System Rev 07 and provided with terminal strips. The junction boxes shall be suitable for termination
of Cable glands of required size. The junction boxes shall be provided with 4 way
Clause no. knockouts suitable for street lighting/switchyard lighting terminals suitable for 2
6.6(i) (b) numbers 4C x 16 Sq.mm Al. cable or as per requirement. All Outdoor Junction boxes
shall be of Stainless Steel of thickness 1.5mm of grade 304. Outdoor Junction Boxes shall
be suitable for mounting on columns, structures etc for Outdoor Lighting. The outdoor
Junction shall have IP 55 protection. Alternatively, outdoor junction boxes of
Aluminum shall also be acceptable as per provisions stipulated in Section GTR.
54. Section: LT Contractor shall submit type test reports for the Lighting transformers as per IS:2026 for
Switchgear Rev 05 which test conducted once are acceptable (i.e. The requirement of test conducted within
Clause no. 1.21.2 last ten years shall not be applicable)
Page 11 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
55. Section LT MCCB shall in general conform to IS: 13947 Part-2. All MCCB offered shall have Ics =
Switchgear Rev 05 100% Icu rating.
56. Section: Structure POWERGRID will issue the fabrication drawings of the standard structures to the
Rev 06 successful bidder. The contractor shall do the proto assembly of the structures as per the
issued fabricated drawings. Employer may opt to witness such proto assembly. The
New Clause No. bidder shall follow the fabrication drawing for preparing the proto assembly and do the
3.2.4 Added minor adjustments if necessary, without affecting the strength of the structure. In case of
equipment support structure the attachment of stool and fixing of MOM box etc. shall be
taken care by the contractor as per the requirement of the equipment. The contractor
however shall not submit the proto corrected drawings and BOM for approval of the
employer. The arrangement shall however not absolve the contractor from the
responsibility of supply and erection of safe sound and durable structure.
57. Section: Structure Nuts, Bolts and washers for all non standard structures shall be payable as per BPS.
Rev 06
New
Clause no. 3.4
58. Section Civil The dewatering pump shall be Portable, Self Priming, Non clog, horizontal type
Works Rev 11A monobloc pump. The Pump shall be driven by electric motor suitable for outdoor
application with IP-55 degree of protection. Following are the major technical
New parameters for the pumps to be supplied as per BPS:
Clause No. 21.0
(A) Pump Rating : 2 HP
Flow Rate : 200-400 LPM
Minimum Total Head : 12 Mtrs
Voltage Range : 415 ± 10% Volts (Three Phase)
New For Spare Unit connection to form 3-ph bank of 765kV Class Transformers with isolator
Clause no. 20.1 based switching arrangement without physical shifting of spare unit along with
necessary Neutral Formation, Earthing Arrangement & Tertiary (DELTA) formation for
3-ph bank formation with 1-ph units shall be under present scope as per the details
Page 12 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
mentioned below:
The contractor shall connect the neutrals of three (3) 1-phase transformers by overhead
connection using 3" IPS Al tube. The neutral formation shall be such that neutral
winding of single-phase spare transformer can be disconnected or connected to the
three phase banks. The connection from the neutral bushing to neutral bus shall be
through 3" IPS Al tube and wherever flexible jumper needs to be provided, same shall
be through twin conductor. All material like Bus post insulator, Aluminium tube,
conductor, clamps & connectors, earthing materials, support structure, hardware etc.
required for neutral formation and connection with neutral CT and earthing of neutral
shall be provided by contractor.
61. Section: Switchyard Neutral formation for Reactor banks, connection to neutral grounding reactor through
Erection 132kV Surge arrester, connection to ground through neutral CTs and connection
Rev 10 arrangement to connect spare reactor unit in place of any other units of the bank
without physical shifting and Earthing Arrangement :
New
Clause no. 20.2 For Spare Unit connection to 3-ph bank of 765kV Class Reactors with isolator based
switching arrangement without physical shifting of spare unit along with necessary
Neutral Formation, Earthing Arrangement for 3-ph bank formation with 1-ph units shall
be under present scope as per the details mentioned below:
The contractor shall connect the neutrals of three (3) 1-phase reactors by overhead
connection using 3" IPS Al tube. The neutral formation shall be such that neutral
winding of single-phase spare reactor can be disconnected or connected to the three
phase banks. Neutral Connections of spare unit shall be extended upto the other unit(s)
Page 13 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
by forming Neutral auxiliary bus. The connection from the neutral bushing to neutral
bus shall be through 3" IPS Al tube and wherever flexible jumper needs to be provided,
same shall be through twin conductor. All material like Bus post insulator, Aluminum
tube, conductor, clamps & connectors, earthing materials, support structure, hardware
etc. required for neutral formation and connection with neutral CT and earthing of
neutral shall be provided by contractor. Required Insulation level is 145 kV from
individual reactor neutral to point of neutral formation. However after neutral
formation, the insulation level is 36kV.
Connection of each Line reactor bank formed under present scope to Neutral grounding
reactor through 132kV Surge Arrester including NGR by passing arrangement is also
under present scope.
Formation of HV auxiliary bus for connection of reactor 3-Phase bank with 1-Phase
Spare reactor unit is under the present scope of the bidder. All associated materials like
Bus post insulators, Aluminium tube, conductors, clamps & connectors, insulator
strings, hardware, earthing materials, support structures, required for the above-
mentioned arrangement shall be provided by the contractor.
62. Section: Switchyard Supply & Laying of Power, Control Cables & Special Cables (if any) (including all
Erection cabling works for spare unit of transformer/reactor ) along with accessories for power
Rev 10 supply, alarm, trip, control & indication, status and monitoring signals & contacts made
available at MB/CMB of Transformers/Reactors upto Control & Relay Panels and BCUs
New located in the Switchyard Panel Room/Control Room and successful integration of same
Clause no. 20.3 with Station Control, Protection & SAS System is in the scope of the contractor.
63. Section: Switchyard 3½Cx300 Sq. mm XLPE power cable for oil filtration units of reactors & transformers
Erection Rev 10 shall be provided. The cable shall be terminated at 250A receptacle near Reactor &
Transformer in the switchyard. XLPE Power cables shall be looped in & out for 250A
New Power receptacles.
Clause no. 20.4
64. Section: Switchyard Neutral of spare transformer/reactor is to be connected to station grounding system
Erection Rev 10 through a jumper/copper flat. This shall be applicable for single phase
transformer/reactor wherever spare unit have been provided.
New
Clause no. 20.5
65. Section: Switchyard Tertiary connections made for tertiary loading of LT Transformer shall be insulated
Erection Rev 10 using suitable insulation tape or sleeve of at least 52kV class at site
New
Clause no. 20.6
66. Section Switchyard Transmission line side insulator string along with hardware for line termination shall be
Erection Rev 10 in the scope of substation contractor.
Page 14 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
68. Section Switchyard For connection to HV bushing of LT Transformer, insulated copper rod/strip of at least
Erection Rev 10 75 sq.mm cross sectional area shall be used.
Clause no. 10.15 Tan δ value of RIP (Resin Impregnated Polymer) condenser bushing shall be 0.005
(max.) in the temperature range of 20°C to 90°C. The measured Tan δ value at site
should not exceed by 0.001 w.r.t. factory results (measured at approx. similar
temperature conditions) during warrantee period.
71. Section: Auto- Canopy arrangement shall be provided for Pressure Relief Device, Sudden Pressure
transformer Rev-07 Relay and Buchholz Relay to prevent ingress of rain water.
New Para added Further, metallic support structure (for cooler pipe supports, Buchholz pipe (if required)
under Clause No. shall be fixed directly in the pit through Anchor Fastener with chemical grouting.
6.4 Further, these support structures shall be encased with concrete to prevent rusting. No
foundation block for these support structures are envisaged.
Specific area shall not be provided for jacking pad in the foundation as jacking shall be
done by laying temporary metal plates size 400 mm x 400 mm x 32 mm (min) thick. One
set of metal plates for jacking of Transformer shall be provided by manufacturer.
Page 15 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
74. Section: Auto- Manufacturer may also offer Gas to Liquid (GTL) based insulating oil. The technical
transformer Rev-07 parameters of this oil shall be finalized during detailed engineering.
76. Section: Auto- 16 numbers optical temperature sensors shall be fitted on each unit. The optical sensors
transformer Rev-07 measuring system shall be of direct measurement non-calibrating type. All the sensors
shall be brought out to separate optical sensor box or in Individual Marshalling Box
Clause No. 6.14 mounted on transformer tank to facilitate measurement of temperature during service
life on each unit.
Location of optical temperature sensors inside the transformer shall be decided during
design review. The installation and commissioning at site shall be done under the
supervision of OEM representative or OEM certified representative.
Supply of temperature measuring unit is not required. However, manufacturer shall
keep one unit in their works as a part of testing equipment for measurement of
temperature through sensor during factory testing.
77. Section: Auto- Suitable provision (valves, etc.) shall be provided for installation of Nitrogen Injection
transformer Rev-07 Fire Protection System in transformer.
Annexure – C Test
Procedures Sr. No.5
80. Section: 765kV Deleted
Shunt Reactor Rev-
07
Clause No.11.14
Page 16 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
81. Section: 765kV If Tan delta of OIP bushing goes beyond 0.005 or increase is more than 0.001 within the
Shunt Reactor Rev- warrantee period w.r.t. pre-commissioning values, the contractor shall arrange to
07 replace the defective bushing by new one. No temperature correction factor shall be
applicable for tan delta.
Clause No.11.15
Tan δ value of RIP (Resin Impregnated Polymer) condenser bushing shall be 0.005
(max.) in the temperature range of 20°C to 90°C. The measured Tan δ value at site
should not exceed by 0.001 w.r.t. factory results (measured at approx. similar
temperature conditions) during warrantee period.
82. Section: 765kV 04 nos. of Gate valves (minimum size 50NB) for UHF sensors for PD Measurements at
Shunt Reactor Rev- various locations. Location of valves shall be finalized during design review.
07
Annexure-I
85. Section: 765kV Manufacturer may also offer Gas to Liquid (GTL) based insulating oil. The technical
Shunt Reactor Rev- parameters of this oil shall be finalized during detailed engineering.
07
Location of optical temperature sensors inside the reactor shall be decided during design
review. The installation and commissioning at site shall be done under the supervision
of OEM representative or OEM certified representative.
New Clause
No.7.1.5 (f)
88. Section: 765kV When the flow from conservator to main tank is more than the normal operating
Shunt Reactor Rev- conditions, the valve shall shut off by itself and will have to be reset manually. It shall be
Page 17 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
07 provided with valve open/close position indicator along with alarm contact indication
in control room during closing operation of valve. This valve shall be provided with
locking arrangement for normal position and oil filling / filtration position. Glass
window for visual inspection similar to Buchholz glass inspection window shall be
Clause No.14.8 (c) provided for physical checking of status of valve. It shall have IP 67 class degree of
protection. A suitable platform or ladder (if required) shall be provided to approach the
valve for manual reset.
89. Section: 765kV Frequency Response analysis
Shunt Reactor Rev-
07 The test shall be performed on each phase of the Reactor by taking open circuit response
of complete winding as HV to neutral terminal and vice versa. The response shall be
Annexure – C compared with other units of same design for reference.
Test Procedures
Sr. No.14
Clause no.10.13
91. Section : Tan δ value of RIP (Resin Impregnated Polymer) condenser bushing shall be 0.005
Transformer (max.) in the temperature range of 20°C to 90°C. The measured Tan δ value at site
(Upto 400kV Class) should not exceed by 0.001 w.r.t. factory results (measured at approx. similar
Rev 11 temperature conditions) during warrantee period.
Clause no.10.14
92. Section : 04 nos. of Gate valves (minimum size 50NB) for UHF sensors for PD Measurements
Transformer (applicable for 400kV Transformer only) at various locations. Location of valves shall be
(Upto 400kV Class) finalized during design review.
Rev 11
Page 18 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
Note:
Transformer manufacturer who have already short circuit tested 315MVA or above
rating 400kV class transformer shall offer the 315MVA Transformer meeting the above
specified losses for which design review shall be carried out based on earlier short
circuit tested transformer design.
96. Section : z. On line insulating oil drying system(if specified in BPS) as per Annexure-M
Transformer
(Upto 400kV Class) aa. Online Dissolved Gas (Multi-gas) and Moisture Measuring Equipment (if
Rev 11 specified in BPS) as per Annexure-K
Clause No.21
Z, aa, bb, dd
bb. On line dissolved Hydrogen and Moisture Measuring Equipment (if specified in
BPS) as per Annexure-L
dd. Deleted
Page 19 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
97. Section : Optical temperature sensors shall be fitted on each Transformer unit. 16 number probes
Transformer for 3-ph unit and 8 number probes for 1-ph unit shall be provided. The optical sensors
(Upto 400kV Class) measuring system shall be of direct measurement non-calibrating type. All the sensors
Rev 11 shall be brought out to separate optical sensor box or in Individual Marshalling Box
mounted on transformer tank to facilitate measurement of temperature during service
Clause No.6.14 life on each unit.
Location of optical temperature sensors inside the transformer shall be decided during
design review. The installation and commissioning at site shall be done under the
supervision of OEM representative or OEM certified representative.
98. Section : Suitable provision (valves, etc.) shall be provided for installation of Nitrogen Injection
Transformer Fire Protection System in transformer.
(Upto 400kV Class)
Rev 11
New Clause
No.6.1.5(f)
99. Section : When the flow from conservator to main tank is more than the normal operating
Transformer conditions, the valve shall shut off by itself and will have to be reset manually. It shall be
(Upto 400kV Class) provided with valve open/close position indicator along with alarm contact indication
Rev 11 in control room during closing operation of valve. This valve shall be provided with
locking arrangement for normal position and oil filling / filtration position. Glass
Clause No.13.7.8(c) window for visual inspection similar to Buchholz glass inspection window shall be
provided for physical checking of status of valve. It shall have IP 67 class degree of
protection. A suitable platform or ladder (if required) shall be provided to approach the
valve for manual reset.
Annexure – C Test
Procedures, Sr.No.5
101. Section : Upto Deleted
400kV Shunt
Reactor Rev 10
Page 20 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
102. Section : Upto Tan δ value of RIP (Resin Impregnated Polymer) condenser bushing shall be 0.005
400kV Shunt (max.) in the temperature range of 20°C to 90°C. The measured Tan δ value at site
Reactor Rev 10 should not exceed by 0.001 w.r.t. factory results (measured at approx. similar
temperature conditions) during warrantee period.
Clause no. 11.14
103. Section : Upto 04 nos. of Gate valves (minimum size 50NB) for UHF sensors for PD Measurements
400kV Shunt (applicable for 420kV Reactor only) at various locations. Location of valves shall be
Reactor Rev 10 finalized during design review.
Location of optical temperature sensors inside the reactor shall be decided during design
review. The installation and commissioning at site shall be done under the supervision
of OEM representative or OEM certified representative.
New Clause
No.7.1.5 (f)
108. Section : Upto Deleted
400kV Shunt
Reactor Rev 10
Clause No.22.1.
(xxix)
Page 21 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02
109. Section : Upto When the flow from conservator to main tank is more than the normal operating
400kV Shunt conditions, the valve shall shut off by itself and will have to be reset manually. It shall be
Reactor Rev 10 provided with valve open/close position indicator along with alarm contact indication
in control room during closing operation of valve. This valve shall be provided with
Clause No.14.8 (c) locking arrangement for normal position and oil filling / filtration position. Glass
window for visual inspection similar to Buchholz glass inspection window shall be
provided for physical checking of status of valve. It shall have IP 67 class degree of
protection. A suitable platform or ladder (if required) shall be provided to approach the
valve for manual reset.
110. Section : Upto Frequency Response analysis
400kV Shunt
Reactor Rev 10 The test shall be performed on each phase of the Reactor by taking open circuit response
of complete winding as HV to neutral terminal and vice versa. The response shall be
Annexure – C Test compared with other units of same design for reference.
Procedures,
Sr.No.14
Page 22 of 22
Annexure-S2
SPECIFICATION FOR DIGITIAL PROTECTION COUPLER
1.0 Digital protection coupler for protection signalling through optical fibre cable
system.
1.1 The Digital protection signalling equipment is required to transfer the trip commands from
one end of the line to the other end in the shortest possible time with adequate security
and dependability. It shall also monitor the healthiness of the link from one end to the
other and give alarms in case of any abnormality. The protection signalling equipment
shall have a proven operating record in similar application over EHV systems and shall
operate on 48V DC (+10%, -10%). It shall provide minimum four commands. These
commands shall be suitable for Direct tripping, Intertripping and Blocking protection
schemes of EHV lines.
The protection signalling equipment shall communicate to the remote end interfacing
with SDH terminal equipment at its 2Mbps port. It shall provide suitable interfaces for
protective relays, which operate at 220/110V DC. Power supply points shall be immune
to electromagnetic interface.
All signal processing i.e. generation of tripping signal and the evaluation of the signals
being received shall be performed completely digital using Digital Signal Processing
techniques.
It shall also be possible to initiate a loop test manually at any station by pressing a button
on the front of the equipment.
Internal test routine shall continuously monitor the availability of the protection signaling
equipment.
-1-
Proper tripping signal shall always take the priority over the test procedure.
The high speed digital protection signalling equipment shall be designed and provided
with following features.
Bidder shall quote for protection signalling equipment suitable for 4 commands with
separate trip counters for transmit and receive. With regard to trip counters alternate
arrangement .i.e. Laptop along with software & all accessories to download events
including carrier receipt and transmit shall be acceptable. Laptop for the above shall be
supplied at each substation under substation package.
The DPC can be either housed in offered Control & Protection Panel / PLCC Panel or in
separate panel.
Reports of the following tests as per clause 9.2 of Chapter 2-GTR shall be submitted for
approval for protection signalling equipment and relays associated with the protection
signalling equipment and interface unit with protective relay units, if any.
-2-
c) LF disturbance emission
d) Reverse polarity
All the above tests at i, ii & iii (except temperature & humidity tests) shall be as per IEC
60834-1 and the standards mentioned therein.
iv) Relays
The isolation requirements of the protection interface shall be for 2kV rms.
-3-
v) Interface to Protection relays
Input: Contact Rating:
Rated voltage : 250 volts DC
Maximum current rating: 5 amps
Output: Contact Rating:
Rated voltage : 250 volts DC
Rated current : 0.1 A DC
Other parameters : As per IEC-255-0-20
vi) Alarm contact
Rated voltage : 250 volts DC
Rated current : 0.1 A DC
Other parameters : As per IEC-255-0-20
-4-
Annexure-S3
1.2 Air conditioning system shall be designed to maintain the inside DBT
below 24oC. Bidder shall submit necessary design calculations for
employer’s approval.
1.3 At least 50% spare Air-Conditioning capacity shall be provided for Local
Control rooms in the GIS halls.
1.4 Controllers shall be provided in Local Control room inside GIS hall for
controlling and monitoring the AC units in these rooms as detailed in
clause no.2.6
1.5 Each Local Control room inside GIS hall shall be provided with
temperature transducer to monitor the temperature of the Local Control
rooms in the GIS halls. The Temperature transducer shall have the
following specification:
2.2 Type & Capacity of air conditioners shall be so chosen such that quantity
of air conditioners in the room is optimized keeping the necessary air
flow.
2.3 Scope
Page 1 of 4
Annexure-S3
2.3.1 Required number of Cassette type split AC units of 3TR capacity each
complete with air cooled outdoor condensing unit having hermetically
sealed compressor unit with cordless remote controller.
2.3.2 Required number of High wall type split AC units of 2TR capacity each
complete with air cooled outdoor condensing unit having hermetically
sealed compressor and high wall type indoor evaporator unit with cordless
remote controller.
2.3.3 Copper refrigerant piping complete with insulation between the indoor and
outdoor units as required.
2.3.4 First charge of refrigerant and oil shall be supplied with the unit.
2.3.6 Local start/stop facility for local starting/ stopping of all electrical
equipment/ drives.
2.3.7 All instruments and local control panels alongwith controls and interlock
arrangements and accessories as required for safe and trouble free
operation of the units.
2.3.8 PVC drain piping from the indoor units upto the nearest drain point.
2.3.9 Supply and erection of Power and control cable and earthing.
Page 2 of 4
Annexure-S3
2.4.1.2 Indoor units shall be of 4-way, ceiling mounted cassette type. The indoor
unit shall be compact and shall have elegant appearance. They shall have
low noise centrifugal blowers driven by suitable motors and copper tube
aluminium finned cooling coils. Removable and washable polypropylene
filters shall be provided. They shall be complete with multi function
cordless remote control unit with special features like programmable
timer, sleep mode etc.
2.4.1.3 Cooling capacity of 3TR AC units shall not be less than 36000btu/hr. and
shall have energy efficiency rating of 5 star as on the date of NOA.
2.4.2.1 The split AC units shall be complete with indoor evaporator unit, outdoor
condensing units and cordless remote control units.
2.4.2.3 The indoor units shall be high wall type. The indoor unit shall be compact
and shall have elegant appearance. They shall have low noise centrifugal
blowers driven by suitable motors and copper tube aluminium finned
cooling coils. Removable and washable polypropylene filters shall be
provided. They shall be complete with multi function cordless remote
control unit with special features like programmable timer, sleep mode
and soft dry mode etc.
2.4.2.4 Cooling capacity of 2TR AC & 3 TR AC units shall not be less than
22000btu/hr. and shall have energy efficiency rating of 5 star as on the
date of NOA.
2.5 The Split AC units shall be of Carrier, Voltas, Blue Star, Hitachi, Daikin,
LG, National, O’General, or Samsung make.
Page 3 of 4
Annexure-S3
2.6 Controllers shall be provided in Local Control room inside GIS hall, one
controller for each room, to control and monitoring of AC units and shall
have the following facilities;
2.7 Warranty
All compressors shall have minimum 5 years Warranty from the date of
commissioning.
Each GIS Hall shall have an independent ventilation system. Each Ventilation
system shall consist of two 100% capacity systems, one operating and one stand-by.
To ensure that the air being supplied to the GIS hall is free from dust particles, a
minimum two stage dust filtration process shall be supplied. This shall consist of at
least the following:
1. Pre Filters: To remove dust particles down to 10 micron in size with at least
95% efficiency.
2. Fine Filters: To remove dust particles down to 5 microns in size with at least
99% efficiency.
All the filters shall be panel type. Easy access should be available to the filters for
replacement/cleaning.
The ventilation of the GIS hall shall be of a positive pressure type with minimum 2
air changes per hour. The pressure inside the GIS hall shall be maintained 5 mm of
water above the atmospheric pressure. Fresh outdoor air shall be filtered before
being blown into the GIS hall by the air fans to avoid dust accumulation on
components present in the GIS hall. GIS hall shall be provided with motorized
exhaust dampers with local control.
Page 4 of 4
SECTION-GENERAL TECHNICAL REQUIREMENTS (GTR)
ANNEXURE-A
1. General
Unless otherwise stipulated, all equipment, shall be tested for external corona (for
400kV & above) both by observing the voltage level for the extinction of visible corona
under falling power frequency voltage and by measurement of radio interference
voltage (RIV) for 132kV and above.
2. Test Levels:
The test voltage levels for measurement of external RIV and for corona extinction
voltage are listed under the relevant clauses of the specification.
3. Test Methods for RIV:
3.1 RIV tests shall be made according to measuring circuit as per International Special-
Committee on Radio Interference (CISPR) Publication 16-1(1993) Part -1. The
measuring circuit shall preferably be tuned to frequency with 10% of 0.5 Mhz but
other frequencies in the range of 0.5 MHz to 2 MHz may be used, the measuring
frequency being recorded. The results shall be in microvolts.
3.2 Alternatively, RIV tests shall be carried out in accordance with relevant IEC of
respective equipment or NEMA standard Publication No. 107-2016.
3.3 In measurement of, RIV, temporary additional external corona shielding may be
provided. In measurements of RIV only standard fittings of identical type supplied
with the equipment and a simulation of the connections as used in the actual
installation will be permitted in the vicinity within 3.5 meters of terminals.
3.4 Ambient noise shall be measured before and after each series of tests to ensure that
there is no variation in ambient noise level. If variation is present, the lowest ambient
noise level will form basis for the measurements. RIV levels shall be measured at
increasing and decreasing voltages of 85%, 100%, and 110% of the specified RIV test
voltage for all equipment unless otherwise specified. The specified RIV test voltage for
765kV, 400 kV, 220 KV, 132kV is listed in the detailed specification together with
maximum permissible RIV level in microvolts.
3.5 The metering instruments shall be as per CISPR recommendation or equivalent device
so long as it has been used by other testing authorities.
3.6 The RIV measurement may be made with a noise meter. A calibration procedure of the
frequency to which noise meter shall be tuned shall establish the ratio of voltage at the
high voltage terminal to voltage read by noise meter.
4. Test Methods for Visible Corona
The purpose of this test is to determine the corona extinction voltage of apparatus,
connectors etc. The test shall be carried out in the same manner as RIV test described
above with the exception that RIV measurements are not required during test and a
search technique shall be used near the onset and extinction voltage, when the test
voltage is raised and lowered to determine their precise values. The test voltage shall
be raised to 110% of specified corona extinction voltage and maintained there for five
minutes. In case corona inception does not take place at 110%, test shall be stopped,
otherwise test shall be continued and the voltage will then be decreased slowly until
all visible corona disappears. The procedure shall be repeated at least 3 times with
____________________________________________________________________________
Technical Specification: GTR Page 1 of 2 (Annexure-A, Rev01)
C/ENGG/SPEC/GTR (Rev. No.:-14)
SECTION-GENERAL TECHNICAL REQUIREMENTS (GTR)
ANNEXURE-A
corona inception and extinction voltage recorded each time. The corona extinction
voltage for purposes of determining compliance with the specification shall be the
lowest of the three values at which visible corona (negative or positive polarity)
disappears.
The test to determine the visible corona extinction voltage need not be carried out
simultaneously with test to determine RIV levels.
However, both test shall be carried out with the same test set up and as little time
duration between tests as possible. No modification on treatment of the sample
between tests will be allowed. Simultaneous RIV and visible corona extinction voltage
testing may be permitted at the discretion of Employer’s inspector if, in his opinion, it
will not prejudice other test.
5. Test Records:
In addition to the information previously mentioned and the requirements specified as
per CISPR or NEMA 107-2016 the following data shall be included in test report:
a) Background noise before and after test.
b) Detailed procedure of application of test voltage.
c) Measurements of RIV levels expressed in micro volts at each level.
d) Results and observations with regard to location and type of interference
sources detected at each step.
e) Test voltage shall be recorded when measured RIV passes through 100
microvolts in each direction.
f) Onset and extinction of visual corona for each of the three tests required shall be
recorded.
____________________________________________________________________________
Technical Specification: GTR Page 2 of 2 (Annexure-A, Rev01)
C/ENGG/SPEC/GTR (Rev. No.:-14)
ANNEXURE – I (Rev 1)
e. Installation Outdoor
u. Partial discharge at 1.05 continuous over voltage Not more than 50pC
1.1 Nitrogen Injection Type Fire Protection System (NIFPS) shall be designed to prevent
explosion of transformer/reactor tank and the fire during internal faults/arc.
The system shall work on the principle of Drain & stir. On activation, it shall drain a
pre-determined quantity of oil from the tank top through drain valve to reduce the
tank pressure, isolate conservator tank oil and inject nitrogen gas at high pressure
from the bottom side of the tank through inlet valves to create stirring action and
reduce the temperature of oil below flash point to extinguish the fire. On operation,
the quantity of oil removed from the tank shall be such that adequate amount of oil
shall remain to cover active part (i.e. core coil assembly).
The system operation shall be fully automatic and activate from the required fire and
other trip signals. In addition to automatic operation, remote operation from control
room/ remote centre and local manual control in the fire extinguishing cubicle shall
also be provided. System shall operate on following situations:
To prevent transformer from explosion and fire in case of an internal fault, signals
given by operation of Electrical protection relays (Differential / Restricted earth fault)
and tripping of circuit breaker of transformer and operation of either Buchholz relay
or pressure relief valve (PRV) shall be used to activate the system. The exact logic for
system activation shall be finalized during detailed engineering.
In case of fire, sensed by fire detectors, the system shall be activated only after
electrical isolation of the transformer, confirmed by breaker trip. If the fire detection
is not associated with any other fault, the system activation shall be only manual.
Manual operation switch shall be provided in the control room with a cover to avoid
accidental operation of it.
i) Open the quick opening drain valve to drain the top layer oil
ii) Shut off the conservator isolation valve to prevent flow of oil from the
Conservator tank to the main tank
iii) Open the valve to inject Nitrogen into the transformer tank to create
stirring of oil.
There shall be interlock to prevent activation of the system if the transformer is not
Section: Fire Protection Rev 6
electrically isolated.
There shall also be provision for isolating the system during maintenance and/or
testing of the transformer.
The contractor shall be responsible for the design of the complete system and shall
submit the drawings and design calculations for the number of fire detectors, pipe
sizing of drain pipe and Nitrogen injection pipe, Nitrogen cylinder capacity, number
of injection points, etc. and get approval from POWERGRID.
Facility shall be provided to test the system when the transformer is in service,
without actually draining the oil and injecting Nitrogen.
The Nitrogen regulator valve shall be designed in such a way that the Nitrogen shall
not enter the transformer tank even in case of passing/ leakage of valve.
Owner shall provide two distinct station auxiliary DC feeders for control purposes.
The system shall work on station DC supply with voltage variation defined in GTR
.The control box of fire protection system shall have facility to receive these feeders
for auto changeover of supply. It shall be the contractor’s responsibility to further
distribute power to the required locations. In case auxiliary DC power supply
requirement is different than station auxiliary DC supply, then all necessary DC-DC
converters shall be provided by the Contractor.
Following minimum indications and alarms shall be provided in the local cubicle as
well as in the control box:-
The scope of supply shall include the following items and any other items required for
safe and trouble free operation of the system.
i) Fire extinguishing cubicle with base frame and containing at least the
following:
Oil Drain Assembly including oil drain pipe extension of suitable size
for connecting pipes to oil pit
Section: Fire Protection Rev 6
Mechanical release device for oil drain and nitrogen release
Limit switches for monitoring of the systems
Panel lighting
Flanges on top of the panel for connecting oil drain and nitrogen
injection pipes for transformer
Back up pressure switch to operate nitrogen gas valve
Pressure indicators for Nitrogen pressure of the cylinder and actual
injection through Nitrogen regulator
Fire Extinguishing Cubicle shall have oil leakage detection
arrangement for detecting oil leakage from drain valve. In case of any
oil leakages, alarm to be provided.
shall have minimum IP55 degree of protection
ii) Control box to be installed in the control room of the station for
monitoring system operation, automatic control and remote operation, with
alarms, indications, switches, push buttons, audio signal, suitable for
tripping and signalling.
iv) All controls, alarms, panels, cables, cable trays (if required), junction
boxes etc.
Each transformer unit shall be provided with an underground oil storage tank. The oil
storage tank shall have Non Corrosive, water proof, epoxy coated (from Inside) mild
steel (minimum thickness 5 mm) to store drained out oil on operation of NIFPS. The
tank shall be painted from outside as per table below:
The total capacity of storage tank shall be at least 10% of transformer tank oil to avoid
overflowing of oil considering that drained oil volume shall be around 10% of
Section: Fire Protection Rev 6
transformer tank oil. Necessary arrangement shall be made on underground storage
tank so as to take out the drained oil from the tank for further processing and use. All
the pipe and physical connection from transformer to oil pit shall be in the scope of
contractor.
This storage tank shall be placed in the pit made of brick walls with PCC (1:2:4)
flooring with suitable cover plates to avoid ingress of rain water. The design of tank
and pit shall be finalised during detailed engineering.
After installation the system pre-commissioning tests shall be carried out jointly with
the Owner’s representative before the system is put in service.
(Volume-II)
DOC: D-5-10-30-01-05
Revision 5
July 2019
4
Doc: D-5-10-30-01-05
INDEX
Sl.No. Description Page No.
(A) Norms for Testing Instruments & T&P for Substations 1
(B) Technical Specifications
01. CT Analyzer 7
02. Circuit Breaker Analyzer with DCRM 9
03. SF6 Gas Quality Analyser 11
04. Digital Earth Resistance Meter 13
05. Fully Automatic Capacitance & Tan Delta Measurement Kit 15
06. Automatic THRC Measurement Kit for Gapless Surge Arrestor 17
07. Transformer Winding Resistance Meter 19
08. Transformer Oil BDV Test Set 22
09. Automatic Transformer Turn Ratio Meter 24
10. Automatic Battery Discharge kit 26
11. Automatic Contact Resistance Meter 28
12. Mobile Dry Air Plant (Heatless type) 30
13. Digital Insulation Tester 32
14. Automatic Relay Test Kit 34
15. Thermo Vision Scanning Camera- Low End 37
16. Sweep Frequency Response Analyser 41
17. Digital Level Meter cum Level Generator 43
18. SF6 Gas Handling Plant 45
19. Off line Transformer Oil Filtration Plant (10000/6000 lt/hr) 47
20. Gas Chromatograph for DGA of Transformer Oil 54
21. Portable Dissolved Gas Analysis Kit of Transformer Oil 58
22. Propelled Articulating Boom lift for 765 kV Substations 60
23. Propelled Articulating Boom lift for 400 kV Substations 61
24. Battery Operated Platform Trolley for Substations 62
25. Primary Injection Kit 63
26. Portable Automatic Particle counter 64
27. 1 kLPH Transformer Oil Filtration Plant with NAS Filter 65
28. Stand Alone Vacuum Pumping System 71
29. Insulation/Dielectric Diagnostic Analyser(FDS kit) 74
30. D.C. Earth Fault Locator 76
31. SF6 Leakage Detector (Applicable Only for GIS) 78
32. Portable Partial Discharge Measurement kit 80
(C) Guide Line for Procurement of Testing Equipments 81
5
Doc: D-5-10-30-01-05
1
Doc: D-5-10-30-01-05
2
Doc: D-5-10-30-01-05
3
Doc: D-5-10-30-01-05
(f) Rheostats
(i) CT Analyser 1 1 - -
4
Doc: D-5-10-30-01-05
60 ft-Double - 2 - -
5
Doc: D-5-10-30-01-05
6
Doc: D-5-10-30-01-05
The kit shall confirm the name plate details .It shall also help in
analyzing the CT behaviour in case of change of primary or secondary
currents when the revised data is entered in to test data.
The kit shall be able to plot the excitation curve and locate the Knee
point Voltage and Current in real time.
7
Doc: D-5-10-30-01-05
8
Doc: D-5-10-30-01-05
S No Description Specification
1. Functional 1. The instrument should be suitable for measuring the
Requirement operation timing of main, PIR (suitable with PIR ranging from
200 ohm to 500 ohm) and auxiliary contacts (wet & dry) as
well as coil currents.
2. It should measure the Dynamic Contact Resistance of main &
arcing contacts as well as travel measurement (with external
travel transducer) of operating mechanism.
3. The instrument should be suitable for testing the CBs upto
765 kV as per applicable standards and testing procedure of
Powergrid.
4. The test results should have repeatability, consistency &
immunity to electromagnetic interference in live switchyard
upto 765 kV levels.
2. No. of Channels 1. Main Contact Channels:24 (4 Main + 4 PIR per pole on 3 pole
simultaneously)
2. Aux. Contact Channel:06 wet & 06 Dry
3. DCRM/Test Current Channels:12 set (6 Channel for resistance
+ 6 channel for current)
4. Travel Channel:06
5. Coil Current Channel:06
3. Sampling Speed Upto 20 kC
4. Accuracy 1. Timing : ± 1 % of reading
2. Coil Current: ± 1 % of reading
3. R : ± 2 % of reading
4. Travel: ± 1 % of reading
5. Measurement 1. Timing: 0-4 s
Range: 2. R: 0-8 m Ω.
3. Coil Current:0-25 A
6. Resolution Timing: 0.1 ms
7. DCRM Test Current 100 A.(Minimum)
8. Test Leads and One complete set of cables of sufficient length (min 20metre) with
accessories suitable clamps & connectors, compatible with the all type of CBs
should be provided for successfully carrying out the test in
POWERGRID S/S. Additionally all the required accessories should be
provided for the smooth functioning of kit. Further hard carrying
case (which should be robust/ rugged enough) for ensuring proper
safety of the kit during transportation shall have to be provided.
9. Travel Transducers One set of travel transducers along with clamp/fixtures to suit
765/400/220 kV CBs of ABB/AREVA/ALSTOM/BHEL/CGL/
SIEMENS etc (wherever applicable) make for AIS and for GIS Stations,
CB details shall be provided by POWERGRID and the supplier shall
have to develop & supply the transducers within delivery schedule.
The voltage class and make shall be intimated along with the order.
10. Design/Engg. The complete equipment along with complete accessories must be
designed/engineered by Original Equipment Manufacturer.
11. Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply
with standard socket.
9
Doc: D-5-10-30-01-05
S No Description Specification
12. Operating 0 to +50 deg C
Temperature
13. Relative humidity Max. 90% non-condensing.
14. Protection/ Control Against short circuit, over voltage, improper ground connection over
load & transient surges, the kit should have alarm/cut-off features to
protect the instrument. Also the kit should have facility of stopping
automatically on power failure.
15. Cooling Necessary in built cooling arrangement should be provided to
Arrangement dissipate the heat generated during testing. No external coolant/
accessory shall have to be required.
16. Weight It should be highly portable and trolley mounted for smooth
movement in live switchyards.
17. Software The software should be suitable for automatic testing & report
generation, signature as well as trend analysis. The kit should have
facility to store and communicate with windows based computer for
exporting the test data.
18. PC Interface It shall include supply of one laptop PC of Dell/Lenovo/HP make with
latest specifications such as Core i5 Intel Processor,4GB RAM, 320GB
or better HDD, 15’’ TFT screen, Combo 24xCD R/W Drive ie having
CD read / write facility complete with required cables and connectors
with preloaded operating MS Window 7 professional or better with
latest version application software require for storage analysis and
record management.
19. Environment The test kit shall be compatible for EMI/EMC/Safey environment
requirement as per IEC .
20. Guarantee Warranty/Guarantee Period: Min 01 year from the date of successful
& complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to be
covered under warranty/guaranty period. If the kit needs to be
shifted to supplier’s works for repairs within warranty/guaranty
period, suppliers will have to bear the cost of spares, software,
transportation of kit for repair at test lab/ works.
21. Calibration Unit shall be duly calibrated before supply and the date of calibration
Certificate shall not be older than two month from the date of supply of Kit.
22. Training Supplier shall have to ensure that the kit is made user friendly. Apart
from the detailed demonstration at site, the supplier shall also have
to arrange necessary training to POWERGRID engineers, where kit is
being supplied.
23. Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed.
24. After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt services.
10
Doc: D-5-10-30-01-05
11
Doc: D-5-10-30-01-05
12
Doc: D-5-10-30-01-05
S. No Item Specification
1 Functional
Requirement 1. The instrument should be suitable for measuring of all type of
earth electrode resistance single/multi electrode system, in live
switchyard upto 765 kV level, and soil resistivity as per applicable
standard testing procedure of Powergrid.
2. The test results should have repeatability, consistency &
immunity to electromagnetic interference in live switchyard upto
765 kV levels.
3. The instrument should be suitable for four terminal measurement
2 Output Voltage: 30 V Peak Min. (At a test frequency different from 50Hz to
avoid electromagnetic interference)
3 Measurement Resistance : 0.01 – 19.99k Ω (Auto Ranging &Digital
Range:
4 Accuracy Resistance: 2% upto 200 Ω and 3% above 200 Ω.
5 Test Leads and One complete set of cables of sufficient length with suitable clamps &
accessories connectors, compatible with the instruments should be provided for
successfully carrying out the test in POWERGRID S/S. Additionally all
the required accessories should be provided for the smooth
functioning of kit. Further hard carrying case (which should be
robust/ rugged enough) for ensuring proper safety of the kit during
transportation shall have to be provided.
7 Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply with
standard socket & Internal Re-chargeable Battery.
13
Doc: D-5-10-30-01-05
S. No Item Specification
of kit for repair at test lab/works.
15 Calibration Unit shall be duly calibrated before supply and the date of calibration
Certificate shall not be older than two month from the date of supply of Kit.
16 Training Supplier shall have to ensure that the kit is made user friendly. Apart
from the detailed demonstration at site, the supplier shall also have to
arrange necessary training to POWERGRID engineers.
17 Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed.
18 After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt after sale services.
14
Doc: D-5-10-30-01-05
05. Technical Specification of Fully Automatic Capacitance & Tan Delta Measurement
kit
14 Software The software should be suitable for automatic testing & report
generation and trend analysis. The kit should have facility to store and
15
Doc: D-5-10-30-01-05
16
Doc: D-5-10-30-01-05
06. Technical Specification of Automatic Third Harmonic Resistive Current Measurement Kit
for Gapless Surge Arrestor
17
Doc: D-5-10-30-01-05
18
Doc: D-5-10-30-01-05
19
Doc: D-5-10-30-01-05
20
Doc: D-5-10-30-01-05
21
Doc: D-5-10-30-01-05
22
Doc: D-5-10-30-01-05
23
Doc: D-5-10-30-01-05
24
Doc: D-5-10-30-01-05
25
Doc: D-5-10-30-01-05
26
Doc: D-5-10-30-01-05
27
Doc: D-5-10-30-01-05
28
Doc: D-5-10-30-01-05
29
Doc: D-5-10-30-01-05
30
Doc: D-5-10-30-01-05
31
Doc: D-5-10-30-01-05
32
Doc: D-5-10-30-01-05
33
Doc: D-5-10-30-01-05
34
Doc: D-5-10-30-01-05
35
Doc: D-5-10-30-01-05
36
Doc: D-5-10-30-01-05
37
Doc: D-5-10-30-01-05
9 The system shall have the voice annotation (voice recording) facility
for not less than 30 seconds per image and voice recording shall be
Voice Recording
tagged to particular image or the system shall have provision to
/ Text
attach pre-defined text on each image file during measurement.
annotation
Infrared image along with corresponding visual image and voice
recording or text annotation shall be linked together.
10 Image storage The system shall be supplied with minimum of 2 GB flash memory
capacity (internal/ external).
11 The camera should store (in selectable built in flash memory or flash
memory card in selectable directory) the image in full radiometric
format as well as standard image format e.g. bmp, jpeg, tif, png, gif etc.
readable without use of special software indicating marked temp,
with date and time stampings along with all technical parameters
corresponding to image, in addition to visual image, voice/ text
annotation. If required, operator shall have the facility to recall,
Image storage analyze, save, and delete the images in the field including the replay
facilities and edit of its voice/text annotation. It shall be possible for operator
to view the live images/ recalled image details.
Camera shall have the facility to freeze/ hold the image and store a
single image or multiple of images either continuously or
periodically. While saving the image, the camera shall automatically
prompt for saving of voice or text annotation and visual image. It
shall also be possible to store only IR images with or without
voice/text annotation or IR image.
38
Doc: D-5-10-30-01-05
14 All the required accessories like PC/ video interface cables, Power
supply cables, Battery, Battery Charger (in addition to the AC
Accessories
adopter), Standby battery set, Operating manual, Original CD and
software, Application CD, Hard carrying case etc. should be provided.
15 Operating Shall operate at Temperature 0 to 50°C, Relative Humidity: 10 to 90%
conditions (with non- condensing..
all accessories)
16 Safety Thermo vision camera shall have minimum protection grade of IP-54.
Standards The unit shall meet all EMC emission, immunity standards as per IEC/
EN 61000-4-4, IEC/ EN 61000-4-2 and IEC/ EN 61000-4-8
respectively or equivalent latest standards, with CE marking to work
in EHV areas without any interference. Copy of relevant certificates
shall be furnished along with the bid.
17 Demonstration The acceptance of the Instrument shall be subject to the successful
demonstration by supplier to the satisfaction of POWERGRID at
prescribed site. During the demonstration, if the instrument is found
not up to the mark/ not meeting working requirements of
POWERGRID, the same shall be summarily rejected and repeated
attempts shall not be permitted.
18 Guaranty Camera shall be guaranteed for minimum 5 years from the date of
successful & complete commissioning at POWERGRID Substation. All
the materials including accessories, cables etc. are to be covered in
guaranty period. If the kit needs to be shifted to supplier’s works for
repairs within guaranty period, suppliers will have to bear the cost of
39
Doc: D-5-10-30-01-05
40
Doc: D-5-10-30-01-05
41
Doc: D-5-10-30-01-05
42
Doc: D-5-10-30-01-05
NOTE: Two separate units for Level Meter and Level Generator
may also be accepted. In this case the weight of individual unit
must not be more than 3Kg (With Batteries).
LEVEL METER
1 Frequency Range: 100Hz to 2 MHz
Display: 5 Digits or better
Accuracy: 2 x 10-6 ± 1Hz or better
2 Input Impedance’s 75, 150, 600 ohm and High Impedance,
3 Level Resolution 0.1 dB
4 Level, Selective -100 to +10dB
5 Level, Wideband With 4kHz Filter -100 to +10dB
With 300kHz Filter -90 to +10dB
With 600kHz Filter -80 to +10dB
6 Accuracy of level ±0.3dB
measurement at 0dBm
7(a) Return Loss Frequency range:200 Hz– 2MHz
Measurement Measuring range:60Ω-600Ω
Accuracy:+/-1dB for 10Khz to 500Khz & +/- 2 dB for other
frequency range
7(b) Bridge Impedance Frequency range:200Hz– 2MHz
Measurement Measuring range:50Ω-1600Ω
Accuracy:±5% ± 5 Ω
LEVEL GENERATOR
1 Signal generation freq. Range: 100Hz to 2 MHz
Range Display: 5 Digits or better
Accuracy: 2 x 10-6 ± 1Hz or better
2 Output impedances Balanced O/p
10kHz to 2MHz : 75,150
100Hz to 10kHz :600
3 Output Level Range Coaxial O/P
Impedance (Ohm)
43
Doc: D-5-10-30-01-05
44
Doc: D-5-10-30-01-05
4 Dew Point Measuring The dew point measuring instrument shall consist of the
Instrument following:
Measuring Sensor: Range +30˚C to (-) 60˚C
Operating Temp. 0-50˚C
Panel Mounted Indicator
5 Maintenance Tool Kit A Tool kit comprising of all tools required for Operation and
Maintenance of the plant shall be supplied along with the plant.
6 Power Supply The machine shall operate with I/P supply : 3-Phase, 415V, 50Hz
AC or 1-Phase, 240V, 50Hz AC
The unit shall be equipped with a Phase Sequence relay for
ensuring the correct sequence of rotation of the compressor /
Vacuum Pump.
45
Doc: D-5-10-30-01-05
46
Doc: D-5-10-30-01-05
1.1.1 The Ultra High Vacuum type oil treatment plant of capacity of 10000/ 6000 liters per hour
shall be mobile and shall be suitable for treatment of new oil and reconditioning of used oil
in EHV class transformer, shunt reactor and other oil filled equipment in order to achieve
properties of treated oil within specified limits at the rated capacity.
1.1.2 The plant shall be capable of treatment of new oil (as per IEC 296/IS:335) and
reconditioning of used oil (as per IS:1865/IEC:422 for oil in-service) at rated capacity on
single pass basis as follows:
(i) Removal of moisture from 100 ppm to 3 ppm (max.)
(ii) Removal of dissolved gas content from 10% by Vol. to 0.1% by vol.
(iii) Improvement of dielectric strength break down voltage from 20 KV to 70 KV (min).
(iv) Vacuum level of degassing chamber at rated flow and at final stage :- not more than 0.15
torr (0.2 m bar) max.
(Degassing chambers of different degree of vacuum should have sufficient surface areas to
achieve the final parameters. A detailed justification as to how end parameters shall be
met with detailed calculations and test reports in support of the same shall be submitted
along with the offer.
(v) Filtering capacity: Max. particle size less than 0.5 micron in the filtered oil.
(vi) Processing temperature :- 40º C to 60ºC (Maximum allowed temp. in oil to prevent
oxidation (when oil is at atmospheric pressure) :- 60ºC)
1.1.3 Bidder is to furnish along with the bid detailed calculation to establish the sizing and
capability of the vacuum pumping system with respect to moisture and gas removal as
above.
1.1.4 Bidder is to submit along with the bid test reports, test methodology to prove the
capability of the plant offered.
1.1.5 The plant shall also have two independent vacuum pumping systems one for evacuating
the transformer for vacuum filling of oil in transformer and the other for degassing
chamber. The blank off vacuum of each pumping system shall be 10ֿ³ torr or less.
1.1.6 The plant shall be provided with control and indication panel with full automation.
1.1.7 The plant shall be fitted with hoses for connection of oil lines and vacuum lines to
transformers and reactors. Hoses shall have leakage rate of 10ֿ² torr-ltr/sec. (max.)
1.1.8 The Ultra High Vacuum Type oil purification plant shall be complete with oil pumps for
drawing oil for transformers and reactors, oil heater (max. heating rate = 2.0W/cm²) of
adequate rating, suitable filter or centrifuge as required to ensure oil quality, degasifier
complete with vacuum pumps, oil extraction pump etc. of adequate capacity such that
throughout from the purification plant is of guaranteed purity.
1.1.9 The plant shall also be suitable for cleaning and degassing of the oil stored in the storage
tanks.
1.1.10 All equipments required as above shall be mounted on a tow-able road worthy trailer unit
with 4 nos. pneumatic tyres. The equipment shall be suitable for outdoor use.
47
Doc: D-5-10-30-01-05
The features and construction details of each 10000/6000 liters per hour capacity mobile
outdoor type oil filtration & purification plant shall be in accordance with the requirements
stated hereunder.
1.2.1.1 Two (2) nos. electrically driven oil pumps with one (1) working and one (1) standby shall
be provided. Selection switch is to be provided for selection of either of pumps. The pumps
shall be single stage positive displacement gear type. Suitable mechanical seals shall be
provided to ensure vacuum tightness. A built-in pressure relief valve to re-circulate the oil
to suction side in case of accidental pressure rise shall be provided. Suction lift of the pump
shall be at least 5 meters of transformer oil at atmospheric pressure & temperature. A
separate by pass valve is provided across the gear pump so that the flow rate through the
filter can be adjusted as required. The pump should be controlled by frequency drive. This
should help to set the flow rating of filter pant from 4000 – 6000 LPH for 6 KLPH machine &
8000-10000 LPH for 10KLPH machine.
1.2.1.2 The pumps shall be provided with an interlock with delay such that if there is no oil flow of
30 sec. through the heater, the pump shall trip automatically and also if the pump is not
operating the heater will not be energized.
1.2.3 Heater
a) An oil heater for heating up inlet oil shall be provided at the discharge side of the oil
pump.
b) The oil heater vessel shall be of mild steel welded construction & insulated with
glass/mineral wool.
c) The vessel shall be constructed for ultra high vacuum & pressure application.
d) Electric heater shall be provided inside the heater vessel to heat up oil from lowest
ambient temperature to temperature required for filtration/degasification operation in
single pass. The heater shall also be rated for heating the inlet oil from lowest ambient
temperature at 70°C in single pass during filling up of transformers. Two separate
temperature settings with thermostatic controllers shall be provided for this purpose.
e) The heating shall be indirect type and specific heat load shall not exceed 2.0 watt/cm² in
order to avoid local overheating.
f) The total heating capacity shall be divided into three independent thermostatically
controlled heating stages evenly balancing the three phases of power supply. The
control switches and knobs shall be housed on a control panel.
g) An additional preset temper proof safety thermostat set at the highest temperature shall
be provided on the heater to put off the heater and give audio and visual alarm to take
care of accidental overheating.
h) The heater body shall be so designed as to allow replacement of heating elements
without draining of oil. Suitable pressure relief valve, vent and drain valves & two (2)
dial type temperature gauges at inlet & outlet of heater shall be provided.
48
Doc: D-5-10-30-01-05
1.2.4 Filter
a) Cartridge filter as may be required to ensure maximum particle size to less than 0.5
micron in the filtered oil shall be provided.
b) The filter body shall be fabricated of mild steel & designed for leak tightness at full
vacuum & high pressures. The oil will flow from dirty oil chamber to clean oil chamber
through filter elements.
c) Cartridge type element used shall be suitable for transformer oil in service and
submicronic filtration, the media shall be non hygroscopic and of high dirt holding
capacity.
d) The filter elements shall be easily removable for replacement when required.
Compound gauge to indicate pressure across the filter, vent and drain with valves &
other necessary accessories shall be mounted on the filter for each operation.
Two valves should be provided at the inlet and outlet of the plant. The moment inlet
and outlet pumps are switched on these valves open thus making way for oil to pass. In
case of power failure, oil from the transformer will not enter the plant and vacuum
system.
a) The degassing chamber shall be of welded construction and shall be suitable for
operation under full vacuum. The fill of rasching rings & trays for distribution shall be
designed for efficient distribution of oil over large areas. Incoming transformer oil
should be spread over these rings in the form of film and over a longer surface area,
thus achieving better degassing and dehumidification.
b) The degassing chamber shall be multistage (minimum 02 stages) type suitable for
ensuring the desired oil properties. Arrangement for condensing back lighter fraction
(aromatics) of the insulating oil into the system shall be provided.
c) The degassing channels shall have adequate height to allow long enough free fall for
complete degassing. Design shall be such as to minimize foam formation.
d) The degassing chambers shall be provided with suitable level monitor for oil or foam
level in the chamber and shall trip the inlet gear pump when the level rises above the
designed maximum level in order to prevent foam/oil to enter the vacuum pumping
system. The oil inlet pump starts again automatically once the oil level in the degassing
chamber falls below the preset oil level.
e) Necessary illuminated sight glass shall be provided through which oil flow through the
degasser can be viewed clearly.
f) The degasser shall be provided with vacuum gauges, vacuum breaking valves, main and
auxiliary vacuum connections and other necessary accessories.
a) The pump shall be provided with a suitable vacuum pumping system for creating
adequate high vacuum in the degassing chambers. The pumping system shall consist of
49
Doc: D-5-10-30-01-05
suitable combination of Roots Blowers and Rotary vane vacuum pumps with inter-stage
condensing units.
b) The roots blowers shall be of reputed make. Suitable built in labyrinth packing system,
slinger rings, oil return chambers shall be provided between bearings and working
chambers to prevent penetration of lubricating oil to the working chamber. The pumps
motor shall be dynamically balanced. The pumps shall be suitable for starting
evacuation from atmospheric pressure and shall be applied with necessary overflow
valve.
c) The rotary vane vacuum pumps shall be installed after the roots blower. An automatic
by pass valve across the roots blower shall permit operation of rotary vane pump alone
to operate when so required. The rotary vane pumps are provided with gas ballast
valve to prevent contamination of vacuum pump oil with moisture. The vacuum pump
shall also be provided with suitable non-return valve device such that in the event of
power failure the vacuum in the degassing chamber shall be maintained and the vacuum
pump oil is not sucked back into the degassing chamber. A high vacuum safety valve
(piston type) to prevent back streaming of oil and air intrusion shall be provided. The
pump motors shall be having return stop device.
d) Necessary water cooled condensing units to condense the light faction (aromatics) and
return the same to the transformer oil shall be provided to reduce the loss of aromatics.
Condensing units shall also be suitable for operation with broken ice for remote location
operation where cooling water connection is not available.
(a) 60KL in one hour from 1 atm to 1 mbar (for 6 KLPH Machine)
The vacuum systems for degasser and transformer evacuation shall be inter connected
in such a way that it shall be possible to use either or both the systems for any of the
purpose. A reinforced hose of 10 mts. length should be provided. The hoses must be for
vacuum leakage rate of 10ֿ² torr-litre/sec.
Suitable pumping system shall be provided for extracting oil from degasser under
vacuum and supplying to transformer/reactor etc., at discharge pressure of 1.5 kg/cm²
at the outlet hose nozzle of the plant, the pump shall be either glandless centrifugal type
with canned motors or a combination of gear pump and centrifugal pump with
mechanical seals suitable for extracting oil from high vacuum degassing chamber. The
oil extraction pump shall be located at a suitable level below the degasser chamber so as
to ensure adequate suction head for the pump. The pump shall be supplied with double
check valve assembly and solenoid operated non return valve. In order to stop reverse
flow of oil in case of power failure, the pumping system shall preferably be self priming
type alternatively priming device with safety interlock to protect pump against dry
50
Doc: D-5-10-30-01-05
a) Separate reinforced rubber hoses shall be provided for each operation for oil suction, oil
discharge, transformer vacuum connection and cooling water supply and return. The
hoses shall be at least 15 meter long each and shall be complete with hose quick connect
couplers for connection to installations under operation.
b) Hose pipes for oil service shall be suitable for transformer oil application upto
temperature of 100° C, full vacuum and pressure upto 2.5 kg/cm². All oil hoses shall be
built up around an earthed core or have built in earthed conductor to avoid static
electricity accumulation. Inlet and outlet nozzles of purification plant and
corresponding hoses shall be of 50 NB/40 NB size respectively in order to avoid error in
connecting.
c) Vacuum hoses shall be of braided nitrile rubber suitable for full vacuum without
collapsing and kinking. Suitable provision/ mechanism should be provided to monitor
oil flow in the vacuuming system . Further, in case of accidental oil flow in the vacuum
hose, the vacuum process should get stopped automatically.
1.2.11 Oil sampling valve: Suitable valve shall be provided for taking sample during filtration.
a) Oil heater, filter vessel, degasser shall be of mild steel construction. The internal and
external surfaces including oil heater, filter vessel, degasifier and structural steel work
to be painted shall be shot or sand blasted to remove all rust and scale of foreign
adhering matter or grease. All steel surface in contact with insulating oil shall be
painted with two coats of heat resistant oil insoluble, insulating varnish.
b) All internal paints steel surfaces shall be given a primary coat of zinc chromate, second
coat of oil and weather resistant varnish of a color distinct from primary and final two
coats of glossy oil and weather resisting paint.
c) All paints shall be carefully selected to withstand heat and extremes of weather. The
paint shall not scale off or crinkle or be removed by abrasion due to normal handling.
d) Bolts & Nuts: All bolts and nuts exposed to weather shall be hot dip
galvanized/cadmium plated and passivated /zinc plated and passivated.
e) Material of construction for vacuum pumps air compressor, air drying plant, air receiver
shall be steel of suitable grade.
f) All piping and equipment carrying transformer oil shall be insulated with glass
wool/mineral wool insulation.
1.3.1 Following minimum instruments shall be provided on the oil purification plant:
a) Compound gauge at oil pump discharge
b) Compound gauge at filter inlet.
51
Doc: D-5-10-30-01-05
A centralized electrical panel with auxiliary step down transformer, contractors, back up
protection fuses, indicating lamps etc. to be provided with following minimum audio and visual
alarms:
a) High temperature at heater outlet
b) High differential pressure across filters
c) Oil pump trip
d) Vacuum pump trip
e) Loss of vacuum in degassing chamber
f) Loss of vacuum in transformer evacuation line
g) No oil flow through heater
h) High oil level in degasser.
All controls and annunciation equipment should be suitable for 240 V AC.
1.3.3 Suitable interlock as described against each equipment shall be provided for safe and trouble
free operation.
1.3.4 All instruments, control hardware and alarms shall be mounted on a suitable control panel. A
mimic diagram with indication lamps showing on-off status of various equipments shall be
provided on the control panel.
1.3.5 The plant shall be fully equipped with adequate instrumentation having provision of manual
operation, if required. All necessary control and indicating panel shall be provided.
1.3.6 It shall be possible to use the oil transfer pump for the purpose of loading oil to transformers
or reactors from tankers and vice versa by by-passing to purification plant, if required.
1.3.7 There shall be independent vacuum pump for creating and holding the transformer/ reactor
winding under vacuum for vacuum drying and filling of winding when required. The vacuum
pump shall have capacity to develop and maintain adequate vacuum in the oil space of the
60KL tank for 6KL plant & 90 KL for 10 KL plant within 1 hour time.
52
Doc: D-5-10-30-01-05
1.4.1 The plant shall receive 415V, 3 phase, 50 Hz, 4 wire power supply through flexible cable in the
distribution panel located on the plant. The incomer of the distribution panel shall be switch
fuse unit.
1.4.2 One length of 50 meters of core 1100V grade flexible cable with crimped lugs at one end shall
be provided for connection of the unit to the mains. The length of the cable will be covered in
a suitable cable drum.
1.4.3 Provision for earthing the plant at the operating locations with earthing terminals for safety
shall be provided.
1.4.4 The plant shall be suitably illuminated and ventilated for comfort of operator.
1.5 Guarantee: Min 01 year from the date of successful & complete commissioning at Powergrid
sub-station. All the materials, including accessories, cables, components etc. are to be covered
under warranty/guaranty period. If any component of the pant needs to be shifted to
supplier’s works for repairs within warranty/guaranty period, suppliers will have to bear the
cost of spares, transportation of component/plant for repair at works.
1.6 Commissioning, handing over the Instrument: Successful bidder will have to commission
the plant to the satisfaction of POWERGRID. The equipment failed during the demo shall be
rejected and no repairs are allowed.
1.7 Training: Supplier shall have to ensure that the plant is made user friendly. Apart from the
detailed demonstration at site, the supplier shall also have to arrange necessary training to
POWERGRID engineers.
1.8 After Sales Services: Bidder will have to submit the documentary evidence of having
established mechanism in India for “after sales services”.
53
Doc: D-5-10-30-01-05
54
Doc: D-5-10-30-01-05
55
Doc: D-5-10-30-01-05
56
Doc: D-5-10-30-01-05
57
Doc: D-5-10-30-01-05
58
Doc: D-5-10-30-01-05
59
Doc: D-5-10-30-01-05
22. Technical Specifications for Self Propelled Articulating Boom Lift For 765 Kv
Substations
60
Doc: D-5-10-30-01-05
23. Technical Specifications for Self Propelled Articulating Boom Lift For 400 Kv Substations
61
Doc: D-5-10-30-01-05
24. Technical Specifications for Battery Operated Platform Trolley For Substations
1.10 BRAKING AND SHOCK Rear wheel Hydraulic Brake and shock absorber
ABSORBER SYSTEM suspension system.
62
Doc: D-5-10-30-01-05
63
Doc: D-5-10-30-01-05
26. Specification for Portable Automatic Particle counter for measuring particles in
Mineral Insulating Oils as per ASTM-D6876
1. Application:
1.1. The intended use of the test set up is to perform filed / lab measurement of particles in
Mineral Insulating Oils as per ASTM D-6876.
a) Working Principle: Liquid Particle Counter shall be based on the Light Extinction Principle.
The Instrument shall be capable of recording size and number of particles as they pass across
the detector.
b) Number channels: Liquid Particle counter shall have a minimum of 7 channels and these
channels shall be selectable/programmable form the operating range
c) Report:
1. Liquid Particle Counter shall report average of the particle count runs as the cumulative
number of particles per mL >4 µm, >6 µm, >10 µm, >14 µm, >21 µm, >38 µm and >70 µm.
2. Liquid Particle Counter shall also report the ISO solid contamination code corresponding
to the number of particles per mL >4 µm, >6 µm and >14 µm as prescribed in ISO –
4406:1999.
d) Calibration: Calibration of the Instrument shall be with a NIST Traceable calibration fluid in
accordance with ISO-11171. Instrument shall have facility to run Interim check calibration
and in case required the calibrations shall be adjusted (Automatic / Manual). The vendor shall
have a facility in India to under take full calibration as per ISO-11171.
e) In Built Memory: Particle Counter shall have an In-Built memory form storing the minimum
of 500 tests.
f) Battery for Field Operation: Particle Counter shall have an In-Built battery for filed
operation apart from working on singe AC voltage.
g) Operating Voltage: 230 Volts , Singe Phase , 50 Hz
h) Range of Particle Counting: Minimum 4 µm to 100 µm
i) Flow Cell / Flow Controller/In Built Pump: The Instrument shall have a Flow Cell or built
in pump or flow controller with regulator to maintain the desired flow
j) Key pad / Touch Screen/ Computer: The Instrument shall have a built in keypad or Touch
screen for operation. In case Instrument is being operated through software a laptop / PC
shall be supplied along with the Instrument.
k) USB/RS232 PORT: The Instrument shall have a USB/RS232 Port for communicating /
downloading / operating through software.
l) Software for Download /Operation: The Instrument shall be supplied with a software for
operating instrument / downloading the data form instrument and the software shall be
based on WINDOWS Operating System.
m) Report Print out: The Instrument shall have a built in printer for results printout. In case
Instrument is being operated through software through PC, a printer shall be included in the
scope of supply.
n) Working Pressure: The Instrument shall work with inlet pressure of minimum of 0.5
Kg/cm2
3. Acceptability Criteria: The acceptability criteria of the equipment shall be based on the
complete receipt of the instrument, Successful demonstration and calibration check using ISO-
11171 NIST traceable ISO MTD FLUID at our Regional Laboratory, Hyderabad 400 KV Station.
64
Doc: D-5-10-30-01-05
27.Technical specifications for ‘1 kLPH Transformer Oil Filtration Plant with NAS
Filter’
1.1.1 The High Vacuum type oil treatment plant of capacity of 1000 liters per hour shall be mobile
and shall be suitable for treatment of new oil and reconditioning of used oil in EHV class
transformer, shunt reactor, Current Transformer, OLTC and other oil filled equipment in order
to achieve properties of treated oil within specified limits at the rated capacity.
1.1.2 The plant will generally confirm to IS-6034-1989 and its latest revision. The plant shall be
capable of treatment of new oil (as per IEC 296/IS:335) and reconditioning of used oil (as per
IS:1865/IEC:422 for oil in-service) at rated capacity on single pass basis as follows:
65
Doc: D-5-10-30-01-05
Positive displacement gear type pump with a capacity of required 1000 LPH will be provided. The
pump will be thoroughly tested for vacuum & will be suitable for continuous trouble free operation.
The pump will be provided with automatic protection against over pressure build up. Inter locking
arrangement will be provided between the oil inlet pump & the heater so that heater cannot be
energized unless inlet pump is ON.
Interlocking arrangement will be provided in the filter plant between inlet pump & the high level float
switch (locating into degassing column) to excessive rise of oil in the degassing columns. For
adjustment of flow rate through filter, a flow control valve will be provided across the gear pump .The
suction head of the inlet feed pump at inlet will be 4-5 Mtrs.
The main function of this filter will be to prevent any damage to the inlet pump. It will have strainer
capable of retaining all particles above 0.5 mm size & also magnetic particles. Incoming oil will pass
through this filter .It will be possible to clean the strainer without dismantling the filter from the
pipeline.
Coarse filter will consist of Filter cartridge. Filters will be easily changeable. It will be suitable for
removal of particles bigger than 5 Microns. This shall be useful for removal of sludge content in the
used oil. A drain Plug shall be provided for the Filter.
Non-hygroscopic throwaway type cartridge filters of 0.5 micron rating will be provided. These
cartridge elements will have large dust holding capacity. The replacement of cartridge is quite easy
and can be done without any special tools. The housing vessel is suitable for high vacuum and
pressure application. The Compound Gauge will be provided in the filter vessel for inlet pressure in
order to ascertain condition of cartridge elements. Aeration will be provided on the filter vessel, for
aeration during draining.
1.2.2.4 NAS FILTER
Unit shall be equipped with PALL or Equivalent Make NAS Filter assembly along with NAS Filter
cartridge (Glass Fiber Media absolute element) after Fine Filter assembly with Bye-Pass arrangement
such that NAS Filter can be taken into service at any point of time. This is in addition to coarse and
Fine filter assembly.
1.2.3 HEATER
66
Doc: D-5-10-30-01-05
Heaters will be provided in protection tubes to avoid localized overheating, hot spot & breaking of oil.
Heater will be capable of heating oil to 80 Deg. C. However temperature during degassing &
dehydration for good results will not exceed 60 Deg. C. Heater rating will be minimum 15kW. Heater
will be divided into 3 Groups.
Heater element will be of Nichrome /Kanthhal wire filaments inserted in suitable arrangement which
are located in protection tubes. Construction of the heat exchanger will be such that the replacement
of heater will be easy & will not require any special tools.
Heater will be interlock with gear pump & will not be in ON position unless, the inlet pump is
working. Heater tank will be adequately thermally insulated to minimize loss of heat. Heater pipe
surface density will not be more than 2 Watts per sq. cm. Each group of heater will be controller by
individual thermostat. A safety thermostat will be provided to take care of any accidental rise of
temperature of oil & will put off the heater in that eventuality. This thermostat will be set at slightly
higher temperature than that of controlling thermostat. One suitable pressure relief valve will be
provided on the heater chamber to prevent any pressure rise above the acceptable limit. A Drain plug
for the heater tank will be provided.
a) The pump shall be provided with a suitable vacuum pumping system for creating adequate high
vacuum in the degassing chambers. Rotary Vacuum Pump will be provided for evacuation of
Degassing chamber for machine. ROTARY OIL SEAL PUMP.
The degassing chamber will function as degasser and dehumidifier and will be capable of removing
dissolved gases and moisture from the oil. It will be of M. S. and will have welded construction. The
chamber will be able to withstand the vacuum to which it will be subjected.
Efficiently spread rashing rings will be placed in the degassing columns. The surface area offered by
the rashing rings will be sufficient to form a thin film of oil and facilitates removal of dissolved gases
and moisture at the rated flow rate of oil. A sight glass with illuminating lamps will be provided for
observation of flow of oil.
One float switch on the degassing chamber will be provided for preventing excess rise of level. It will
be electrically interlocked with inlet pump. Another float switch to control low level of the oil in
degassing chamber will be provided and it will be electrically interlocked with the discharge pump.
Centrifugal Glandless type discharge pump with the capacity (as per requirement i.e. 1000LPH)
suitable for sucking oil from chamber held under vacuum will be provided. This will be fully tested
for pressure and vacuum leak rate.
Interlocking arrangement will be provided between low level float switch (located in degassing
columns) and discharge pump to prevent dry running of discharge pump. The discharge head of the
outlet pump will be 10 meters.
67
Doc: D-5-10-30-01-05
One no. mechanical non return valve will be provided at inlet and one at outlet of the plant. This
arrangement will prevent mixing of processed and unprocessed oil, which may happen in case of
power failure.
1.2.8 AIRING VALVE One airing valve for airing the degassing chamber will be provided.
Feed pump of the purifier will be provided with oil flow control valves to adjust the rate of flow.
Sampling valves will be provided on the purifier at suitable places so that sample of oil may be taken
to determine the condition of oil as it passes through each stage of filtration.
One dial Temp. Indicator of 0 –150 Deg. C will be provided to measure the temp. Before and after
heater tank.
One compound gauge of adequate capacity will be provided before the filter tanST.
A digital type thermometer will be provided at outlet of the heater for indication of oil temperature.
Thermometer range 0 – 1500C.
One no. digital type vacuum gauge (range 0 to 760 mm Hg) will be provided on degassing chamber.
Vacuum gauge shall be with a resolution of 1 milli bar.
Independent drives for oil discharge pump oil inlet pump, vacuum pumps will be provided. Motors
will conform generally to IS 325. Motors will be of Crompton/ Siemens make.
68
Doc: D-5-10-30-01-05
Two numbers nitrile rubber hoses each 15 meters along with flanged and connection on both sides
will be provided. One for oil inlet and one for oil outlet. Oil hoses will be capable of handling the
transformer oil at 100 Deg. C. (Maximum).
The flow indicator/meter near outlet of the plant will be provided. This will measure the out flow in
LPH/LPM with a totalizer.
A centralized electrical panel with auxiliary step down transformer, contractors, back up protection
fuses, indicating lamps, electric control gear main isolation arrangement, motors, starters, pilot lamp,
push buttons, relays, MIMIC and interlocking etc. to be provided with following minimum audio and
visual alarms:
I. High temperature at heater outlet
II. High differential pressure across filters
III. Oil pump trip
IV. Vacuum pump trip
V. Loss of vacuum in degassing chamber
VI. Loss of vacuum in transformer evacuation line
VII. No oil flow through heater
VIII. High oil level in degasser.
All wiring will be neatly routed and all wire termination will be suitable identified with ferrules. Bulb
will be provided for illumination. All controls and annunciation equipment should be suitable for on
415V, 3 phase 4 wire, 50 Hz AC supply. All HRC fuses will be of Indoasian, Standard Switch Gear make
and switch gear will be of Siemens/L&T make. Mains isolating switch will be of Siemens/L&T Make.
The plant will be suitable for operation
The inspection of the Transformer Oil Filtration Unit will be carried out by POWERGRID before
dispatch.
01 set of detailed drawings of the Transformer Oil Filtration Unit and its mounting arrangement
together with part list and troubleshooting will be provided along with the offer and installation /
operation / maintenance manual at the time of supply.
1.2.23 PAINTING
A suitable rust resisting primer will be applied on the interior and exterior surface of steel, which will
be followed by application of two coats of durable paints of suitable to serve as base and binder for
the finished coat.
69
Doc: D-5-10-30-01-05
a. Heater will trip when control thermostat trips after achieving the set temperature.
b. Heater will trip when safety thermostat trips after achieving the set temperature.
c. Heater will not switch on unless the inlet gear pump is running.
a) Inlet gear pump will stop when high level float switch operates.
b) The centrifugal outlet pump shall stop when low level float switch operates.
The motor will trip when the overload or single phasing condition occurs, or set current range is
exceeded.
70
Doc: D-5-10-30-01-05
Mobile type trolley mounted vacuum Pumping system covered by this specification will be
suitable for evacuation of transformer of volume 90 Kiloliters of vacuum level from atmospheric
pressure to 1mbar in one hour. The Vacuum Pum pi ng s y s t e m wi ll be suitable for continuous
operation to absorb surface moisture of new transformer b efore installation/charging & also to
extract moisture from windings of old transformer after overhauling/repair.
a. R o t a r y Vacuum Pump
b. R o o t s Vacuum Pump
c. V a c u u m Hose
d. C o n t r o l Panel, including main isolation switch with fuses of suitable rating for
control of inlet power supply.
e. I n d i c a t i n g and control instruments.
f. Suitable E l e c t r o p n e u m a t i c Ball valve.
i) The pump shall be provided with a suitable vacuum pumping system for creating adequate high
vacuum inside the transformer. The pumping system shall consist of suitable combination of
Roots Blowers and Rotary vane vacuum pumps with inter-stage condensing units.
j) The roots blowers shall be of reputed make. Suitable built in labyrinth packing system, slinger
rings, oil return chambers shall be provided between bearings and working chambers to prevent
penetration of lubricating oil to the working chamber.
k) The pumps motor shall be dynamically balanced. The pumps shall be suitable for starting
evacuation from atmospheric pressure and shall be applied with necessary overflow valve.
l) The rotary vane vacuum pumps shall be installed after the roots blower. An automatic by pass
valve across the roots blower shall permit operation of rotary vane pump alone to operate when
so required. The rotary vane pumps are provided with gas ballast valve to prevent contamination
of vacuum pump oil with moisture.
m) The vacuum pump shall also be provided with suitable non-return valve device such that in the
event of power failure the vacuum in the transformer shall be maintained and the vacuum pump
oil is not sucked back into the transformer. A high vacuum safety valve (piston type) to prevent
71
Doc: D-5-10-30-01-05
back streaming of oil and air intrusion shall be provided. The pump motors shall be having return
stop device.
b). 1 No. of airing solenoid valve will be provided for admitting air into the vacuum pump before
switching off the vacuum pump.
7.0 PAINTING:
All exposed surfaces wi ll be thoroughly cleaned of all dust, dirt, scale and foreign matter
and will be applied with one coat of approved rust preventive compound and finished with two
coats of paint.
8.0 MATERIAL OF CONSTRUCTION AND PAINTING
a) The Vacuum Pumping System will be mounted on the mild steel base. The surfaces
of structural steel work to be painted shall be shot or sand blasted to remove all rust and scale of
foreign adhering matter or grease. All steel surface in contact with insulating oil shall be painted with
two coats of heat resistant oil insoluble, insulating varnish.
b) All internal paints steel surfaces shall be given a primary coat of zinc chromate, second
coat of oil and weather resistant varnish of a color distinct from primary and final two coats of glossy
oil and weather resisting paint.
c) All paints shall be carefully selected to withstand heat and extremes of weather. The
paint shall not scale off or crinkle or be removed by abrasion due to normal handling.
72
Doc: D-5-10-30-01-05
d) Bolts & Nuts: All bolts and nuts exposed to weather shall be hot dip
galvanized/cadmium plated and passivated /zinc plated and passivated.
e) Lifting Hooks shall be a capacity to lift the total plant with Factor of Safety of 2 and
locate the hooks to lift with uniform loading.
73
Doc: D-5-10-30-01-05
74
Doc: D-5-10-30-01-05
12) Safety Standards The test set shall meet international safety standard for IEC 61010-1
safety and IEC 61326-1 EMC
13) Warranty/AMC Kit shall be guaranteed for minimum 3 years. Supplier will have to
execute AMC for five years for smooth and reliable operation of the
kit after the completion of guarantee period. The rates shall be
quoted along with the bid and it shall be taken into consideration
during evaluation of bids. The AMC shall cover,
75
Doc: D-5-10-30-01-05
1) Functional Kit shall be able to locate earth faults on live Floating 220V/110V DC
system in EHV Sub-station (upto 765kV) up to length of 1km
Requirement without isolating any circuits. Instrument shall have
noise/harmonics free performance. Instrument should be able to
work reliabily in charged 765kV Substation.
2) Special Features Portable. Light weight, in-built transmitter. Based on low frequency
sine wave/ coded pulse injection into energized system. Detection
by receiver instrument during operation shall not cause an
interference with the operation of sensitive protection of the relay.
3) Fault Resistance Upto 250 KΩ
sensitivity Range
(Minimum)
4) Display Analogue or Audio visual alarm or equivalent indication for fault
detection.
5) Power Supply 240 V 50 Hz A.C. or Battery Operated with built in charger
6) Repeatability & The instrument shall be proven for Repeatability & Reliability of test
Reliability results in charged switchyard conditions.
7) Accessories Clamp on sensor suitable for cables and bus bars upto 45 sqmm.
Test leads, Power supply leads, carrying case, Manual etc (as
applicable) required for all testing.
8) Environment Temp- 0 to 50:C.
Humidity- 90% non Condensing.
(Ambient
The test kit shall meet EMI/EMC requirement as per relevant
Working/Operating
IEC/IS/equivalent standard.
Condition)
9) Guaranty/Warranty Guarantee period for kit shall be one (01) year. Supplier will have to
execute a comprehensive AMC for four (04) years for smooth &
reliable opration of kit after expiry of gurantee period. The rates
shall be quoted along with the bid and it shall be taken into
consideration during evaluation of bids. The AMC shall cover :
a. Calibration of Instrument : Annually or as per Instruction Manual
b. As much as visits for repairs to site
If kit needs to be shifted to suppliers works for repairs, supplier will
have to bear the cost of repairs including spares, F&I etc. Kit after
repair should be supplied back to site within 45 days effective from
date when information of kit going defective is communicated to
supplier by POWERGRID (except for the case for which kit needs to
be shifted outside India for repairs)
All the expenses for maintaining supplied instruments in "Healthy
and in working condition" is to be borne by successful bidder as per
76
Doc: D-5-10-30-01-05
LOA.
10) Calibration Calibration certificate from/traceable to NABL accredited lab or any
certificate other national/internationally reputed lab, shall be submitted. Date
of calibration shall not be older than three month from the date of
supply of kit.
11) Service after sale Bidder should have a well established after sale service support
network in India. Bidder will have to submit the documentary
evidences of having established mechanism for prompt services as
and when required by POWERGRID. Bidder need to submit their
organization service chart along with bid.
12) Commissioning, Successful bidder will have to commission the instrument to the
Training and satisfaction of POWERGRID. The instrument failed during the
Handing Over of the demonstration shall be rejected and no repairs are allowed.
Instrument Bidder will have to provide training to POWERGRID engineers for
safe operation and maintenance of the instrument before handing
over the instrument.
13) Packing and The kit and accessories shall be robust and rugged enough so that it
transport cases can be transported safely at different locations. The transportation
case and packing of the kit shall be such that the transportation from
one station to other will not affect the performance and accuracy of
measurement/working of the kit.
77
Doc: D-5-10-30-01-05
31. Technical Specifications for SF6 Leakage Detector (Applicable Only for Gas
Insulated Substations)
1) Functional Instrument shall be used for detection of SF6 Leakage from SF6
filled Circuit Breakers, Current Transformers, Gas Compartments of
Requirement Gas Insulated Substations. It shall operate successfully without any
influence of induction of electrically charged switchyard upto 765Kv
& 400kV. SF6 gas leak detector shall be free from induced voltage
effects and shall not be sensitive to moisture, any other gases &
vapour.
2) Method of Continuous leak detection & leak measurement operation during
operation & leak measurement operation during leak check without limitation
Principle with audible/visual indication. Based on Non Dispersive Infrared
technology
3) Range & Operation Range : 0 – 1000 ppm by volume (minimum)
Accuracy : 0 – 100 ppmv : +/- 5 % or better & 100 – 1000 ppmv : +/-
2 % or better
4) Senstivity 3.5 gm SF6 per year or less. No cross sensitive to other gases
7) Power Supply Lithum-Ion batteries or equivalent power supply with charger &
having operating time of 6 hours (minimum)
8) Operating 0 to 50:C.
Temperature
9) Accessories Battery Charger, Manual, Hard Carrying Case, Power Cord, Adopter
for 220 V, Software CD & other mandatory accessory (as applicable)
ect required for successful operation of kit.
10) Guarantee & AMC Guarantee period for kit shall be one (01) year. Supplier will have to
execute a comprehensive AMC for four (04) years for smooth &
reliable opration of kit after expiry of gurantee period. The rates
shall be quoted along with the bid and it shall be taken into
consideration during evaluation of bids. The AMC shall cover :
a. Calibration of Instrument : Annually or as per Instruction Manual
b. As much as visits for repairs to site
If kit needs to be shifted to suppliers works for repairs, supplier will
have to bear the cost of repairs including spares, F&I etc. Kit after
repair should be supplied back to site within 45 days effective from
date when information of kit going defective is communicated to
78
Doc: D-5-10-30-01-05
supplier by POWERGRID (except for the case for which kit needs to
be shifted outside India for repairs)
All the expenses for maintaining supplied instruments in "Healthy
and in working condition" is to be borne by successful bidder as per
LOA.
11) Calibration Calibration certificate from/traceable to NABL accredited lab or any
certificate other national/internationally reputed lab, shall be submitted. Date
of calibration shall not be older than three month from the date of
supply of kit.
12) Service after sale Bidder should have a well established after sale service support
network in India. Bidder will have to submit the documentary
evidences of having established mechanism for prompt services as
and when required by POWERGRID. Bidder need to submit their
organization service chart along with bid.
13) Commissioning, Successful bidder will have to commission the instrument to the
Training and satisfaction of POWERGRID. The instrument failed during the
Handing Over of the demonstration shall be rejected and no repairs are allowed.
Instrument Bidder will have to provide training to POWERGRID engineers for
safe operation and maintenance of the instrument before handing
over the instrument.
14) Packing and The kit and accessories shall be robust and rugged enough so that it
transport cases can be transported safely at different locations. The transportation
case and packing of the kit shall be such that the transportation from
one station to other will not affect the performance and accuracy of
measurement/working of the kit.
79
Doc: D-5-10-30-01-05
(Applicable Only for Gas Insulated Substations where Online PDMS is not available)
1. The equipment shall be used for detecting different types of defects in Gas Insulated Stations
(GIS) such as Particles, Loose shields and Partial Discharges as well as for detection of Partial
discharges.
2. It shall be capable for measuring PD in charged GIS environment as EHV which shall have
bandwidth in order of 300 MHz – 1500 MHz with possibility to select a wide range of
intermediate bandwidths for best measurement results. The principle of operation shall be based
on UHF principle of detection.
3. Detection and measurement of PD and bouncing particles shall be displayed on built in large LCD
display and the measurement shall be stored in the instrument and further downloadable to a PC
for further analysis to locate actual source of PD such as free conducting particles, floating
components, voids in spacers, particle on spacer surfaces etc. Incase offered equipment does not
have inbuilt LCD Display/ inbuilt storage then suitable laptop (having latest configuration) with
required software for display & diagnosis of PD signals shall be supplied along with equipment.
Software for display and diagnosis of PD signals and an expert software system for accurate
interpretation of cause of PD shall also be supplied and installed by the contractor on
POWERGRID Laptop/PC and licensed copy of software to be handed over to POWERGRID in a CD.
4. The equipment shall meet the following requirements
a. Measurement shall be possible in noisy environment.
b. Stable reading shall be possible in presence of vibrations within complex GIS assemblies,
which can produce signals similar to PD.
c. Equipment should have necessary synchronizing circuits to obtain PD correlation with
power cycle and power frequency.
d. The equipment shall be battery operated with built-in-battery charger. It shall also be
suitable for 230V AC/50 Hz input.
e. Measurement shall be possible in the charged switchyard in the presence of EMI/EMC.
f. Kit shall be used for measurement for partial discharge measurement in GIS by using UHF
sensors already installed in our Gas Insulated Substation
g. Instrument shall be supplied with standard accessories like i.e. four numbers duly
screened connecting cable (with each cable having minimum 10 meter length) to be used
for connecting installed UHF sensors with kit, carrying case, rechargeable battery pack
with charger suitable for 230V AC, 50Hz supply, noise sensor etc (as applicable).
h. Kit should have minimum three number channels for connecting UHF sensors input to kit
so that partial discharge measurement can be carried out at UHF sensors installed in GIS.
Simultaneous partial discharge measurement should be possible on these three channels.
i. Kit should have minimum one number noise channel (in addition to three number
channels mentioned at 4(h) above) for giving noise feedback to kit.
j. The function of software shall be covering the following:
Data recording, storage and retrieval in computer
Data base analysis
Evaluation of PD measurement i.e, Amplitude, Phase Synchronization etc.
Expert software system for accurate interpretation of cause of PD like corona, free
particle, protrusion etc.
Report generation.
k. To prove the suitability in charged switchyard condition, practical demonstration shall be
80
Doc: D-5-10-30-01-05
81
Doc: D-5-10-30-01-05
For procurement of Testing Instruments & tools, the general guide lines are under:
1. The equipment offered should have been successfully demonstrated in the Region. In case the
offered equipment is proposed to be supplied first time in the Region, a successful demonstration
has to be carried out for accuracy and repeatability of test results in the actual working condition
before considering for procurement. The demonstration of the new equipments should be done
in the most stringent condition and to be witnessed by a committee comprising of members from
RHQ and site.
2. For smooth operation of the equipments, an AMC after completion of the warranty period, for a
period of four years (additionally) may be taken by the regions for selective equipments as per
the requirements. The said clause of the AMC may be included in the technical specifications of
those equipments, wherever the necessity for AMC is felt by the regions depending upon their
experience.
3. Since the technological up-gradations are taking place at a fast pace and some times equipments
become obsolete because of technical obsolescence or irreparable due to phasing out, it is
imminent to write-off such equipments and replace the same with the latest equipments for
proper operation and maintenance of the system. A committee at regional level may be
constituted which shall evaluate the modalities for write-off due to the reasons as stated above
and approval for the same may be obtained from the Regional Head accordingly.
4. The issue of calibration of the testing equipment is already being addressed by the Regions based
on the ISO requirements and the same needs to be followed for uniform implementation.
5. With regard to finalization of make and model for vendor enlistment, it is pertinent to mention
that the standard technical specifications as mentioned in the document shall henceforth be
adopted by the Regions. Hence, it is not appropriate to finalize make and model of particular
equipment for the purpose of enlistment.
The specifications may be reviewed after a period of two years. However, as there are very fast
technological up gradations in the field of instrumentations, inclusion of an equipment with
better specifications or any modification in the existing specifications may be recommended by
the Regional Head to Corporate AM for review and approval.
The technical specification for other testing instruments which are not covered in this document
may be prepared at Regional level and may be adopted with the approval of Regional Head.
However, norms for testing instruments shall be taken as mentioned in this document.
The recommendations are based on actual requirement of substations / sites. Regional Head is
empowered to increase or decrease the quantities suitably in consultation with Corporate AM.
POWERGRID S/S is defined as S/S wholly owned and operated by POWERGRID. Requirement of
Testing Instruments for POWERGRID bays in SEB S/Ss would be met out by the Testing
Instruments stored in the nearest POWERGRID S/S. All major tools & plants are to be stored in
POWERGRID S/S stores only and shall cater the maintenance requirement for Substation and
Transmission Lines.
82
Annexure-VI
(MANDATORY SPARES BREAKUP FOR ILLUMINATION SYSTEM AND ERECTION H/W)
Section – Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV Surjamaninagar Substation of
TSECL to 400/132kV Substation (RTN1001014)
TECHNICAL SPECIFICATION
FOR
UP-GRADATION OF 132KV SURJAMANINAGAR SUBSTATION
OF TSECL TO 400KV SUBSTATION
(VOLUME-II)
VOLUME-II
TECHNICAL SPECIFICATION
FOR
UP-GRADATION OF 132KV SURJAMANINAGAR
SUBSTATION OF TSECL TO 400KV SUBSTATION
Substations Portion:-
1.1 Tripura State Electricity Corporation Limited (A Govt. of Tripura Enterprises) (TSECL)
1.1 having its office at Agartala, Tripura is the owner of the project.
1.2 Power Grid Corporation of India Ltd. (POWERGRID), a Govt. of India Enterprise is
responsible for bulk Power transmission of electrical energy from various Central Govt.
Power Projects to various utilities/beneficiaries and interconnecting regional grids,
operating and maintaining the National electrical grid of India. It is established with
mandate of "We will become a Global Transmission Company with Dominant Leadership in
Emerging Power Markets with World Class Capabilities by:
World Class: Setting superior standards in capital project management and operations for
the industry and ourselves.
Global: Leveraging capabilities to consistently generate maximum value for all
stakeholders in India and in emerging and growing economies.
Inspiring, nurturing and empowering the next generation of professionals.
Achieving continuous improvements through innovation and state of the art technology.
Committing to highest standards in health, safety, security and environment.” as its
mission.
2.0 SCOPE
2.1 The scope of work to be executed under subject Substation Package (AIS) including
Transformers & Reactors is as described below:
A. Up-gradation of 132kV Surjamaninagar Substation to 400/132kV Level
2.2 It is the intent of this specification to describe primary features, materials, and design &
performance requirements and to establish minimum standards for the work. The
specification is not intended to specify the complete details of various practices of
manufactures/ bidders, but to specify the requirements with regard to performance,
durability and satisfactory operation under the specified site conditions.
2.3 The detailed scope of work is brought out in subsequent clauses of this section:-
2.2.1 Substation Package (including Transformers & Reactors) associated with Up-gradation of
132kV Surjamaninagar Substation to 400/132kV Level
2.2.1.1.1 Design, Engineering, Manufacture, Testing, Supply including transportation & insurance,
storage, Erection, Testing and Commissioning of the following equipments/items at
Surjamaninagar Substation, complete in all respects.
(a) 420kV Circuit breakers, controlled switching device, isolators, current transformers,
capacitive voltage transformers, surge arresters, wave traps, Bus post Insulators.
(e) Digital RTCC panel consists of 4 Nos. Digital RTCC relay which shall be used to
control the following:
2 Nos. digital RTCC relays for two number 3-phase banks of 105MVA,
400/132/33kV Transformer covered under present scope.
2 No. digital RTCC relay as spare for future use (Mounted in the above digital
RTCC panel)
(f) 1x80MVAR, 420kV, 3-Phase Bus Reactor including all fittings & accessories.
(g) Supply & Installation of on line dissolved gas (Multi-gas) & Moisture Analyser and on
line insulating oil drying system (cartridge type) for 7x105MVA, 400/132/33kV, 1-
Phase Transformers and 400kV, 3-Phase Bus Reactor as per BPS.
(h) Complete relay and protection system as per section– Control and Relay panels for
the 400kV & 132kV bays covered under present scope including 400kV bus bar
Section – Project Rev. 03
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 5 of 13
protection for complete 400kV substation and 132kV Bus bar protection for new
132kV Switchyard including future bays as per SLD.
Further, at present, there is no bus bar protection for existing 132kV System. Under
present scope, new bus bar protection and modification of existing scheme along
with supply of Aux. relay (if any) & associated cabling works for the complete
existing 132kV switchyard including all existing bays.
Differential line protection has been envisaged for 132kV D/C lines interconnecting
132kV Switchyard (New) and 132kV existing switchyard.
(i) Complete Substation automation based on IEC 61850 including hardware and
software with associated equipments for following bays (bay as defined in technical
specification, Sec.-Substation Automation):
Further the contractor shall also supply necessary BCUs for control and monitoring of
substation auxiliary system. SAS server & gateway shall have licenses sufficient for all
present & future 400kV & 132kV bays as shown in the tender SLD.
New 400kV/132kV Switchyard, shall be monitored from the existing 132kV Control
Room Building. Hence, supply of additional HMI, cables, communication
switches/gateways, inverters, printers etc for control & monitoring of new
400/132kV Switchyard shall be considered in the present scope of work and no
separate payment shall be done for this.
Further, the existing 132kV Switchyard data shall be transferred to SLDC through
new gateway under present scope. Necessary modification/shifting of existing
communication system and additional port requirement shall also be considered
under present scope of work
(j) PLCC equipment’s for 400kV Pallatana-Surjamaninagar D/C Transmission lines for
both end including Analogue protection coupler & Digital Protection Coupler
(suitable for interfacing with E1 port of SDH equipment) and Cabling between DPC
and communication equipment shall be considered under present scope.
(k) 1.1 kV grade Power & Control cable along with complete accessories including
special cables (if any) for RTD sensor and on line Gas monitoring system/Oil
drying system, optical cables and Ethernet switch .
(l) Lattice and pipe structures (galvanized): Design of all types of Towers, Beams and
Equipment support structure is in the scope of the contractor. Lattice type structure
shall be used for Towers/beams. Pipe type structure shall be used for 400kV
equipment support structure only and lattice type structure shall be used for other
equipment support structures. CB support structure shall be as per CB
manufacturer’s design.
The existing 132kV Main Bus-I and Main Bus-II are having Twin Moose ACSR
conductor and same shall be replaced with twin HTLS conductor (of capacity
2x1500A, and weight equivalent to Moose) along with associated hard wares for
stringing and for interconnection of 132kV bays under the present scope as
indicated in tender drawing.
(o) Dismantling of existing 132kV AIS equipment’s (i.e. CVT, Isolator, CB, CT, WT) with
associated support structures and 132kV BPI with associated support structures (if
required), which is installed in existing 132kV Pallatana line bays ( 2 nos. bay).
These equipment’s shall be handed over to Surjamaninagar site store as per
instruction of site in-charge. New 145kV Isolator, CB, CT and BPI (if required) shall
be installed for the above bays. New Power & Control cables shall be laid for new
equipment’s. Necessary hardware for above replacement shall also be considered
under present scope of work. Further, new Circuit Breaker panels have been
envisaged for above two bays, which shall be placed in the existing Control Room
Building. Necessary integration with the control panel/protection panel shall be
done by the contractor.
(q) Complete Lighting and illumination for the switchyard area under present scope
shall be provided by the contractor as per Bid price schedule (BPS).
(r) Direct Stroke Lightning protection of 400kV switchyard and 132kV new Switchyard
under present scope
(s) LT SWITCHGEAR:
415V ACDB, 415V MLDB, 415V ELDB, 220V DCDBs & 48V DCDBs are envisaged
under present scope considering present and future 400kV & 132kV bays as per
SLD. The LT panels shall be placed in the Control Room Building to be constructed
under present scope.
(t) 220V & 48V Battery & Battery chargers: The capacity of batteries and battery
chargers shall be supplied as worked out by the contractor for the 400/132kV
present and future bays as shown in the Single Line Diagram of the substation and
shall be subjected to owner’s approval. However, the capacity for battery & ratings
for battery chargers shall not be less than the capacity & rating mentioned in the bid
price schedule (BPS).
(w) Earthmat including measurement of soil resistivity for 400kV switchyard area is in
the scope of Contractor. Earthing design calculation shall be done for the entire
400kV switchyard area including transformer/reactor area and 132kV area. Based
on the earthing design, Earthmat shall be laid in the entire 400kV switchyard area
including transformer/reactor area and new 132kV switchyard area.
(x) Fire protection system including HVWS & Hydrant system for 400/132kV, 1-Phase
transformers & 420kV, 3-Phse Reactors and Smoke detection, Fire alarm &
Annunciation System for Switchyard panel Rooms and Control Room Building.
(y) Telecommunication Equipment including PMU for the station as per Technical
specification.
(z) Any other equipment/ material required to complete the specified scope.
(aa) The broad Scope of the procurement of FO based Communication Equipment shall
include planning, designing, engineering, supply, transportation, insurance,
delivery at site, unloading, handling, storage, installation, termination, testing,
training and demonstration for acceptance, commissioning and documentation for :
(bb) The broad Scope of the procurement of PMU shall include planning, designing,
engineering, supply, transportation, insurance, delivery at site, unloading handling,
storage, installation, termination, testing and demonstration for acceptance,
commissioning and documentation for PMU as per BPS at 400/132kV
Surjamaninagar Substation and these PMU shall support IEEE C 37.118 protocols.
These PMUs shall be integrated with Phasor Data Concentrator (PDC) at
RLDC/SLDC for the subject project.
2.2.1.1.2 Mandatory Spares - Design, engineering, manufacture, Testing and Supply including
transportation & insurance, storage at site for items mentioned in the bid price schedule
(BPS). Breakup of lighting and erection hardware spare is attached at Annexure-VI.
(a) Foundation for 80MVAR, 420kV Bus Reactor along with foundation bolt, Jacking
Pad, pylon supports, rail cum road and unloading platform. The contractor shall
indicate recommended pocket size for placing foundation bolts in their foundation
plan drawing.
(b) Foundation for 7x105MVA, 400/132/33kV Single Phase Transformer along with
foundation bolt, Jacking Pad, pylon supports, rail cum road, common oil pit and
unloading platform. The contractor shall indicate recommended pocket size for
placing foundation bolts in their foundation plan drawing.
(d) Fire resistant walls between 400/132kV transformers and 420kV Bus Reactor.
(e) Fire fighting pump house, fire water tank, Switchyard Panel Room (3.9 x 6Mtr).
(g) Cable trenches along with covers including road/rail crossing, sump pits, culverts
etc. However the cable trench layout including invert levels shall be developed by
the contractor. The existing cable trench layout shall be provided during detailed
engineering.
(h) All roads as shown in GA drawing including culverts. All roads shall be Concrete
road.
(i) Rain water harvesting system
(e) Foundation for lighting poles/panels, bay marshalling boxes, control cubicles etc.
as required.
(h) Stone spreading and anti-weed treatment along with PCC for the 400kV and 132kV
switchyard area under present scope. The Gravel spreading in the existing 132kV
area is already laid. However, removal & re-spreading of the existing gravel after
cleansing and washing for the area under present scope as per layout requirement
shall be included in the present scope.
2.4 The work to be done under this specification shall include all labour, plant, equipment,
material and performance of all work necessary for the complete installation and
commissioning of switchyard. All apparatus, appliances, material and labour etc. not
specifically mentioned or included, but are necessary to complete the entire work or any
portion of the work in compliance with the requirements implied in this specification is
deemed to be included in the scope of contractor.
2.5 Before proceeding with the construction work the Contractor shall fully familiarize himself
with the site conditions and General arrangements & scheme etc. Though the Owner shall
endeavor to provide the information, it shall not be binding for the Owner to provide the
same. The bidders are advised to visit the substation sites and acquaint themselves with the
topography, infrastructure and also the design philosophy. The bidder shall be fully
responsible for providing all equipment, materials, system and services specified or
otherwise which are required to complete the construction and successful commissioning,
operation & maintenance of the substation in all respects. All materials required for the Civil
and construction/installation work including cement and steel shall be supplied by the
Contractor.
The complete design (unless specified otherwise in specification elsewhere) and detailed
engineering shall be done by the Contractor based on conceptual tender drawings. The
design review for Transformers & Reactors shall be done by the employer or employer’s
appointed consultant at different stages of design, manufacture & testing to ensure that
technical specification has been fully met. Any improvement/modification required due to
design review shall be done by the contractor without any additional cost to the employer.
2.6 Design of substation and its associated electrical & mechanical auxiliaries systems includes
preparation of single line diagram, electrical layout, foundation & cable trench layouts
(including invert levels), erection key diagrams, direct stroke lightning protection, electrical
and physical clearance diagrams, Control and protection schematics, wiring and
termination schedules, design of fire fighting system, outdoor lighting/illumination and
other relevant drawings & documents required for engineering of all facilities within the
fencing to be provided under this contract, are covered under the scope of the Contractor.
2.7 Any other items not specifically mentioned in the specification but which are required for
erection, testing and commissioning and satisfactory operation of the substation are deemed
to be included in the scope of the specification unless specifically excluded.
2.8 Model technical specification for various equipment’s and works for different voltage levels
is enclosed. Items, which are not applicable for the scope of this package as per schedule of
quantities described in Bid Price Schedule (BPS), the technical specification for the items
should not be referred to.
The following items of work are specifically excluded from the scope of the specifications
The requirement of various items/equipments and civil works are indicated in Bid price
Schedules.
All equipments/items and civil works for which quantities has been given in the BPS shall be
payable on unit rate basis. During actual execution, any variation in such quantities shall be
paid based on the unit rate under each item incorporated in Letter of award.
Wherever the quantities of items/works are indicated in Lot/Set, the bidder is required to
estimate the quantity required for entire execution and completion of works and incorporate
their price in respective Bid price schedules. For erection hardware items, Bidders shall
estimate the total requirement of the works and indicate module-wise lump sum price bay
wise and include the same in relevant Bid price schedules. Any material/works for the
modules not specifically mentioned in the description in BPS, as may be required shall be
deemed to be included in the module itself.
Bidder should include all such items in the bid proposal sheets, which are not specifically
mentioned but are essential for the execution of the contract. Item which explicitly may not
appear in various schedules and required for successful commissioning of substation shall be
included in the bid price and shall be provided at no extra cost to Owner.
6.1 132kV Surjamaninagar s/s is existing Air Insulated Substation with Double main & Transfer
Bus switching scheme and for 400kV Voltage level, Air Insulated Substation with I-type One
and half Breaker bus switching scheme is envisaged. Further, new 132kV switchyard with
Single main & Transfer scheme is envisaged for interconnection of 400kV System with
existing 132kV Substation. Single line diagram and general arrangement (G.A.) arrangements
are enclosed with the bid documents, which shall be further engineered by the bidder.
The enclosed drawings give the basic scheme, layout of substation, substation buildings,
associated services etc. In case of any discrepancy between the drawings and text of
specification, the requirements of text shall prevail in general. However, the Bidder is advised
to get these clarified from Owner before bidding.
For the purpose of present scope of work, technical specification (Vol. II) shall consist of
following sections and they should be read in conjunction with each other.
In case of any discrepancy between Section-PROJECT and Section-GTR and other technical
specifications on scope of works, Section-PROJECT shall prevail over all other sections.
In case of any discrepancy between Section-GTR and individual sections for various
equipments, requirement of individual equipment section shall prevail.
Section – Project Rev. 03
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 12 of 13
8.0 MANDATORY SPARES
The Mandatory Spares shall be included in the bid proposal by the bidder. The prices of these
spares shall be given by the Bidder in the relevant schedule of BPS and shall be considered for
evaluation of bid. It shall not be binding on the Owner to procure all of these mandatory
spares.
The bidder is clarified that no mandatory spares shall generally be used during the
commissioning of the equipment. Any spares required for commissioning purpose shall be
arranged by the Contractor. The unutilized spares if any brought for commissioning purpose
shall be taken back by the contractor.