You are on page 1of 146

ANNEXURE-I

LIST OF DRAWINGS
SL. No. DRAWING NO. TITLE
I PROJECT SPECIFIC LIST OF DRAWING
1.0 Drawings for 400/132kV Surjamaninagar s/s (Upgradation)
1.1 C/ENGG-SS/NER/TRP/SURJ/SLD/01, Rev-00 Single Line Diagram
1.2 C/ENGG-SS/NER/TRP/SURJ/LAY/01, Rev-00 Electrical Layout Paln Drawing
1.3 C/ENGG-SS/NER/TRP/132KV SURJ/GA/01, Rev-00 General Arrangement of Existing 132kV Switchyard

II COMMON DRAWINGS
A COMMON ELECTRICAL DRAWINGS
1. C/ENGG/STD/LT/SLD/01, R-4 Standard SLD for AC & DC System
2. 0000-000-T-E-L-28 Wiring Diagram for Marshalling Box for 400kV Current Transformer,
Sheet 1 of 2 & 2 of 2
B COMMON DRAWINGS (CIVIL & STRUCTURE)
3. C/ENGG/STD/ ROAD CULVERTS-01, R-0 Detail of road culverts
4. C/ENGG/STD/DRAIN/01, R-1 Details of drain
5. C:ENGG/CVL/SYD/FENCE/101, R-1 Standard details for switch yard chain link fencing
6. C/ENGG/STD/ROAD/411, R-2 Details of Concrete road (Rigid Pavement) in Switchyard Area
7. C/ENGG/CVL/STD/RR/1, R-0 Details of Rail cum Road
8. C/ENGG/STD/CT-3, R-1 G.A & R.C.C details of Sump Pit
9. C/ENGG/STD/CT-4,R-0& Details of Cable Trench Crossing
C/ENGG/STD/CT-5 R-2
10. C/ENGG/STD/CT-1, R-0 Details of Cable Trench section, Sheet No- 1 & 2
11. C/ENGG/STD/CT-2,R-0 RCC detail for cable trench sections
12. C:ENGG/CVL/SYD/GATE/002.R-0 Details of switchyard gate
13. C-ENGG-STD-PR-ARCH-3000,R-1 Standard Switchyard Panel Room Architectural Drawing of Panel
Room-(3 Sheets)
C FIRE FIGHTING PUMP HOUSE DRAWING
14. C/ENGG/STD/M25/FFPH-1 Ground floor plan for fire fighting pump house & water tank.
15. C/ENGG/STD/ M25/FFPH-2 Elevation for fire fighting pump house & water tank
16. Front & rear elevation & terrace plan for fire fighting pump house &
C/ENGG/STD/ M25/FFPH-3
water tank
17. C/ENGG/STD/ M25/FFPH-4 Section for fire fighting pump house & water tank
18. Details of doors, windows & ventilators (steel) for fire fighting pump
C/ENGG/STD/ M25/FFPH-5
house & water tank
19. C/ENGG/STD/ M25/FFPH-6 Foundation layout & details for fire fighting pump house.
20. C/ENGG/STD/ M25/FFPH-7 Plinth level layout & details of plinth beam for FFPH.
21. C/ENGG/STD/ M25/FFPH-8 Lintel level layout & details of lintel beam for FFPH.
22. C/ENGG/STD/ M25/FFPH-9 Roof level layout & details of beams & slab for FFPH.
23. C/ENGG/STD/ M25/FFPH-10 RCC detail of on ground water storage tank for fire fighting pump house
24. C/ENGG/STD/ M25/FFPH-11 RCC detail of on ground water storage tank for fire fighting pump house
25. C/ENGG/STD/ M25/FFPH-12 A.C. Roof level plan & details for fire water water tank
26. C/ENGG/STD/ M25/FFPH-13 Details of pump/motor foundation at plinth level for FFPH
27. C/ENGG/STD/ M25/FFPH-14 Details of pump/motor foundation at plinth level for FFPH
28. C/ENGG/STD/ M25/FFPH-15 General notes for fire fighting pump house & water tank
29. C-ENGG-STD-SPR-STR-3012 Standard Switchyard Panel Room (3 Sheets)
30. C/ENGG/STD/BW-01 (SH-03 OF 07) LAYOUT & PLAN SECURITY ROOM &GATE
31. C/ENGG/STD/BW-01 (SH-04 OF 07) SECURITY ROOM & GATE DETAILS
32. C/ENGG/STD/BW-01 (SH-05 OF 07) SECURITY ROOM & GATE DETAILS
33. C/ENGG/STD/BW-01 (SH-06 OF 07) SECURITY ROOM & GATE DETAILS
34. C/ENGG/STD/BW-01 (SH-07 OF 07) SECURITY ROOM & GATE DETAILS
D CONTROL ROOM BUILDING DRAWING
35. C-ENGG-STD-CRB-SINGLE-ARCH-
Control Room Building Single Storied Ground Floor Plan
400,Rev-01

Page 1 of 2
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV Surjamaninagar
Substation of TSECL to 400/132kV (Rev-02)
ANNEXURE-I
LIST OF DRAWINGS
36. C-ENGG-STD-CRB-SINGLE-ARCH-
Control Room Building Single Storied Terrace Plan
401A,Rev-0
37. C-ENGG-STD-CRB-SINGLE-ARCH-
Control Room Building Single Storied Front and Rear side Elevation
402A,Rev-0
38. C-ENGG-STD-CRB-SINGLE-ARCH-
Control Room Building Single Storied Section
403A,Rev-0

Page 2 of 2
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV Surjamaninagar
Substation of TSECL to 400/132kV (Rev-02)
Annexure-II
Technical Specification
SECTION – PROJECT

REQUIREMENTS FOR 145 kV CURRENT TRANSFORMERS

No. of Core Application Current Output Accuracy Min Max. CT Max. Excitation
Cores no. Ratio Burden class as knee sec. Wdg current at VK (in
(VA) per IEC point resistance mA)
voltage ( ohms)
VK
5 1 BUS DIFF 1600- - PX 1600- 8/4 25 on 1600/1 Tap;
CHECK 800/1 800/1 50 on 800/1 Tap,

2 BUS DIFF 1600- - PX 1600- 8/4 25 on 1600/1 Tap;


CHECK 800/1 800/1 50 on 800/1 Tap,

3 METERING 1600- 20 0.2S - - -


800/1
4 TRANS. 1600- - PX 1600- 8/4 25 on 1600/1 Tap;
BACKUP/ 800/1 800/1 50 on 800/1 Tap,
LINE
PROTN.
5 TRANS. 1600- - PX 1600- 8/4 25 on 1600/1 Tap;
DIFF/LINE 800/1 800/1 50 on 800/1 Tap,
PROTN.

Note: 1. Protection cores shall be of accuracy class PX as per IEC 61869.


2. Metering Core shall be of accuracy class 0.2S as per IEC: 61869

SECTION-PROJECT
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation
Page 1 of 1
Annexure-III

Technical Particulars / Parameters of Transformers (400/132/33 kV 3-Phase Auto


Transformer)

Clause Description Unit Technical Parameters


No.
1.1 Rated Capacity
HV MVA 315 105
IV MVA 315 105
LV (Tertiary) : MVA 1/3 RD of rated capacity of HV
Active + Reactive loading winding
1.2 Voltage ratio (Line to Line)
1.3 Single / Three Phase Design 3(THREE) 1(SINGLE)
1.4 Applicable Standard IEC 60076
1.5 Frequency Hz 50
1.6 Cooling & Percentage Rating at ONAN/ONAF/(OFAF or ODAF) :
different cooling 60% / 80%/100%
OR
ONAN/ONAF1/ONAF2: 60% /
80%/100%
OR
OFAF (with 5 x 25% unit cooler)
1.7 Type of Transformer Constant Ohmic impedance type
(Refer note 1)
1.8 Impedance at 75 Deg C
i) HV - IV
Max. Voltage tap % 10.3
Principal tap % 12.5
Min. Voltage tap % 15.4
ii) HV - LV
Principal tap (minimum) % 45.0
iii) IV - LV
Principal tap (minimum) % 30.0
iv) Tolerance on Impedance (HV-IV) % As per IEC
1.9 Service Outdoor
1.10 Duty Continuous
1.11 Overload Capacity IEC-60076-7
1.12 Temperature rise over 50deg C ambient
Temp
O
i) Top oil measured by thermometer C 50
O
ii) Average winding measured by C 55
resistance method
1.13 Windings
i) System Fault level
HV kA 63
IV kA 31.5

Section –Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV
Annexure-III

LV kA 25
ii) Lightning Impulse withstand Voltage
HV kVp 1300
IV kVp 550
LV kVp 250
Neutral kVp 95
iii) Switching Impulse withstand Voltage
HV kVp 1050
iv) One Minute Power Frequency
withstand Voltage
HV kVrms 570
IV kVrms 230
LV kVrms 95
Neutral kVrms 38
v) Neutral Grounding Solidly grounded
vi) Insulation
HV Graded
IV Graded
LV Uniform
vii) Tertiary Connection Ungrounded Delta
viii) Tan delta of winding % < 0.5
ix) Vector Group (3 –ph) YNaOd11
(unless specified differently elsewhere)
1.14 Tap Changer OLTC
i) Tap Range & No. of steps  10% of HV variation in the step of
1.25%, 16 steps
ii) Location of Tap changer On the 132 kV side of the series
winding
iii) Design Constant flux voltage variation type
as per cl. 6.2 of IEC 60076 part-I
iv) Tap control Full capacity - on load tap changer
suitable for group / independent,
remote /local electrical and local
manual operation and bi-directional
power flow
1.15 Bushing
i) Rated voltage
HV kV 420
IV kV 145
LV kV 52
Neutral kV 36
ii) Rated current (Min.)
HV A 1250
IV A 2000
LV A 3150
Section –Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV
Annexure-III

Neutral A 2000
iii) Lightning Impulse withstand Voltage
HV kVp 1425
IV kVp 650
LV kVp 250
Neutral kVp 170
iv) Switching Impulse withstand Voltage
HV kVp 1050
v) One Minute Power Frequency
withstand Voltage
HV kVrms 695
IV kVrms 305
LV kVrms 105
Neutral kVrms 77
vi) Minimum total creepage distances
HV mm 10500
IV mm 3625
LV mm 1300
Neutral mm 900
vii) Tan delta of bushings
HV % < 0.4
IV % < 0.4
LV % < 0.4
viii) Max Partial discharge level at Um
HV pC 10
IV pC 10
LV pC 10
1.16 Max Partial discharge level at 1.58 * Ur pC 100
/ √3
1.17 Max Noise level at rated voltage and at dB 80
principal tap on full load and all
cooling active
1.18 Maximum Permissible Losses of
Transformer
i) Max. No Load Loss at rated voltage and kW 30
frequency
ii) Max. Load Loss at rated current and at kW 190
75O C
iii) Max. Auxiliary Loss at rated voltage and kW 8
frequency

Notes:

1. No external or internal Transformers / Reactors are to be used to achieve the specified


HV/IV, HV/LV and IV/LV impedances.
Section –Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV
Annexure-III

2. Tan delta of Winding & Bushing shall be measured at ambient temperature. No


temperature correction factor shall be applied.

3. The criteria for Transformer losses shall be “Copper Loss (Load Loss) > Iron Loss (No
Load Loss) > Cooler Loss (Auxiliary Loss)”.

Section –Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

Employer has standardized its Specific Requirement for various equipments and works for different voltage levels.
Items or clauses, which are not applicable for the scope of this package as per schedule of quantities described in BPS
or as per scope defined elsewhere in Section Project, the technical specification/clauses for the items specified below
should not be referred to.

S.No. Model Section & Amended As


Clause No.
1. Section GTR Technical Requirements of Equipment’s
Rev 14
Following equipment shall be offered from the Indian manufacturing facilities meeting
Para 1 at the technical requirements as stipulated below, provided that the same equipment are not
Clause No.24 covered under the Bidder’s Qualifying requirement of the Bidding Documents.
2. Section GTR Technical Requirement of Communication Equipment
Rev 14
The SDH equipment shall be offered from a manufacturer(s) who is a “Local Supplier” as
per DPIIT PP notification & has been Manufacturing SDH equipments for the last three
Clause No. (3) years and SDH equipment Manufactured by such manufacturer(s) shall have been
satisfactory operation in 110kV or higher voltage Power Substations for at least two (2)
24.19
years as on the date of NOA.
3. Section GTR Technical Requirement of Sub-contractor for 765kV & 400kV GIS packages:
Rev 14
In case of Indian GIS manufacturer, the erection, testing & commissioning including civil
New works shall be executed either by the bidder himself or by the Subcontractor meeting the
Clause No. following technical requirement:
24.21
The bidder/Subcontractor must have erected, tested and commissioned at least two (2)
nos. GIS/AIS Circuit breaker equipped bays of 345kV or above voltage level in one (1)
substation or switchyard during the last seven (7) years and these bays must be in
satisfactory operation# as on the date of NOA.

Further, the sub-contractor shall also meet the requirement specified at Clause No.
24.23 of this section.
4. Section GTR Technical Requirement of Sub-contractor for 220/132/66 kV* level GIS/Hybrid
Rev 14 GIS/MTS packages:

New In case of Indian GIS manufacturer, the erection, testing & commissioning including civil
works shall be executed either by the bidder himself or by the Subcontractor meeting the
Clause No.
following technical requirement:
24.22
The bidder/Subcontractor must have erected, tested and commissioned at least two (2)
nos. GIS/Hybrid GIS/MTS/AIS Circuit breaker equipped bays@ of 220/110/66kV* or
above voltage level in one (1) substation or switchyard during the last seven (7) years and
these bays must be in satisfactory operation# as on the date of NOA.

Further, the sub-contractor shall also meet the requirement specified at Clause No.
24.23 of this section.

Note:
1. (*) voltage class of respective equipment as applicable

Page 1 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

2. (@) For the purpose of technical requirement, one no. of circuit breaker bay shall
be considered as a bay used for controlling a line or a transformer or a reactor or a
bus section or a bus coupler and comprising of at least one circuit breaker, one
disconnector and three nos. of single phase CTs / Bushing CTs. GIS means SF6
Gas insulated Switchgear, Hybrid GIS means outdoor SF6 Gas insulated
switchgear connected to outdoor Air insulated bus-bar System (AIS bus-bars
System), MTS means outdoor SF6 Gas insulated Mixed Technology Switchgear
connected to outdoor AIS bus bar system.

3. Combination of GIS CB bay, Hybrid GIS CB Bay & MTS CB Bay is also acceptable
5. Section GTR Technical Requirement of Sub-contractor:
Rev 14
1. The sub-contractor must have either of the following experience of having
New successfully completed similar works during last 7 years as on the last day of
Clause No. month previous to the one in which the sub-contractor is proposed to be engaged:
24.23
a) Three similar works costing not less than the amount equal to 40% of the
cost of the work to be sub-contracted.

OR

b) Two similar works costing not less than the amount equal to 50% of the cost
of the work to be sub-contracted.

OR

c) One similar work costing not less than the amount equal to 80% of the cost
of the work to be sub-contracted.

2. Minimum Average Annual Turnover **(MAAT) for best three years i.e. 36
months out of last five financial years of the sub-contractor should be……….:

**Annual Gross Revenue from operations/ Gross operating income as


incorporated in the profit & loss account excluding Other Income.

Note:

a) Similar work shall mean the work which are of similar in nature to the
work to be sub-contracted e.g. for the scope of civil work to be sub-
contracted, the experience should be of civil work.

b) The aforesaid qualifying requirement shall however, not be applicable for


engaging labour as per extant policy.

c) The cost of the work to be sub-contracted shall be considered as available


in the Contract Agreement. However, if the value is not available in the
Contract Agreement, the same shall be the estimated value for such work.

d) The above criteria is in addition to extant policy on selection of sub-


contractor as per WPPP, Vol-II.

Page 2 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

e) The MAAT requirement shall be worked out basis the following


formula:

Minimum = Cost of the work to be sub-


Average Annual contractedx1.5/Completion period in
Turnover years**
(MAAT)

**The completion period shall be considered as 1 year even if the same is


less than 1 year.

6. Section GTR Technical Requirement for 400kV GIS Equipment


Rev 14
(i) The manufacturer whose 400kV GIS bays are offered must have designed,
New manufactured, type tested** (as per IEC or equivalent standard), supplied
Clause No. and supervised erection & commissioning of at least two (2) nos. Gas
Insulated Switchgear (GIS) circuit breaker bays@ of 345kV or above voltage
24.24
class in one (1) Substation or Switchyard during the last seven (7) years and
these bays must be in satisfactory operation# for at least two (2) years as on
the date of NOA.

(ii) Alternatively, the manufacturer, who have established manufacturing and


testing facilities in India and not meeting the requirement stipulated in (i)
above, can also be considered provided that

a) Atleast one no. 345kV or above voltage class GIS Circuit Breaker bay@ must have
been manufactured in the above Indian works based on the technological support
of the Collaborator(s) and either supplied or type tested the above CB bay (as per
IEC or equivalent standard) as on the date of NOA.

b) The collaborator(s) meets the requirements stipulated in (i) above. A valid


collaboration agreement for technology transfer / license to design, manufacture,
test and supply 400kV or above voltage level GIS equipment in India, shall be
submitted.

c) The Collaborator(s) shall furnish performance guarantee for an amount of 10 % of


the ex-works cost of such equipment(s) and this performance guarantee shall be
in addition to Contract Performance Guarantee to be submitted by the bidder.

Note :-

(**) Type test reports of the collaborator/ parent company/ subsidiary company/ group
company shall also be acceptable.

Page 3 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

7. Section GTR Rev Technical Requirement for 220/132/66 kV* level GIS/Hybrid GIS/MTS Equipment:
14

New (i) The manufacturer whose 220/132/66 kV* level GIS/Hybrid GIS/MTS bays
are offered must have designed, manufactured, type tested** (as per IEC or
Clause No. 24.25
equivalent standard), supplied and supervised erection & commissioning of
at least two (2) nos. Gas Insulated Switchgear (GIS)/Hybrid GIS/MTS
circuit breaker bays@ of 220/110/66kV* or above voltage class in one (1)
Substation or Switchyard during the last seven (7) years and these bays
must be in satisfactory operation# for at least two (2) years as on the date of
NOA.

(ii) Alternatively, the manufacturer, who have established manufacturing and


testing facilities in India and not meeting the requirement stipulated in (i)
above, can also be considered provided that

a) Atleast one no. 220/110/66kV* or above voltage class GIS/Hybrid GIS/MTS


Circuit Breaker bay@ must have been manufactured in the above Indian works
based on the technological support of the Collaborator(s) and either supplied or
type tested the above CB bay (as per IEC or equivalent standard) as on the date
of NOA.

b) The collaborator(s) meets the requirements stipulated in (i) above. A valid


collaboration agreement for technology transfer / license to design,
manufacture, test and supply 220/110/66*kV or above voltage level
GIS/Hybrid GIS/MTS equipment in India, shall be submitted.

c) The Collaborator(s) shall furnish performance guarantee for an amount of 10 %


of the ex-works cost of such equipment(s) and this performance guarantee shall
be in addition to Contract Performance Guarantee to be submitted by the
bidder.

Note:
1. (*) voltage class of respective equipment as applicable

2. (@) For the purpose of technical requirement, one no. of circuit breaker bay
shall be considered as a bay used for controlling a line or a transformer or a
reactor or a bus section or a bus coupler and comprising of at least one circuit
breaker, one disconnector and three nos. of single phase CTs / Bushing CTs.
GIS means SF6 Gas insulated Switchgear, Hybrid GIS means outdoor SF6 Gas
insulated switchgear connected to outdoor Air insulated bus-bar System (AIS
bus-bars System), MTS means outdoor SF6 Gas insulated Mixed Technology
Switchgear connected to outdoor AIS bus bar system.

3. Combination of GIS CB bay, Hybrid GIS CB Bay & MTS CB Bay is also
acceptable

4. (**) Type test reports of the collaborator/ parent company/ subsidiary


company/ group company shall also be acceptable.

Page 4 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

8. Section GTR Rev Technical Requirement for 765kV class Transformer


14
(i) The Manufacturer whose 765kV Transformer(s) are offered must have
designed, manufactured, tested & supplied 715 kV or higher voltage class
Clause No. 24.2 one (1) number 1-phase Transformer of at least 500 MVA capacity or at least
three (3) numbers 1-phase Transformers each having a capacity of at least
166 MVA, and the same transformer (s) should have been in satisfactory
operation# for atleast two (2) years as on the date of NOA.

(ii) Alternatively, the manufacturer, who have established manufacturing and


testing facilities in India and not meeting the requirement stipulated in (i)
above, can also be considered provided that

d) 715 kV or higher voltage class either One (1) no. 1-phase Transformer of at least
166 MVA capacity or One (1) no. 1-phase Reactor of at least 80 MVAR capacity
must have been manufactured in the above Indian works based on technological
support of collaborator, type tested (as per IEC/IS standard) and same should
have been supplied as on the date of NOA.

e) The collaborator meets the requirements stipulated in (i) above. A valid


collaboration agreement for technology transfer / license to design,
manufacture, test and supply 765kV transformer in India, shall be submitted.

f) the collaborator shall furnish performance guarantee for an amount of 10% of


the ex-works cost of such equipment(s) and this performance guarantee shall be
in addition to contract performance guarantee to be submitted by the contractor.

9. Section GTR Rev Technical Requirement for 765kV class Reactor


14
(i) The Manufacturer whose 765kV Reactor(s) are offered must have designed,
manufactured, tested & supplied 715 kV or higher voltage class one (1)
Clause No. 24.3 number 1-phase Reactor of at least 110 MVAR capacity or at least three (3)
numbers 1-phase Reactors each having a capacity of at least 36.7 MVAR
and the same Reactor(s) should have been in satisfactory operation# for
atleast two (2) years as on the date of NOA.

OR

The Manufacturer must have designed, manufactured, tested & supplied


715 kV or higher voltage class one (1) number 1-phase Transformer of at
least 500 MVA capacity or at least three (3) numbers 1-phase Transformers
each having a capacity of at least 166 MVA and the bidder should have
designed, manufactured, tested & supplied 345 kV or higher voltage class
one (1) number 3-phase Reactor of at least 50 MVAR capacity or at least
three (3) numbers 1-phase Reactors each having a capacity of at least 16.7
MVAR and the same Transformer(s) & Reactor(s) should have been in
satisfactory operation# for atleast two (2) years as on the date of NOA.

(ii) Alternatively, the manufacturer, who have established manufacturing and


testing facilities in India and not meeting the requirement stipulated in (i)
above, can also be considered provided that

Page 5 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

a) 715 kV or higher voltage class either One (1) no. 1-phase Reactor of at least 80
MVAR capacity or One (1) no. 1-phase Transformer of at least 166 MVA
capacity must have been manufactured in the above Indian works based on
technological support of collaborator, type tested (as per IEC/IS standard) and
same should have been supplied as on the date of NOA.

b) The collaborator meets the requirements stipulated in (i) above. A valid


collaboration agreement for technology transfer/license to design,
manufacture, test and supply 765kV Reactor in India, shall be submitted.

c) the collaborator shall furnish performance guarantee for an amount of 10% of


the ex-works cost of such equipment(s) and this performance guarantee shall be
in addition to contract performance guarantee to be submitted by the contractor.
10. Section GTR Rev
Technical Requirement for 1.1 KV Grade PVC Control Cable
14
The manufacturer(s), whose PVC control cables are offered, must have designed,
Clause No. 24.9 manufactured, tested and supplied in a single contract atleast 100 Kms of 1.1kV grade
PVC insulated control cables as on date of NOA. Further the manufacturer must also
have designed, manufactured, tested and supplied atleast 1 km of 27C x 2.5 Sq.mm or
higher size as on the date of NOA.

11. Section GTR Rev


Technical Requirement for 1.1 KV Grade PVC Power Cable
14
The manufacturer(s), whose PVC Power Cables are offered, must have designed,
Clause No. 24.10 manufactured, tested and supplied in a single contract atleast 100 Kms of 1.1kV or
higher grade PVC insulated power cables as on the date of NOA. Further the
manufacturer must also have designed, manufactured, tested and supplied atleast 1 km
of 1C x 150 Sq. mm or higher size as on the date of NOA.

12. Section GTR Rev


Technical Requirement for 1.1 KV Grade XLPE Power Cables
14
The manufacturer(s), whose XLPE Power cables are offered, must have designed,
Clause No. 24.11 manufactured, tested and supplied in a single contract atleast 25 Kms of 1.1 KV or
higher grade XLPE insulated power cables as on the date of NOA. Further the
manufacturer must also have designed, manufactured, tested and supplied atleast 1 km
of 1C x 630 Sq. mm or higher size as on the date of NOA.

13. Section GTR Rev Tests witnessed by agencies certified by National Accreditation Board for Certification
14 Bodies (NABCB) shall also be acceptable.

New para added


under
Clause No. 9.2

14. Section GTR Rev Annexure-A stand replaced by Annexure-A (Rev 1)


14
Annexure-A

15. Section GTR Rev “The seismic withstanding test on the complete equipment (for 400kV and above) shall
14 be carried out along with supporting structure. Seismic Withstand Test carried out
using either lattice or pipe structure is acceptable.”

Page 6 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

Para-1 at Annexure-
B

16. Section GTR Rev Band colour is required for Emulsifier system detection line only if both water and air
14 detection lines are present at the same substation. Further, band colour shall be applied
at an interval of 2 meters approx. along the length and minimum width of band shall be
New para added 25mm.
under Clause no.
12.3.6
17. Section GTR Rev Pickup value of binary input modules of Intelligent Electronic Devices, Digital
14 protection couplers, Analog protection couplers shall not be less than 50% of the
specified rated station auxiliary DC supply voltage level.
New Clause no.
15.2
18. Section GTR In case, different designs of lattice and pipe structures other than Employer supplied
Rev 14 structures are required to be adopted in view of higher creepage (31mm/kV) of the
switchgear/equipments, insulator strings, bushings & bus post insulators etc., Design,
New Clause No. supply & erection of such structures shall be in the scope of contractor against
16.3 respective standard structure. However dimensional details (except height) shall not be
less than that specified in standard structure drawing of respective equipments.

19. Section GTR RTV coating shall be done at site on all porcelain insulators including mandatory spares
Rev 14 (i.e. bushings, hollow and solid insulators, disc insulators etc.) for substation(s) in
coastal area as defined elsewhere. The cost of RTV coating shall be deemed to be
Clause No. 22.9 included in the respective equipment/items’ erection cost. The technical details of RTV
coating is attached in Annexure-H (Rev 1).

20. Section GTR Erection, testing and commissioning of Transformers, Reactors, Circuit breakers,
Rev 14 Isolators, Substation automation system, Control & protection panels, PLCC, PMU,
Telecommunication Equipments, etc. shall be done by the contractor under the
New Clause No. supervision of respective equipment manufacturers. Charges for the above supervision
13.14 shall be included by the bidder in the erection charges for the respective equipment in
the BPS.

21. Section Switchgear- Outer insulator of surge arrester shall be porcelain/polymer conforming to
SA Rev 11 requirements stipulated in Section-GTR. Terminal connectors shall conform to
requirements stipulated under Section-GTR.
Clause No. 3.0 (e)
The outer insulator housing shall be so coordinated that external flashover will not
occur due to application of any impulse or switching surge voltage upto the maximum
design value for arrester.
22. Section Switchgear- Technical Parameters for 765kV, 400kV, 220kV and 132kV Surge Arresters (with
SA Rev 11 Polymer/Porcelain Housing)

Annexure-l
Table 1.0

23. Section Switchgear- CTs must have adequate provision for taking oil samples from the bottom of the CT
INST Rev 11 without exposure to atmosphere. Manufacturer shall recommend the frequency at
which oil samples should be taken and norms for various gases in oil after being in
Clause No. 9.2 operation for different durations. Manufacturer should also indicate the total quantity of

Page 7 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

Para 3 & 4 oil which can be withdrawn from CT for gas analysis before refilling or further
treatment of CT becomes necessary.

Manufacturer/Contractor shall supply 2 nos. of oil sampling device for every 20 nos. of
oil filled CT supplied with a minimum of 2 nos. of oil sampling device for each
substation.
24. Section Switchgear- Voltage Transformers
INST Rev 11
a) Insulation Resistance test for primary (if applicable) and secondary winding
Clause No. 9.3 b) Polarity test
c) Ratio test
d) Dielectric test of oil (wherever applicable)
e) Tan delta and capacitance measurement of individual capacitor stacks
f) Secondary winding resistance measurement
g) DGA of oil (for IVT/PT)

Dissolved Gas Analysis (DGA) shall be carried out twice within the first year of service,
first within the first month of commissioning/charging and second between six months
to one year from the date of commissioning/charging.

IVTs/PTs must have adequate provision for taking oil samples from the bottom of the
IVT/PT without exposure to atmosphere. Manufacturer shall recommend the frequency
at which oil samples should be taken and norms for various gases in oil after being in
operation for different durations. Manufacturer should also indicate the total quantity of
oil which can be withdrawn from IVT/PT for gas analysis before refilling or further
treatment of IVT becomes necessary.

Manufacturer/Contractor shall supply 2 nos. of oil sampling device for every 20 nos. of
oil filled IVT/PT supplied with a minimum of 2 nos. of oil sampling device for each
substation.

25. Section Switchgear- Defect Liability


INST Rev 11
The actions required to be taken by contractor in case of defects observed in
Clause No. 10.0
CT/CVT/IVT/PT of ratings 145kV & above during the warranty period (defect liability
period) shall be as per enclosed Annexure-V (Revised) of this specification. Further, the
replaced/repaired/refurbished equipment (or part of equipment) shall have Two (2)
years warranty without prejudice to contractual warranty period (defect liability
period).
26. Section Switchgear The CSD shall be provided in Circuit breaker of switchable line reactor bay and in Main
– CB Rev 11 & Tie bay circuit breakers of Transformers (required for 765/400kV transformers only),
line with non-switchable line reactors and Bus reactors. The CSD shall be supplied as
Clause no. 2.6
per bid price schedules.
Para 2
27. Section Switchgear For Circuit breaker with CSD controlling a Transformer following is applicable
– CB Rev 11
“The limit for inrush current for switching of Transformer by CSD shall be 1.0 p.u. of
New Clause no. rated current of transformer after fine tuning of CSD settings during pre-commissioning
2.6.1(n) checks. For site acceptance of CSD, during online CSD test after fine tuning inrush
current should be less than 1.0 P.U. of rated current in five consecutive operations”.

Page 8 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

28. Section Separate cables shall be used for AC, DC-I, DC-II and selected DC. Each control cable
Switchgear – CB shall include minimum 10% spare cores (subject to minimum 1 no. of spare core).
Rev 11

Clause No. 11.4


29. Section Requirement of Plug-In type connector for Inter-pole cabling is deleted
Switchgear – CB
Rev 11

Clause No. 11.5


30. Section Vertical run of cables to the operating mechanism box shall be properly supported by
Switchgear – CB providing the perforated closed type galvanized cable tray (Cable tray also to be
Rev 11 supplied along with the Circuit Breaker) to be fixed as an integral part of the structures.
The load of the cable shall not be transferred to the mechanism box/terminal
arrangement in any circumstances. Hanging or loose run of cable is not permitted. The
Clause No. 11.6 drawing of cable tray including fixing arrangement shall be incorporated in the GA
drawing of CB also.

31. Section GIS Rev 5A The CSD shall be provided in 765kV/400kV Circuit breakers for controlling
transformers (required for 765/400kV transformers only) and reactors (ie for breakers of
Clause no. switchable line reactor and in Main& Tie circuit breakers of Transformers, Transmission
6.8.2 lines with non-switchable line reactors and Bus reactors). The requirement of CSD shall
be explicitly specified in price schedule

32. Section GIS Rev 5A For 400kV & above voltage class GIS bay module, CT cores shall be duly distributed on
both side of circuit breaker. For 220 kV and below voltage level GIS bay module, CT on
New Clause no. one side of the circuit breaker is also acceptable.
10.1.3(n)
33. Section GIS Rev 5A During detailed engineering, the type test reports of GIS equipment of the parent
company/subsidiary company/group company shall also be acceptable provided that
New Para added the design of offered GIS is same as that of type tested GIS equipment.
under Clause no.20
34. Section GIS Rev 5A All 765kV & 400kV Circuit Breaker control schematics shall be finalized in such a way,
that it may operate with or without CSD by using a suitable selector switch irrespective
New Clause no. of whether circuit breakers to be supplied are envisaged along with CSD or not as per
15.2.14 bid price schedules.
35. Section GIS Rev 5A The price of Bus-duct inside the GIS hall shall be integral part of the respective bay
module and it will not be paid separately. However, the payment of bus-duct for
New Clause no. outside the GIS hall along with support structure shall be paid as per running meters in
5.41(10) line with provision of Bid Price schedule.

36. Section Air Annexure S3 – Air Conditioning & Ventilation System for GIS Building
Conditioner
Rev 04

New
Annexure-S3
37. Section CRP Rev 09 Back-up Impedance protection function shall be provided for 765kV & 400kV sides of
765/400/33kV ICT and for 400kV side of 400kV class ICT. This protection function and
New Clause No. Differential Protection function shall not be combined in the same IED.
21.8

Page 9 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

38. Section CRP Rev 09 Line Differential relays used as both Main –I & Main-II protection of a line, shall be of
either different make & model or shall be on different hardware platform.
New para added
under Clause
no.18.8
39. Section CRP Rev 09 Requirement of Shrouding shall not be applicable to TB’s where live parts are concealed.

New Para added


under Clause
No.5.1
40. Section PLCC Rev All protection couplers (Analog protection coupler, digital protection coupler) shall be
05 equipped with direct reading type counter facility for all the codes (Tx & Rx).

New Clause no.


10.4.13
41. Section PLCC Rev Digital protection coupler (DPC) shall be used as one of the two tele-protection channel
05 on the lines between the stations having Optical Fiber link alongwith SDH Equipment.
Specification of digital protection coupler is enclosed as Annexure-S2. The DPC can be
New Clause no.10.5 housed either in offered Control & Protection Panel / PLCC Panel or in separate panel.
Generally SDH Equipment are placed in communication room of Control room where as
DPC is placed in panel room. The connection between SDH equipment and each DPC
shall be through Optical fiber. Necessary converter(s) for converting E1 signal to optical
fiber at both ends (at Panel Room as well as at Control room) along with FODP shall be
in the scope of the contractor. Further sharing of additional spare ports of converter for
DPC placed in other Panel Room or in same Panel Room is also permitted. Necessary
optical fiber for interconnection of DPC is to be provided by the contractor. Further any
copper wiring for ensuring the protection signaling/data/speech shall be in the scope of
the contractor.
42. Section PLCC Rev For 765 kV Wave Trap, cantilever strength of BPIs used for Wave Trap shall be 10 kN.
05

New Clause No.


6.12.4
43. Section: Power & The cable sizes specified at clause no. 1.1.4 of Section-Power & Control Cables Rev-6 are
Control Cable Rev minimum required. In case, more nos. of runs or larger sizes of cables are required
06 between two points based on design calculations, same shall deemed to be included in
the scope of bidder.
New Para added
under Clause 1.1.4

44. Section: Power & Standard lengths for each size of power and control cables shall be 500/1000 meters.
Control Cable Rev However, to avoid cable wastage and cable jointing at site, non-standard lengths of each
06 size of Power & Control cable may also be acceptable subject to maximum length of
1000meters (+ 5% tolerance)
Clause No. 4.2
45. Section Fire Appendix-I (Rev 4) stand replaced by following Appendix-I (Rev 5)
Protection Rev 06

Appendix-I

Page 10 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

46. Section: Fire Deleted


Protection Rev 06

Clause No.9.01.00(c)
&
Appendix-V
47. Section Fire Fire detection and alarm system shall also be provided in the GIS Hall using beam type
Protection Rev 06 smoke detectors to be installed at suitable mounting height, and in the Relay Panel room
with ionization/optical type smoke detectors to be installed on the ceiling.
New para added at
Clause no.2.03.00
48. Section Fire Adequate no. of Hydrant posts and Fire extinguishers (CO2 and DCP type) shall also be
Protection Rev 06 provided for GIS Building.

New Clause
no.2.01.02
49. Section Fire Mechanical foam type fire extinguishers wherever specified as 50 litre capacity,
Protection Rev 06 conforming to IS:13386, shall be read as 60 litre capacity conforming to IS 16018

Clause No. 2.04.02 Further in case of non-availability of any type of fire extinguisher (i.e. water, CO2, DPC,
& 10.00.00 foam type) of a particular size as specified in BPS or technical specification, next
available higher size conforming to IS shall be supplied.

50. Section Fire Alternatively, bidder may offer Nitrogen Injection based fire prevention & extinguishing
Protection Rev 06 system for transformer/reactor instead of HVW Spray System. Nitrogen Injection Fire
Prevention & Extinguishing system shall be as per Appendix – VII.
New Clause No.
2.02.06
51. Section DG Set Rev Alternatively, AMF Panel for DG Set may be installed outside the acoustic enclosure
05 near the DG Set. In such cases, AMF panel with or without additional enclosure shall
New para added meet IP-55 degree of protection.
under Clause no.
7.1(a)
52. Section: Lighting All Outdoor Lighting Panels shall be Stainless sheet steel of Grade 304 and shall be dust,
System Rev 07 weather and vermin proof. Panels shall be of thickness not less than 1.5 mm smoothly
finished, leveled and free from flaws. Stiffeners shall be provided wherever necessary.
Clause no. 6.2.1(ii)
Alternatively, outdoor lighting panels of Aluminum shall also be acceptable as per
provisions stipulated in Section GTR.
53. Section: Lighting The outdoor junction boxes shall be complete with conduit knockouts/threaded nuts
System Rev 07 and provided with terminal strips. The junction boxes shall be suitable for termination
of Cable glands of required size. The junction boxes shall be provided with 4 way
Clause no. knockouts suitable for street lighting/switchyard lighting terminals suitable for 2
6.6(i) (b) numbers 4C x 16 Sq.mm Al. cable or as per requirement. All Outdoor Junction boxes
shall be of Stainless Steel of thickness 1.5mm of grade 304. Outdoor Junction Boxes shall
be suitable for mounting on columns, structures etc for Outdoor Lighting. The outdoor
Junction shall have IP 55 protection. Alternatively, outdoor junction boxes of
Aluminum shall also be acceptable as per provisions stipulated in Section GTR.
54. Section: LT Contractor shall submit type test reports for the Lighting transformers as per IS:2026 for
Switchgear Rev 05 which test conducted once are acceptable (i.e. The requirement of test conducted within
Clause no. 1.21.2 last ten years shall not be applicable)

Page 11 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

55. Section LT MCCB shall in general conform to IS: 13947 Part-2. All MCCB offered shall have Ics =
Switchgear Rev 05 100% Icu rating.

Clause no. 1.6.1

56. Section: Structure POWERGRID will issue the fabrication drawings of the standard structures to the
Rev 06 successful bidder. The contractor shall do the proto assembly of the structures as per the
issued fabricated drawings. Employer may opt to witness such proto assembly. The
New Clause No. bidder shall follow the fabrication drawing for preparing the proto assembly and do the
3.2.4 Added minor adjustments if necessary, without affecting the strength of the structure. In case of
equipment support structure the attachment of stool and fixing of MOM box etc. shall be
taken care by the contractor as per the requirement of the equipment. The contractor
however shall not submit the proto corrected drawings and BOM for approval of the
employer. The arrangement shall however not absolve the contractor from the
responsibility of supply and erection of safe sound and durable structure.

57. Section: Structure Nuts, Bolts and washers for all non standard structures shall be payable as per BPS.
Rev 06

New
Clause no. 3.4
58. Section Civil The dewatering pump shall be Portable, Self Priming, Non clog, horizontal type
Works Rev 11A monobloc pump. The Pump shall be driven by electric motor suitable for outdoor
application with IP-55 degree of protection. Following are the major technical
New parameters for the pumps to be supplied as per BPS:
Clause No. 21.0
(A) Pump Rating : 2 HP
Flow Rate : 200-400 LPM
Minimum Total Head : 12 Mtrs
Voltage Range : 415 ± 10% Volts (Three Phase)

(B) Pump Rating : 5 HP


Flow Rate : 1000-1400 LPM
Minimum Total Head : 10 Mtrs
Voltage Range : 415 ± 10% Volts (Three Phase)

59. Section Switchyard


Erection Rev 10 S.No Item Size Material
j) Isolator MOM 50X6 mm GS flat Galvanise
Clause No. 9.4(j)
Box & Flexible copper steel and
braid copper
braid
60. Section: Switchyard Neutral formation for Transformer(s), DELTA formation and making connection
Erection arrangement to connect spare unit in place of any unit of the bank without physical
Rev 10 shifting and Earthing Arrangement :

New For Spare Unit connection to form 3-ph bank of 765kV Class Transformers with isolator
Clause no. 20.1 based switching arrangement without physical shifting of spare unit along with
necessary Neutral Formation, Earthing Arrangement & Tertiary (DELTA) formation for
3-ph bank formation with 1-ph units shall be under present scope as per the details

Page 12 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

mentioned below:

i. Neutral Formation including Neutral auxiliary bus and Earthing Arrangement

The contractor shall connect the neutrals of three (3) 1-phase transformers by overhead
connection using 3" IPS Al tube. The neutral formation shall be such that neutral
winding of single-phase spare transformer can be disconnected or connected to the
three phase banks. The connection from the neutral bushing to neutral bus shall be
through 3" IPS Al tube and wherever flexible jumper needs to be provided, same shall
be through twin conductor. All material like Bus post insulator, Aluminium tube,
conductor, clamps & connectors, earthing materials, support structure, hardware etc.
required for neutral formation and connection with neutral CT and earthing of neutral
shall be provided by contractor.

ii. Tertiary Delta Formation including Tertiary auxiliary bus(Insulation level 52


kV) .
The contractor shall connect 33kV tertiary of single-phase auto-transformers in DELTA
configuration by overhead connection to operate in 3-Ph Bank. The Delta shall be
formed by 3" IPS Al tube, which shall be insulated with heat shrinkage insulating
sleeve of at least 52kV class and shall be supported by structure mounted bus post
insulators at suitable intervals. Jumpers (twin conductors) wherever provided shall
also be insulated using suitable insulation tape or sleeve at least 52kV class at site. The
minimum phase to phase horizontal spacing for delta formation shall be 1.5meter. All
associated materials like bus post insulators, Aluminium tube, conductor, clamps &
connectors, support structures, hardware, earthing materials etc. required for tertiary
delta formation shall be provided by the contractor.

iii. HV & IV Auxiliary Buses (Applicable for AIS Substation)


Formation of HV & IV auxiliary buses for connection of transformer 3-Phase bank
with 1-Phase Spare transformer unit is under the present scope of the bidder. All
associated materials like Bus post insulators, Aluminium tube, conductors, clamps &
connectors, insulator strings, hardware, earthing materials, support structures,
required for the above-mentioned arrangement shall be provided by the contractor.

61. Section: Switchyard Neutral formation for Reactor banks, connection to neutral grounding reactor through
Erection 132kV Surge arrester, connection to ground through neutral CTs and connection
Rev 10 arrangement to connect spare reactor unit in place of any other units of the bank
without physical shifting and Earthing Arrangement :
New
Clause no. 20.2 For Spare Unit connection to 3-ph bank of 765kV Class Reactors with isolator based
switching arrangement without physical shifting of spare unit along with necessary
Neutral Formation, Earthing Arrangement for 3-ph bank formation with 1-ph units shall
be under present scope as per the details mentioned below:

i. Neutral Formation including Neutral auxiliary bus and Earthing Arrangement

The contractor shall connect the neutrals of three (3) 1-phase reactors by overhead
connection using 3" IPS Al tube. The neutral formation shall be such that neutral
winding of single-phase spare reactor can be disconnected or connected to the three
phase banks. Neutral Connections of spare unit shall be extended upto the other unit(s)

Page 13 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

by forming Neutral auxiliary bus. The connection from the neutral bushing to neutral
bus shall be through 3" IPS Al tube and wherever flexible jumper needs to be provided,
same shall be through twin conductor. All material like Bus post insulator, Aluminum
tube, conductor, clamps & connectors, earthing materials, support structure, hardware
etc. required for neutral formation and connection with neutral CT and earthing of
neutral shall be provided by contractor. Required Insulation level is 145 kV from
individual reactor neutral to point of neutral formation. However after neutral
formation, the insulation level is 36kV.

Connection of each Line reactor bank formed under present scope to Neutral grounding
reactor through 132kV Surge Arrester including NGR by passing arrangement is also
under present scope.

ii.HV Auxiliary Bus (Applicable for AIS Substation)

Formation of HV auxiliary bus for connection of reactor 3-Phase bank with 1-Phase
Spare reactor unit is under the present scope of the bidder. All associated materials like
Bus post insulators, Aluminium tube, conductors, clamps & connectors, insulator
strings, hardware, earthing materials, support structures, required for the above-
mentioned arrangement shall be provided by the contractor.

62. Section: Switchyard Supply & Laying of Power, Control Cables & Special Cables (if any) (including all
Erection cabling works for spare unit of transformer/reactor ) along with accessories for power
Rev 10 supply, alarm, trip, control & indication, status and monitoring signals & contacts made
available at MB/CMB of Transformers/Reactors upto Control & Relay Panels and BCUs
New located in the Switchyard Panel Room/Control Room and successful integration of same
Clause no. 20.3 with Station Control, Protection & SAS System is in the scope of the contractor.

63. Section: Switchyard 3½Cx300 Sq. mm XLPE power cable for oil filtration units of reactors & transformers
Erection Rev 10 shall be provided. The cable shall be terminated at 250A receptacle near Reactor &
Transformer in the switchyard. XLPE Power cables shall be looped in & out for 250A
New Power receptacles.
Clause no. 20.4

64. Section: Switchyard Neutral of spare transformer/reactor is to be connected to station grounding system
Erection Rev 10 through a jumper/copper flat. This shall be applicable for single phase
transformer/reactor wherever spare unit have been provided.
New
Clause no. 20.5

65. Section: Switchyard Tertiary connections made for tertiary loading of LT Transformer shall be insulated
Erection Rev 10 using suitable insulation tape or sleeve of at least 52kV class at site

New
Clause no. 20.6
66. Section Switchyard Transmission line side insulator string along with hardware for line termination shall be
Erection Rev 10 in the scope of substation contractor.

New Clause No. 2.5

Page 14 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

67. Section Switchyard Connection arrangement of 765kV equipment’s shall be done


Erection Rev 10 as per the conceptual drawing (Drawing No. C/ENGG/SS/CONCEPTUAL 765KV BAY
CONNECTION, Rev-0) enclosed as Annexure-S1of this Section-Project.
New Clause No. 21

68. Section Switchyard For connection to HV bushing of LT Transformer, insulated copper rod/strip of at least
Erection Rev 10 75 sq.mm cross sectional area shall be used.

New Clause No. 22

69. Section: Auto- Deleted


transformer
Rev-07

Clause no. 10.14


70. Section: Auto- If Tan delta of OIP bushing goes beyond 0.005 or increase is more than 0.001 within the
transformer warrantee period w.r.t. pre-commissioning values, the contractor shall arrange to
Rev-07 replace the defective bushing by new one. No temperature correction factor shall be
applicable for tan delta.

Clause no. 10.15 Tan δ value of RIP (Resin Impregnated Polymer) condenser bushing shall be 0.005
(max.) in the temperature range of 20°C to 90°C. The measured Tan δ value at site
should not exceed by 0.001 w.r.t. factory results (measured at approx. similar
temperature conditions) during warrantee period.
71. Section: Auto- Canopy arrangement shall be provided for Pressure Relief Device, Sudden Pressure
transformer Rev-07 Relay and Buchholz Relay to prevent ingress of rain water.

New Clause no.


18.00 (cc)
72. Section: Auto- 04 nos. of Gate valves (minimum size 50NB) for UHF sensors for PD Measurements at
transformer Rev-07 various locations. Location of valves shall be finalized during design review.

New Clause no.


6.1.5(f)
73. Section: Auto- Fixing of cooler bank support shall be provided through Anchor Fastener with chemical
transformer Rev-07 grouting and no pockets for bolting shall be provided.

New Para added Further, metallic support structure (for cooler pipe supports, Buchholz pipe (if required)
under Clause No. shall be fixed directly in the pit through Anchor Fastener with chemical grouting.
6.4 Further, these support structures shall be encased with concrete to prevent rusting. No
foundation block for these support structures are envisaged.

Specific area shall not be provided for jacking pad in the foundation as jacking shall be
done by laying temporary metal plates size 400 mm x 400 mm x 32 mm (min) thick. One
set of metal plates for jacking of Transformer shall be provided by manufacturer.

Page 15 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

74. Section: Auto- Manufacturer may also offer Gas to Liquid (GTL) based insulating oil. The technical
transformer Rev-07 parameters of this oil shall be finalized during detailed engineering.

New Para added


under Clause no.
8.0
75. Section: Auto- On-line insulating oil drying system (Cartridge type) (if specified in BPS) as per
transformer Rev-07 Annexure-L

Clause No. 18.v

76. Section: Auto- 16 numbers optical temperature sensors shall be fitted on each unit. The optical sensors
transformer Rev-07 measuring system shall be of direct measurement non-calibrating type. All the sensors
shall be brought out to separate optical sensor box or in Individual Marshalling Box
Clause No. 6.14 mounted on transformer tank to facilitate measurement of temperature during service
life on each unit.
Location of optical temperature sensors inside the transformer shall be decided during
design review. The installation and commissioning at site shall be done under the
supervision of OEM representative or OEM certified representative.
Supply of temperature measuring unit is not required. However, manufacturer shall
keep one unit in their works as a part of testing equipment for measurement of
temperature through sensor during factory testing.
77. Section: Auto- Suitable provision (valves, etc.) shall be provided for installation of Nitrogen Injection
transformer Rev-07 Fire Protection System in transformer.

New Clause no.


6.1.5(g)
78. Section: Auto- When the flow from conservator to main tank is more than the normal operating
transformer Rev-07 conditions, the valve shall shut off by itself and will have to be reset manually. It shall be
provided with valve open/close position indicator along with alarm contact indication
Clause no. 13.4.8(c) in control room during closing operation of valve. This valve shall be provided with
locking arrangement for normal position and oil filling / filtration position. Glass
window for visual inspection similar to Buchholz glass inspection window shall be
provided for physical checking of status of valve. It shall have IP 67 class degree of
protection. A suitable platform or ladder (if required) shall be provided to approach the
valve for manual reset.
79. Section: Auto- Deleted
transformer Rev-07

Annexure –B, Test


Plan Sr. No. 17

Annexure – C Test
Procedures Sr. No.5
80. Section: 765kV Deleted
Shunt Reactor Rev-
07

Clause No.11.14

Page 16 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

81. Section: 765kV If Tan delta of OIP bushing goes beyond 0.005 or increase is more than 0.001 within the
Shunt Reactor Rev- warrantee period w.r.t. pre-commissioning values, the contractor shall arrange to
07 replace the defective bushing by new one. No temperature correction factor shall be
applicable for tan delta.
Clause No.11.15
Tan δ value of RIP (Resin Impregnated Polymer) condenser bushing shall be 0.005
(max.) in the temperature range of 20°C to 90°C. The measured Tan δ value at site
should not exceed by 0.001 w.r.t. factory results (measured at approx. similar
temperature conditions) during warrantee period.
82. Section: 765kV 04 nos. of Gate valves (minimum size 50NB) for UHF sensors for PD Measurements at
Shunt Reactor Rev- various locations. Location of valves shall be finalized during design review.
07

Clause No.7.1.5 (d)


83. Section: 765kV Cooler bank shall be tank mounted. Further, specific area shall not be provided for
Shunt Reactor Rev- jacking pad in the foundation as jacking shall be done by laying temporary metal plates
07 size 400 mm x 400 mm x 32 mm (min) thick. One set of metal plates for jacking of reactor
New Para added shall be provided by the manufacturer.
under Clause No.
7.4
84. Section: 765kV Annexure-I stands replaced as Annexure-I (Rev 1)
Shunt Reactor Rev-
07

Annexure-I
85. Section: 765kV Manufacturer may also offer Gas to Liquid (GTL) based insulating oil. The technical
Shunt Reactor Rev- parameters of this oil shall be finalized during detailed engineering.
07

New para added


under Clause No.9
86. Section: 765kV 8 numbers optical temperature sensors shall be fitted on each unit. The optical sensors
Shunt Reactor Rev- measuring system shall be of direct measurement non-calibrating type. All the sensors
07 shall be brought out to separate optical sensor box or in Individual Marshalling Box
mounted on reactor tank or ground mounted to facilitate measurement of temperature
Clause No.7.14 during service life on each unit.

Location of optical temperature sensors inside the reactor shall be decided during design
review. The installation and commissioning at site shall be done under the supervision
of OEM representative or OEM certified representative.

Supply of temperature measuring unit is not required. However, manufacturer shall


keep one unit in their works as a part of testing equipment for measurement of
temperature through sensor during factory testing.
87. Section: 765kV Suitable provision (valves, etc.) shall be provided for installation of Nitrogen Injection
Shunt Reactor Rev- Fire Protection System in reactor.
07

New Clause
No.7.1.5 (f)
88. Section: 765kV When the flow from conservator to main tank is more than the normal operating
Shunt Reactor Rev- conditions, the valve shall shut off by itself and will have to be reset manually. It shall be

Page 17 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

07 provided with valve open/close position indicator along with alarm contact indication
in control room during closing operation of valve. This valve shall be provided with
locking arrangement for normal position and oil filling / filtration position. Glass
window for visual inspection similar to Buchholz glass inspection window shall be
Clause No.14.8 (c) provided for physical checking of status of valve. It shall have IP 67 class degree of
protection. A suitable platform or ladder (if required) shall be provided to approach the
valve for manual reset.
89. Section: 765kV Frequency Response analysis
Shunt Reactor Rev-
07 The test shall be performed on each phase of the Reactor by taking open circuit response
of complete winding as HV to neutral terminal and vice versa. The response shall be
Annexure – C compared with other units of same design for reference.
Test Procedures
Sr. No.14

90. Section : Deleted


Transformer
(Upto 400kV Class)
Rev 11

Clause no.10.13
91. Section : Tan δ value of RIP (Resin Impregnated Polymer) condenser bushing shall be 0.005
Transformer (max.) in the temperature range of 20°C to 90°C. The measured Tan δ value at site
(Upto 400kV Class) should not exceed by 0.001 w.r.t. factory results (measured at approx. similar
Rev 11 temperature conditions) during warrantee period.

Clause no.10.14
92. Section : 04 nos. of Gate valves (minimum size 50NB) for UHF sensors for PD Measurements
Transformer (applicable for 400kV Transformer only) at various locations. Location of valves shall be
(Upto 400kV Class) finalized during design review.
Rev 11

Clause No.6.1.5 (d)


93. Section : Fixing of cooler support for 400kV class transformer shall be provided through Anchor
Transformer Fastener with chemical grouting and no pockets for bolting shall be provided.
(Upto 400kV Class)
Rev 11 Further, metallic support structure (for cooler pipe supports, Buchholz pipe (if required)
shall be fixed directly in the pit through Anchor Fastener with chemical grouting.
New para added Further, these support structures shall be encased with concrete to prevent rusting. No
under Clause foundation block for these support structures are envisaged.
No.6.4
94. Section : Manufacturer may also offer Gas to Liquid (GTL) based insulating oil. The technical
Transformer parameters of this oil shall be finalized during detailed engineering.
(Upto 400kV Class)
Rev 11

New para added


under Clause No.8

Page 18 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

95. Section : For 400 kV Class Auto transformer:


Transformer
(Upto 400kV Class) i. Bidder / Manufacturer should have successfully carried out Dynamic Short
Rev 11 Circuit test on 315MVA or above rating 400/220/33kV, 3-Phase Auto transformer
as on the originally scheduled date of bid opening and shall enclose the relevant
Clause No.3.13.1 Test Report/certificate along with bid. In case bidder/manufacturer has not
successfully tested 315MVA or above rating 400/220/33kV, 3-Phase Auto
transformer for Dynamic Short Circuit test, their bid shall be considered
technically non responsive. Further, design review of offered 400kV Class Auto
transformer shall be carried out based on the design of short circuit tested
315MVA or above rating 400/220/33kV, 3-Phase Auto transformer.

ii. Following Loss parameters of 315 MVA, 400/220/33kV 3-Phase Auto


Transformer are added to 2.20 of Annexure A of Technical Specification: Section -
Transformer (Upto 400kV Class) Rev-11

Sr. No. Maximum Permissible Losses


Losses of 315 MVA, 400kV
Transformer

i) Max. No Load Loss at rated 75 kW


voltage and frequency

ii) Max. Load Loss at rated 440 kW


current and at 75O C

iii) Max. Auxiliary Loss at rated 10 kW


voltage and frequency

Note:
Transformer manufacturer who have already short circuit tested 315MVA or above
rating 400kV class transformer shall offer the 315MVA Transformer meeting the above
specified losses for which design review shall be carried out based on earlier short
circuit tested transformer design.

96. Section : z. On line insulating oil drying system(if specified in BPS) as per Annexure-M
Transformer
(Upto 400kV Class) aa. Online Dissolved Gas (Multi-gas) and Moisture Measuring Equipment (if
Rev 11 specified in BPS) as per Annexure-K
Clause No.21
Z, aa, bb, dd
bb. On line dissolved Hydrogen and Moisture Measuring Equipment (if specified in
BPS) as per Annexure-L

dd. Deleted

Page 19 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

97. Section : Optical temperature sensors shall be fitted on each Transformer unit. 16 number probes
Transformer for 3-ph unit and 8 number probes for 1-ph unit shall be provided. The optical sensors
(Upto 400kV Class) measuring system shall be of direct measurement non-calibrating type. All the sensors
Rev 11 shall be brought out to separate optical sensor box or in Individual Marshalling Box
mounted on transformer tank to facilitate measurement of temperature during service
Clause No.6.14 life on each unit.

Location of optical temperature sensors inside the transformer shall be decided during
design review. The installation and commissioning at site shall be done under the
supervision of OEM representative or OEM certified representative.

Supply of temperature measuring unit is not required. However, manufacturer shall


keep one unit in their works as a part of testing equipment for measurement of
temperature through sensor during factory testing.

98. Section : Suitable provision (valves, etc.) shall be provided for installation of Nitrogen Injection
Transformer Fire Protection System in transformer.
(Upto 400kV Class)
Rev 11

New Clause
No.6.1.5(f)

99. Section : When the flow from conservator to main tank is more than the normal operating
Transformer conditions, the valve shall shut off by itself and will have to be reset manually. It shall be
(Upto 400kV Class) provided with valve open/close position indicator along with alarm contact indication
Rev 11 in control room during closing operation of valve. This valve shall be provided with
locking arrangement for normal position and oil filling / filtration position. Glass
Clause No.13.7.8(c) window for visual inspection similar to Buchholz glass inspection window shall be
provided for physical checking of status of valve. It shall have IP 67 class degree of
protection. A suitable platform or ladder (if required) shall be provided to approach the
valve for manual reset.

100. Section : Deleted


Transformer
(Upto 400kV Class)
Rev 11

Annexure –B, Test


Plan Sr. No. 18

Annexure – C Test
Procedures, Sr.No.5
101. Section : Upto Deleted
400kV Shunt
Reactor Rev 10

Clause no. 11.13

Page 20 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

102. Section : Upto Tan δ value of RIP (Resin Impregnated Polymer) condenser bushing shall be 0.005
400kV Shunt (max.) in the temperature range of 20°C to 90°C. The measured Tan δ value at site
Reactor Rev 10 should not exceed by 0.001 w.r.t. factory results (measured at approx. similar
temperature conditions) during warrantee period.
Clause no. 11.14

103. Section : Upto 04 nos. of Gate valves (minimum size 50NB) for UHF sensors for PD Measurements
400kV Shunt (applicable for 420kV Reactor only) at various locations. Location of valves shall be
Reactor Rev 10 finalized during design review.

Clause No.7.1.5 (d)


104. Section : Upto For 400kV Reactors, cooler bank shall be tank mounted.
400kV Shunt
Reactor Rev 10 Further, reactor Manufacturers to ensure that roller mounting pad at the bottom of the
tank shall be removed for better contact of reactor bottom plate to plinth. Roller to be
New Para added mounted directly with tank bottom.
under Clause
No.7.4 Specific area shall not be provided for jacking pad in the foundation as jacking shall be
done by laying temporary metal plates size 400 mm x 400 mm x 32 mm (min) thick. One
set of metal plates for jacking of reactor shall be provided.
105. Section : Upto Manufacturer may also offer Gas to Liquid (GTL) based insulating oil. The technical
400kV Shunt parameters of this oil shall be finalized during detailed engineering.
Reactor Rev 10

New para added


under Clause No.9
106. Section : Upto 8 numbers optical temperature sensors shall be fitted on each unit. The optical sensors
400kV Shunt measuring system shall be of direct measurement non-calibrating type. All the sensors
Reactor Rev 10 shall be brought out to separate optical sensor box or in Individual Marshalling Box
mounted on reactor tank or ground mounted to facilitate measurement of temperature
Clause No.7.14 during service life on each unit.

Location of optical temperature sensors inside the reactor shall be decided during design
review. The installation and commissioning at site shall be done under the supervision
of OEM representative or OEM certified representative.

Supply of temperature measuring unit is not required. However, manufacturer shall


keep one unit in their works as a part of testing equipment for measurement of
temperature through sensor during factory testing.
107. Section : Upto Suitable provision (valves, etc.) shall be provided for installation of Nitrogen Injection
400kV Shunt Fire Protection System in reactor.
Reactor Rev 10

New Clause
No.7.1.5 (f)
108. Section : Upto Deleted
400kV Shunt
Reactor Rev 10

Clause No.22.1.
(xxix)

Page 21 of 22
SPECIFIC REQUIREMENT’S (Section- Project)
C/ENGG/SPEC/SEC-PROJECT/SPECIFIC REQUIREMENT REV NO 02

109. Section : Upto When the flow from conservator to main tank is more than the normal operating
400kV Shunt conditions, the valve shall shut off by itself and will have to be reset manually. It shall be
Reactor Rev 10 provided with valve open/close position indicator along with alarm contact indication
in control room during closing operation of valve. This valve shall be provided with
Clause No.14.8 (c) locking arrangement for normal position and oil filling / filtration position. Glass
window for visual inspection similar to Buchholz glass inspection window shall be
provided for physical checking of status of valve. It shall have IP 67 class degree of
protection. A suitable platform or ladder (if required) shall be provided to approach the
valve for manual reset.
110. Section : Upto Frequency Response analysis
400kV Shunt
Reactor Rev 10 The test shall be performed on each phase of the Reactor by taking open circuit response
of complete winding as HV to neutral terminal and vice versa. The response shall be
Annexure – C Test compared with other units of same design for reference.
Procedures,
Sr.No.14

Page 22 of 22
Annexure-S2
SPECIFICATION FOR DIGITIAL PROTECTION COUPLER

1.0 Digital protection coupler for protection signalling through optical fibre cable
system.

1.1 The Digital protection signalling equipment is required to transfer the trip commands from
one end of the line to the other end in the shortest possible time with adequate security
and dependability. It shall also monitor the healthiness of the link from one end to the
other and give alarms in case of any abnormality. The protection signalling equipment
shall have a proven operating record in similar application over EHV systems and shall
operate on 48V DC (+10%, -10%). It shall provide minimum four commands. These
commands shall be suitable for Direct tripping, Intertripping and Blocking protection
schemes of EHV lines.

The protection signalling equipment shall communicate to the remote end interfacing
with SDH terminal equipment at its 2Mbps port. It shall provide suitable interfaces for
protective relays, which operate at 220/110V DC. Power supply points shall be immune
to electromagnetic interface.

1.2 Principle of operation

During normal operation, protection signalling equipment shall transmit a guard


signal/code. In case Protection signalling equipment is actuated by protective relays for
transmission of commands, it shall interrupt the guard signal/code and shall transmit the
command code to the remote end. The receiver shall recognize the command code and
absence of the guard code and will generate the command to the protective relays.

All signal processing i.e. generation of tripping signal and the evaluation of the signals
being received shall be performed completely digital using Digital Signal Processing
techniques.

1.3 Loop testing

An automatic loop testing routine shall check the teleprotection channel.

It shall also be possible to initiate a loop test manually at any station by pressing a button
on the front of the equipment.

Internal test routine shall continuously monitor the availability of the protection signaling
equipment.

-1-
Proper tripping signal shall always take the priority over the test procedure.

The high speed digital protection signalling equipment shall be designed and provided
with following features.

● Shall work in conjunction with SDH terminal equipment.


● It shall communicate on G 703 (E1,2 Mbps)
● Full Duplex operation
● Auto loop facility shall be provided
● Shall meet IEC 60834-1 standard
● Shall be able to transmit upto 4 commands with trip counter simultaneously
or sequentially in one 2Mbps channel

Bidder shall quote for protection signalling equipment suitable for 4 commands with
separate trip counters for transmit and receive. With regard to trip counters alternate
arrangement .i.e. Laptop along with software & all accessories to download events
including carrier receipt and transmit shall be acceptable. Laptop for the above shall be
supplied at each substation under substation package.

High security and dependability shall be ensured by the manufacturer. Probability of


false tripping and failure to trip shall be minimum. Statistical curves/figures indicating
above mentioned measures shall be submitted along with the bid.

The DPC can be either housed in offered Control & Protection Panel / PLCC Panel or in
separate panel.

Reports of the following tests as per clause 9.2 of Chapter 2-GTR shall be submitted for
approval for protection signalling equipment and relays associated with the protection
signalling equipment and interface unit with protective relay units, if any.

i) General equipment interface tests :

a) Insulated voltage withstand tests


b) Damped oscillatory waves disturbance test
c) Fast transient bursts disturbance test
d) Electrostatic discharge disturbance test
e) Radiated electromagnetic field test
f) RF disturbance emission test

ii) Specific power supply tests

a) Power supply variations


b) Interruptions

-2-
c) LF disturbance emission
d) Reverse polarity

iii) Tele-protection system performance tests


a) Security
b) Dependability
c) Jitter
d) Recovery time
e) Transmission time
f) Alarm functions
g) Temperature and Humidity tests (As per IEC 68-2)
- Dry heat test (50°C for 8 hours)
- Low temperature test (-5°C for 8 hours)
- Damp heat test (40°C/95%RH for 8 hours)

All the above tests at i, ii & iii (except temperature & humidity tests) shall be as per IEC
60834-1 and the standards mentioned therein.

iv) Relays

a) Impulse voltage withstand test as per IEC 60255.

b) High frequency disturbance test as per IEC 60255.

The protection signalling equipment shall be of modular construction and preferably


mounted in the Relay panels. Cabling between the protection signalling equipment &
Protection relays and between protection signalling equipment & Communication
equipment shall be in the scope of bidder.

The input/output interface to the protection equipment shall be achieved by means of


relays and the input/output rack wiring shall be carefully segregated from other
shelf/cubicle wiring.

The isolation requirements of the protection interface shall be for 2kV rms.

1.4 Major technical Particulars

The major technical particulars of protection signalling equipment shall be as follows.


i) Power supply 48V DC +10%, -10%
ii) Number of commands 4 (four)
iii) Operating time <7 ms
iv) Back to back operate time without propagation delay ≤ 8 ms

-3-
v) Interface to Protection relays
Input: Contact Rating:
Rated voltage : 250 volts DC
Maximum current rating: 5 amps
Output: Contact Rating:
Rated voltage : 250 volts DC
Rated current : 0.1 A DC
Other parameters : As per IEC-255-0-20
vi) Alarm contact
Rated voltage : 250 volts DC
Rated current : 0.1 A DC
Other parameters : As per IEC-255-0-20

vii) Digital communication interface: G 703(E1)

-4-
Annexure-S3

AIR CONDITIONING & VENTILATION SYSTEM FOR GIS BUILDING

AIR CONDITIONING SYSTEM FOR GIS


1 GENERAL

1.1 This specification covers supply, installation, testing and commissioning


and handing over to POWERGRID of Air conditioning system for the
Local Control rooms & Maintenance Room in the GIS halls.

1.2 Air conditioning system shall be designed to maintain the inside DBT
below 24oC. Bidder shall submit necessary design calculations for
employer’s approval.

1.3 At least 50% spare Air-Conditioning capacity shall be provided for Local
Control rooms in the GIS halls.

1.4 Controllers shall be provided in Local Control room inside GIS hall for
controlling and monitoring the AC units in these rooms as detailed in
clause no.2.6

1.5 Each Local Control room inside GIS hall shall be provided with
temperature transducer to monitor the temperature of the Local Control
rooms in the GIS halls. The Temperature transducer shall have the
following specification:

Sensor : Air temperature sensor (indoor use)


Output : 4 to 20mA
Temperature range : -5oC to 60oC
Resolution : 0.1oC
Accuracy : 0.5oC or better.

2 AIR CONDITIONING SYSTEM REQUIREMENTS.

2.1 Air conditioning requirement of the buildings shall be met using a


combination of following types Air Conditioning units as required.

a) Cassette type split AC units of 3TR.


b) High wall type split AC units of 2TR.

2.2 Type & Capacity of air conditioners shall be so chosen such that quantity
of air conditioners in the room is optimized keeping the necessary air
flow.

2.3 Scope

The scope of the equipment to be furnished and services to be provided


under the contract are outlined hereinafter and the same is to be read in

Page 1 of 4
Annexure-S3

AIR CONDITIONING & VENTILATION SYSTEM FOR GIS BUILDING

conjunction with the provision contained in other sections/ clauses. The


scope of the work under the contract shall be deemed to include all such
items, which although are not specifically mentioned in the bid documents
and/or in Bidder's proposal, but are required to make the
equipment/system complete for its safe, efficient, reliable and trouble free
operation.

2.3.1 Required number of Cassette type split AC units of 3TR capacity each
complete with air cooled outdoor condensing unit having hermetically
sealed compressor unit with cordless remote controller.

2.3.2 Required number of High wall type split AC units of 2TR capacity each
complete with air cooled outdoor condensing unit having hermetically
sealed compressor and high wall type indoor evaporator unit with cordless
remote controller.

2.3.3 Copper refrigerant piping complete with insulation between the indoor and
outdoor units as required.

2.3.4 First charge of refrigerant and oil shall be supplied with the unit.

2.3.5 GSS/Aluminium sheet air distribution ducting for distributing conditioned


dehumidified air along with supply air diffusers and return air grilles with
volume control dampers and necessary splitters etc., suitable fixtures for
grilles/diffusers and supports for ducting complete with insulation.

2.3.6 Local start/stop facility for local starting/ stopping of all electrical
equipment/ drives.

2.3.7 All instruments and local control panels alongwith controls and interlock
arrangements and accessories as required for safe and trouble free
operation of the units.

2.3.8 PVC drain piping from the indoor units upto the nearest drain point.

2.3.9 Supply and erection of Power and control cable and earthing.

2.3.10 MS Brackets for outdoor condensing units, condensers as required.

2.4 Technical specifications.

2.4.1 Cassette type split AC units.


The Cassette type AC units shall be complete with indoor evaporator unit,
outdoor condensing units and cordless remote control units.

Page 2 of 4
Annexure-S3

AIR CONDITIONING & VENTILATION SYSTEM FOR GIS BUILDING

2.4.1.1 Outdoor unit shall comprise of hermetically/ semi hermetically sealed


compressors mounted on vibration isolators, fans and copper tube
aluminium finned coils all assembled in a sheet metal casing. The casing
and the total unit shall be properly treated and shall be weatherproof type.
They shall be compact in size and shall have horizontal discharge of air.

2.4.1.2 Indoor units shall be of 4-way, ceiling mounted cassette type. The indoor
unit shall be compact and shall have elegant appearance. They shall have
low noise centrifugal blowers driven by suitable motors and copper tube
aluminium finned cooling coils. Removable and washable polypropylene
filters shall be provided. They shall be complete with multi function
cordless remote control unit with special features like programmable
timer, sleep mode etc.

2.4.1.3 Cooling capacity of 3TR AC units shall not be less than 36000btu/hr. and
shall have energy efficiency rating of 5 star as on the date of NOA.

2.4.2 High wall type split AC units

2.4.2.1 The split AC units shall be complete with indoor evaporator unit, outdoor
condensing units and cordless remote control units.

2.4.2.2 Outdoor unit shall comprise of hermetically/semi hermetically sealed


compressors mounted on vibration isolators, propeller type axial flow fans
and copper tube aluminium finned coils all assembled in a sheet metal
casing. The casing and the total unit shall be properly treated and shall be
weatherproof type. They shall be compact in size and shall have horizontal
discharge of air.

2.4.2.3 The indoor units shall be high wall type. The indoor unit shall be compact
and shall have elegant appearance. They shall have low noise centrifugal
blowers driven by suitable motors and copper tube aluminium finned
cooling coils. Removable and washable polypropylene filters shall be
provided. They shall be complete with multi function cordless remote
control unit with special features like programmable timer, sleep mode
and soft dry mode etc.

2.4.2.4 Cooling capacity of 2TR AC & 3 TR AC units shall not be less than
22000btu/hr. and shall have energy efficiency rating of 5 star as on the
date of NOA.

2.5 The Split AC units shall be of Carrier, Voltas, Blue Star, Hitachi, Daikin,
LG, National, O’General, or Samsung make.

Page 3 of 4
Annexure-S3

AIR CONDITIONING & VENTILATION SYSTEM FOR GIS BUILDING

2.6 Controllers shall be provided in Local Control room inside GIS hall, one
controller for each room, to control and monitoring of AC units and shall
have the following facilities;

 Standby units shall come in to operation automatically when the


running main unit fails
 Main and standby units shall be changed over periodically which shall
be finalised during detailed engineering.
 Following alarms shall be provided:

a. Compressor On/OFF condition of each unit


b. Compressor failure of each unit
c. Power OFF to AC unit
d. High temperature in room.

2.7 Warranty
All compressors shall have minimum 5 years Warranty from the date of
commissioning.

Ventilation system for GIS Hall

Each GIS Hall shall have an independent ventilation system. Each Ventilation
system shall consist of two 100% capacity systems, one operating and one stand-by.

To ensure that the air being supplied to the GIS hall is free from dust particles, a
minimum two stage dust filtration process shall be supplied. This shall consist of at
least the following:

1. Pre Filters: To remove dust particles down to 10 micron in size with at least
95% efficiency.

2. Fine Filters: To remove dust particles down to 5 microns in size with at least
99% efficiency.

All the filters shall be panel type. Easy access should be available to the filters for
replacement/cleaning.

The ventilation of the GIS hall shall be of a positive pressure type with minimum 2
air changes per hour. The pressure inside the GIS hall shall be maintained 5 mm of
water above the atmospheric pressure. Fresh outdoor air shall be filtered before
being blown into the GIS hall by the air fans to avoid dust accumulation on
components present in the GIS hall. GIS hall shall be provided with motorized
exhaust dampers with local control.

Page 4 of 4
SECTION-GENERAL TECHNICAL REQUIREMENTS (GTR)
ANNEXURE-A

CORONA AND RADIO INTERFERENCE VOLTAGE (RIV) TEST

1. General
Unless otherwise stipulated, all equipment, shall be tested for external corona (for
400kV & above) both by observing the voltage level for the extinction of visible corona
under falling power frequency voltage and by measurement of radio interference
voltage (RIV) for 132kV and above.
2. Test Levels:
The test voltage levels for measurement of external RIV and for corona extinction
voltage are listed under the relevant clauses of the specification.
3. Test Methods for RIV:
3.1 RIV tests shall be made according to measuring circuit as per International Special-
Committee on Radio Interference (CISPR) Publication 16-1(1993) Part -1. The
measuring circuit shall preferably be tuned to frequency with 10% of 0.5 Mhz but
other frequencies in the range of 0.5 MHz to 2 MHz may be used, the measuring
frequency being recorded. The results shall be in microvolts.
3.2 Alternatively, RIV tests shall be carried out in accordance with relevant IEC of
respective equipment or NEMA standard Publication No. 107-2016.
3.3 In measurement of, RIV, temporary additional external corona shielding may be
provided. In measurements of RIV only standard fittings of identical type supplied
with the equipment and a simulation of the connections as used in the actual
installation will be permitted in the vicinity within 3.5 meters of terminals.
3.4 Ambient noise shall be measured before and after each series of tests to ensure that
there is no variation in ambient noise level. If variation is present, the lowest ambient
noise level will form basis for the measurements. RIV levels shall be measured at
increasing and decreasing voltages of 85%, 100%, and 110% of the specified RIV test
voltage for all equipment unless otherwise specified. The specified RIV test voltage for
765kV, 400 kV, 220 KV, 132kV is listed in the detailed specification together with
maximum permissible RIV level in microvolts.
3.5 The metering instruments shall be as per CISPR recommendation or equivalent device
so long as it has been used by other testing authorities.
3.6 The RIV measurement may be made with a noise meter. A calibration procedure of the
frequency to which noise meter shall be tuned shall establish the ratio of voltage at the
high voltage terminal to voltage read by noise meter.
4. Test Methods for Visible Corona
The purpose of this test is to determine the corona extinction voltage of apparatus,
connectors etc. The test shall be carried out in the same manner as RIV test described
above with the exception that RIV measurements are not required during test and a
search technique shall be used near the onset and extinction voltage, when the test
voltage is raised and lowered to determine their precise values. The test voltage shall
be raised to 110% of specified corona extinction voltage and maintained there for five
minutes. In case corona inception does not take place at 110%, test shall be stopped,
otherwise test shall be continued and the voltage will then be decreased slowly until
all visible corona disappears. The procedure shall be repeated at least 3 times with
____________________________________________________________________________
Technical Specification: GTR Page 1 of 2 (Annexure-A, Rev01)
C/ENGG/SPEC/GTR (Rev. No.:-14)
SECTION-GENERAL TECHNICAL REQUIREMENTS (GTR)
ANNEXURE-A

corona inception and extinction voltage recorded each time. The corona extinction
voltage for purposes of determining compliance with the specification shall be the
lowest of the three values at which visible corona (negative or positive polarity)
disappears.

The test to determine the visible corona extinction voltage need not be carried out
simultaneously with test to determine RIV levels.
However, both test shall be carried out with the same test set up and as little time
duration between tests as possible. No modification on treatment of the sample
between tests will be allowed. Simultaneous RIV and visible corona extinction voltage
testing may be permitted at the discretion of Employer’s inspector if, in his opinion, it
will not prejudice other test.
5. Test Records:
In addition to the information previously mentioned and the requirements specified as
per CISPR or NEMA 107-2016 the following data shall be included in test report:
a) Background noise before and after test.
b) Detailed procedure of application of test voltage.
c) Measurements of RIV levels expressed in micro volts at each level.
d) Results and observations with regard to location and type of interference
sources detected at each step.
e) Test voltage shall be recorded when measured RIV passes through 100
microvolts in each direction.
f) Onset and extinction of visual corona for each of the three tests required shall be
recorded.

____________________________________________________________________________
Technical Specification: GTR Page 2 of 2 (Annexure-A, Rev01)
C/ENGG/SPEC/GTR (Rev. No.:-14)
ANNEXURE – I (Rev 1)

Gapless Surge Arrester – Technical parameters

a. Rated arrester voltage 132 kV

b. Rated system voltage 145 kV

c. Rated system frequency 50Hz

d. System neutral earthing Earthed through NGR

e. Installation Outdoor

f. Nominal discharge current 10kA of 8/20 microsec wave.

g. Class of arrester 20kA heavy duty type

h. Minimum discharge capacity 12 kJ/kV (referred to rated


voltage)
i. Continuous operating voltage at 50øC 106 kV

j. Maximum switching surge residual voltage (1kA) 280kVp

k. Maximum residual voltage at

(i) 10kA 314kVp

(ii) 20kA nominal discharge current 334kVp

l. Long duration discharge class 4

m. High current short duration test value (4/10micro- 100kAp


sec.wave)
n. Current for pressure relief test 40kArms

o. Low current long duration test value (2000microsec.) 1000Apeak

p. Min. total creepage distance 3625 mm.

q. One minute dry power frequency withstand voltage of 275kVrms


arrester housing
r. Impulse withstand voltage of arrester housing with + 550KVp
1.2/50 micro-sec. wave
s. Pressure relief class A

t. RIV at 92 kVrms. Less than 500microvolts

u. Partial discharge at 1.05 continuous over voltage Not more than 50pC

v. Seismic acceleration As specified in section project

w. Reference ambient temperature 50 deg C

Technical Specification, 765kV Shunt Reactor


C/ENGG/MODEL-SPEC/765kV SR Rev. 07
Section: Switchgear-INST (INSRUMENT TRANSFORMER) REV 11

Annexure-V (Revised): Actions required in case of defects observed during warrantee


period

Equipment Nature of problem Corrective measures to be taken


by contractor
CT/IVT/PT DGA Violation Refurbished or replaced
(Oil filled) H2 > 300 ppm
C2H2> 2 ppm

CT/IVT/PT a) SF6 gas leakage a)Repair/ replacement


(SF6 filled) b) High Dew point of SF6 gas ( > -36 deg C at b)Re-processing of gas and
atm press) replacement of Gas in case of no
improvement

CT/IVT/PT Violation of Tan delta Replacement


(Oil filled) Tan Delta:
>0.5%( during pre-commisioning )
>0.7% ( in operation)
or change w.r.t. to previous year value > 0.1%

CT, IVT/PT - Oil leakage Replacement or repair as per repair


& CVT - Low Oil level procedure approved by QA.
-Sec winding problem leading to open/ short
circuit, saturation etc

CVT Secondary voltage drift: Upto ± 0.5 volts Healthy


a) ± 0.5 or beyond a) CVT to be replaced

*Replaced/Repaired/Refurbished Equipment (or part of equipment) shall have 2 years warranty


without prejudice to contractual warranty period.

Technical Specification, Section: Switchgear-INST C/ENGG/SPEC/SWGR/R11


Appendix-VII

Nitrogen Injection Type Fire Prevention & Extinguishing System

1.1 Nitrogen Injection Type Fire Protection System (NIFPS) shall be designed to prevent
explosion of transformer/reactor tank and the fire during internal faults/arc.

The system shall work on the principle of Drain & stir. On activation, it shall drain a
pre-determined quantity of oil from the tank top through drain valve to reduce the
tank pressure, isolate conservator tank oil and inject nitrogen gas at high pressure
from the bottom side of the tank through inlet valves to create stirring action and
reduce the temperature of oil below flash point to extinguish the fire. On operation,
the quantity of oil removed from the tank shall be such that adequate amount of oil
shall remain to cover active part (i.e. core coil assembly).

Electrical isolation of transformer shall be an essential pre-condition for activating the


system.

1.2 Operational Controls

The system operation shall be fully automatic and activate from the required fire and
other trip signals. In addition to automatic operation, remote operation from control
room/ remote centre and local manual control in the fire extinguishing cubicle shall
also be provided. System shall operate on following situations:

1.2.1 Prevention of transformer from explosion and fire

To prevent transformer from explosion and fire in case of an internal fault, signals
given by operation of Electrical protection relays (Differential / Restricted earth fault)
and tripping of circuit breaker of transformer and operation of either Buchholz relay
or pressure relief valve (PRV) shall be used to activate the system. The exact logic for
system activation shall be finalized during detailed engineering.

1.2.2 Prevention of transformer from fire

In case of fire, sensed by fire detectors, the system shall be activated only after
electrical isolation of the transformer, confirmed by breaker trip. If the fire detection
is not associated with any other fault, the system activation shall be only manual.
Manual operation switch shall be provided in the control room with a cover to avoid
accidental operation of it.

1.3 Operation of System

On receiving activation signal, the following shall take place:

i) Open the quick opening drain valve to drain the top layer oil

ii) Shut off the conservator isolation valve to prevent flow of oil from the
Conservator tank to the main tank

iii) Open the valve to inject Nitrogen into the transformer tank to create
stirring of oil.

There shall be interlock to prevent activation of the system if the transformer is not
Section: Fire Protection Rev 6
electrically isolated.

There shall also be provision for isolating the system during maintenance and/or
testing of the transformer.

1.4 Technical Particulars

The contractor shall be responsible for the design of the complete system and shall
submit the drawings and design calculations for the number of fire detectors, pipe
sizing of drain pipe and Nitrogen injection pipe, Nitrogen cylinder capacity, number
of injection points, etc. and get approval from POWERGRID.

Facility shall be provided to test the system when the transformer is in service,
without actually draining the oil and injecting Nitrogen.

The Nitrogen regulator valve shall be designed in such a way that the Nitrogen shall
not enter the transformer tank even in case of passing/ leakage of valve.

Owner shall provide two distinct station auxiliary DC feeders for control purposes.
The system shall work on station DC supply with voltage variation defined in GTR
.The control box of fire protection system shall have facility to receive these feeders
for auto changeover of supply. It shall be the contractor’s responsibility to further
distribute power to the required locations. In case auxiliary DC power supply
requirement is different than station auxiliary DC supply, then all necessary DC-DC
converters shall be provided by the Contractor.

Following minimum indications and alarms shall be provided in the local cubicle as
well as in the control box:-

 Nitrogen cylinder pressure indication - manometer with sufficient number of


adjustable NO contacts
 Nitrogen cylinder pressure low
 Fire in Transformer/ Reactor
 Oil drain started
 Conservator oil isolation valve closed
 Nitrogen injection started
 DC supply fail
 Oil drain valve closed
 Gas inlet valve closed

1.5 Details of Supply of System Equipments and Other Related Activities:

The scope of supply shall include the following items and any other items required for
safe and trouble free operation of the system.

i) Fire extinguishing cubicle with base frame and containing at least the
following:

 Nitrogen gas cylinder of sufficient capacity with pressure regulator and


manometer with sufficient number of adjustable NO contacts.

 Oil Drain Assembly including oil drain pipe extension of suitable size
for connecting pipes to oil pit
Section: Fire Protection Rev 6
 Mechanical release device for oil drain and nitrogen release
 Limit switches for monitoring of the systems
 Panel lighting
 Flanges on top of the panel for connecting oil drain and nitrogen
injection pipes for transformer
 Back up pressure switch to operate nitrogen gas valve
 Pressure indicators for Nitrogen pressure of the cylinder and actual
injection through Nitrogen regulator
 Fire Extinguishing Cubicle shall have oil leakage detection
arrangement for detecting oil leakage from drain valve. In case of any
oil leakages, alarm to be provided.
 shall have minimum IP55 degree of protection

ii) Control box to be installed in the control room of the station for
monitoring system operation, automatic control and remote operation, with
alarms, indications, switches, push buttons, audio signal, suitable for
tripping and signalling.

iii) Required number of fire detectors to be located in strategic locations to be


finalized during detailed engineering. Fire detectors shall have minimum
IP-67 class degree of protection.

iv) All controls, alarms, panels, cables, cable trays (if required), junction
boxes etc.

v) Flow sensitive conservator Isolation valve to isolate the conservator oil


from the main tank is being provided by the transformer/reactor supplier.
This valve shall be located in the piping between the conservator and the
buchholz relay.

1.6 Under Ground Oil Storage Tank

Each transformer unit shall be provided with an underground oil storage tank. The oil
storage tank shall have Non Corrosive, water proof, epoxy coated (from Inside) mild
steel (minimum thickness 5 mm) to store drained out oil on operation of NIFPS. The
tank shall be painted from outside as per table below:

PAINTING Surface Primer Intermediate Finish coat Total dry Colour


preparation coat undercoat film shade
thick-
ness
(DFT)
Oil storage Shot Blast Epoxy Epoxy high Aliphatic Minimum RAL 7035
tank cleaning Sa 2 base Zinc build polyurethan 155m
½* primer Micaceous e (PU)
(30- iron oxide (Minimum
40m) (HB MIO) 50m)
(75m)
Note: (*) indicates Sa 2 ½ as per Swedish Standard SIS 055900 of ISO 8501 Part-1.

The total capacity of storage tank shall be at least 10% of transformer tank oil to avoid
overflowing of oil considering that drained oil volume shall be around 10% of
Section: Fire Protection Rev 6
transformer tank oil. Necessary arrangement shall be made on underground storage
tank so as to take out the drained oil from the tank for further processing and use. All
the pipe and physical connection from transformer to oil pit shall be in the scope of
contractor.

This storage tank shall be placed in the pit made of brick walls with PCC (1:2:4)
flooring with suitable cover plates to avoid ingress of rain water. The design of tank
and pit shall be finalised during detailed engineering.

1.7 Installation and pre-commissioning test

After installation the system pre-commissioning tests shall be carried out jointly with
the Owner’s representative before the system is put in service.

Section: Fire Protection Rev 6


NORMS AND TECHNICAL SPECIFICATIONS OF TESTING
INSTRUMENTS

(Volume-II)

FOR SUBSTATIONS, REGIONAL & SPECIAL TESTING LABORATORIES

DOC: D-5-10-30-01-05
Revision 5
July 2019

ASSET MANAGEMENT DEPARTMENT


POWER GRID CORPORATION OF INDIA LTD
GURGAON
Doc: D-5-10-30-01-05

POWER GRID CORPORATION OF INDIA LTD.


ASSET MANAGEMENT DEPARTMENT

NORMS AND TECHNICAL SPECIFICATIONS OF TESTING INSTRUMENTS


(Volume-II)

DOC: D-5-10-30-01-05 (rev.05)

Revision Department Date Signature Signature


00 CC/AM 10.01.1996 Sd/- Sd/-
01 CC/AM 25.01.2003 Sd/- Sd/-

02 CC/AM 01.04.2005 Sd/- Sd/-

03 CC/AM 11.08.2011 Sd/- Sd/-

04 CC/AM 05.10.2016 Sd/- Sd/-

05 CC/AM 30.07.2019 Sd/- Sd/-

Sl.No. Chapter Page No. Action

01 All chapters All Pages Replace all

4
Doc: D-5-10-30-01-05

INDEX
Sl.No. Description Page No.
(A) Norms for Testing Instruments & T&P for Substations 1
(B) Technical Specifications
01. CT Analyzer 7
02. Circuit Breaker Analyzer with DCRM 9
03. SF6 Gas Quality Analyser 11
04. Digital Earth Resistance Meter 13
05. Fully Automatic Capacitance & Tan Delta Measurement Kit 15
06. Automatic THRC Measurement Kit for Gapless Surge Arrestor 17
07. Transformer Winding Resistance Meter 19
08. Transformer Oil BDV Test Set 22
09. Automatic Transformer Turn Ratio Meter 24
10. Automatic Battery Discharge kit 26
11. Automatic Contact Resistance Meter 28
12. Mobile Dry Air Plant (Heatless type) 30
13. Digital Insulation Tester 32
14. Automatic Relay Test Kit 34
15. Thermo Vision Scanning Camera- Low End 37
16. Sweep Frequency Response Analyser 41
17. Digital Level Meter cum Level Generator 43
18. SF6 Gas Handling Plant 45
19. Off line Transformer Oil Filtration Plant (10000/6000 lt/hr) 47
20. Gas Chromatograph for DGA of Transformer Oil 54
21. Portable Dissolved Gas Analysis Kit of Transformer Oil 58
22. Propelled Articulating Boom lift for 765 kV Substations 60
23. Propelled Articulating Boom lift for 400 kV Substations 61
24. Battery Operated Platform Trolley for Substations 62
25. Primary Injection Kit 63
26. Portable Automatic Particle counter 64
27. 1 kLPH Transformer Oil Filtration Plant with NAS Filter 65
28. Stand Alone Vacuum Pumping System 71
29. Insulation/Dielectric Diagnostic Analyser(FDS kit) 74
30. D.C. Earth Fault Locator 76
31. SF6 Leakage Detector (Applicable Only for GIS) 78
32. Portable Partial Discharge Measurement kit 80
(C) Guide Line for Procurement of Testing Equipments 81

5
Doc: D-5-10-30-01-05

(A) Norms of Testing / Measuring Instruments for


Substations / RTL / STL

Sl. Name of Instruments and Quantity (in no.) Calibration Frequency


No. Specifications RHQ/RTL HVAC (yearly)
/ HVDC
Stn
1 DC Earth Fault Locator 1
2. Insulation Testers: (as per TS at
Sl.No. 13 of 10kV insulation tester)
(a) Digital Insulation tester, Battery 1 1 Yes 4
operated – 10 kV
(500V, 1000V, 2.5kV,5.0KV, 10KV),
suitable for PI Measurement.
(b) Digital Insulation Tester Low-Voltage 1 1 Yes 4
(250V, 500V, 1000V) Battery operated
3. Digital Earth Resistance Meter: as
per TS at Sl.No. 04
(a) Battery (rechargeable) operated earth 1 1 Yes 4
resistance / resistivity tester
4. Digital Clamp –on- Ammeters:
(a) Suitable for 0 –1000 Amps A.C - 1 - -
(b) Leakage AC Current ( 0 – 5 A) with 1 2 - -
resolution of at least 01 mA
(c) Very low current 0-30 mA 1 2 - -

(d) AC and DC current 0-400Amps 1 2 - -

(e) Low DC current (0 - 1 1 - -


2/20A D.C)
5. Digital Automatic Contact - 1 Yes 4
Resistance Meter:
6. Transformer Winding Resistance 1 1 Yes 4
Meters:
7. Digital Multimeters

(a) General Purpose 3 5 Yes 4

(b) Precision grade (+/- 0.5 % Accuracy 2 3 Yes 4


for AC RMS Voltage)

8. SF6 Gas Detectors - 1 - -


(Battery operated) suitable to detect
SF6 gas leakage from CBs/CTs
9. SF6 Leakage Detector with high - 1 (only - -
sensitivity applicable
for GIS)

1
Doc: D-5-10-30-01-05

Sl. Name of Instruments and Quantity (in no.) Calibration Frequency


No. Specifications RHQ/RTL HVAC (yearly)
/ HVDC
Stn
10. Phase Sequence Indicator - 2 - -

11. Light Meter - 1 Yes 4


(Lux Meter)
12. Harmonic Analyser - 1 no for - -
HVDC Stn
13. Low Voltage Capacitance Meter - 1 (for - -
SVC/STATC
OM ,
FACTS, &
HVDC Stn)
14. Vibration Meters 1 1 Yes 4

15. Portable Moisture Test Kit / 1 1 Yes 4


Measuring Sensor
16. Transformer oil BDV Test Set 2 1 Yes 4

17. Automatic Resistivity &Tan Delta 2 - Yes 4


Test Set for Insulating Oil
18. Automatic Transformer Turns Ratio 1 1 for per Yes 4
Meter 5 S/S
19. SF6 Gas Quality Analyzer 1 1 Yes 4

20. Digital Level Meter cum Level 1 1 Yes 4


Generator
21. Automatic Third Harmonic 1 1 Yes 4
Resistive Current (THRC)
Measurement Kit suitable for
monitoring gapless LA
22. Fully Automatic Capacitance & Tan- 1 1 Yes 4
Delta Measurement
23. Circuit Breaker analyzer with DCRM 1 1 - -
kit
24. Automatic Relay Test 1 1 - -

25. Sweep Frequency Response 4 Nos/ region - -


Analyser (FRA kit)

26. IC Tester and Transistor Tester 1 1 no for - -


HVDC Stn
27. Printed Circuit Board (PCB) Tester 1 1 no for - -
HVDC Stn
28. Thermovision Camera –Low end - 1 Yes 4

2
Doc: D-5-10-30-01-05

Sl. Name of Instruments and Quantity (in no.) Calibration Frequency


No. Specifications RHQ/RTL HVAC (yearly)
/ HVDC
Stn
29. Portable DGA Kit - 1 no per - -
5 S/S
1 no. for
every
765KV S/S
30. Portable Partial Discharge - 1 no. per - -
Measurement kit GIS
(wherever
Online
PDMS is not
available)
31. Calibration Instruments

(a) Digital Universal Timer / Counter 1 1 Yes 4

(b) Standard High Resistance 1 - Yes 4


(Rating suitable for 5 kV)
(c) Standard Low Resistance 1 - Yes 4
(rating suitable for winding resistance
& Contact resistance meters)
(d) Digital Multimeter (Bench Model) 1 - Yes 4
Precision Grade (with all accessories)
(e) Pressure Calibrator 1 1 Yes 4

(f) RTD / Thermocouple Calibrator 2 1 no per Yes 4


5 S/S
(g) Multifunction Calibrator 1 - Yes 4

32. Tools and Plants for Substation

(a) Single Phase Auto Transformer 1 1 - -


0 – 10 , 250V
(b) Electric Oven 1 1 - -

(c) Oil Sampling Bottles

i 50 ml Capacity Syrings 100 No of - -


Transfrme
rs &
Reactors +
20
ii 1 lr. Capacity 50 20 - -

(d) Soldering Iron

i Low Wattage (10W, 35W) 3 2 - -

3
Doc: D-5-10-30-01-05

Sl. Name of Instruments and Quantity (in no.) Calibration Frequency


No. Specifications RHQ/RTL HVAC (yearly)
/ HVDC
Stn
ii High Wattage (65W, 100W) 3 2 - -

(e) Soldering Station 2 1 - -

(f) Rheostats

i Low Current (1A/High Resistance in 3 3 - -


k ohms)
ii Medium Current (5A/ Medium 3 3 - -
Resistance in ohms)
iii High Current (10A/Low Resistance) 3 3 - -

(g) SF6 Gas Handling Plant - 1 - -

(h) Primary Current Injection test kit - 1 per 5 s/s - -

(i) CT Analyser 1 1 - -

(j) Automatic Battery Discharge Kit - 1 no. per 2 - - -


s/s
(k) Off-Line Transformer Oil Filtration - 1 no. per Yes 4
Plant Capacity 10000Ltr/Hr s/s for (Temp
765KV, Gauge)
400 KV &
HVDC s/s
(l) Off-Line Transformer Oil Filtration - 1 per 3 for Yes 4
Plant Capacity 6000Ltr/Hr 220 KV & (Temp
132 KV Gauge)
s/s(Plain
Terrain)
1 no. per
220kV &
132kV
s/s(Hilly
Terrain)
(m) On-Line Filtration Plant / De- - 1 no per Yes 4
Hydration Plant 5 S/S (Temp.
Moisture Removal Capacity of Cartidge gauge)
: 20 L (minimum)
(n) Nitrogen Pressure Gauge (Low - 2 Yes 4
pressure range)
(o) Digital Temperature Meter (Having 2 1 - -
Remote Sensor)
(p) R.H. Meter 1 1 - -

4
Doc: D-5-10-30-01-05

Sl. Name of Instruments and Quantity (in no.) Calibration Frequency


No. Specifications RHQ/RTL HVAC (yearly)
/ HVDC
Stn
(q) Walkie-Talkie Sets - 4 Sets - -

(r) Manlift with Self propelled and - 1 no per - -


Articulating Boom Manlift 765kV &
765kV S/s – 23.5 Mtr 400kV s/s
400kV S/s – 13 Mtr

(s) Battery Operated Platform Trolley - 1 no per - -


minimum capacity of 2000 kg. 765kV,
400kV &
220 KV s/s
(t) Standalone Vacuum pump - 1 no per - -
765kV s/s
(u) FDS Instrument 2 - -

(v) Small filter machine (1kL/Hr) with - 1 No. / - -


NAS Filter 765kV S/S -
(x) Portable Particle Counter 2 - -

33. Additional Instruments / tools

(a) Optical Time-Domain Reflectometer 1 - - -


(OTDR)
(b) Optical Power Meter ( SAS - 1 - -
Station)
(c) Light Source - 1 - -

(d) Gigabit Ethernet tester (SAS) 1 - - -

(e) Sound Level Meter 1 1 - -

(f) Mobile Dry Air Plant (Heatless type) - 1 - -


as per TS at Sl.No. 12
(g) Light weight telescopic ladders as
per requirement of Substation
40 ft-Single - 2 - -

60 ft-Double - 2 - -

34. *Additional Instruments / tools


(IOTL / CIOTL / STL Oil Lab)
Quantity for instruments required
for oil physical parameters testing
may be decided by Lab in
consultation with CC-AM/RHQ-AM.

5
Doc: D-5-10-30-01-05

Sl. Name of Instruments and Quantity (in no.) Calibration Frequency


No. Specifications RHQ/RTL HVAC (yearly)
/ HVDC
Stn
Quantity mentioned below are
indicative only
(a) Gas Chromatograph for DGA of 2 - - -
Transfr oil as per TS at Sl.No. 21
(b) Interfacial Tension Meter for 1 - - -
Transformer Oil
(c) Automatic water content 1 - - -
measurement kit for transformer
oil
(d) Automatic titrator for measuring 1 - - -
Total acidity of Insulating Oil
(e) Automatic Dielectric Constant, Tan 1 - - -
Delta & Resistivity Test Set for
Transformer Oil
(f) Furan analysis using solid phase 1 - - -
extraction apparatus and High
performance liquid chromatograph
(g) Automatic PMCC Flash Point Tester 1 - - -

(h) Viscosity test kit for Transformer 1 - - -


Oil -30ºC to 100ºC (Stabinger
Method)
(i) Pour point test kit for Transformer 1 - - -
Oils
(j) BDV test Kit for Transformer Oils 1 - - -

(k) Negative Impulsive Test kit for New 1 - - -


Transformer Oils
(l) Oxidation Stability Test Kit - 1 - - -
Rotating Bomb Test Kit
(m) Oxidation Stability Test Kit – PDSC 1 - - -
test kit
(n) Oxidation Inhibitor Test Kit – FTIR 1 - - -

6
Doc: D-5-10-30-01-05

(B) 01. Technical Specifications for CT Analyzer

S.No Description Specifications


1. Function of the kit This instrument shall perform the current transformer saturation test,
measure the CT winding resistance preferably and CT turn ratios
automatically. Shall indicate winding polarity and preferably measure
burden of CT. The analyzer shall also measure phase angle and indicate
errors for ratio and phase angle.

The kit shall confirm the name plate details .It shall also help in
analyzing the CT behaviour in case of change of primary or secondary
currents when the revised data is entered in to test data.

The kit shall be able to plot the excitation curve and locate the Knee
point Voltage and Current in real time.

The accessories required for utilization of additional facilities/features


if any apart from above shall be quoted separately.

2. Input Power 230V ±10% at 50 Hz


3. Voltage range 4kV in steps/automatically controlled. VA rating not less than 300 VA
(Continuous). Accuracy 1.0% of reading or better Or equivalent
arrangement for testing the CTs with Knee Point Voltage of 4kV or
better.
4. CT turns ratio 1 to 5000 @ accuracy 0.2% or better.
5. Phase angle 0 to 360 deg @ ±1deg (Required only if kit uses Frequency conversion
method)
6. Software The test record shall be able to download via RS 232 C port to a PC in
windows Excel/equivalent format. CT Set and ratio tests can also run
on windows NT 2000/XP/latest based software application.
7. Storage/Memory It should store/record minimum 140 test records in kit or storage
device. Each test record must contain up-to 10 saturation curves, turns
ratio reading, polarity and DC resistance reading etc.
8. Display If operated through inbuilt LCD screen, it must be Visible in bright
sunlight and must have backlight display
9. Protection Fuse / MOV / MCB with over voltage and Over current, Thermal
overload etc. Zero start and end Interlocks shall also be provided.
10. Accessories All testing/measurement cables 20 meter long. PC inter phase cables,
Power supply cables, Operating manual, Original CD and software,
Application CD etc. Hard carrying case etc.

11. Repeatability It should offer repeatability of test results in charged switchyard.


12. Environment The kit shall be compatible for EMI / EMC requirement as per relevant
IEC.
13. Operating Shall operate at Temperature 0 to 50 deg C, Humidity not condensing
conditions up to 90%.
14. Testing Standards IEC600 44- and ANSI C57.13 or 10/50, international and IS 2705
15. Safety Standards The test set must meet the international safety standard for a CE Mark
being IEC 61010-1 safety and IEC 61326-1 for EMC

7
Doc: D-5-10-30-01-05

S.No Description Specifications


16. Warranty Warranty/Guarantee Period: Min 01 year from the date of successful &
complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to be
covered under warranty/guaranty period. If the kit needs to be shifted
to supplier’s works for repairs within warranty/guaranty period,
suppliers will have to bear the cost of spares, software, transportation
of kit for repair at test lab/ works.
17. Calibration Unit shall be duly calibrated before supply and the date of calibration
certificate shall not be older than two months from the date of supply of Kit.
18. Training Supplier shall have to ensure the kit is made user friendly for all the
CTs available in POWERGRID. The supplier shall have to arrange
necessary training to POWERGRID Engineers.
19. Commissioning, Successful bidder will have to commission the instrument to the
Handing Over of satisfaction of POWERGRID. The instrument failed during the
the Instrument demonstration shall be rejected and no repairs are allowed.
20. Services after Sale Bidder will have to submit the documentary evidences of having
established mechanism for prompt services as and when required by
POWERGRID.

8
Doc: D-5-10-30-01-05

02. Technical Specification of Circuit Breaker Analyzer with DCRM

S No Description Specification
1. Functional 1. The instrument should be suitable for measuring the
Requirement operation timing of main, PIR (suitable with PIR ranging from
200 ohm to 500 ohm) and auxiliary contacts (wet & dry) as
well as coil currents.
2. It should measure the Dynamic Contact Resistance of main &
arcing contacts as well as travel measurement (with external
travel transducer) of operating mechanism.
3. The instrument should be suitable for testing the CBs upto
765 kV as per applicable standards and testing procedure of
Powergrid.
4. The test results should have repeatability, consistency &
immunity to electromagnetic interference in live switchyard
upto 765 kV levels.
2. No. of Channels 1. Main Contact Channels:24 (4 Main + 4 PIR per pole on 3 pole
simultaneously)
2. Aux. Contact Channel:06 wet & 06 Dry
3. DCRM/Test Current Channels:12 set (6 Channel for resistance
+ 6 channel for current)
4. Travel Channel:06
5. Coil Current Channel:06
3. Sampling Speed Upto 20 kC
4. Accuracy 1. Timing : ± 1 % of reading
2. Coil Current: ± 1 % of reading
3. R : ± 2 % of reading
4. Travel: ± 1 % of reading
5. Measurement 1. Timing: 0-4 s
Range: 2. R: 0-8 m Ω.
3. Coil Current:0-25 A
6. Resolution Timing: 0.1 ms
7. DCRM Test Current 100 A.(Minimum)
8. Test Leads and One complete set of cables of sufficient length (min 20metre) with
accessories suitable clamps & connectors, compatible with the all type of CBs
should be provided for successfully carrying out the test in
POWERGRID S/S. Additionally all the required accessories should be
provided for the smooth functioning of kit. Further hard carrying
case (which should be robust/ rugged enough) for ensuring proper
safety of the kit during transportation shall have to be provided.
9. Travel Transducers One set of travel transducers along with clamp/fixtures to suit
765/400/220 kV CBs of ABB/AREVA/ALSTOM/BHEL/CGL/
SIEMENS etc (wherever applicable) make for AIS and for GIS Stations,
CB details shall be provided by POWERGRID and the supplier shall
have to develop & supply the transducers within delivery schedule.
The voltage class and make shall be intimated along with the order.
10. Design/Engg. The complete equipment along with complete accessories must be
designed/engineered by Original Equipment Manufacturer.
11. Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply
with standard socket.

9
Doc: D-5-10-30-01-05

S No Description Specification
12. Operating 0 to +50 deg C
Temperature
13. Relative humidity Max. 90% non-condensing.
14. Protection/ Control Against short circuit, over voltage, improper ground connection over
load & transient surges, the kit should have alarm/cut-off features to
protect the instrument. Also the kit should have facility of stopping
automatically on power failure.
15. Cooling Necessary in built cooling arrangement should be provided to
Arrangement dissipate the heat generated during testing. No external coolant/
accessory shall have to be required.
16. Weight It should be highly portable and trolley mounted for smooth
movement in live switchyards.
17. Software The software should be suitable for automatic testing & report
generation, signature as well as trend analysis. The kit should have
facility to store and communicate with windows based computer for
exporting the test data.
18. PC Interface It shall include supply of one laptop PC of Dell/Lenovo/HP make with
latest specifications such as Core i5 Intel Processor,4GB RAM, 320GB
or better HDD, 15’’ TFT screen, Combo 24xCD R/W Drive ie having
CD read / write facility complete with required cables and connectors
with preloaded operating MS Window 7 professional or better with
latest version application software require for storage analysis and
record management.
19. Environment The test kit shall be compatible for EMI/EMC/Safey environment
requirement as per IEC .
20. Guarantee Warranty/Guarantee Period: Min 01 year from the date of successful
& complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to be
covered under warranty/guaranty period. If the kit needs to be
shifted to supplier’s works for repairs within warranty/guaranty
period, suppliers will have to bear the cost of spares, software,
transportation of kit for repair at test lab/ works.
21. Calibration Unit shall be duly calibrated before supply and the date of calibration
Certificate shall not be older than two month from the date of supply of Kit.
22. Training Supplier shall have to ensure that the kit is made user friendly. Apart
from the detailed demonstration at site, the supplier shall also have
to arrange necessary training to POWERGRID engineers, where kit is
being supplied.
23. Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed.
24. After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt services.

10
Doc: D-5-10-30-01-05

03. Technical Specification of SF6 Gas Quality Analyser

S.No Description Specification


1. Functional 1. The instrument should be suitable for online measurement of
Requirement Moisture (Dew point & ppm), Purity & SO2 content of SF6 Gas in gas
insulated EHV equipments, in live switchyard upto 765 kV level, as
per applicable standard testing procedure of Powergrid.
2. The Instrument should be able to measure Dew point of N2 & Dry Air
also
3. The measurement should be possible at standard pressure/ system
pressure.
4. The test results should have repeatability, consistency & immunity to
electromagnetic interference in live switchyard upto 765 kV levels.
2. Measurement 1. SF6 purity – Range: 0-100 % , Accuracy: +/- 0.5 % & Resolution:
Parameters 0.1 %
2. Dew point - Range : -60 to +20 deg C, Accuracy: +/- 4 deg C
3. SO2 - Range : 0-100 ppm, Accuracy : +/- 3 ppm
3. Input Pressure 0.5 to 9 Bar
4. Re-circulation/ The kit shall have the inbuilt facility of pumping back the measured SF6
Pumping Back of gas to the equipment being tested.
SF6 gas
5. Test Leads and Complete set of Hoses,pipes,coupling,valves etc. for measurement (Min.
accessories 10 meter Length) with suitable adaptors for connection with Equipment
(BHEL, CGL, ABB, Areva, Siemens,Trench make CBs/CTs etc.)
6. Design/Engg. The complete equipment along with complete accessories must be
designed/engineered by Original Equipment Manufacturer.
7. Power Supply 150 – 240 V AC at 50 Hz or Inbuilt battery with charger/adapter etc.
8. Operating -10 to +50 °C
Temperature
9. Relative Max. 90 % non-condensing
humidity
10.. Display/Control LCD/Keypads.
11. Environment The test kit shall be compatible for EMI/EMC/safety environment
requirement as per IEC.
12. Guarantee Warranty/Guarantee Period: Min 05 year from the date of successful &
complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables etc. are to be covered
under warranty/guaranty period. If the kit needs to be shifted to
supplier’s works for repairs within warranty/guaranty period, suppliers
will have to bear the cost of spares, software, transportation of kit for
repair at test lab/ works.
If any calibration is required (as per kit manufacturer requirement)
within warranty/guarantee period, same is to be done by supplier at free
of cost
13. Calibration Unit shall be duly calibrated before supply and the date of calibration
Certificate shall not be older than two month from the date of supply of Kit.
14. Training Supplier shall have to ensure that the kit is made user friendly. Apart
from the detailed demonstration at site, the supplier shall also have to

11
Doc: D-5-10-30-01-05

S.No Description Specification


arrange necessary training to POWERGRID engineers.
15. Commissioning, Successful bidder will have to commission the instrument to the
handing over satisfaction of POWERGRID. The instrument failed during the
the Instrument demonstration shall be rejected and no repairs are allowed.
16. After sales Bidder will have to submit the documentary evidence of having
service established mechanism in India for prompt after sale services.

12
Doc: D-5-10-30-01-05

04. Technical Specification of Digital Earth Resistance Meter

S. No Item Specification
1 Functional
Requirement 1. The instrument should be suitable for measuring of all type of
earth electrode resistance single/multi electrode system, in live
switchyard upto 765 kV level, and soil resistivity as per applicable
standard testing procedure of Powergrid.
2. The test results should have repeatability, consistency &
immunity to electromagnetic interference in live switchyard upto
765 kV levels.
3. The instrument should be suitable for four terminal measurement

2 Output Voltage: 30 V Peak Min. (At a test frequency different from 50Hz to
avoid electromagnetic interference)
3 Measurement Resistance : 0.01 – 19.99k Ω (Auto Ranging &Digital
Range:
4 Accuracy Resistance: 2% upto 200 Ω and 3% above 200 Ω.

5 Test Leads and One complete set of cables of sufficient length with suitable clamps &
accessories connectors, compatible with the instruments should be provided for
successfully carrying out the test in POWERGRID S/S. Additionally all
the required accessories should be provided for the smooth
functioning of kit. Further hard carrying case (which should be
robust/ rugged enough) for ensuring proper safety of the kit during
transportation shall have to be provided.

6 Design/Engg. The complete equipment along with complete accessories must be


designed/engineered by Original Equipment Manufacturer.

7 Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply with
standard socket & Internal Re-chargeable Battery.

8 Operating 0 to +50 deg C


Temperature

9 Relative humidity Max. 90% non-condensing.


10 Protection/ Against short circuit, over voltage the kit should have cut-off features
Control to protect the instrument.
11 Weight It should be easily portable.
12 Display/Control Digital LCD / Keypad
13 Environment The test kit shall be compatible for EMI/EMC/Safety environment
requirement as per IEC.
14 Guarantee Warranty/Guarantee Period: Min 01 year from the date of successful
& complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to be
covered under warranty/guaranty period. If the kit needs to be shifted
to supplier’s works for repairs within warranty/guaranty period,
suppliers will have to bear the cost of spares, software, transportation

13
Doc: D-5-10-30-01-05

S. No Item Specification
of kit for repair at test lab/works.
15 Calibration Unit shall be duly calibrated before supply and the date of calibration
Certificate shall not be older than two month from the date of supply of Kit.
16 Training Supplier shall have to ensure that the kit is made user friendly. Apart
from the detailed demonstration at site, the supplier shall also have to
arrange necessary training to POWERGRID engineers.
17 Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed.
18 After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt after sale services.

14
Doc: D-5-10-30-01-05

05. Technical Specification of Fully Automatic Capacitance & Tan Delta Measurement
kit

S.No Item Specification


1 Functional 1. The instrument should be suitable for automatic offline
Requirement measurement of C& Tan δ of the switchyard equipments as
well as excitation current of transformers/reactors, in live
switchyard upto 765 kV level, as per applicable standards and
testing procedure of Powergrid.
2. The test results should have repeatability, consistency &
immunity to electromagnetic interference in live switchyard
upto 765 kV levels.
3. The measurement of ambient temperature & relative humidity
with inbuilt/external arrangement.
2 Output 1. 25V-12 kV AC (continuously variable)
2. I: 100mA(min)cont, 180mA (min) intermittent.
3 Test Frequency 15 Hz to 400 Hz or better, with 12kV output voltage between 45 to 70
Hz & minimum 3.5kV between 15 to 400 Hz.
4 Accuracy 1. Cp : 0.5 % of reading ± 1pF
2. Tan δ : 1 % of reading ± 0.02%
5 Measurement 4. Cp: 10 pF to 1µF with Resolution of 0.01 pF or better.
Range: 5. Tanδ: 0 to 100% with Resolution of 0.01% or better.
6 Test Leads and One complete set of cables of sufficient length (Min 20Metre) with
accessories suitable clamps & connectors, compatible with the instruments should
be provided for successfully carrying out the test in POWERGRID S/S.
Additionally all the required accessories, drawing & documents, tools
etc. should be provided for the smooth functioning of kit. Original
carrying case which should be robust/ rugged enough, for ensuring
proper safety of the kit during transportation shall have to be
provided.
7 Design/Engg. The complete equipment along with complete accessories must be
designed / engineered by Original Equipment Manufacturer.
8 Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply with
standard socket.
9 Operating 0 to +50 deg C
Temperature

10 Relative Max. 90 % non-condensing


humidity
12 Cooling Necessary in built cooling arrangement should be provided to
Arrangement dissipate the heat generated during testing. No external coolant/
accessory shall have to be required.
13 Weight It should be easily portable and trolley mounted for smooth
movement in live switchyards.

14 Software The software should be suitable for automatic testing & report
generation and trend analysis. The kit should have facility to store and

15
Doc: D-5-10-30-01-05

S.No Item Specification


communicate with windows based computer for exporting the test
data.
15 Display/Control It shall include supply of one laptop PC of Dell/Lenovo/HP make with
latest specifications such as Core i5 Intel Processor, 4GB RAM, 320GB
or better HDD, 15’’ TFT screen, Combo DVD Drive i.e having CD read /
write facility complete with required cables and connectors with
preloaded operating MS Window 7 professional or better with latest
version of application software required for storage, analysis and
record management.
If kit is being controlled through inbuilt LCD monitor and kit is having
data storage facility, then there is no need to supply laptop.
16 Environment The test kit shall be compatible for EMI/EMC/safety environment
requirement as per IEC.
17 Guarantee Warranty/Guarantee Period: Min 01 year from the date of successful
& complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to be
covered under warranty/guaranty period. If the kit needs to be shifted
to supplier’s works for repairs within warranty/guaranty period,
suppliers will have to bear the cost of spares, software, transportation
of kit for repair at test lab/ works.
18 Calibration Unit shall be duly calibrated before supply and the date of calibration
Certificate shall not be older than two month from the date of supply of Kit.
19 Training Supplier shall have to ensure that the kit is made user friendly. Apart
from the detailed demonstration at site, the supplier shall also have to
arrange necessary training to POWERGRID engineers.
20 Commissioning, Successful bidder will have to commission the instrument to the
handing over satisfaction of POWERGRID. The instrument failed during the
the Instrument demonstration shall be rejected and no repairs are allowed.
21 After sales Bidder will have to submit the documentary evidence of having
service established mechanism in India for prompt after sale services.

16
Doc: D-5-10-30-01-05

06. Technical Specification of Automatic Third Harmonic Resistive Current Measurement Kit
for Gapless Surge Arrestor

S.No Item Specification


1 Functional 1. The instrument should be suitable for automatic online
Requirement measurement of Third Harmonic Resistive Current of the
Gapless Surge Arrestor, in live switchyard upto 765 kV level, as
per IEC standard
2. The measurement should not be affected by the presence of
harmonics in the system voltage i.e. compensation of harmonics
in system voltage as per IEC 60099-5 B2.
3. The test results should have repeatability, consistency &
immunity to electromagnetic interference in live switchyard
upto 765 kV levels.
4. The instrument shall have in built temperature measurement
and voltage/temperature correction facility.
2 Measurement 1. Total Leakage Current: 200µA To 5 mA
Parameters/rang 2. Resistive Leakage Current: 1µA To 5 mA
e
3 Accuracy ±5 % of reading
4 Resolution 1µA
5 Test Leads and One complete set of cables of sufficient length (suitable for up-to
accessories 765kV Lighting Arresters) with suitable clamps & connectors,
compatible with the instruments should be provided for successfully
carrying out the test in POWERGRID S/S. Additionally all the required
accessories, drawing & documents, tools etc. should be provided for the
smooth functioning of kit. Further hard carrying case (which should be
robust/ rugged enough) for ensuring proper safety of the kit during
transportation shall have to be provided.
6 Design/Engg. The complete equipment along with complete accessories must be
designed/engineered by Original Equipment Manufacturer.
7 Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply with
standard socket/ Inbuilt battery with charging facility.
8 Operating 0 to +50 deg C
Temperature
9 Relative humidity Max. 90 % non-condensing
10 Protection/ Against short circuit, over voltage, improper ground connection over
Control load & transient surges, the kit should have alarm/cut-off features to
protect the instrument.
11 Cooling Necessary in built cooling arrangement should be provided to dissipate
Arrangement the heat generated during testing. No external coolant/ accessory shall
have to be required.
12 Weight It should be easily portable.
13 Software The software should be suitable for analysis of test data. The kit should
have facility to store and communicate with windows based computer
for exporting the test data.
14 Display/Control LCD/Keypad
15 Repeatability The instrument should have been proven for repeatability of test
results in charged switchyard conditions and same to be confirmed
during demo.

17
Doc: D-5-10-30-01-05

S.No Item Specification


16 Environment The test kit shall be compatible for EMI/EMC/safety environment
requirement as per IEC.
17 Guarantee Warranty/Guarantee Period: Min 01 year from the date of successful &
complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to be
covered under warranty/guaranty period. If the kit needs to be shifted
to supplier’s works for repairs within warranty/guaranty period,
suppliers will have to bear the cost of spares, software, transportation
of kit for repair at test lab/ works.
18 Calibration Unit shall be duly calibrated before supply and the date of calibration
Certificate shall not be older than two month from the date of supply of Kit.
19 Training Supplier shall have to ensure that the kit is made user friendly. Apart
from the detailed demonstration at site, the supplier shall also have to
arrange necessary training to POWERGRID engineers.
20 Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed.
21 After sales Bidder will have to submit the documentary evidence of having
service established mechanism in India for prompt after sale services.

18
Doc: D-5-10-30-01-05

07. Technical Specifications for Transformer Winding Resistance Meter

S.No Description Specification


1 Function The instrument shall be used for measuring DC winding
resistance of all Transformers & Reactors up to 765 KV class
Transformer/ Reactors where high inductance is present.
The test kit shall be able to withstand inductive kicks from
transformer winding and shall be capable of working in
inductive atmosphere of 765/400kV Substation.
It should employ four wire methods and no lead compensation
shall be required for the measurement.
Shall have minimum two independent measuring Channels and
quick stabilisation period.
2 Test current 50 Amp DC continuous then open circuit voltage  50 V
or
If 30 A DC continuous then open circuit voltage  100 V,
3 Display Digital LCD display with backlight viewable in bright sunlight.
4 Resolution and accuracy Resolution: 1 μΩ up to 1000 μΩ range and 0.02% of FS above
500 μΩ range
Accuracy:0.5 % ± 5 Count
5 Range 0 to 1000 ohms Auto reading.
6 Demagnetization The equipment shall have Built-in demagnetization circuitry
which shall allow the operator to manually/automatically de-
magnetize the transformer core, either before or upon
completion of resistance testing, or as a standalone feature.
7 Temperature correction The kit should have the facility to have correction of resistance
value to a reference temp. i.e. provide temp. compensate
reading of resistance (for Cu and Al)
8 Key Board Front Panel ,interactive
9 Power Supply It shall work on single-phase 230±10% V, 50±5% Hz, supply
with variations in voltage and frequency respectively on
standard sockets
10 Protection of Kit Kit should have all necessary protections against transient
voltages, induction, short circuits etc. Built-in-discharge circuit
should be provided to discharge the specimen when test is
completed or when current lead accidentally disconnects or
when instrument power supply is lost.
11 Storage Internal, nonvolatile memory for storing up to minimum 1000
sets of readings.
12 Repeatability It should offer repeatability of test results in 400 Kv/765 kV
charged area.
13 Protection/Control Against short circuit, over voltage, over load & transient surges,
induction. The kit should have facility of discharging the
specimen when test is completed or when current cable
accidently disconnected or when instrument power supply lost.
Also the kit should have built in rapid discharge circuit for
automatically discharging the stored energy in the transformer
at the end of each test.
14 Cooling arrangement Necessary in built cooling arrangement should be provided to
dissipate the heat generated during testing. No external

19
Doc: D-5-10-30-01-05

S.No Description Specification


coolant/accessory shall have to be required.
15 Software The software should be suitable for automatic testing & report
generation including temperature compensation. The kit should
have facility to connect with windows based computer/laptop
for exporting test data.
16 Accessories Complete set of test leads of min. 20 meter length, combination
plugs clamps and connectors, power-supply cables, original
hard carrying case for main kit and cables (which should be
robust/ rugged enough for proper safety of the kit during
transportation), manual (both in soft copy & hard copies) etc,
required for carrying out all types of testing. All the accessories
for desired monitoring, operation & control of instrument shall
have to be provided.
17 Design/Engg. The complete equipment along with complete accessories must
be designed/ engineered by Original Equipment Manufacturer.
18 Calibration certificate Unit shall be duly calibrated before supply and the date of
calibration shall not be older than two month from the date of
supply of Kit. However party will have to submit the calibration
certificate from/traceable to, NABL accredited lab or
internationally reputed lab. Date of calibration shall not be
older than two months from the date of supply of Kit.
19 Environment  The test kit shall be compatible for EMI/EMC/ safety
environment requirement as per IEC.
 Temp 0 to 50Deg.C,
 Humidity not condensing-up to 90%,
20 Warranty Kit shall have Warranty for minimum 3 years for smooth and
reliable operation of the kit. The warranty includes:
a) Calibration of instrument (annually till completion of 3
years)
b) As much as visits for repairs to site.
c) If the kit needs to be shifted to suppliers works for repairs,
supplier will have to bear the cost of spares, softwares,
transportation, transit insurance (To & Fro), etc of kit for repair
at test lab/works. Kit after repairs need to be returned within
thirty days from the date of despatch.
d) All the expenses for maintaining the supplied instrument
“Healthy and in working condition” is to be borne by Successful
bidder as per LOA
21 Transit Case The kit and accessories shall be robust and rugged enough, so
that it can be transported safely at different locations .The
transportation and packing cases of the kit shall be such that
the transportation from one station to other will not affect the
performance and accuracy of measurement of kit
22 Services after Sales Bidder will have to submit the documentary evidences of
having established mechanism for prompt services as and when
required by Powergrid. Bidder need to submit their
organization service chart along with bid

20
Doc: D-5-10-30-01-05

S.No Description Specification


23 Demonstration and The contractor shall have to demonstrate the instrument to the
Handing over of satisfaction of POWERGRID. The Supplier shall have to ensure
Instruments. the kit is made user friendly apart from the detailed
demonstrations at each site. The instrument failed during the
demonstration shall be rejected and no repairs are allowed.
24 Training Supplier shall have to ensure that the instrument is made user
friendly. Apart from the detailed demonstration at site, the
supplier shall also have to arrange necessary training to
POWERGRID engineers.

21
Doc: D-5-10-30-01-05

08. Technical Specification of Transformer Oil BDV Test Set

S.No Description Specification


1 Functional 1. The instrument should be suitable for Automatic
Requirement Measurement of Electrical Breakdown Strength of
transformer oil as per relevant standards.

2. The test results should have repeatability, consistency in


laboratory condition.

2 Test Output 0-100 kV rms (Rate of rise: 0.5 to 5 kV/ Sec)


3 Accuracy ± 1 kV
4 Resolution 0.1 KV
5 Switch off Time ≤ 1ms
6 Display/Control LCD/Keypads.
7 Printer Inbuilt/External
8 Measurement Fully Automatic Pre-programmed/User programmed Test
Programmes Sequences including as per latest IEC & other
national/international standards.
9 Test Lead/ Accessories One complete set of electrodes, gauge etc. compatible with the
instruments should be provided for successfully carrying out the
test in POWERGRID S/S. Additionally all the required accessories,
tools, drawing, documents should be provided for the smooth
functioning of kit. Further hard carrying case (which should be
robust/ rugged enough) for ensuring proper safety of the kit
during transportation shall have to be provided.
10 Design/Engg. The complete equipment along with complete accessories must
be designed/ engineered by Original Equipment Manufacturer.
11 Power Supply It shall work on input supply variations, V: 230 ±10 %, f: 50 Hz ±5
% on standard sockets.
12 Operating Temperature 0 to +50 deg C
13 Relative humidity Max. 90% non-condensing.
14 Protection/ Control Against short circuit, over load, transient surges etc. Also the
instrument should have facility of stopping automatically on
power failure. Also, the kit should have facility of HV chamber
interlocking as well as zero start interlocking.
15 Display/Control LCD/keypads.
16 Environment The test kit shall be compatible for EMI/EMC/Safety
environment requirement as per IEC.
17 Guarantee Warranty/Guarantee Period: Min 01 year from the date of
successful & complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to
be covered under warranty/guaranty period. If the kit needs to

22
Doc: D-5-10-30-01-05

S.No Description Specification


be shifted to supplier’s works for repairs within
warranty/guaranty period, suppliers will have to bear the cost of
spares, software, transportation of kit for repair at test lab/
works.
18 Calibration Certificate Unit shall be duly calibrated before supply and the date of
calibration shall not be older than two month from the date of
supply of Kit.
19 Training Supplier shall have to ensure that the instrument is made user
friendly. Apart from the detailed demonstration at site, the
supplier shall also have to arrange necessary training to
POWERGRID engineers.
20 Commissioning, handing Successful bidder will have to commission the instrument to the
over the Instrument satisfaction of POWERGRID. The instrument failed during the
demonstration shall be rejected and no repairs are allowed.
21 After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt services.

23
Doc: D-5-10-30-01-05

09. Technical Specification of Automatic Transformer Turn Ratio Meter

S.No Item Specification


1 Functional 1. The instrument should be suitable for automatic offline
Requirement measurement of 3-phase turns ratio or single phase turns
ratio, phase angle deviation as well as detecting vector
group in transformer, upto 765 kV, in live switchyard upto
765 kV level, as per applicable standards/ testing
procedure of Powergrid.
2. The test results should have repeatability, consistency &
immunity to interference in live switchyard upto 765 kV
levels.
2 Measurement 1. Ratio: 1-1000 Auto Ranging
Ratio Range 2. Excitation Current: 1mA to 0.5 Amp.
3 Accuracy 1. Ratio:0.1 %
2. Phase Angle:0.5°
4 Phase angle
up to 360 Deg
measurement
5
Excitation Voltage up to 80 Volts in suitable steps
6 Test Lead/ One complete set of cable of sufficient length (Min 20Mtr) with
Accessories suitable clamps & connectors, compatible with the instruments
should be provided for successfully carrying out the test in
POWERGRID S/S. Additionally all the required accessories should
be provided for the smooth functioning of kit. Further hard
carrying case (which should be robust/ rugged enough) for
ensuring proper safety of the kit during transportation shall have
to be provided. All the standard accessories for desired monitoring,
operation & control of instrument shall have to be provided.
The kit should be provided with built in printer and interface with
PC for data downloading.
7 Design/Engg. The complete equipment along with complete accessories must be
designed/ engineered by Original Equipment Manufacturer.
8 Power Supply It shall work on input supply variations, V: 230 ±10 %, f: 50 Hz ±5
% on standard sockets.
9 Operating 0 to +50 deg C
Temperature
10 Relative humidity Max. 90% non-condensing.
11 Protection/ Against short circuit, over load, induction, transient surges etc.
Control
12 Cooling Necessary in built cooling, if required, arrangement should be
Arrangement provided to dissipate the heat generated during use. No external
coolant/ accessory shall have to be required.
13 Weight It should be easily portable.
14 Software The software should be suitable for report generation. The kit
should have facility to connect with windows based computer for
exporting the test data.
15 Display/Control LCD(Back-lit)/Keypads
16 Environment The test kit shall be compatible for EMI/EMC/Safety environment
requirement as per IEC.

24
Doc: D-5-10-30-01-05

S.No Item Specification


17 Guarantee Warranty/Guarantee Period: Min 01 year from the date of
successful & complete commissioning at Powergrid substation.
All the materials, including accessories, cables, laptops etc. are to
be covered under warranty/guaranty period. If the kit needs to be
shifted to supplier’s works for repairs within warranty/guaranty
period, suppliers will have to bear the cost of spares, software, and
transportation of kit for repair at test lab / works.
18 Calibration Unit shall be duly calibrated before supply and the date of
Certificate calibration shall not be older than two month from the date of
supply of Kit.
19 Training Supplier shall have to ensure that the instrument is made user
friendly. Apart from the detailed demonstration at site, the
supplier shall also have to arrange necessary training to
POWERGRID engineers.
20 Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed.
21 After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt services.

25
Doc: D-5-10-30-01-05

10. Technical specification of Automatic Battery Discharge kit

S.No Item Specification


1 Functional The instrument shall be able to discharge the substation battery
requirement set of 12/24/48/110/ 220 V DC system with automatic facility of
regulating discharge rate. The discharging current can be settable
at every voltage, subject to maximum current value.
2 Discharge Continuous Rating for all Voltage Ratings can be as per following
current range depending upon Battery Capacity :
1. 0 – 100 A (Upto Battery Capacity 1000 AH)
2. 0 – 150 A (Upto Battery Capacity 1500 AH)
3 Load pattern The kit shall have the facility to operate on constant current,
constant resistance (modes for effective discharge of Battery sets.
4 Accuracy/ Current: ±0.5 % of reading ±0.2 A (for all ranges) / 0.1 Amps
Resolution Voltage: ±0.5 % of reading ± 1 V (for all ranges) / 0.1 Volts
5 Measurement Current: 0-200Amps
Range Voltage: 0-300V
6 Control and The kit shall be able to display the running parameters like
display unit current and voltage during discharging and also show total
discharging time etc.
7 Test Leads and One complete set of cable set of sufficient length (min 5 meter)
accessories with suitable clamps & connectors, compatible with the
instruments should be provided for successfully carrying out the
discharging test of batteries installed in POWERGRID S/S.
Additionally all the required accessories should be provided for
the smooth functioning of kit. Further hard carrying case (which
should be robust/ rugged enough) for ensuring proper safety of
the kit during transportation shall have to be provided. The
battery connection cable should be suitable for normal
continuous current rating of 250 A.
8 Design/Engg. The complete equipment along with complete accessories must
be designed/engineered by Original Equipment Manufacturer.
9 Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply
on standard supply socket.
10 Operating 0 to +50 deg C
Temperature
11 Relative 90% non-condensing
humidity
12 Protection/ Against short circuit, over load & transient surges the kit should
Control have alarm/cut-off features for protect the instrument. Also the
kit should have facility of stopping automatically on power
failure. Further, kit should have test resume facility on return of
power automatically.
13 Cooling Necessary in built cooling arrangement should be provided to
Arrangement dissipate the heat generated during discharging. No external
coolant/ accessory shall have to require.
14 Weight It should be easily portable and trolley mounted for smooth
movement.
15 Software The kit should have facility to connect with computer through
USB/RS 232 port for exporting the test data. The software should

26
Doc: D-5-10-30-01-05

S.No Item Specification


be provided for analysis of discharging test and should plot graph
between voltage & current with respect to time. Further if
computer is connected during discharging test, then the software
should plot the real time discharging curve etc. The software shall
be compatible with windows XP/7 platform.
16 Environment The test kit shall be compatible for EMI/EMC/Safety environment
requirement as per IEC.
17 Guarantee Warranty/Guarantee Period: Min 01 year from the date of
successful & complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to
be covered under warranty/guaranty period. If the kit needs to be
shifted to supplier’s works for repairs within warranty/guaranty
period, suppliers will have to bear the cost of spares, software,
transportation of kit for repair at test lab/ works.
18 Calibration Unit shall be duly calibrated before supply and the date of
Certificate calibration shall not be older than two month from the date of
supply of Kit.
19 Training Supplier shall have to ensure that the kit is made user friendly.
Apart from the detailed demonstration at site, the supplier shall
also have to arrange necessary training to POWERGRID engineers.
20 Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed.
21 After sales Bidder will have to submit the documentary evidence of having
service established mechanism in India for prompt services.

27
Doc: D-5-10-30-01-05

11. Technical Specification of Automatic Contact Resistance Meter

S.No Item Specification


1 Functional 1. The instrument should be suitable for automatic offline
Requirement measurement of contact resistance of the switchyard
equipments i.e. CB, Isolators, clamps/connectors, joints, in
live switchyard upto 765 kV level, as per applicable standard
testing procedure of Powergrid.
2. The test results should have repeatability, consistency &
immunity to electromagnetic interference in live switchyard
upto 765 kV levels.
3. The instrument shall perform properly in both side ground
open as well as one side ground open condition.
2 Measurement 0-1999 µΩ
Range
3 Test Current 100 A or Higher.
4 Resolution 1. 0.1µΩ for upto 199.9 µΩ
2. 1 µΩ for above 199.9 µΩ
5 Accuracy ±2%
6 Display 3-1/2 LCD (Back-lit)
7 Test Leads and One complete set of cables of sufficient length (Min 20Metre) with
accessories suitable clamps & connectors, compatible with the instruments
should be provided for successfully carrying out the test in
POWERGRID S/S. Additionally all the required accessories should
be provided for the smooth functioning of kit. Further hard carrying
case (which should be robust/ rugged enough) for ensuring proper
safety of the kit during transportation shall have to be provided.
8 Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply
with standard socket.
9 Operating 0 to +50 deg C
Temperature
10 Relative humidity Max. 95% non-condensing
11 Protection/ Against short circuit, over voltage, improper ground connection over
Control load & transient surges, the kit should have alarm/cut-off settings to
protect the instrument.
12 Cooling Necessary in built cooling arrangement should be provided to
Arrangement dissipate the heat generated during testing. No external coolant/
accessory shall have to be required.
13 Weight It should be highly portable or trolley mounted for smooth
movement in live switchyards.
14 Software The kit should have facility to store and communicate with windows
based computer for exporting the test data.
15 Display/Control Onboard Display or external laptop control (to be supplied with
instrument).
16 Environment The test kit shall be compatible for EMI/EMC environment
requirement as per IEC.
17 Guarantee Warranty/Guarantee Period: Min 01 year from the date of
successful & complete commissioning at Powergrid sub-station.

28
Doc: D-5-10-30-01-05

S.No Item Specification


All the materials, including accessories, cables, laptops etc. are to be
covered under warranty/guaranty period. If the kit needs to be
shifted to supplier’s works for repairs within warranty/guaranty
period, suppliers will have to bear the cost of spares, software and
transportation of kit for repair at test lab / works.
18 Calibration Unit shall be duly calibrated before supply and the date of
Certificate calibration shall not be older than two month from the date of
supply of Kit.
19 Training Supplier shall have to ensure that the kit is made user friendly.
Apart from the detailed demonstration at site, the supplier shall also
have to arrange necessary training to POWERGRID engineers.
20 Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed.
21 After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt services.

29
Doc: D-5-10-30-01-05

12. Technical Specification of Mobile Dry Air Plant (Heatless type)

S.No Item Specification


1 Functional The Dry air Plant should be suitable for
Requirement 1. Supply the dry air for purging of the transformer/reactor
tank.
2. The plant shall have suitable arrangement of filters, including
oil filters, and heatless desiccants i.e. activated alumina and
molecular sieve to achieve heatless drying.
3. It should be mobile in switchyard roads.
2 Construction 1. The plant shall be covered with sheet steel enclosure. The
plant will have adequate strength and rigidity to withstand
handling during normal as well as transport condition.
2. The complete system shall be sand blasted to remove the
scales before painting with a primary coat of zinc chromate
and subsequent coats of weather resistant glossy oil
paint/varnish.
3. All the nuts and bolts shall be hot dip galvanized/cadmium
plated/zinc plated passivated.
3 Rating 1. (136) m3/Hr min on outlet.
2. Working pressure: 7 Kg/Cm2 min
3. Dew Point at Outlet: (- 70) C min at atmospheric pressure.
4. Regulated Outlet pressure: 0-1.5 kg/cm2
5. Particle size at outlet: Less than 0.5 micron
4 Compressor Oil free type.
5 Hoses and Adaptor Complete set of Hoses, pipes, coupling, valves etc. of rated pressure
and temperature withstand capacity (Min. 20 meter Length) with
suitable flanges for connection with Transformers/Reactors.
6 Accessories All the standard accessories, tools, power cable of min. 20m length
etc. for desired, operation, control monitoring of plant as well as for
visual/audio indication/alarm etc. shall be supplied with plant.
Also, all the mandatory spares including set of gaskets, a seal, O rings.
Fuses, switches etc and consumables like compressor oil, filters, etc
shall be supplied along with equipment.
7 Drawing/Documen The supplier shall submit GA drawings, technical data sheets,
ts/Certificates guaranteed parameters, list of components, wiring diagrams,
instrument drawings. Test certificate for hydraulic and radiographic
test for main system as well as sub-system.
8 Design/Engg. The complete equipment along with complete accessories must be
designed/engineered by Original Equipment Manufacturer.
9 Power Supply It shall work on input supply variations, V: 415/230 ±10 %, f: 50 Hz
±5 % on standard sockets. The plant shall be equipped with
additional protections against reverse phase sequence and single
phasing. The plant shall have necessary illumination for night
working.
10 Operating 0 to +50 deg C
Temperature
11 Relative humidity Max. 90 % non-condensing.
12 Protection/ Control Against short circuit, over load, transient surges, high pressure etc. to
protect the plant & to avoid abnormal pressure to Equipment. Also

30
Doc: D-5-10-30-01-05

S.No Item Specification


the plant should have facility of stopping automatically on power
failure.
13 Cooling Necessary in built cooling, if required, arrangement should be
Arrangement provided to dissipate the heat generated during use. No external
coolant/ accessory shall have to be required.
14 Portability The plant should be mounted on skid and shall be mobile, having
pneumatic/Iron wheel (Min 12” dia) and front wheel steering
arrangement, for smooth movement on switchyard roads.
15 Instrumentation The plant shall be equipped with all necessary instrumentation of
pressure, flow, dew point, temperature. The dew point meter shall be
digital on line type capable of showing dew point at measured
pressure as well as at atmospheric pressure. All the meters shall be of
reputed make and shall be calibrated from traceable to NABL
accredited lab or any internationally reputed lab.
16 Environment The plant shall be compatible for safety environment requirement as
per applicable standards.
17 Guarantee Warranty/Guarantee Period: Min 01 year from the date of successful
& complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables etc. are to be covered
under warranty/guaranty period. If any component of the pant needs
to be shifted to supplier’s works for repairs within
warranty/guaranty period, suppliers will have to bear the cost of
spares, transportation of component/plant for repair at works.
18 Acceptance test and The bidder shall have to submit the details manufacturing quality
inspection plan and inspection plan/facilities at the works at the time of
bidding. Bidder shall have to demonstrate about achieving desired
parameters of oil at works. The bidder shall also arrange to validate
the specifications/guaranteed parameters mentioned for a complete
system or subsystems under different clauses. The plant shall be
offered for inspection before dispatch to site. Powergrid shall reserve
the right to carry out inspection before dispatch.
19 Training Supplier shall have to ensure that the plant is made user friendly.
Apart from the detailed demonstration at site, the supplier shall also
have to arrange necessary training to POWERGRID engineers.
20 Commissioning, Successful bidder will have to commission the plant to the
handing over the satisfaction of POWERGRID.
Instrument
21 After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for “after sales services”.

31
Doc: D-5-10-30-01-05

13. Technical Specification of Digital Insulation Tester

S.No Item Specification


1 Functional 1. The instrument should be suitable for measuring insulation
Requirement resistance and PI, in live switchyard upto 765 kV level, as per
applicable standard testing procedure of Powergrid.
2. The test results should have repeatability, consistency &
immunity to electromagnetic interference in live switchyard
upto 765 kV levels.
3. The instrument should automatically discharge the energy
transferred to test specimen at the end of test.
4. The instrument should have Guard Terminal to eliminate the
effect of surface leakages etc.
2 Output V: 0-10 kV in steps ( Digital), short Circuit Current min. 5mA at
10KV
3 Accuracy 1. IR : ±05 % of reading
2. Voltage: ±05 % of reading
4 Measurement Insulation Resistance : 0- 1T Ω (Auto Ranging & Digital)
Range:
5 Test Modules Auto IR,PI,DAR
6 Test Leads and Two complete set of screened cables, each of 3m and 15m with
accessories suitable clamps & connectors, compatible with the instruments
should be provided for successfully carrying out the test in
POWERGRID S/S. Additionally all the required accessories should
be provided for the smooth functioning of kit. Further hard carrying
case (which should be robust/ rugged enough) for ensuring proper
safety of the kit during transportation shall have to be provided.
7 Design/Engg. The complete equipment along with complete accessories must be
designed / engineered by Original Equipment Manufacturer.
8 Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply
with standard socket/ Internal rechargeable Battery.
9 Operating 0 to +50 deg C
Temperature
10 Relative humidity Max. 90% non-condensing
11 Protection/ Against short circuit, over voltage, improper ground connection over
Control load & transient surges, the kit should have alarm/cut-off features to
protect the instrument.
12 Weight It should be easily portable
13 Display/Control Digital LCD/Keypad
14 Environment The test kit shall be compatible for EMI/EMC/Safety environment
requirement as per IEC.
15 Guarantee Warranty/Guarantee Period: Min 01 year from the date of
successful & complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables etc. are to be covered
under warranty/guaranty period. If the kit needs to be shifted to
supplier’s works for repairs within warranty/guaranty period,
suppliers will have to bear the cost of spares, software,
transportation of kit for repair at test lab/ works.
16 Calibration Unit shall be duly calibrated before supply and the date of
Certificate calibration shall not be older than two month from the date of

32
Doc: D-5-10-30-01-05

S.No Item Specification


supply of Kit.
17 Training Supplier shall have to ensure that the kit is made user friendly.
Apart from the detailed demonstration at site, the supplier shall also
have to arrange necessary training to POWERGRID engineers.
18 Commissioning, Successful bidder will have to commission the instrument to the
handing over the satisfaction of POWERGRID. The instrument failed during the
Instrument demonstration shall be rejected and no repairs are allowed
19 After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt after sale services.

33
Doc: D-5-10-30-01-05

14. Technical Specification of Automatic Relay Test Kit

S.No Item Specification


1 Functional 1. The instrument should be suitable for testing all types & models
Requirement of relays (used in protection schemes of transmission lines,
transformer, reactor and bus bar etc.) of all the major
manufacturers in fully automatic mode (including high-burden
electromechanical relays) as well as transducers having
accuracy class of 0.25 or better. The test kit should be suitable
for dynamic and transient testing, with facility of transient
(COMTRADE format) record playback for both analog and
digital channels.
2. The kit shall be suitable for testing of the relays in the
substations having conventional protection as well as
protection based on IEC 61850 protocol using GOOSE/GSSE.
The test results should have repeatability, consistency in
results.
2 Output
1. All outputs shall have over voltage and short circuit protection.
Specifically, all the voltage and current generators shall have
over-voltage/short-circuit protection. The instruments should
not get over heated, while supplying the rated output
continuously. Further, the kit should be stable even during
extensive continuous usage and should not get hanged or
restarted.
2. V/I Generators:
a) Current Outputs: Software controlled/configurable six phase.
Current outputs: 0 – 15A (r.m.s) minimum between 10 Hz to
300 Hz sine wave,
Resolution: 1mA or less.
Output Burden: 150 VA minimum per phase.
b) Voltage Outputs: Software controlled/configurable four-phase
voltage.
Voltage output:0-300 Volts AC/DC (Ph-N) between 10 Hz to 300
Hz sine wave,
Resolution: 10mV or less.
Output Burden: 50VA minimum per phase.
c) The total current/voltage output channels should be at least 08
nos.

3. Aux. DC Output: Software controlled, 0-250 V and 50W min.


(continuous rating), with continuous / step-less control. The DC
supply should have short circuit protection, galvanically
isolated and over load indication
3 Measuring Input 1. Voltage range -10V to +10 V DC
2. Current range -20mA to +20 mA DC
3. Accuracy -0.02% or better
4 Test Frequency V/I Generator/Amplifier shall have controlled frequency range
from 10Hz to 1 kHz for sine and DC to 3 kHz (minimum) for

34
Doc: D-5-10-30-01-05

S.No Item Specification


transients with resolution of 1 mHz or better and accuracy 0.01 %
or better.
5 Phase Angles 0 to 359.90 lag/lead with resolution of 0.1 degree or better, with
accuracy of 0.5 deg. (min.).
6 Accuracy Accuracy shall be ≤±0.2% for voltage and current sources
throughout the range. The total distortion shall also be less than
0.2%.
7 Binary I/O Minimum four binary outputs and eight inputs with galvanic
Configuration isolation. Software controlled input should be capable of sensing
potential free relay contacts (NO/NC) as well as potential of 0 to
250V AC/DC. Associated timers should have time resolution of
100µS or better. The software controlled outputs should have
potential free contacts (NO/NC) with breaking capacity of 8 Amp
250V AC/DC.
8 Fault Replay It should also have the facility of Transient data playback, by
accepting transient fault data in COMTRADE format along with the
facility to extend pre-fault/ post-fault durations. It should
accurately simulate disturbance signal along with DC and high
frequency components (with sampling rate of 3kHz or better) as
well as Binary signals. Further, it should offer repeatability of
results, e.g same fault location for a particular fault etc.
9 Communication Shall have the ETHERNET connectivity as a standard feature. The
ports / IEC ETHERNET port shall be suitable for control through external PC as
61850 well as for IEC 61850 protocols. GOOSE/ GSSE configuration
compatibility software module should be provided with the kit for effective
checking of protection relays/ IEDs based on IEC 61850 protocol. It
shall read, write, poll and check data models/ values in detail. It
shall have the facility to transfer GOOSE information to suitable
modules during testing of IEDs. Specifically, it will be the
responsibility of the supplier to demonstrate the working of IEC
61850 module for input / output GOOSE messaging and capturing
of live data.
10 Test Leads and Complete set of test leads, PC cables, drawing, manuals,tools,
accessories Licensed OS software & antivirus for PC, Licensed software of the
testing kit, combination plugs, power supply cables, original
carrying case (which should be robust/ rugged enough for proper
safety of the kit during transportation), manual (both in soft copy &
hard copies) etc. required for carrying out all types of testing.
11 Design/Engg. The complete equipment along with complete accessories must be
designed/engineered by Original Equipment Manufacturer.
12 Power Supply It shall work on single phase 230 Volts ±10 %, 50 Hz ±5 % supply
and standard AC socket.
13 Operating 0 to +50 deg C
Temperature
14 Relative Max. 90 % non-condensing
humidity
15 Protection/ Against short circuit, over voltage, improper ground connection over
Control load & transient surges, the kit should have alarm/cut-off features
settings to protect the instrument.

35
Doc: D-5-10-30-01-05

S.No Item Specification


16 Cooling Necessary in built cooling arrangement should be provided to
Arrangement dissipate the heat generated during testing. No external coolant/
accessory shall have to be required.
17 Weight It should be easily portable for smooth movement.
18 Software The software should be suitable for automatic testing & report
generation and analysis. The software of the kit should be windows
based and should be operated through suitable Laptop PC. All
control tasks and data acquisition, processing and recording of test
results shall be performed by the operating software on laptop PC or
controller.
The software should be capable of creating customized relay
characteristics as well as of importing relay characteristics from
IED/Relay. The kit should support GPS receiver with suitable port
which shall enable carrying out end to end testing using GPS
receivers available at both ends of the local and remote substations.
Software should have facility to simulate line fault for end to end
testing.
The software shall be able to get updated with respect to new relays
and new operating techniques whenever they are introduced. The
updating shall be intimated and done by supplier during the period
of guarantee and AMC.
19 PC Interface It shall include supply of one laptop PC of Dell/Lenovo/HP make
with latest specifications such as Core i5 Intel Processor, 4GB RAM,
320GB or better HDD, 15’’ TFT screen, Combo DVD Drive ie having
CD read / write facility complete with required cables and
connectors with preloaded operating MS Window 7 professional or
better with latest version of application software required for
storage, analysis and record management.
20 Environment The test kit shall be compatible for EMI/EMC/safety environment
requirement as per IEC .
21 Guarantee Warranty/Guarantee Period: Min 01 year from the date of successful
& complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables, laptops etc. are to be
covered under warranty/guaranty period. If the kit needs to be
shifted to supplier’s works for repairs within warranty/guaranty
period, suppliers will have to bear the cost of spares, software and
transportation of kit for repair at test lab / works.
22 Calibration Unit shall be duly calibrated before supply and the date of
Certificate calibration shall not be older than two month from the date of
supply of Kit.
23 Training Supplier shall have to ensure that the kit is made user friendly. Apart
from the detailed demonstration at site, the supplier shall also have
to arrange necessary training to POWERGRID engineers.
24 Commissioning, Successful bidder will have to commission the instrument to the
handing over satisfaction of POWERGRID. The instrument failed during the
the Instrument demonstration shall be rejected and no repairs are allowed.
25 After sales Bidder will have to submit the documentary evidence of having
service established mechanism in India for prompt “after sale services”.

36
Doc: D-5-10-30-01-05

15. Technical Specification of Thermo Vision Scanning Camera- Low End

S.No Item Specification


1 Function & The infrared Thermal imaging and temperature measurement
Scope camera should be fully automated and shall be useful for thermo–
vision scanning, having capability to identify hot spots and loose
connections in sub-stations and transmission lines up to 400/ 765 kV.
Min. Distance of use is 15 mtr for standard and 60 mtr for Telephoto
lens.
The camera shall have the laser pointing facility and shall have built
in high resolution colour screen (LCD/TFT min 3.5” size). The
instrument shall be portable and battery operated.
The infrared thermal imaging and measurement system should be
based on un-cooled focal plane array (UFPA) technology. It shall also
have a built in digital colour visual camera of minimum 3 Mega pixels,
thus creating a colour visual image of corresponding thermal image.
It should be possible to store the thermal and visual image together
(thermal fusion-merging visual & thermal images).

2 Thermal The thermal detector of the Thermo-vision camera should be based


Imaging on the Focal Plane Array, un-cooled micro-bolometer technology with
Performance minimum 320 x 240 pixels (Infrared pixels to be captured by the
camera and not enhance after image capturing).
It should have Thermal sensitivity of the order of 0.05° at 30°
Centigrade or better.
Image frequency should be such that the buffering effect/ delay shall
not come on display.
The Spectral Range should be of the order of 8 to 13 µm or better.
The Thermo-vision camera shall be supplied with the standard lens
and an additional telephoto lens.
The minimum focus distance of the camera for the standard lens &
telephoto lens shall be such that it does not affect measurement in
switchyard & transmission lines.
The Thermo-vision camera shall have Automatic as well as manual
focus. It should also have electronic/ digital zoom for IR function of
4x or better.
a.Spatial Standard lens: 1.7 mrad or less.
resolution Tele-photo lens: 0.4 mrad or less.
(IFOV)
b.Lens Standard lens: 23° or more.
(Horizontal Tele-photo lens: 7° or less.
FOV)
3 Temperature 0 to 350°C (minimum), with accuracy of ± 2% of reading or ± 2°C.
measurement
range &
Accuracy
4 Emissivity The camera shall have automatic temperature correction facility for

37
Doc: D-5-10-30-01-05

S.No Item Specification


Correction emissivity (emissivity range 0.1 to 1).
5 LCD and The system shall have a tilt-able (min.90°) LCD display or tilt-able
Indicators lens. Display shall be properly visible in sunlight. Camera shall also
have status indications to view the status of battery/ power mode
indication etc.
6 Physical The system should be lightweight, hand-held with on-board
Characteristics rechargeable, field replaceable battery. The thermo vision camera
shall also operate on 230 V AC supply ± 10 % and camera battery
shall also get charged with this while the camera is in operation.
Separate battery charger and spare battery shall also be provided.
The equipment shall be well balanced for one hand operation. Hand/
Neck straps should be provided for safety of Camera while using in
field. The total weight of the thermo vision camera including battery,
memory card, LCD display, laser pointer, and Standard as well as
Tele- lens shall not exceed 2.0 kg.
7 Battery Camera battery (preferably Li-Ion) shall have sufficient power for 3
operation time. hours of continuous operation with LCD display ON.

8 The camera shall have video output: CCIR/PAL composite video/ S-


Output
video/ USB.

9 The system shall have the voice annotation (voice recording) facility
for not less than 30 seconds per image and voice recording shall be
Voice Recording
tagged to particular image or the system shall have provision to
/ Text
attach pre-defined text on each image file during measurement.
annotation
Infrared image along with corresponding visual image and voice
recording or text annotation shall be linked together.

10 Image storage The system shall be supplied with minimum of 2 GB flash memory
capacity (internal/ external).

11 The camera should store (in selectable built in flash memory or flash
memory card in selectable directory) the image in full radiometric
format as well as standard image format e.g. bmp, jpeg, tif, png, gif etc.
readable without use of special software indicating marked temp,
with date and time stampings along with all technical parameters
corresponding to image, in addition to visual image, voice/ text
annotation. If required, operator shall have the facility to recall,
Image storage analyze, save, and delete the images in the field including the replay
facilities and edit of its voice/text annotation. It shall be possible for operator
to view the live images/ recalled image details.
Camera shall have the facility to freeze/ hold the image and store a
single image or multiple of images either continuously or
periodically. While saving the image, the camera shall automatically
prompt for saving of voice or text annotation and visual image. It
shall also be possible to store only IR images with or without
voice/text annotation or IR image.

38
Doc: D-5-10-30-01-05

S.No Item Specification


12 The thermo vision camera shall measure absolute temperature of
hotspots and have auto spot function (auto placement of cursor at
min or max temperature). It shall be possible to create movable
cross-hairs/ spots (with temperature) in the live/freeze image. It
shall be possible to create different areas with continuously
adjustable dimensions and position in an image with their selectable
max., min., and average temperature display. All the area shall be
Measurement
movable and shall give maximum and minimum temperature value
function
and its position within the area. It shall be possible to manually adjust
emissivity (preferably with an online help table), reflected
temperature, distance for individual spot as well as for individual
area.
The laser locator shall be active in IR mode with push button. The
camera should have all the required standard palettes/ colour
schemes (minimum 4 pallets).

13 The analyzing software (to be provided alongwith the Camera) shall


be windows based, simple to operate, compatible to IR and visual
camera images and capable of providing comprehensive report
Software generation facility in addition to image analysis and post processing.
It should also be possible to insert a visual image (photo) as well as
text object in the report. The software should include tools for
extensive image analysis & reporting.

14 All the required accessories like PC/ video interface cables, Power
supply cables, Battery, Battery Charger (in addition to the AC
Accessories
adopter), Standby battery set, Operating manual, Original CD and
software, Application CD, Hard carrying case etc. should be provided.
15 Operating Shall operate at Temperature 0 to 50°C, Relative Humidity: 10 to 90%
conditions (with non- condensing..
all accessories)
16 Safety Thermo vision camera shall have minimum protection grade of IP-54.
Standards The unit shall meet all EMC emission, immunity standards as per IEC/
EN 61000-4-4, IEC/ EN 61000-4-2 and IEC/ EN 61000-4-8
respectively or equivalent latest standards, with CE marking to work
in EHV areas without any interference. Copy of relevant certificates
shall be furnished along with the bid.
17 Demonstration The acceptance of the Instrument shall be subject to the successful
demonstration by supplier to the satisfaction of POWERGRID at
prescribed site. During the demonstration, if the instrument is found
not up to the mark/ not meeting working requirements of
POWERGRID, the same shall be summarily rejected and repeated
attempts shall not be permitted.
18 Guaranty Camera shall be guaranteed for minimum 5 years from the date of
successful & complete commissioning at POWERGRID Substation. All
the materials including accessories, cables etc. are to be covered in
guaranty period. If the kit needs to be shifted to supplier’s works for
repairs within guaranty period, suppliers will have to bear the cost of

39
Doc: D-5-10-30-01-05

S.No Item Specification


spares, software, transportation , transit insurance (To & Fro) etc. of
kit for repair at test lab/ works. Kit after repair needs to be returned
within thirty (30) days from the date of despatch from POWERGRID
site.
19 Training Supplier shall have to ensure the camera is made user friendly for the
POWERGRID engineers in addition to the detailed demonstrations at
site. Apart from this, the supplier shall also provide all the “technical
know-how” to the POWERGRID Engineers as and when required,
during the tenure of guarantee as well as AMC period.
20 Commissioning, Successful Bidder will have to commission the instrument to the
Handing Over of satisfaction of POWERGRID. The instrument failed during the demo
the Instrument shall be rejected and no repairs are allowed.
21 Services after Supplier shall have adequate facility for after sales service in India
Sale

40
Doc: D-5-10-30-01-05

16. Technical Specification for Sweep Frequency Response Analyser

S.No Description Specifications


The Instrument shall be able to detect and aid identification of
dielectric and mechanical failures in large power transformers
in 400KV/765 KV charged area, preceded by mechanical
changes in the winding structure due to Transportation damage,
Short circuit forces, Natural effects of aging on the insulating
1 Scope Of Work
structures etc. The testing method should be based on Sweep
Frequency Response Analysis of complex R-L-C-network. The
test instrument shall be designed and supplied complete with
accessories cables connectors, leads etc along with required
licensed software for proper analysis and storage of test data.
2 Frequency Range 10Hz to 10 MHz minimum
Input And Output
3 50Ω
Impedance
4 Measuring Points 1600 minimum
5 Dynamic Range >90dB
6 Accuracy Range ±1dB (down to – 80 dB)
7 Plot Frequency Vs. Magnitude, phase etc.
8 Ground Loop Detection Yes
8 Scaling /Sweep Mode Log/Linear
Shall be controlled through built in industrial PC with touch
screen/keyboard. Or external laptop PC of reputed brand with
latest specifications such as 2nd Generation i5 intel processor,
4GB DDR RAM 500GB HDD DVD writer, 15’’TFT/LCD screen or
9 Control And Display Unit
with better specs. Preloaded with Operating system MS
Windows-7 or latest with antivirus. Original CDs of PC
diagnostics from OEM etc and application software for the test
kit.
One set of 15 meters or more but not more than 30 mtr coaxial
10 Test Leads or equivalent with clamps and connectors, compatible with the
test instrument.
It shall work on single-phase 230±10% V, 50±5% Hz, supply
11 Power Supply
with variations in voltage and frequency respectively.
12 Operating Temperature 0 to +50°C
13 Storage Temperature -20 to +70°C
14 Relative Humidity 10 to 90 % non-condensing
15 Protection Against short circuit & overload
It should offer repeatability of test results in 400 kV/765kV
16 Repeatability
charged area.
Software of the kit should be Windows based, Menu driven and
user friendly. It should have all the templates/features required
17 Software
for complete testing of transformer, reactors etc. and facility for
comparison of past template of the tested unit.

41
Doc: D-5-10-30-01-05

S.No Description Specifications


PC cables, Licensed OS software & antivirus for PC, Licensed
software of the testing kit, , combination plugs, power-supply
cables, original hard & soft carrying case (which should be
18 Accessories
robust/ rugged enough for proper safety of the kit during
transportation), manual (both in soft copy & hard copies) etc,
required for carrying out all types of testing.
The test kit shall be compatible for EMI/EMC environment
19 Environment
required for EHV switchyard as per IEC61000.
Unit shall be duly calibrated before supply and the date of
20 Calibration Certificate calibration shall not be older than two month from the date of
supply of Kit.
Kit shall be guaranteed for the manufacturing defects for
minimum 1 years from date of taking over with successful
completion of supply at site.
21 Guarantee
If the kit needs to be shifted to suppliers works for repairs,
supplier will have to bear the cost of, spares, software,
transportation etc of kit for repair at test lab/works.

Commissioning & The supplier shall have to arrange necessary training to


Training POWERGRID Engineers. Training materials, Technical
22
documents/manuals along with case studies to equip the
personnel for testing.
Bidder will have to submit the documentary evidences of having
23 Services After Sale established mechanism for prompt services in India as required
as per the specifications.

42
Doc: D-5-10-30-01-05

17. Technical Specification of Digital Level Meter cum Level Generator

S.No. Description Specification


1 Functional requirement Equipment shall be used for measurement of strength of PLCC
signal.
The instrument shall be capable to receive / generate all
frequencies/levels within a reasonable accuracy and resolution.
In addition to the selective level measurements also wide band
measurements, return to measurement, Bridge Impedance
measurement shall be provided.

The instrument shall be capable to store set-ups and measuring


results. For field use it should offer a mains power independent
operation with batteries. The mechanical design and
construction of the unit shall be compact, robust and rigid under
all conditions of operation with Max. weight of 3Kg (With
Batteries).

NOTE: Two separate units for Level Meter and Level Generator
may also be accepted. In this case the weight of individual unit
must not be more than 3Kg (With Batteries).

LEVEL METER
1 Frequency Range: 100Hz to 2 MHz
Display: 5 Digits or better
Accuracy: 2 x 10-6 ± 1Hz or better
2 Input Impedance’s 75, 150, 600 ohm and High Impedance,
3 Level Resolution 0.1 dB
4 Level, Selective -100 to +10dB
5 Level, Wideband With 4kHz Filter -100 to +10dB
With 300kHz Filter -90 to +10dB
With 600kHz Filter -80 to +10dB
6 Accuracy of level ±0.3dB
measurement at 0dBm
7(a) Return Loss Frequency range:200 Hz– 2MHz
Measurement Measuring range:60Ω-600Ω
Accuracy:+/-1dB for 10Khz to 500Khz & +/- 2 dB for other
frequency range
7(b) Bridge Impedance Frequency range:200Hz– 2MHz
Measurement Measuring range:50Ω-1600Ω
Accuracy:±5% ± 5 Ω
LEVEL GENERATOR
1 Signal generation freq. Range: 100Hz to 2 MHz
Range Display: 5 Digits or better
Accuracy: 2 x 10-6 ± 1Hz or better
2 Output impedances Balanced O/p
10kHz to 2MHz : 75,150
100Hz to 10kHz :600
3 Output Level Range Coaxial O/P
Impedance (Ohm)

43
Doc: D-5-10-30-01-05

S.No. Description Specification


Zout= 75, 150,600: +4 to -40dBm

Balanced O/P: +10 to -40dBm, dB


4 Level Resolution 0.1dB
5 Accuracy of level ±0.3dB
measurement at 0dBm
BELOW MENTIONED SPECIFICATIONS ARE COMMON FOR BOTH LEVEL METER CUM
LEVEL GENERATOR AS WELL AS FOR SEPARATE UNITS FOR LEVEL METER AND LEVEL
GENERATOR
2 Power supply Both 230 V, single phase, AC 50Hz supply and internal Battery.
Battery operation must be Min. 04 Hours.
3 Operating Temp. Range -5 ºC to 45 ºC
4 Memory for storage of Sufficient memory for storage of 100 results must be provided.
Results
5 Accessories Measuring cable, power cable, synchroniser cable, Battery
connecting cable, fuse, operating manual, Carrying case and any
other accessories required for use of the specified equipment.
6 Guarantee Warranty/Guarantee Period: Min 01 year from the date of
successful & complete commissioning at Powergrid sub-station.
All the materials, including accessories, cables etc. are to be
covered under warranty/guaranty period. If the kit needs to be
shifted to supplier’s works for repairs within
warranty/guaranty period, suppliers will have to bear the cost
of spares, software, transportation of kit for repair at test lab/
works.
7 Calibration Certificate Unit shall be duly calibrated before supply and the date of
calibration shall not be older than two month from the date of
supply of Kit.
8 Training Supplier shall have to ensure that the kit is made user friendly.
Apart from the detailed demonstration at site, the supplier shall
also have to arrange necessary training to POWERGRID
engineers, where kit is being supplied.
9 Commissioning, handing Successful bidder will have to commission the instrument to the
over the Instrument satisfaction of POWERGRID. The instrument failed during the
demonstration shall be rejected and no repairs are allowed.
10 After sales service Bidder will have to submit the documentary evidence of having
established mechanism in India for prompt services.

44
Doc: D-5-10-30-01-05

18. Technical Specifications SF6 Gas Handling Plant

S.No Description Specification


1 Functional Equipment shall be able to evacuate, filter and fill the sf6 gas in
Requirement breakers, from CB pole to cylinder and vice versa etc. SF6
recovery shall be more than 99.5%
It shall also filter and dry sf6 during the process to achieve the
desired properties.
The unit shall be portable mounted on a cart with min. 12” size
pneumatic wheels so that it can freely move on metal spread
switchyard.
2 Assembly parts The equipment shall be inbuilt with following components
operating on 240 V 50 Hz power supply.

1. Vacuum pump of capacity 40m³/h or more and shall be able


to create vacuum less than 1mbar.
2. High pressure direct drive oil less compressor of capacity
5.5 m³/h or more to built up pressure up-to 50 bar.
3. Vacuum Compressor of capacity 4.5 m³/h or more which
shall create vacuum less than 5 mbar.

The mimic diagram shall be provided showing the circuits of Gas


flow.
The unit shall also have vacuum and pressure gauges, particle
and dry filters, Three way valves., anti suck back valve, SF6
bottle balance, set of tools, working hour counter, Dew point
measuring instrument and hoses of minimum 15 Mtr. length
with couplings for connecting to SF6 gas cylinder and to
equipment etc.

The vacuum and pressure gauges shall have the resolution to


measure the minimum vacuum (0.1 mbar / 10 pascal) and
maximum pressure (50 bar).
The equipment shall have on board cylinder having storage
capacity of minimum 300 ltr/280 KG along with facility to
measure weight of SF6 gas present in cylinder.
3 Filtration Capacity Filtration up to 1 microns or less during recovery and filling.

4 Dew Point Measuring The dew point measuring instrument shall consist of the
Instrument following:
 Measuring Sensor: Range +30˚C to (-) 60˚C
 Operating Temp. 0-50˚C
Panel Mounted Indicator
5 Maintenance Tool Kit A Tool kit comprising of all tools required for Operation and
Maintenance of the plant shall be supplied along with the plant.
6 Power Supply The machine shall operate with I/P supply : 3-Phase, 415V, 50Hz
AC or 1-Phase, 240V, 50Hz AC
The unit shall be equipped with a Phase Sequence relay for
ensuring the correct sequence of rotation of the compressor /
Vacuum Pump.

45
Doc: D-5-10-30-01-05

S.No Description Specification


7 Maximum Filling 50 Bar and above.
Pressure
8 Operating Voltage 230±10% ,50 Hz
9 Guarantee 12 months
10 Commissioning, Successful Bidder will have to commission the instrument to the
Training and Handing satisfaction of Powergrid. The instrument failed during the demo
Over of the
shall be rejected and no repairs are allowed.
Instrument Bidder will have to provide training to Powergrid engineers for
safe operation and maintenance of the instrument before
handing over the instrument. Instruction and operation manuals
should be supplied along with the instrument.
11 Packing and transport The kit and accessories shall be robust and rugged enough, so
cases that it can be transported safely at different locations .The
transportation case and packing of the kit shall be such that the
transportation from one station to other will not affect the
performance and accuracy of measurement of kit.
12 Services after Sale Bidder will have to submit the documentary evidences of having
established mechanism for prompt services as and when
required by Powergrid. Bidder need to submit their organisation
service chart along with bid

46
Doc: D-5-10-30-01-05

19. Technical specifications for ‘Transformer Oil Filtration Plant’

1.1 Performance Requirement

1.1.1 The Ultra High Vacuum type oil treatment plant of capacity of 10000/ 6000 liters per hour
shall be mobile and shall be suitable for treatment of new oil and reconditioning of used oil
in EHV class transformer, shunt reactor and other oil filled equipment in order to achieve
properties of treated oil within specified limits at the rated capacity.
1.1.2 The plant shall be capable of treatment of new oil (as per IEC 296/IS:335) and
reconditioning of used oil (as per IS:1865/IEC:422 for oil in-service) at rated capacity on
single pass basis as follows:
(i) Removal of moisture from 100 ppm to 3 ppm (max.)
(ii) Removal of dissolved gas content from 10% by Vol. to 0.1% by vol.
(iii) Improvement of dielectric strength break down voltage from 20 KV to 70 KV (min).
(iv) Vacuum level of degassing chamber at rated flow and at final stage :- not more than 0.15
torr (0.2 m bar) max.
(Degassing chambers of different degree of vacuum should have sufficient surface areas to
achieve the final parameters. A detailed justification as to how end parameters shall be
met with detailed calculations and test reports in support of the same shall be submitted
along with the offer.

(v) Filtering capacity: Max. particle size less than 0.5 micron in the filtered oil.
(vi) Processing temperature :- 40º C to 60ºC (Maximum allowed temp. in oil to prevent
oxidation (when oil is at atmospheric pressure) :- 60ºC)

1.1.3 Bidder is to furnish along with the bid detailed calculation to establish the sizing and
capability of the vacuum pumping system with respect to moisture and gas removal as
above.
1.1.4 Bidder is to submit along with the bid test reports, test methodology to prove the
capability of the plant offered.
1.1.5 The plant shall also have two independent vacuum pumping systems one for evacuating
the transformer for vacuum filling of oil in transformer and the other for degassing
chamber. The blank off vacuum of each pumping system shall be 10ֿ³ torr or less.
1.1.6 The plant shall be provided with control and indication panel with full automation.
1.1.7 The plant shall be fitted with hoses for connection of oil lines and vacuum lines to
transformers and reactors. Hoses shall have leakage rate of 10ֿ² torr-ltr/sec. (max.)
1.1.8 The Ultra High Vacuum Type oil purification plant shall be complete with oil pumps for
drawing oil for transformers and reactors, oil heater (max. heating rate = 2.0W/cm²) of
adequate rating, suitable filter or centrifuge as required to ensure oil quality, degasifier
complete with vacuum pumps, oil extraction pump etc. of adequate capacity such that
throughout from the purification plant is of guaranteed purity.
1.1.9 The plant shall also be suitable for cleaning and degassing of the oil stored in the storage
tanks.
1.1.10 All equipments required as above shall be mounted on a tow-able road worthy trailer unit
with 4 nos. pneumatic tyres. The equipment shall be suitable for outdoor use.

1.2 Design & Construction

47
Doc: D-5-10-30-01-05

The features and construction details of each 10000/6000 liters per hour capacity mobile
outdoor type oil filtration & purification plant shall be in accordance with the requirements
stated hereunder.

1.2.1 Oil Pump (Inlet Side)

1.2.1.1 Two (2) nos. electrically driven oil pumps with one (1) working and one (1) standby shall
be provided. Selection switch is to be provided for selection of either of pumps. The pumps
shall be single stage positive displacement gear type. Suitable mechanical seals shall be
provided to ensure vacuum tightness. A built-in pressure relief valve to re-circulate the oil
to suction side in case of accidental pressure rise shall be provided. Suction lift of the pump
shall be at least 5 meters of transformer oil at atmospheric pressure & temperature. A
separate by pass valve is provided across the gear pump so that the flow rate through the
filter can be adjusted as required. The pump should be controlled by frequency drive. This
should help to set the flow rating of filter pant from 4000 – 6000 LPH for 6 KLPH machine &
8000-10000 LPH for 10KLPH machine.

1.2.1.2 The pumps shall be provided with an interlock with delay such that if there is no oil flow of
30 sec. through the heater, the pump shall trip automatically and also if the pump is not
operating the heater will not be energized.

1.2.2 Magnetic Strainer


The plant shall be provided with suitable magnetic strainer with wire mesh to filter all
particles of sizes above 0.5 mm and all magnetic particles. The strainer shall be installed at
the suction of the oil pump described above.

1.2.3 Heater

a) An oil heater for heating up inlet oil shall be provided at the discharge side of the oil
pump.
b) The oil heater vessel shall be of mild steel welded construction & insulated with
glass/mineral wool.
c) The vessel shall be constructed for ultra high vacuum & pressure application.
d) Electric heater shall be provided inside the heater vessel to heat up oil from lowest
ambient temperature to temperature required for filtration/degasification operation in
single pass. The heater shall also be rated for heating the inlet oil from lowest ambient
temperature at 70°C in single pass during filling up of transformers. Two separate
temperature settings with thermostatic controllers shall be provided for this purpose.
e) The heating shall be indirect type and specific heat load shall not exceed 2.0 watt/cm² in
order to avoid local overheating.
f) The total heating capacity shall be divided into three independent thermostatically
controlled heating stages evenly balancing the three phases of power supply. The
control switches and knobs shall be housed on a control panel.
g) An additional preset temper proof safety thermostat set at the highest temperature shall
be provided on the heater to put off the heater and give audio and visual alarm to take
care of accidental overheating.
h) The heater body shall be so designed as to allow replacement of heating elements
without draining of oil. Suitable pressure relief valve, vent and drain valves & two (2)
dial type temperature gauges at inlet & outlet of heater shall be provided.

48
Doc: D-5-10-30-01-05

1.2.4 Filter

a) Cartridge filter as may be required to ensure maximum particle size to less than 0.5
micron in the filtered oil shall be provided.

b) The filter body shall be fabricated of mild steel & designed for leak tightness at full
vacuum & high pressures. The oil will flow from dirty oil chamber to clean oil chamber
through filter elements.

c) Cartridge type element used shall be suitable for transformer oil in service and
submicronic filtration, the media shall be non hygroscopic and of high dirt holding
capacity.

d) The filter elements shall be easily removable for replacement when required.
Compound gauge to indicate pressure across the filter, vent and drain with valves &
other necessary accessories shall be mounted on the filter for each operation.

1.2.5 External Solenoid Operated valves

Two valves should be provided at the inlet and outlet of the plant. The moment inlet
and outlet pumps are switched on these valves open thus making way for oil to pass. In
case of power failure, oil from the transformer will not enter the plant and vacuum
system.

1.2.6 Degassing Chamber

a) The degassing chamber shall be of welded construction and shall be suitable for
operation under full vacuum. The fill of rasching rings & trays for distribution shall be
designed for efficient distribution of oil over large areas. Incoming transformer oil
should be spread over these rings in the form of film and over a longer surface area,
thus achieving better degassing and dehumidification.
b) The degassing chamber shall be multistage (minimum 02 stages) type suitable for
ensuring the desired oil properties. Arrangement for condensing back lighter fraction
(aromatics) of the insulating oil into the system shall be provided.
c) The degassing channels shall have adequate height to allow long enough free fall for
complete degassing. Design shall be such as to minimize foam formation.
d) The degassing chambers shall be provided with suitable level monitor for oil or foam
level in the chamber and shall trip the inlet gear pump when the level rises above the
designed maximum level in order to prevent foam/oil to enter the vacuum pumping
system. The oil inlet pump starts again automatically once the oil level in the degassing
chamber falls below the preset oil level.
e) Necessary illuminated sight glass shall be provided through which oil flow through the
degasser can be viewed clearly.
f) The degasser shall be provided with vacuum gauges, vacuum breaking valves, main and
auxiliary vacuum connections and other necessary accessories.

1.2.7 Vacuum Pumping System

a) The pump shall be provided with a suitable vacuum pumping system for creating
adequate high vacuum in the degassing chambers. The pumping system shall consist of

49
Doc: D-5-10-30-01-05

suitable combination of Roots Blowers and Rotary vane vacuum pumps with inter-stage
condensing units.
b) The roots blowers shall be of reputed make. Suitable built in labyrinth packing system,
slinger rings, oil return chambers shall be provided between bearings and working
chambers to prevent penetration of lubricating oil to the working chamber. The pumps
motor shall be dynamically balanced. The pumps shall be suitable for starting
evacuation from atmospheric pressure and shall be applied with necessary overflow
valve.
c) The rotary vane vacuum pumps shall be installed after the roots blower. An automatic
by pass valve across the roots blower shall permit operation of rotary vane pump alone
to operate when so required. The rotary vane pumps are provided with gas ballast
valve to prevent contamination of vacuum pump oil with moisture. The vacuum pump
shall also be provided with suitable non-return valve device such that in the event of
power failure the vacuum in the degassing chamber shall be maintained and the vacuum
pump oil is not sucked back into the degassing chamber. A high vacuum safety valve
(piston type) to prevent back streaming of oil and air intrusion shall be provided. The
pump motors shall be having return stop device.
d) Necessary water cooled condensing units to condense the light faction (aromatics) and
return the same to the transformer oil shall be provided to reduce the loss of aromatics.
Condensing units shall also be suitable for operation with broken ice for remote location
operation where cooling water connection is not available.

1.2.8 Vacuum Pumping system for Transformer Evacuation

An independent vacuum pumping system shall be provided for evacuating the


transformer for oil filling. The vacuum level required for transformer evacuation for oil
transfer is about 0.76 torr (1 m bar) for transformer oil heated to 70-80°C. The
pumping system shall be identical to that of the degassing vacuum system. The capacity
shall be adequate for evacuation of

(a) 60KL in one hour from 1 atm to 1 mbar (for 6 KLPH Machine)

(b) 90KL in one hour from 1 atm to 1 mbar(for 10KLPH machine)

The vacuum systems for degasser and transformer evacuation shall be inter connected
in such a way that it shall be possible to use either or both the systems for any of the
purpose. A reinforced hose of 10 mts. length should be provided. The hoses must be for
vacuum leakage rate of 10ֿ² torr-litre/sec.

1.2.9 Oil Extraction Pump

Suitable pumping system shall be provided for extracting oil from degasser under
vacuum and supplying to transformer/reactor etc., at discharge pressure of 1.5 kg/cm²
at the outlet hose nozzle of the plant, the pump shall be either glandless centrifugal type
with canned motors or a combination of gear pump and centrifugal pump with
mechanical seals suitable for extracting oil from high vacuum degassing chamber. The
oil extraction pump shall be located at a suitable level below the degasser chamber so as
to ensure adequate suction head for the pump. The pump shall be supplied with double
check valve assembly and solenoid operated non return valve. In order to stop reverse
flow of oil in case of power failure, the pumping system shall preferably be self priming
type alternatively priming device with safety interlock to protect pump against dry

50
Doc: D-5-10-30-01-05

running shall be provided. Sampling valves shall be provided at the discharge of


extraction pump for testing of oil properties. A recirculation line with valves shall be
provided to re-circulate a part of the purified oil to the inlet point if necessary during
operation. The pump should be controlled by frequency drive .This should help to set
the flow rating of filter pant from 4000 – 6000 LPH for 6 KLPH machine & from 8000-
10000 LPH for 10 KLPH machine.

1.2.10 Hoses For Transformer Oil, Vacuum, Air And Water

a) Separate reinforced rubber hoses shall be provided for each operation for oil suction, oil
discharge, transformer vacuum connection and cooling water supply and return. The
hoses shall be at least 15 meter long each and shall be complete with hose quick connect
couplers for connection to installations under operation.

b) Hose pipes for oil service shall be suitable for transformer oil application upto
temperature of 100° C, full vacuum and pressure upto 2.5 kg/cm². All oil hoses shall be
built up around an earthed core or have built in earthed conductor to avoid static
electricity accumulation. Inlet and outlet nozzles of purification plant and
corresponding hoses shall be of 50 NB/40 NB size respectively in order to avoid error in
connecting.
c) Vacuum hoses shall be of braided nitrile rubber suitable for full vacuum without
collapsing and kinking. Suitable provision/ mechanism should be provided to monitor
oil flow in the vacuuming system . Further, in case of accidental oil flow in the vacuum
hose, the vacuum process should get stopped automatically.

1.2.11 Oil sampling valve: Suitable valve shall be provided for taking sample during filtration.

1.2.12 Material of construction and painting

a) Oil heater, filter vessel, degasser shall be of mild steel construction. The internal and
external surfaces including oil heater, filter vessel, degasifier and structural steel work
to be painted shall be shot or sand blasted to remove all rust and scale of foreign
adhering matter or grease. All steel surface in contact with insulating oil shall be
painted with two coats of heat resistant oil insoluble, insulating varnish.
b) All internal paints steel surfaces shall be given a primary coat of zinc chromate, second
coat of oil and weather resistant varnish of a color distinct from primary and final two
coats of glossy oil and weather resisting paint.
c) All paints shall be carefully selected to withstand heat and extremes of weather. The
paint shall not scale off or crinkle or be removed by abrasion due to normal handling.
d) Bolts & Nuts: All bolts and nuts exposed to weather shall be hot dip
galvanized/cadmium plated and passivated /zinc plated and passivated.
e) Material of construction for vacuum pumps air compressor, air drying plant, air receiver
shall be steel of suitable grade.
f) All piping and equipment carrying transformer oil shall be insulated with glass
wool/mineral wool insulation.

1.3 Instrumentation and Control

1.3.1 Following minimum instruments shall be provided on the oil purification plant:
a) Compound gauge at oil pump discharge
b) Compound gauge at filter inlet.

51
Doc: D-5-10-30-01-05

c) Compound Gauge at filter outlet


d) Pressure Gauge at discharge pump outlet
e) Pressure Gauge at degasifier
f) Vacuum Gauge at transformer evacuation line
g) Vacuum Gauge in between roots, vacuum pump and rotary vane vacuum pump.
h) Panel mounted vacuum indicators at degasser
i) Panel mounted vacuum indicators at transformer evacuating line.
j) Separate fine vacuum gauge for measurement of vacuum for transformer evacuation
system and oil line degassing chamber evacuation system should be provided. This
vacuum gauge should be electronic type having range from 0.01 torr to 20 torr and
should be of any of these reputed manufacturers’ (Wika/ Hasting/ Edwards) make.
k) Oil Filtration Machine should be fitted with on-line moisture in oil-PPM indicator.
l) Sight glass at degassifier
m) Temperature indicator cum controller at heater inlet
n) Temperature indicator cum controller at heater outlet
o) Voltmeter
p) Oil flow meter (Positive displacement type)
q) Ammeter

1.3.2 Control Panel :

A centralized electrical panel with auxiliary step down transformer, contractors, back up
protection fuses, indicating lamps etc. to be provided with following minimum audio and visual
alarms:
a) High temperature at heater outlet
b) High differential pressure across filters
c) Oil pump trip
d) Vacuum pump trip
e) Loss of vacuum in degassing chamber
f) Loss of vacuum in transformer evacuation line
g) No oil flow through heater
h) High oil level in degasser.
All controls and annunciation equipment should be suitable for 240 V AC.

1.3.3 Suitable interlock as described against each equipment shall be provided for safe and trouble
free operation.
1.3.4 All instruments, control hardware and alarms shall be mounted on a suitable control panel. A
mimic diagram with indication lamps showing on-off status of various equipments shall be
provided on the control panel.
1.3.5 The plant shall be fully equipped with adequate instrumentation having provision of manual
operation, if required. All necessary control and indicating panel shall be provided.
1.3.6 It shall be possible to use the oil transfer pump for the purpose of loading oil to transformers
or reactors from tankers and vice versa by by-passing to purification plant, if required.
1.3.7 There shall be independent vacuum pump for creating and holding the transformer/ reactor
winding under vacuum for vacuum drying and filling of winding when required. The vacuum
pump shall have capacity to develop and maintain adequate vacuum in the oil space of the
60KL tank for 6KL plant & 90 KL for 10 KL plant within 1 hour time.

1.4 Electrical System:

52
Doc: D-5-10-30-01-05

1.4.1 The plant shall receive 415V, 3 phase, 50 Hz, 4 wire power supply through flexible cable in the
distribution panel located on the plant. The incomer of the distribution panel shall be switch
fuse unit.
1.4.2 One length of 50 meters of core 1100V grade flexible cable with crimped lugs at one end shall
be provided for connection of the unit to the mains. The length of the cable will be covered in
a suitable cable drum.
1.4.3 Provision for earthing the plant at the operating locations with earthing terminals for safety
shall be provided.
1.4.4 The plant shall be suitably illuminated and ventilated for comfort of operator.

1.5 Guarantee: Min 01 year from the date of successful & complete commissioning at Powergrid
sub-station. All the materials, including accessories, cables, components etc. are to be covered
under warranty/guaranty period. If any component of the pant needs to be shifted to
supplier’s works for repairs within warranty/guaranty period, suppliers will have to bear the
cost of spares, transportation of component/plant for repair at works.
1.6 Commissioning, handing over the Instrument: Successful bidder will have to commission
the plant to the satisfaction of POWERGRID. The equipment failed during the demo shall be
rejected and no repairs are allowed.
1.7 Training: Supplier shall have to ensure that the plant is made user friendly. Apart from the
detailed demonstration at site, the supplier shall also have to arrange necessary training to
POWERGRID engineers.
1.8 After Sales Services: Bidder will have to submit the documentary evidence of having
established mechanism in India for “after sales services”.

53
Doc: D-5-10-30-01-05

20. Technical Specification of Gas Chromatograph for Dissolved Gas Analysis of


Transformer Oil

S.No. Particulars Specification


01 Functional The Gas Chromatograph is mainly qualitative and quantitative analysis
Requirement and shall work in conjunction with head space sampler as specified in
ASTM-D-3612-2002-Method C / IEC-60567-05 shall meet minimum
detection limits mentioned in the said standard and completely
programmable/controllable/data collection through common software.
Also a built in key pad and display shall be available for easy operation.
02 Detailed 1. A suitable and spacious oven to house all the columns shall be available
technical with various temperature programmes
requirement 2. Various heated zones shall be available for inlets and detectors as
for gas required.
Chromatograph 3. Six/eight port valve
4. Detectors like FID and TCD as per Standard
5. Electronic pressure and flow control of various gases as per standard.
6. All necessary flow/pressure sensors as per standard shall be available
7. Necessary communication from PC to instrument for control/data
transfer with software integrated with the equipment.
8. A set of columns as specified in the standard shall be in built with GC
9. A suitable catalytic converter as per the standard
10.Column cutting tool with rotating diamond blade
11.FID jet cleaning kit and septum removing tool.
12.Molecular service 5A PLOT column (30 Mtrx0.53 mm ID with film
thickness of 50 micro meters)
13.Carboxen 1006 PLOT column (30 Mtrx0.53 mm ID)
14.Data station computer along with printer and licensed operating
system software.
15.All necessary adopters for interconnecting columns and to connect
head space system to GC as per standard.
03 Detailed The Auto Sampler should have a programmable oven with multiple
technical temperature setting, mechanical shaking for vials, built in flow control,
requirement necessary interface connection with GC software controls compatible with
for Head Space GC as per the standards and it shall have following accessories.
sampler
1. Vial tray
2. Sample vial heating tray
3. 1 ml loop and 3ml loop
4. Six/eight port valve
5. Transfer line with needle.
6. Vial shaking arrangement
7. Built in pressure regulator and flow controller
8. Software
9. LAN/RS 232 communication
10.Manual crimper for 20 ml head space vial with one spare Crimp head-1
no.
11. Manual decapper for 20 ml head space vial with spare

54
Doc: D-5-10-30-01-05

S.No. Particulars Specification


Decapper head-1 No.
04 Power Supply it shall be operated with AC single phase,50 Hz +/-5%, 230 V +/- 10%
supply
05 Software and There shall be software to control and monitor all functions of GC and
Interfacing Auto sampler with facility to carry out complete setting of parameters
through software itself, monitor all the system components in real time
and give a visual indication. It shall be possible to programme run-time
events like, temperature programming, carrier gas /fuel flow settings,
time programming, valve operating, data acquisition etc. It shall have
facility to configure, store, recall and run analytical methods, which shall
hold comprehensive information like event programming, detector
configuration, integrator programming calibration tables etc to carry out
complete analysis automatically. The Software shall have common MS-
Windows-XP/WIN 7 based user friendly, menu driven GUI type.
06 Data The software shall be capable of acquiring run-data from all the detectors
Acquisition, and storing it in raw form on the hard disk. It shall have following
Analysis and features;
Storage a) Automatic and manual integration with various integration functions
b) Custom Report generation with chromatograms, spectrum analysis
data printouts etc.

Calibration Curves; Software shall have facility to accept, store and


apply multipoint calibration curves for concentrations with various
curve-fitting techniques for standard gas concentrations.
Other Features it is desirable that, the software has additional features
likes settings, methods, early maintenance, feed back, data base for
organizing, storing and retrieval chromatographic data etc.
Software Validation The Software shall be fully validated, relevant
certificate of software validation shall be supplied. This software
validation shall also be carried during AMC every year.
Computer with Laser Printers
Controlling computer and Printer shall have minimum specification
enclosed.
07 General All required items/instruments /spares /consumable /connecting
Conditions cables/communicationcables/instruments/manuals/Certificates/training
materials/original software/original licensed data//station operating
software/education CD/DVDs that are essential to understand the basics
and advanced gas chromatography and in parts/items that are essential
to complete the supply, installation and commissioning the system
required in the international standards ASTM-D-3612/2002 Method C /
IEC-60567-05 shall be supplied to our laboratory in healthy condition and
no extra cost.
08 Receipt, It shall be the responsibility of the supplier to ensure proper receipt and
Storage storage before starting the installation and commissioning activities.
POWERGRID only provide the proper storage and power supply.
09 Installation and It shall be the responsibility of the supplier for entire installation of the
Commissioning test set up as required to fulfil the international standard ASTM-D-
3612/2002 Method C / IEC-60567-05 at our laboratory. All necessary
installation kits are automatically parts and parcel of the supply.

55
Doc: D-5-10-30-01-05

S.No. Particulars Specification


Commissioning of entire test set up shall be the responsibility of the
supplier. A certificate of completion shall be issued to POWERGRID as
supporting document.
10 Infrastructure Necessary infrastructure arrangements like UPS, Wiring for power Points,
Furniture etc will also in the scope of supplier.
11 Calibration and The Test set up shall be calibrated as required in the latest international
Testing standards ASTM-D-3612/2002 Method C / IEC-60567-05. Actual sample
testing shall be demonstrated by supplier at our laboratory. Few samples
shall be tested for repeatability and reproducibility.
12 Warranty The entire test set up shall be covered on warranty for a period of one
year from the last date of complete commissioning and taking over the
test set up. Also the supplier shall give a certificate that, service support
including all necessary spares will be available on payment for next 5
years after expiry of warranty period.
If the kit / any component need to be shifted to suppliers works for
repairs, supplier will have to bear the cost of, spares, software,
transportation etc of kit for repair at test lab/works.
13 Training The supplier shall arrange complete hands on training by an application
scientist/Engineer, who acquired technical & academic capacity of the
principle company, in the premises of our Laboratory for a period of three
working days. The required reading materials/CDs shall be arranged by
the supplier.
14 System It is the responsibility of the supplier to ensure integration of entire GC
Integration system. He shall offer all essential components to carry out analysis,
compatible parts, and products and mention clearly the mandatory
spares required to match with the specification/carry the testing as per
ASTM-D-3612/2002, Method-C / IEC-60567-05.
15 Application An application note/principle document from original manufacturer
Note compliance with standard test method ASTM-D-3612/2002, Method-C /
IEC-60567-05. Shall be submitted along with the offer as proof of this test
method is already established in their laboratory.
16 Service Support The supplier shall furnish the detailed organization structure of the
service team, who has acquired qualification and regular training records
from manufacturer. Mode of attending service calls shall be given in
details.
17 Initial Initial accessories and consumables like 20/30 ml flat bottom vials, silver
Accessories aluminium crimp caps, Butyal septas, consumables like
and Argon/hydrogen/Zero air in gas cylinders etc. for successful installation,
Consumables commissioning, sample testing and further requirement for 5000
samples testing for DGA of transformer oil.
18 Additional It is the responsibility of the supplier to supply the necessary accessories
Accessories for complete installation with necessary plumbing accessories for
connecting high purity gas cylinder to GPS, GPS to GC and GC to Head
Space Auto sampler. It shall also include.
01. Two stage pressure regulators with SS diaphragm, inlet pressure up to
3000 psi, outlet pressure adjustable from 1 to 125 psi, outlet
connection 1/8” NPT connection for ARGON&ZERO AIR (Positive )-4
Nos.
02. Two stage pressure regulators with SS diaphragm, inlet pressure up to

56
Doc: D-5-10-30-01-05

S.No. Particulars Specification


300 psi, outlet pressure adjustable from 1 to 125 psi, outlet connection
1/8” NPT connection for FID FUEL GAS (HYDROGEN) and for
calibration, gas cylinders (Negative) - 2 Nos.
03. Electronic flow meter with the range from 0-500 ml/min with NIST
traceable certificate for measuring carrier/FID gas flows shall supplied
with rechargeable battery, battery charger with 230 V single phase AC-
1 No.
04.Gas leak detector for ARGON and HYDROGEN shall supply with
rechargeable battery, battery charger with 230 V single phase AC-1 No.
05.Three cartridge of high capacity purification system for removing
moisture, hydro carbons and oxygen from carrier gas(ARGON) and FID
fuel gas(HYDROGEN) purification system for removing moisture and
oxygen along with 50 feet pre cleaned copper tubing-2 sets
06. Calibrated 30 / 20 ml capacity glass syringe with three way plastic
stop cock-1 No.
07. Copper pre cleaned tubing for connection between regulator to gas
purifier system(GPS) and from GPS to GC
08. Kits and tools like GC column installation kit, fitting kit, GC column
rinsing kit, column cutting tool with rotating diamond, injection port
cleaning kit, FID jet clear kit, septum removing tool.
09. Installation kit for GC having TCD and FID combination.

57
Doc: D-5-10-30-01-05

21. Technical Specification of Portable Dissolved Gas Analysis of Transformer Oil

S.No. Particulars Specification


01 Functional The Portable DGA equipment to extract, detect, analyze and display
Requirement the dissolved gases in insulating oil as specified in IEEE C 57-104-
2008 and IEC 60599-2007.
02 Detection of Gases All the fault gases ie H2, CH4, C2H2, C2H4, C2H6, CO & CO2
concentrations shall be individually measured and displayed. The
minimum detection limits of the instrument for the above gasses shall
be strictly met the requirement of IEC-60567-2011-Page No. 47-
clause 9.2, table-5.
03 Power Supply It shall be operated with AC single phase,50 Hz +/-5%, 230 V +/-
10% supply. All power cable and necessary adaptors shall be
provided by supplier.
04 Instrument control a) Instrument shall be having in-built control for all the functions
and Data handling, (data acquisitions and data storage), it shall have a facility for
Internal Memory communication with computer for downloading the data from
instrument via USB port.

b) Laptop shall be provided for communication with the


instrument. it shall be of latest specification along with licensed
preloaded OS and software as well as software for interpreting
DGA results accordance with IEEE C 57-104-1991 and IEC 60559-
1999. Laptop carrying case shall also be provided.

c) Internal Memory can capable of store atleast 15000 records

05 General Conditions a) Performance Parameters like - Minimum Detection Limits,


Working Range, Accuracy, repeatability etc. shall be finalized
during detailed engineering.

b) The portable DGA equipment supplier shall demonstrate during


commissioning of the kit that the results shown by the kit are
within the specified accuracy and repeatability range and
POWERGRID will provide only the insulating oil/ GAS-IN-OIL
standard for testing.

c) All required items/instruments /spares /consumable


/connecting cables/communication
cables/instruments/manuals/Certificates/training
materials/original software/original licensed data/station
operating software/education CD/DVDs that are essential to
understand and operate the instrument shall be supplied at no
extra cost.

58
Doc: D-5-10-30-01-05

S.No. Particulars Specification


06 Operating 01. Temperature 0-50 Deg. C
Temperature, 02. 85% non-condensing
Relative humidity 03. Portable
& Dimensions
07 Warranty The entire test set up shall be covered on warranty for a period of one
year from the last date of complete commissioning and taking over
the test set up. If the kit needs to be shifted to suppliers works for
repairs, supplier will have to bear the cost of, spares, software,
transportation etc of kit for repair at test lab/works.
08 Service Support The supplier shall furnish the requisite documents ensuring that the
equipment manufacturer is having adequate service team and facility
in India to take care of any issues during operation of the instrument.
09 Training The supplier shall provide adequate training for a period of two
working days pertaining to the operation and troubleshooting to site
personnel.

59
Doc: D-5-10-30-01-05

22. Technical Specifications for Self Propelled Articulating Boom Lift For 765 Kv
Substations

S.No Description Requirements


1 Platform Height Minimum attainable platform height should be 23.5
Meters
2 Horizontal Reach Minimum outreach should be 15.5 Meters
3 Up And Over Clearance Minimum up and over clearance should be 6.5 Meters
4 Platform Size Basket Type/hand railed platform suitable for at least
three persons along with Tools, Tackles and spares.
(Minimum Area should be 1.5 sq. meter)
5 Tyre Should be Foam Filled, Maintenance Free suitable for
Rough Terrain
6 Height Stowed (Max) 3 Meters
7 Length Stowed (Max) 12 Meters
8 Width (Max) 3 Meters
9 Boom Articulating Type Boom design for versatility in lifting
with up and over positioning and excellent overreach
10 Platform Lifting Capacity Minimum 225 Kgs
11 Turntable Rotation Turntable to rotate 350 Degrees for flexibility in Access
12 Turntable Tail Swing 0 - 1.5 Meter
13 Drive In Raised Condition Facility to drive in Raised Conditions
14 Turning Radius Outside Maximum 5 Meters for easy maneuvering
15 Drive & Steer Four Wheel Drive & Four Wheel Steering
16 Gradeabilty(Minimum) 33 %
17 Power Source Diesel Engine powered, complying latest Emission
standards
18 Auxiliary Power Unit Battery or manual facility for lowering the Boom
(Basket) incase of engine breakdown.
230V AC AUX power for Lighting /Utility at platform.
19 Fuel Tank Capacity should be sufficient for continuous operation of
about 8 hours
20 Standard Compliance The Articulating Boom should comply with the
international standards
21 Safety Load Limiting device should be installed at the platform
for safety of the persons working at heights
22 Commissioning Commissioning of the Equipment at Site training to users
and free of cost first year maintenance
23 AMC AMC for next 5 years after completing of free
maintenance period (scope to be indicated in offer)

60
Doc: D-5-10-30-01-05

23. Technical Specifications for Self Propelled Articulating Boom Lift For 400 Kv Substations

S.No Description Requirements


1.1 Platform Height Minimum attainable platform height should be 13
Meters
1.2 Horizontal Reach Minimum outreach should be 7 Meters
1.3 Up And Over Clearance Minimum up and over clearance should be 6 Meters
1.4 Platform Size Basket Type/hand railed platform suitable for at least
three persons along with Tools, Tackles and spares.
(Minimum Area 1.25 sq meter)
1.5 Height Stowed (Max) 3 Meters
1.6 Length Stowed (Max) 7 Meters
1.7 Width (Max) 2.5 Meters
1.8 Boom Articulating Type Boom design for versatility in lifting
with up and over positioning and excellent overreach
1.9 Platform Lifting Capacity 225 Kgs
1.10 Turntable Rotation Turntable to rotate 350 Degrees for flexibility in
Access
1.12 Turntable Tail Swing Zero to avoid collision on tight working Space
1.13 Drive In Raised Condition Facility to drive in Raised Conditions
1.15 Turning Radius Outside Maximum 5 Meters for easy maneuvering
1.16 Tyres Should be Foam Filled, Maintenance Free suitable for
Rough Terrain
1.17 Drive & Steer Four Wheel Drive & Two Wheel Steering
1.18 Gradeabilty 30 %
1.19 Power Source Diesel Engine powered, complying latest Emission
standards
1.20 Auxiliary Power Unit Battery or manual facility for lowering the Boom
(Basket) incase of engine breakdown.
230V AC AUX power for Lighting /Utility at platform
1.21 Fuel Tank Capacity should be sufficient for continuous operation
of about 8 hours
1.21 Standard Compliance The Articulating Boom should comply with the
international standards
1.22 Safety Load Limiting device should be installed at the
platform for safety of the persons working at heights
1.23 Commissioning Commissioning of the Equipment at Site training to
users and free of cost first year maintenance
1.24 AMC AMC for next 5 years after completing of free
maintenance period (scope to be indicated in offer)

61
Doc: D-5-10-30-01-05

24. Technical Specifications for Battery Operated Platform Trolley For Substations

S.No Description Requirements


STANDARD : - Confirming to IS :10311/1982 reaffirmed 2007
1.1 CAPACITY 2000 kg
1.2 PLATFROM Chequered plate of thickness 5 mm minimum with
minimum area of 1.5 sq. meter
Height – 600 mm minimum.
Platform shall be equipped with removable, metal
railings of min. 1.5 feet
Platform surface shall be covered with insulated rubber
mat (min 3mm thickness).
1.3 No. of Wheels 4 Nos
1.3 TRAVEL SPEED – LADEN 5 kmph min.
1.4 TRAVEL SPEED – UNLADEN 7 kmph min.
1.5 SPEED CONTROL Electronic Controller for Speed Regulation
1.6 GRADEABILITY – LADEN 1:15
1.7 GRADEABILITY – UNLADEN 1:10
1.8 TURNING RADIUS OUTSIDE Maximum 3.5 Meters
1.9 BATTERY 290 A.H. Minimum along with battery charger with
inbuilt protection and connecting leads suitable for
charging battery in 10 hours maximum

1.10 BRAKING AND SHOCK Rear wheel Hydraulic Brake and shock absorber
ABSORBER SYSTEM suspension system.

1.11 MOTOR 3.0HP Minimum


Motor shall have a warranty of min three(03) years from
the date of successful commissioning
1.12 ALARM Under Voltage Audio Alarm at 80 to 85 % discharge of
rated battery voltage.
1.13 COMMISSIONING Commissioning of the Equipment at Site training to users
and free of cost first year maintenance
1.14 AMC AMC for next 3 years after completing of free
maintenance period (scope to be indicated in offer)

62
Doc: D-5-10-30-01-05

25. Technical Specifications for Primary Injection Kit:

S.No. Item Specification


Maximum Current
1phase, 2000Amp.
Output
Current Ranges : 0 –1000 – 2000 Amp or Single Auto Range of
1 Minimum 0 – 2000 Amp
Current Ranges : Duty Cycle as per following
0 – 1000 Amp, 50 Hz AC Continuous
0 – 2000 Amp, 50 Hz AC Intermittent (minimum 2.5 minutes ON &
15 minutes OFF)
2 Open circuit Voltage At 12Volts (minimum)
Continuous Current control by variable Auto Transformer/Digital
3 Resolution microprocessor control
Resolution : 1A
4 Accuracy Current measurement of accuracy less than or equal to 1%
5 Timer 0 to 999 second with resolution of 1 second(min.)
Digital display preferably in LCD / LED /TFT or better, for Display
6 Display
of Current, Voltage
8 Power supply Input Power Supply : 1phase, 230 V±10% ac 50 ± 5%Hz.
9 Enclosure Provided with hard & robust enclosure for field use.
Kit should be sturdy, easily portable and modular type and each
10 Mobility
module weight should not exceed 50Kg for easy handling.
Kit shall be supplied along with all accessories including Copper
cable set (2X10 mtr length), clamps, connectors, spare fuses,
11 Test Leads
indipower supply cable, etc (as applicable). all that is required for
carrying out measurement for one unit.
Multiple copper cables to deliver the rated current of 2000A with
each cable of Minimum Diameter of 120sq.mm.
12 Accessories Suitable extension board (with minimum 8 meter cable length) to
connect the Input Power Supply cable of the kit is to be provided to
suit current injection upto 765kV AIS Substation Equipments.
13 Operating Temperature 0 – 50 deg C

14 Relative Humidity 90% RH or better.

Kit shall have safety features like fuses/MCBs, ON indications, ,etc


15 Safety
(as applicable).

Demonstration & Successful Bidder has to carry out the


16
Commissioning at site demonstration/commissioning at all site after supply of the kit.

Minimum 1 years from date of successful demonstration /


17 Warranty
commissioning at site.

63
Doc: D-5-10-30-01-05

26. Specification for Portable Automatic Particle counter for measuring particles in
Mineral Insulating Oils as per ASTM-D6876

1. Application:

1.1. The intended use of the test set up is to perform filed / lab measurement of particles in
Mineral Insulating Oils as per ASTM D-6876.

2. Minimum Technical Specification:

a) Working Principle: Liquid Particle Counter shall be based on the Light Extinction Principle.
The Instrument shall be capable of recording size and number of particles as they pass across
the detector.
b) Number channels: Liquid Particle counter shall have a minimum of 7 channels and these
channels shall be selectable/programmable form the operating range
c) Report:
1. Liquid Particle Counter shall report average of the particle count runs as the cumulative
number of particles per mL >4 µm, >6 µm, >10 µm, >14 µm, >21 µm, >38 µm and >70 µm.
2. Liquid Particle Counter shall also report the ISO solid contamination code corresponding
to the number of particles per mL >4 µm, >6 µm and >14 µm as prescribed in ISO –
4406:1999.
d) Calibration: Calibration of the Instrument shall be with a NIST Traceable calibration fluid in
accordance with ISO-11171. Instrument shall have facility to run Interim check calibration
and in case required the calibrations shall be adjusted (Automatic / Manual). The vendor shall
have a facility in India to under take full calibration as per ISO-11171.
e) In Built Memory: Particle Counter shall have an In-Built memory form storing the minimum
of 500 tests.
f) Battery for Field Operation: Particle Counter shall have an In-Built battery for filed
operation apart from working on singe AC voltage.
g) Operating Voltage: 230 Volts , Singe Phase , 50 Hz
h) Range of Particle Counting: Minimum 4 µm to 100 µm
i) Flow Cell / Flow Controller/In Built Pump: The Instrument shall have a Flow Cell or built
in pump or flow controller with regulator to maintain the desired flow
j) Key pad / Touch Screen/ Computer: The Instrument shall have a built in keypad or Touch
screen for operation. In case Instrument is being operated through software a laptop / PC
shall be supplied along with the Instrument.
k) USB/RS232 PORT: The Instrument shall have a USB/RS232 Port for communicating /
downloading / operating through software.
l) Software for Download /Operation: The Instrument shall be supplied with a software for
operating instrument / downloading the data form instrument and the software shall be
based on WINDOWS Operating System.
m) Report Print out: The Instrument shall have a built in printer for results printout. In case
Instrument is being operated through software through PC, a printer shall be included in the
scope of supply.
n) Working Pressure: The Instrument shall work with inlet pressure of minimum of 0.5
Kg/cm2

3. Acceptability Criteria: The acceptability criteria of the equipment shall be based on the
complete receipt of the instrument, Successful demonstration and calibration check using ISO-
11171 NIST traceable ISO MTD FLUID at our Regional Laboratory, Hyderabad 400 KV Station.

64
Doc: D-5-10-30-01-05

27.Technical specifications for ‘1 kLPH Transformer Oil Filtration Plant with NAS
Filter’

1.1 Performance Requirement

1.1.1 The High Vacuum type oil treatment plant of capacity of 1000 liters per hour shall be mobile
and shall be suitable for treatment of new oil and reconditioning of used oil in EHV class
transformer, shunt reactor, Current Transformer, OLTC and other oil filled equipment in order
to achieve properties of treated oil within specified limits at the rated capacity.

1.1.2 The plant will generally confirm to IS-6034-1989 and its latest revision. The plant shall be
capable of treatment of new oil (as per IEC 296/IS:335) and reconditioning of used oil (as per
IS:1865/IEC:422 for oil in-service) at rated capacity on single pass basis as follows:

(vii) Removal of moisture from 100 ppm to 3 ppm (max.)


(viii) Removal of dissolved gas content from 10% by Vol. to 0.1% by vol.
(ix) Improvement of dielectric strength break down voltage from 20 KV to 70 KV (min).
(x) Vacuum level of degassing chamber at rated flow and at final stage:- not more than 0.15
torr (0.1 m bar) max.
(Degassing chambers of different degree of vacuum should have sufficient surface areas
to achieve the final parameters. A detailed justification as to how end parameters shall
be met with detailed calculations and test reports in support of the same shall be
submitted along with the offer.
(xi) Filtering capacity: Max. Particle size less than 0.5 micron in the filtered oil.
(xii) Processing temperature :- 40º C to 60ºC (Maximum allowed temp. in oil to prevent
oxidation (when oil is at atmospheric pressure) :- 60ºC)
1.1.3 Bidder is to furnish along with the bid detailed calculation to establish the sizing and capability
of the vacuum pumping system with respect to moisture and gas removal as above.
1.1.4 Bidder is to submit along with the bid test reports, test methodology to prove the capability of
the plant offered.
1.1.5 The plant shall be provided with control and indication panel with full automation.
1.1.6 The plant shall be fitted with hoses for connection of oil lines and vacuum lines to transformers
and reactors. Hoses shall have leakage rate of 10ֿ² torr-ltr/sec. (max.)
1.1.7 The High Vacuum Type oil purification plant shall be complete with oil pumps for drawing oil
for transformers and reactors, oil heater (max. heating rate = 2.0W/cm²) of adequate rating,
suitable filter or centrifuge as required to ensure oil quality.
1.1.8 The plant shall also be suitable for cleaning and degassing of the oil stored in the storage tanks.
1.1.9 All equipment required as above shall be mounted on a tow-able road worthy trailer unit with
4 nos. pneumatic tyres. The equipment shall be suitable for outdoor use.
1.1.10 The plant offered will be Mobile Type Mounted on Pneumatic wheels. The plant will be
weather proof. The casing will be provided with doors hinged on fabricated framework to have
access to operational Controls and Inspection window etc. The equipment will be enclosed and
protected against climatic conditions.
1.1.11 All the component will have adequate strength & rigidity to with stand normal condition of
handling transport & usage will be free from edge or corners to avoid injury to operating
personal in normal condition of use the design of the plant will be such that if required the
parts can easily be replaced.
1.1.12 Proper guarding arrangement will be provided on such parts which due to their position &
nature of operation on such parts, which due to their position & nature of operation are liable
to cause accidents.

65
Doc: D-5-10-30-01-05

1.2 Design & Construction

1.2.1 INLET PUMP

Positive displacement gear type pump with a capacity of required 1000 LPH will be provided. The
pump will be thoroughly tested for vacuum & will be suitable for continuous trouble free operation.
The pump will be provided with automatic protection against over pressure build up. Inter locking
arrangement will be provided between the oil inlet pump & the heater so that heater cannot be
energized unless inlet pump is ON.

Interlocking arrangement will be provided in the filter plant between inlet pump & the high level float
switch (locating into degassing column) to excessive rise of oil in the degassing columns. For
adjustment of flow rate through filter, a flow control valve will be provided across the gear pump .The
suction head of the inlet feed pump at inlet will be 4-5 Mtrs.

1.2.2 FILTER SYSTEM

Filtration system will consist of the following.

1.2.2.1 PRELIMINARY FILTER CUM MAGNETIC STRAINER.

The main function of this filter will be to prevent any damage to the inlet pump. It will have strainer
capable of retaining all particles above 0.5 mm size & also magnetic particles. Incoming oil will pass
through this filter .It will be possible to clean the strainer without dismantling the filter from the
pipeline.

1.2.2.2 COARSE FILTER

Coarse filter will consist of Filter cartridge. Filters will be easily changeable. It will be suitable for
removal of particles bigger than 5 Microns. This shall be useful for removal of sludge content in the
used oil. A drain Plug shall be provided for the Filter.

1.2.2.3 FINE FILTER (CARTRIDGE FILTERS):

Non-hygroscopic throwaway type cartridge filters of 0.5 micron rating will be provided. These
cartridge elements will have large dust holding capacity. The replacement of cartridge is quite easy
and can be done without any special tools. The housing vessel is suitable for high vacuum and
pressure application. The Compound Gauge will be provided in the filter vessel for inlet pressure in
order to ascertain condition of cartridge elements. Aeration will be provided on the filter vessel, for
aeration during draining.
1.2.2.4 NAS FILTER

Unit shall be equipped with PALL or Equivalent Make NAS Filter assembly along with NAS Filter
cartridge (Glass Fiber Media absolute element) after Fine Filter assembly with Bye-Pass arrangement
such that NAS Filter can be taken into service at any point of time. This is in addition to coarse and
Fine filter assembly.

1.2.3 HEATER

66
Doc: D-5-10-30-01-05

Heaters will be provided in protection tubes to avoid localized overheating, hot spot & breaking of oil.
Heater will be capable of heating oil to 80 Deg. C. However temperature during degassing &
dehydration for good results will not exceed 60 Deg. C. Heater rating will be minimum 15kW. Heater
will be divided into 3 Groups.

Heater element will be of Nichrome /Kanthhal wire filaments inserted in suitable arrangement which
are located in protection tubes. Construction of the heat exchanger will be such that the replacement
of heater will be easy & will not require any special tools.

Heater will be interlock with gear pump & will not be in ON position unless, the inlet pump is
working. Heater tank will be adequately thermally insulated to minimize loss of heat. Heater pipe
surface density will not be more than 2 Watts per sq. cm. Each group of heater will be controller by
individual thermostat. A safety thermostat will be provided to take care of any accidental rise of
temperature of oil & will put off the heater in that eventuality. This thermostat will be set at slightly
higher temperature than that of controlling thermostat. One suitable pressure relief valve will be
provided on the heater chamber to prevent any pressure rise above the acceptable limit. A Drain plug
for the heater tank will be provided.

1.2.4 VACUUM PUMPING SYSTEM (FOR DEGASSING COLUMN)

a) The pump shall be provided with a suitable vacuum pumping system for creating adequate high
vacuum in the degassing chambers. Rotary Vacuum Pump will be provided for evacuation of
Degassing chamber for machine. ROTARY OIL SEAL PUMP.

Pumping speed: 1000LPM Make: Woosung/Busch/Lay bolt/Mill (UK)

1.2.5 DEGASSING AND DEHYDRATION CHAMBER

The degassing chamber will function as degasser and dehumidifier and will be capable of removing
dissolved gases and moisture from the oil. It will be of M. S. and will have welded construction. The
chamber will be able to withstand the vacuum to which it will be subjected.

Efficiently spread rashing rings will be placed in the degassing columns. The surface area offered by
the rashing rings will be sufficient to form a thin film of oil and facilitates removal of dissolved gases
and moisture at the rated flow rate of oil. A sight glass with illuminating lamps will be provided for
observation of flow of oil.

One float switch on the degassing chamber will be provided for preventing excess rise of level. It will
be electrically interlocked with inlet pump. Another float switch to control low level of the oil in
degassing chamber will be provided and it will be electrically interlocked with the discharge pump.

1.2.6 DISCHARGE PUMP

Centrifugal Glandless type discharge pump with the capacity (as per requirement i.e. 1000LPH)
suitable for sucking oil from chamber held under vacuum will be provided. This will be fully tested
for pressure and vacuum leak rate.

Interlocking arrangement will be provided between low level float switch (located in degassing
columns) and discharge pump to prevent dry running of discharge pump. The discharge head of the
outlet pump will be 10 meters.

67
Doc: D-5-10-30-01-05

1.2.7 MECHANICAL NON RETURN VALVE AT INLET AND OUTLET.

One no. mechanical non return valve will be provided at inlet and one at outlet of the plant. This
arrangement will prevent mixing of processed and unprocessed oil, which may happen in case of
power failure.

1.2.8 AIRING VALVE One airing valve for airing the degassing chamber will be provided.

1.2.9 OIL FLOW CONTROL VALVES

Feed pump of the purifier will be provided with oil flow control valves to adjust the rate of flow.

1.2.10 OIL SAMPLING VALVES

Sampling valves will be provided on the purifier at suitable places so that sample of oil may be taken
to determine the condition of oil as it passes through each stage of filtration.

1.2.11 OIL INLET AND OUTLET VALVES


One valve on the oil inlet side and one on the outlet side of the purifier will be provided. The valves
will be suitable type and will meet the service intended.

1.2.12 GAUGES AND INSTRUMENTS

1.2.13 TEMP. INDICATOR:

One dial Temp. Indicator of 0 –150 Deg. C will be provided to measure the temp. Before and after
heater tank.

1.2.14 COMPOUND GAUGE:

One compound gauge of adequate capacity will be provided before the filter tanST.

1.2.15 DIGITAL TYPE THERMOMETER

A digital type thermometer will be provided at outlet of the heater for indication of oil temperature.
Thermometer range 0 – 1500C.

1.2.16 VACUUM GAUGES

One no. digital type vacuum gauge (range 0 to 760 mm Hg) will be provided on degassing chamber.
Vacuum gauge shall be with a resolution of 1 milli bar.

1.2.17 INDEPENDENT DRIVES

Independent drives for oil discharge pump oil inlet pump, vacuum pumps will be provided. Motors
will conform generally to IS 325. Motors will be of Crompton/ Siemens make.

1.2.18 OIL HOSES

68
Doc: D-5-10-30-01-05

Two numbers nitrile rubber hoses each 15 meters along with flanged and connection on both sides
will be provided. One for oil inlet and one for oil outlet. Oil hoses will be capable of handling the
transformer oil at 100 Deg. C. (Maximum).

1.2.19 FLOW INDICATOR / METER

The flow indicator/meter near outlet of the plant will be provided. This will measure the out flow in
LPH/LPM with a totalizer.

1.2.20 CONTROL PANEL

A centralized electrical panel with auxiliary step down transformer, contractors, back up protection
fuses, indicating lamps, electric control gear main isolation arrangement, motors, starters, pilot lamp,
push buttons, relays, MIMIC and interlocking etc. to be provided with following minimum audio and
visual alarms:
I. High temperature at heater outlet
II. High differential pressure across filters
III. Oil pump trip
IV. Vacuum pump trip
V. Loss of vacuum in degassing chamber
VI. Loss of vacuum in transformer evacuation line
VII. No oil flow through heater
VIII. High oil level in degasser.

All wiring will be neatly routed and all wire termination will be suitable identified with ferrules. Bulb
will be provided for illumination. All controls and annunciation equipment should be suitable for on
415V, 3 phase 4 wire, 50 Hz AC supply. All HRC fuses will be of Indoasian, Standard Switch Gear make
and switch gear will be of Siemens/L&T make. Mains isolating switch will be of Siemens/L&T Make.
The plant will be suitable for operation

1.2.21 INSPECTION AND TESTING

The inspection of the Transformer Oil Filtration Unit will be carried out by POWERGRID before
dispatch.

1.2.22 DRAWINGS AND MANUALS

01 set of detailed drawings of the Transformer Oil Filtration Unit and its mounting arrangement
together with part list and troubleshooting will be provided along with the offer and installation /
operation / maintenance manual at the time of supply.

1.2.23 PAINTING

A suitable rust resisting primer will be applied on the interior and exterior surface of steel, which will
be followed by application of two coats of durable paints of suitable to serve as base and binder for
the finished coat.

1.2.24 VARIOUS INTERLOKS REQUIRED IN THE PLANT

1.2.24.1 INTERLOCK FOR HEATING SYSTEM

69
Doc: D-5-10-30-01-05

a. Heater will trip when control thermostat trips after achieving the set temperature.
b. Heater will trip when safety thermostat trips after achieving the set temperature.
c. Heater will not switch on unless the inlet gear pump is running.

1.2.24.2 INTERLOCK FOR OIL HANDLING SYSTEM

a) Inlet gear pump will stop when high level float switch operates.
b) The centrifugal outlet pump shall stop when low level float switch operates.

1.2.24.3. MISCELLANEOUS INTERLOCK

The motor will trip when the overload or single phasing condition occurs, or set current range is
exceeded.

70
Doc: D-5-10-30-01-05

28.TECHNICAL SPECIFICATION OF STAND ALONE VACUUM PUMPING SYSTEM

1.0 SCOPE OF SUPPLY:

Mobile type trolley mounted vacuum Pumping system covered by this specification will be
suitable for evacuation of transformer of volume 90 Kiloliters of vacuum level from atmospheric
pressure to 1mbar in one hour. The Vacuum Pum pi ng s y s t e m wi ll be suitable for continuous
operation to absorb surface moisture of new transformer b efore installation/charging & also to
extract moisture from windings of old transformer after overhauling/repair.

2.0 SYSTEM COMPONENTS:

It will mainly consists of the following:

a. R o t a r y Vacuum Pump
b. R o o t s Vacuum Pump
c. V a c u u m Hose
d. C o n t r o l Panel, including main isolation switch with fuses of suitable rating for
control of inlet power supply.
e. I n d i c a t i n g and control instruments.
f. Suitable E l e c t r o p n e u m a t i c Ball valve.

3.0 VACUUM PUMPING SYSTEM

Roots – Rotary Combination of vacuum pump s h a l l be provided for evacuation of Transformer.

i) The pump shall be provided with a suitable vacuum pumping system for creating adequate high
vacuum inside the transformer. The pumping system shall consist of suitable combination of
Roots Blowers and Rotary vane vacuum pumps with inter-stage condensing units.

j) The roots blowers shall be of reputed make. Suitable built in labyrinth packing system, slinger
rings, oil return chambers shall be provided between bearings and working chambers to prevent
penetration of lubricating oil to the working chamber.

k) The pumps motor shall be dynamically balanced. The pumps shall be suitable for starting
evacuation from atmospheric pressure and shall be applied with necessary overflow valve.

l) The rotary vane vacuum pumps shall be installed after the roots blower. An automatic by pass
valve across the roots blower shall permit operation of rotary vane pump alone to operate when
so required. The rotary vane pumps are provided with gas ballast valve to prevent contamination
of vacuum pump oil with moisture.

m) The vacuum pump shall also be provided with suitable non-return valve device such that in the
event of power failure the vacuum in the transformer shall be maintained and the vacuum pump
oil is not sucked back into the transformer. A high vacuum safety valve (piston type) to prevent

71
Doc: D-5-10-30-01-05

back streaming of oil and air intrusion shall be provided. The pump motors shall be having return
stop device.

The pumps will be of reputed make as given below.

ROTARY OIL SEALED PUMP (02 Nos.)


Pumping speed : 300 Cu m/Hr.Each.
Make:- LEYBOLD/BUSCH/MILS,UK.

MECHANICAL BOOSTER PUMP


(AIR COOLED)
Pumping speed : 2000 Cu m/Hr.
Make:- LEYBOLD/BUSCH/PIEFIER/PEDROGIL.

4.0 VACUUM HOSE:


Vacuum hoses shall be of braided nitrile rubber suitable for full vacuum without collapsing and
kinking. One number vacuum hose of 15 mtrs along with flanged and connection on both sides
will be provided.

5.0 VACUUM GAUGE:


1 no. Digital type Vacuum Gauge range 0 - 760 mm of hg and diameter of at least 100 mm
with resolution of 1 mm of Hg.
Further 1 no. McLeod gauge range 10- 0.01 TOR, will be provided to indicate/measure Vacuum.

6.0 SYSTEM: VALVE:


a). 1 No. of e l e c t r o p n e u m a t i c valve of 50 NB will be provided at the suction of rotary pump.
This will isolate the transformer from the vacuum pump to avoid the vacuum drop during the
power failure/tripping of vacuum pump. The transformer inside vacuum will keep same
without loss.

b). 1 No. of airing solenoid valve will be provided for admitting air into the vacuum pump before
switching off the vacuum pump.

7.0 PAINTING:
All exposed surfaces wi ll be thoroughly cleaned of all dust, dirt, scale and foreign matter
and will be applied with one coat of approved rust preventive compound and finished with two
coats of paint.
8.0 MATERIAL OF CONSTRUCTION AND PAINTING
a) The Vacuum Pumping System will be mounted on the mild steel base. The surfaces
of structural steel work to be painted shall be shot or sand blasted to remove all rust and scale of
foreign adhering matter or grease. All steel surface in contact with insulating oil shall be painted with
two coats of heat resistant oil insoluble, insulating varnish.
b) All internal paints steel surfaces shall be given a primary coat of zinc chromate, second
coat of oil and weather resistant varnish of a color distinct from primary and final two coats of glossy
oil and weather resisting paint.
c) All paints shall be carefully selected to withstand heat and extremes of weather. The
paint shall not scale off or crinkle or be removed by abrasion due to normal handling.

72
Doc: D-5-10-30-01-05

d) Bolts & Nuts: All bolts and nuts exposed to weather shall be hot dip
galvanized/cadmium plated and passivated /zinc plated and passivated.
e) Lifting Hooks shall be a capacity to lift the total plant with Factor of Safety of 2 and
locate the hooks to lift with uniform loading.

9.0 CAPACITY DEMONSTRATION


The supplier has to submit the detailed calculations in support of meeting the desired vacuuming
capacity in prescribed time along with their technical offer. The capacity calculations submitted by
the supplier shall be evaluated as per below mentioned method:
Pumping Down Time (PDT) = V/S ln (P1/P2)
PDT = 1.2 x ( PDT1 + PDT2) ; Considering 1.2 as service factor
PDT1: V= Volume of Tank to be evacuated (90KL),
S= Capacity of Vacuum pump in LPM, P1= 760mm of Hg, P2=50 mm of Hg
PDT2: V= Volume of Tank to be evacuated (90KL or 60KL),
S= Capacity of Roots pump in LPM, P1= 50 mm of Hg, P2=0.76 mm of Hg
(The capacity shall be adequate for evacuation of 90KL Tank in one hour from 1 atm to
1mbar).

73
Doc: D-5-10-30-01-05

29. Technical Specifications for Insulation/Dielectric Diagnostic Analyser

Sr.No Description Specifications

1) Function of the kit Instrument shall accurately carry out following,


a) Analysis of Water content in Oil-Paper, and insulation of
Power and Instrument Transformer.
b) Diagnosis of all type of bushings and CB insulation.
c) Diagnosis of Cable and Motor Insulation.

The kit shall be based on Frequency Domain Spectrograph (FDS) as


well as Dielectric Frequency Response(DFR) technique for
analysis.The measurements shall be at lower frequencies and
effected through Tan delta and capacitance measurement of
insulation.

2) Mains Input Power 230V ±10% at 50 Hz


3) Voltage out put 0-200V,
Current Out put 0-50mA
Frequency range 0.1mHz to 5KHz min
4) Measurements Capacitance- 10pF to 10μF
Dissipation Factor -0 to 10 @ accuracy of 2% max
5) Measurement Channel 1, Channel 2.
Channels
6) Measurement UST,GST,GSTg. minimum
Modes
7) PC requirement A reputed laptop with latest specifications such as Core 2 Duo
processor, 2GB DDR RAM 320GB HDD DVD writer,15’’TFT screen or
with better specs .Preloaded with MS Windows XP,/VISTA/latest
with antivirus.Original CDs etc
The cost of PC shall be quoted separately.
8) Software The test record should download via RS 232 C port to a PC in
windows Excel/equivalent format. Software shall be able to assist in
analyzing the measurements and its reporting in user friendly
manner.Software upgradation shall be done as and when applies
with no cost to POWERGRID.
9) Accessories All testing/measurement low noise cables 18 meter long. PC inter
phase cables, Power supply cables,USB cables, Operating manual,
Original CD and software, Application CD etc. Hard carrying case
etc.connectors.AC power adopter.
10) Repeatability It should offer repeatability of test results in charged switchyard.
11) Operating Shall operate at Temperature 0 to 50 deg C, Humidity not
conditions condensing up to 95%,

74
Doc: D-5-10-30-01-05

12) Safety Standards The test set shall meet international safety standard for IEC 61010-1
safety and IEC 61326-1 EMC
13) Warranty/AMC Kit shall be guaranteed for minimum 3 years. Supplier will have to
execute AMC for five years for smooth and reliable operation of the
kit after the completion of guarantee period. The rates shall be
quoted along with the bid and it shall be taken into consideration
during evaluation of bids. The AMC shall cover,

a) Calibration of instrument (annually)


b) As much as visits for repairs to site.

If the kit needs to be shifted to suppliers works for repairs, supplier


will have to bear the cost of, spares, software up gradation,
transportation, transit insurance (to&fro), etc of kit for repair at test
lab/works .kit after repairs, need to be returned within thirty days
from the date of despatch.
All the expenses for maintaining supplied instrument “Healthy and
in working condition to be born by Successful bidder during the
AMC period of 5 years within the charges of AMC as per LOA.
14) Training Supplier shall have to ensure the kit is made user friendly. Apart
from the detailed demonstrations at each site, the supplier shall also
have to arrange necessary training to POWERGRID Engineers. It will
be the responsibility of the supplier to ensure that the testing at any
point of time is not held up, for want of “technical know how”.
15) Commissioning, Successful Bidder will have to commission the instrument to the
Handing Over of the satisfaction of POWERGRID.The instrument failed during the
Instrument commissioning shall be rejected and no repairs are allowed. The
acceptance of the kit shall be subjected to the successful
demonstration by supplier to the satisfaction of Power grid at
400KV as well as 765 KV switchyard/sites
16) Services after Sale Bidder will have to submit the documentary evidences of having
established mechanism for prompt services as and when required
by POWERGRID. Bidder need to submit their organisation service
chart along with bid

75
Doc: D-5-10-30-01-05

30. Technical Specifications for D.C. Earth Fault Locator

Sr.No Description Specifications

1) Functional Kit shall be able to locate earth faults on live Floating 220V/110V DC
system in EHV Sub-station (upto 765kV) up to length of 1km
Requirement without isolating any circuits. Instrument shall have
noise/harmonics free performance. Instrument should be able to
work reliabily in charged 765kV Substation.

2) Special Features Portable. Light weight, in-built transmitter. Based on low frequency
sine wave/ coded pulse injection into energized system. Detection
by receiver instrument during operation shall not cause an
interference with the operation of sensitive protection of the relay.
3) Fault Resistance Upto 250 KΩ
sensitivity Range
(Minimum)
4) Display Analogue or Audio visual alarm or equivalent indication for fault
detection.
5) Power Supply 240 V 50 Hz A.C. or Battery Operated with built in charger
6) Repeatability & The instrument shall be proven for Repeatability & Reliability of test
Reliability results in charged switchyard conditions.
7) Accessories Clamp on sensor suitable for cables and bus bars upto 45 sqmm.
Test leads, Power supply leads, carrying case, Manual etc (as
applicable) required for all testing.
8) Environment Temp- 0 to 50:C.
Humidity- 90% non Condensing.
(Ambient
The test kit shall meet EMI/EMC requirement as per relevant
Working/Operating
IEC/IS/equivalent standard.
Condition)
9) Guaranty/Warranty Guarantee period for kit shall be one (01) year. Supplier will have to
execute a comprehensive AMC for four (04) years for smooth &
reliable opration of kit after expiry of gurantee period. The rates
shall be quoted along with the bid and it shall be taken into
consideration during evaluation of bids. The AMC shall cover :
a. Calibration of Instrument : Annually or as per Instruction Manual
b. As much as visits for repairs to site
If kit needs to be shifted to suppliers works for repairs, supplier will
have to bear the cost of repairs including spares, F&I etc. Kit after
repair should be supplied back to site within 45 days effective from
date when information of kit going defective is communicated to
supplier by POWERGRID (except for the case for which kit needs to
be shifted outside India for repairs)
All the expenses for maintaining supplied instruments in "Healthy
and in working condition" is to be borne by successful bidder as per

76
Doc: D-5-10-30-01-05

LOA.
10) Calibration Calibration certificate from/traceable to NABL accredited lab or any
certificate other national/internationally reputed lab, shall be submitted. Date
of calibration shall not be older than three month from the date of
supply of kit.
11) Service after sale Bidder should have a well established after sale service support
network in India. Bidder will have to submit the documentary
evidences of having established mechanism for prompt services as
and when required by POWERGRID. Bidder need to submit their
organization service chart along with bid.
12) Commissioning, Successful bidder will have to commission the instrument to the
Training and satisfaction of POWERGRID. The instrument failed during the
Handing Over of the demonstration shall be rejected and no repairs are allowed.
Instrument Bidder will have to provide training to POWERGRID engineers for
safe operation and maintenance of the instrument before handing
over the instrument.
13) Packing and The kit and accessories shall be robust and rugged enough so that it
transport cases can be transported safely at different locations. The transportation
case and packing of the kit shall be such that the transportation from
one station to other will not affect the performance and accuracy of
measurement/working of the kit.

77
Doc: D-5-10-30-01-05

31. Technical Specifications for SF6 Leakage Detector (Applicable Only for Gas

Insulated Substations)

Sr.No Description Specifications

1) Functional Instrument shall be used for detection of SF6 Leakage from SF6
filled Circuit Breakers, Current Transformers, Gas Compartments of
Requirement Gas Insulated Substations. It shall operate successfully without any
influence of induction of electrically charged switchyard upto 765Kv
& 400kV. SF6 gas leak detector shall be free from induced voltage
effects and shall not be sensitive to moisture, any other gases &
vapour.
2) Method of Continuous leak detection & leak measurement operation during
operation & leak measurement operation during leak check without limitation
Principle with audible/visual indication. Based on Non Dispersive Infrared
technology
3) Range & Operation Range : 0 – 1000 ppm by volume (minimum)
Accuracy : 0 – 100 ppmv : +/- 5 % or better & 100 – 1000 ppmv : +/-
2 % or better
4) Senstivity 3.5 gm SF6 per year or less. No cross sensitive to other gases

5) Response Time Immediately


6) Alarm Visual as well as Audio

7) Power Supply Lithum-Ion batteries or equivalent power supply with charger &
having operating time of 6 hours (minimum)
8) Operating 0 to 50:C.
Temperature
9) Accessories Battery Charger, Manual, Hard Carrying Case, Power Cord, Adopter
for 220 V, Software CD & other mandatory accessory (as applicable)
ect required for successful operation of kit.
10) Guarantee & AMC Guarantee period for kit shall be one (01) year. Supplier will have to
execute a comprehensive AMC for four (04) years for smooth &
reliable opration of kit after expiry of gurantee period. The rates
shall be quoted along with the bid and it shall be taken into
consideration during evaluation of bids. The AMC shall cover :
a. Calibration of Instrument : Annually or as per Instruction Manual
b. As much as visits for repairs to site
If kit needs to be shifted to suppliers works for repairs, supplier will
have to bear the cost of repairs including spares, F&I etc. Kit after
repair should be supplied back to site within 45 days effective from
date when information of kit going defective is communicated to

78
Doc: D-5-10-30-01-05

supplier by POWERGRID (except for the case for which kit needs to
be shifted outside India for repairs)
All the expenses for maintaining supplied instruments in "Healthy
and in working condition" is to be borne by successful bidder as per
LOA.
11) Calibration Calibration certificate from/traceable to NABL accredited lab or any
certificate other national/internationally reputed lab, shall be submitted. Date
of calibration shall not be older than three month from the date of
supply of kit.
12) Service after sale Bidder should have a well established after sale service support
network in India. Bidder will have to submit the documentary
evidences of having established mechanism for prompt services as
and when required by POWERGRID. Bidder need to submit their
organization service chart along with bid.
13) Commissioning, Successful bidder will have to commission the instrument to the
Training and satisfaction of POWERGRID. The instrument failed during the
Handing Over of the demonstration shall be rejected and no repairs are allowed.
Instrument Bidder will have to provide training to POWERGRID engineers for
safe operation and maintenance of the instrument before handing
over the instrument.
14) Packing and The kit and accessories shall be robust and rugged enough so that it
transport cases can be transported safely at different locations. The transportation
case and packing of the kit shall be such that the transportation from
one station to other will not affect the performance and accuracy of
measurement/working of the kit.

79
Doc: D-5-10-30-01-05

32. Technical Specifications for Portable Partial Discharge Measurement kit

(Applicable Only for Gas Insulated Substations where Online PDMS is not available)

1. The equipment shall be used for detecting different types of defects in Gas Insulated Stations
(GIS) such as Particles, Loose shields and Partial Discharges as well as for detection of Partial
discharges.
2. It shall be capable for measuring PD in charged GIS environment as EHV which shall have
bandwidth in order of 300 MHz – 1500 MHz with possibility to select a wide range of
intermediate bandwidths for best measurement results. The principle of operation shall be based
on UHF principle of detection.
3. Detection and measurement of PD and bouncing particles shall be displayed on built in large LCD
display and the measurement shall be stored in the instrument and further downloadable to a PC
for further analysis to locate actual source of PD such as free conducting particles, floating
components, voids in spacers, particle on spacer surfaces etc. Incase offered equipment does not
have inbuilt LCD Display/ inbuilt storage then suitable laptop (having latest configuration) with
required software for display & diagnosis of PD signals shall be supplied along with equipment.
Software for display and diagnosis of PD signals and an expert software system for accurate
interpretation of cause of PD shall also be supplied and installed by the contractor on
POWERGRID Laptop/PC and licensed copy of software to be handed over to POWERGRID in a CD.
4. The equipment shall meet the following requirements
a. Measurement shall be possible in noisy environment.
b. Stable reading shall be possible in presence of vibrations within complex GIS assemblies,
which can produce signals similar to PD.
c. Equipment should have necessary synchronizing circuits to obtain PD correlation with
power cycle and power frequency.
d. The equipment shall be battery operated with built-in-battery charger. It shall also be
suitable for 230V AC/50 Hz input.
e. Measurement shall be possible in the charged switchyard in the presence of EMI/EMC.
f. Kit shall be used for measurement for partial discharge measurement in GIS by using UHF
sensors already installed in our Gas Insulated Substation
g. Instrument shall be supplied with standard accessories like i.e. four numbers duly
screened connecting cable (with each cable having minimum 10 meter length) to be used
for connecting installed UHF sensors with kit, carrying case, rechargeable battery pack
with charger suitable for 230V AC, 50Hz supply, noise sensor etc (as applicable).
h. Kit should have minimum three number channels for connecting UHF sensors input to kit
so that partial discharge measurement can be carried out at UHF sensors installed in GIS.
Simultaneous partial discharge measurement should be possible on these three channels.
i. Kit should have minimum one number noise channel (in addition to three number
channels mentioned at 4(h) above) for giving noise feedback to kit.
j. The function of software shall be covering the following:
 Data recording, storage and retrieval in computer
 Data base analysis
 Evaluation of PD measurement i.e, Amplitude, Phase Synchronization etc.
 Expert software system for accurate interpretation of cause of PD like corona, free
particle, protrusion etc.
 Report generation.
k. To prove the suitability in charged switchyard condition, practical demonstration shall be

80
Doc: D-5-10-30-01-05

conducted before acceptance.


l. Bidder shall have “Adequate after sales service” facility in India and shall provide the
document in support of this.
m. Necessary training may be accorded to personnel to make use of the kit for operation of
kit, analysis of different partial discharge signals, patterns & locating PD sources inside
the GIS
n. Instrument shall be robust and conform to relevant standard.
o. Pulse generator shall be supplied as a standard accessory Calibration report of Pulse
Injector also to be submitted along with supplied Pulse Injector.
p. Operating Temperature : 0 to 50 deg C
q. Guarantee period for kit shall be one (01) year. Supplier will have to execute a
comprehensive AMC for four (04) years for smooth & reliable opration of kit after expiry
of gurantee period. The rates shall be quoted along with the bid and it shall be taken into
consideration during evaluation of bids. The AMC shall cover :
 Calibration of Instrument : Annually or as per Instruction Manual
 As much as visits for repairs to site
If kit needs to be shifted to suppliers works for repairs, supplier will have to bear the cost
of repairs including spares, F&I etc. Kit after repair should be supplied back to site within
45 days effective from date when information of kit going defective is communicated to
supplier by POWERGRID (except for the case for which kit needs to be shifted outside
India for repairs)
All the expenses for maintaining supplied instruments in "Healthy and in working
condition" is to be borne by successful bidder as per LOA.

81
Doc: D-5-10-30-01-05

(C) General Guidelines for Procurement of Testing Equipments

For procurement of Testing Instruments & tools, the general guide lines are under:

1. The equipment offered should have been successfully demonstrated in the Region. In case the
offered equipment is proposed to be supplied first time in the Region, a successful demonstration
has to be carried out for accuracy and repeatability of test results in the actual working condition
before considering for procurement. The demonstration of the new equipments should be done
in the most stringent condition and to be witnessed by a committee comprising of members from
RHQ and site.

2. For smooth operation of the equipments, an AMC after completion of the warranty period, for a
period of four years (additionally) may be taken by the regions for selective equipments as per
the requirements. The said clause of the AMC may be included in the technical specifications of
those equipments, wherever the necessity for AMC is felt by the regions depending upon their
experience.

3. Since the technological up-gradations are taking place at a fast pace and some times equipments
become obsolete because of technical obsolescence or irreparable due to phasing out, it is
imminent to write-off such equipments and replace the same with the latest equipments for
proper operation and maintenance of the system. A committee at regional level may be
constituted which shall evaluate the modalities for write-off due to the reasons as stated above
and approval for the same may be obtained from the Regional Head accordingly.

4. The issue of calibration of the testing equipment is already being addressed by the Regions based
on the ISO requirements and the same needs to be followed for uniform implementation.

5. With regard to finalization of make and model for vendor enlistment, it is pertinent to mention
that the standard technical specifications as mentioned in the document shall henceforth be
adopted by the Regions. Hence, it is not appropriate to finalize make and model of particular
equipment for the purpose of enlistment.

The specifications may be reviewed after a period of two years. However, as there are very fast
technological up gradations in the field of instrumentations, inclusion of an equipment with
better specifications or any modification in the existing specifications may be recommended by
the Regional Head to Corporate AM for review and approval.

The technical specification for other testing instruments which are not covered in this document
may be prepared at Regional level and may be adopted with the approval of Regional Head.
However, norms for testing instruments shall be taken as mentioned in this document.

The recommendations are based on actual requirement of substations / sites. Regional Head is
empowered to increase or decrease the quantities suitably in consultation with Corporate AM.
POWERGRID S/S is defined as S/S wholly owned and operated by POWERGRID. Requirement of
Testing Instruments for POWERGRID bays in SEB S/Ss would be met out by the Testing
Instruments stored in the nearest POWERGRID S/S. All major tools & plants are to be stored in
POWERGRID S/S stores only and shall cater the maintenance requirement for Substation and
Transmission Lines.

82
Annexure-VI
(MANDATORY SPARES BREAKUP FOR ILLUMINATION SYSTEM AND ERECTION H/W)

Sl.N Description Unit 400/132kV Surjamaninagar s/s

A. Illumination system set 1


5% of each type of lighting fixture supplied
B. Erection Hardware Items set 1
5% spares of the actual quantities for Insulator strings &
hardwares, clamps & connectors (including equipment
connectors), spacers, corona bell and welding sleeves,

Section – Project
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV Surjamaninagar Substation of
TSECL to 400/132kV Substation (RTN1001014)
TECHNICAL SPECIFICATION
FOR
UP-GRADATION OF 132KV SURJAMANINAGAR SUBSTATION
OF TSECL TO 400KV SUBSTATION
(VOLUME-II)

Part (A)- Substation Portion:


a) Up gradation of 132kV Surjamaninagar Substation of TSECL to 400/132kV substation,
including 7X105MVA, 1 phase, 400/132kV Transformers & 1X80MVAR, 420kV, 3 phase Bus
reactor.

Part (B) - Transmission Line Portion:

a) 400kV Surajamaninagar TSECL upcoming substation to 132kV Surajamaninagar TSECL


substation on 220kV D/C (Twin Moose) towers charged at 132 kV - 0.5 Kms.

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 1 of 13
PART-A

VOLUME-II
TECHNICAL SPECIFICATION
FOR
UP-GRADATION OF 132KV SURJAMANINAGAR
SUBSTATION OF TSECL TO 400KV SUBSTATION
Substations Portion:-

1) Up gradation of 132kV Surjamaninagar Substation


of TSECL to 400/132kV Substation

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 2 of 13
Contents

S.NO. DESCRIPTION PAGE NO.


1. GENERAL 4
2. SCOPE 4
3. SPECIFIC EXCLUSIONS 11
4. PHYSICAL AND OTHER PARAMETERS 11
5. SCHEDULE OF QUANTITIES 11
6. BASIC REFERENCE DRAWINGS 11
7. DIFFERENT SECTIONS OF TECHNICAL SPECIFICATION 12
8. SPARES 13
SPECIFIC REQUIREMENT 13

ANNEXURE –I LIST OF DRAWINGS.

ANNEXURE-II 145KV CURRENT TRANSFORMER-AIS

ANNEXURE-III TECHNICAL PARTICULARS/ PARAMETERS OF 105MVA, 400/132KV,


1-PHASE TRANSFORMER

ANNEXURE-IV SPECIF REQUIREMENT (REV-02)

ANNEXURE-V TECHNICAL SPECIFICATION OF TESTING EQUIPMENT, REV-05

ANNEXURE-VI MANDATORY SPARES BREAKUP FOR ILLUMINATION SYSTEM AND


ERECTION H/W

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 3 of 13
SECTION -PROJECT
1.0 GENERAL

1.1 Tripura State Electricity Corporation Limited (A Govt. of Tripura Enterprises) (TSECL)
1.1 having its office at Agartala, Tripura is the owner of the project.

1.2 Power Grid Corporation of India Ltd. (POWERGRID), a Govt. of India Enterprise is
responsible for bulk Power transmission of electrical energy from various Central Govt.
Power Projects to various utilities/beneficiaries and interconnecting regional grids,
operating and maintaining the National electrical grid of India. It is established with
mandate of "We will become a Global Transmission Company with Dominant Leadership in
Emerging Power Markets with World Class Capabilities by:

 World Class: Setting superior standards in capital project management and operations for
the industry and ourselves.
 Global: Leveraging capabilities to consistently generate maximum value for all
stakeholders in India and in emerging and growing economies.
 Inspiring, nurturing and empowering the next generation of professionals.
 Achieving continuous improvements through innovation and state of the art technology.
 Committing to highest standards in health, safety, security and environment.” as its
mission.

1.3 TSECL appointed POWERGRID as consultant for up-gradation of 132kV Surjamaninagar


Substation to 400/132kV Substation.

2.0 SCOPE

2.1 The scope of work to be executed under subject Substation Package (AIS) including
Transformers & Reactors is as described below:
A. Up-gradation of 132kV Surjamaninagar Substation to 400/132kV Level

 2 nos. 400 kV line bays for Termination of 400kV Pallatan-Surjamaninagar


D/c line (These line are presently operated at 132kV)
 2 nos. 400 kV ICT bays for 7x105MVA, (400/3)/ (1323)/33kV, 1-phase
Transformers to operate as 2 (two) number 3-phase bank with one unit as
common spare.
 1 no. 400kV bay for 1x80MVAR, 420kV Bus Reactor.
 Associated 5 nos. 400kV Tie bay
 2 nos. 132kV ICT bays for 132kV side of two transformer banks of
(400/3)/(1323)/33kV, 1-phase Auto-Transformers with one unit as
common spare.
 1 nos. 132kV TBC bay for New 132kV Switchyard
 Conversion of existing two nos. 132kV Pallatana line bay to 132kV
interconnection line bay between existing 132kV Switchyard and 132kV New
Switchyard associated with 132kV side of two transformer banks .
 Re-conductoring of existing 132kV Main Bus-I & Main Bus-II with high
capacity HTLS conductor.
 Supply, Erection, Testing & Commissioning (including civil works) of
7x105MVA, (400/3)/(1323)/33kV, 1-Phase Transformers along with
associated Fittings, Accessories, Neutral CTs (one for each bank) and other
materials required commissioning for Transformers to operate as 2 (two)
number 3-phase bank with one unit as common spare and mandatory spares.
 Supply, Erection, Testing & Commissioning (including civil works) of 1 nos.
80MVAR, 420kV, 3 Phase Bus Reactor along with all fittings, accessories and
mandatory spares.

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 4 of 13
 630KVA, 33/0.433kV LT Transformer along with associated 33kV Isolator,
HG Fuse & 30kV surge arrestor to connect existing 33kV Bus.

2.2 It is the intent of this specification to describe primary features, materials, and design &
performance requirements and to establish minimum standards for the work. The
specification is not intended to specify the complete details of various practices of
manufactures/ bidders, but to specify the requirements with regard to performance,
durability and satisfactory operation under the specified site conditions.

2.3 The detailed scope of work is brought out in subsequent clauses of this section:-

2.2.1 Substation Package (including Transformers & Reactors) associated with Up-gradation of
132kV Surjamaninagar Substation to 400/132kV Level

2.2.1.1 Up-gradation of of 132kV Surjamaninagar substation to 400/132 Voltage level:

2.2.1.1.1 Design, Engineering, Manufacture, Testing, Supply including transportation & insurance,
storage, Erection, Testing and Commissioning of the following equipments/items at
Surjamaninagar Substation, complete in all respects.

(a) 420kV Circuit breakers, controlled switching device, isolators, current transformers,
capacitive voltage transformers, surge arresters, wave traps, Bus post Insulators.

Controlled switching devices may be placed/erected in relay panel in bay kiosk /


relay room.

(b) 132kV Circuit breakers, isolators, current transformers, capacitive voltage


transformers, surge arresters, Bus post Insulators and replacement of existing
132kV equipment’s with new equipment as indicated in SLD.

(c) 33kV HG fuse, Isolator, CT, PT & LA

(d) 7x105MVA, (400/3)/(1323)/33kV, 1-Phase Transformers along with associated


Fittings, Accessories, Neutral CTs (one for each bank) and other materials required
commissioning for Transformers to operate as 2 (two) number 3-phase bank with
one unit as common spare.

Technical particulars/ parameters of 105MVA, 400/132kV, 1-phase transformer and


315MVA, 400/132kV, 3-phase transformer is enclosed at Annexure-III.

(e) Digital RTCC panel consists of 4 Nos. Digital RTCC relay which shall be used to
control the following:

 2 Nos. digital RTCC relays for two number 3-phase banks of 105MVA,
400/132/33kV Transformer covered under present scope.

 2 No. digital RTCC relay as spare for future use (Mounted in the above digital
RTCC panel)

(f) 1x80MVAR, 420kV, 3-Phase Bus Reactor including all fittings & accessories.

(g) Supply & Installation of on line dissolved gas (Multi-gas) & Moisture Analyser and on
line insulating oil drying system (cartridge type) for 7x105MVA, 400/132/33kV, 1-
Phase Transformers and 400kV, 3-Phase Bus Reactor as per BPS.

(h) Complete relay and protection system as per section– Control and Relay panels for
the 400kV & 132kV bays covered under present scope including 400kV bus bar
Section – Project Rev. 03
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 5 of 13
protection for complete 400kV substation and 132kV Bus bar protection for new
132kV Switchyard including future bays as per SLD.

Further, at present, there is no bus bar protection for existing 132kV System. Under
present scope, new bus bar protection and modification of existing scheme along
with supply of Aux. relay (if any) & associated cabling works for the complete
existing 132kV switchyard including all existing bays.

Differential line protection has been envisaged for 132kV D/C lines interconnecting
132kV Switchyard (New) and 132kV existing switchyard.

(i) Complete Substation automation based on IEC 61850 including hardware and
software with associated equipments for following bays (bay as defined in technical
specification, Sec.-Substation Automation):

Further the contractor shall also supply necessary BCUs for control and monitoring of
substation auxiliary system. SAS server & gateway shall have licenses sufficient for all
present & future 400kV & 132kV bays as shown in the tender SLD.

Integration of IEC61850 communication based monitoring equipments like Online


dissolved Gas analyzer, Insulating Oil drying system, Optical temperature sensors,
digital RTCC and other Transformers & Reactors accessories as applicable for 420kV,
3-ph Bus Reactor unit & 1-phase transformer units with substation automation
system is included in the present scope.

The necessary interface equipment at Surjamaninagar Substation for transferring data


to SLDC is also under present scope. The contractor scope does not include any
modification at the SLDC control center.

New 400kV/132kV Switchyard, shall be monitored from the existing 132kV Control
Room Building. Hence, supply of additional HMI, cables, communication
switches/gateways, inverters, printers etc for control & monitoring of new
400/132kV Switchyard shall be considered in the present scope of work and no
separate payment shall be done for this.

Further, the existing 132kV Switchyard data shall be transferred to SLDC through
new gateway under present scope. Necessary modification/shifting of existing
communication system and additional port requirement shall also be considered
under present scope of work

(j) PLCC equipment’s for 400kV Pallatana-Surjamaninagar D/C Transmission lines for
both end including Analogue protection coupler & Digital Protection Coupler
(suitable for interfacing with E1 port of SDH equipment) and Cabling between DPC
and communication equipment shall be considered under present scope.

(k) 1.1 kV grade Power & Control cable along with complete accessories including
special cables (if any) for RTD sensor and on line Gas monitoring system/Oil
drying system, optical cables and Ethernet switch .

(l) Lattice and pipe structures (galvanized): Design of all types of Towers, Beams and
Equipment support structure is in the scope of the contractor. Lattice type structure
shall be used for Towers/beams. Pipe type structure shall be used for 400kV
equipment support structure only and lattice type structure shall be used for other
equipment support structures. CB support structure shall be as per CB
manufacturer’s design.

(m) Neutral/Delta Formation: Equipment support insulators (except 132kV BPI)


Section – Project Rev. 03
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 6 of 13
including clamps & connectors, aluminium tube, earthing materials, foundation
bolts, structures as required for (i) Tertiary DELTA formation for 1-ph Auto
transformers (ii) Neutral formation for 1-ph Auto Transformers (iii) HV, IV, tertiary
and neutral auxiliary buses to connect with spare unit of 1-ph Auto Transformers in
place of any faulty unit without physical shifting from its location.

(n) Erection Hardware: Insulator strings hardware, Disc Insulators/Long Rod


Insulators (as applicable), conductor(s), Al tube, bus-bar materials, cable trays &
covers, Bay MB, spacers, clamps & connectors, Junction boxes, earthwire, earthing
material risers, auxiliary earthmat (excluding main earth mat), buried cable
trenches/pipes for equipment & lighting, cable supporting angles/channels,
Insulating mats, cable sealing arrangement, all accessories etc. as required for
completion of present scope of work is included.

The existing 132kV Main Bus-I and Main Bus-II are having Twin Moose ACSR
conductor and same shall be replaced with twin HTLS conductor (of capacity
2x1500A, and weight equivalent to Moose) along with associated hard wares for
stringing and for interconnection of 132kV bays under the present scope as
indicated in tender drawing.

(o) Dismantling of existing 132kV AIS equipment’s (i.e. CVT, Isolator, CB, CT, WT) with
associated support structures and 132kV BPI with associated support structures (if
required), which is installed in existing 132kV Pallatana line bays ( 2 nos. bay).
These equipment’s shall be handed over to Surjamaninagar site store as per
instruction of site in-charge. New 145kV Isolator, CB, CT and BPI (if required) shall
be installed for the above bays. New Power & Control cables shall be laid for new
equipment’s. Necessary hardware for above replacement shall also be considered
under present scope of work. Further, new Circuit Breaker panels have been
envisaged for above two bays, which shall be placed in the existing Control Room
Building. Necessary integration with the control panel/protection panel shall be
done by the contractor.

(p) Air-conditioning system, Fire alarm system/Fire extinguisher and Illumination of


switchyard panel room and Control Room Building. Lighting & Illumination for
Switchyard Panel Rooms under present scope shall be provided by the contractor as
per Section Lighting System

(q) Complete Lighting and illumination for the switchyard area under present scope
shall be provided by the contractor as per Bid price schedule (BPS).

(r) Direct Stroke Lightning protection of 400kV switchyard and 132kV new Switchyard
under present scope

(s) LT SWITCHGEAR:

415V ACDB, 415V MLDB, 415V ELDB, 220V DCDBs & 48V DCDBs are envisaged
under present scope considering present and future 400kV & 132kV bays as per
SLD. The LT panels shall be placed in the Control Room Building to be constructed
under present scope.

(t) 220V & 48V Battery & Battery chargers: The capacity of batteries and battery
chargers shall be supplied as worked out by the contractor for the 400/132kV
present and future bays as shown in the Single Line Diagram of the substation and
shall be subjected to owner’s approval. However, the capacity for battery & ratings
for battery chargers shall not be less than the capacity & rating mentioned in the bid
price schedule (BPS).

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 7 of 13
(u) 250 kVA Silent type outdoor DG Set (shall be connected in new ACDB)

(v) 630kVA, 33/0.433kV LT Transformer: The new 630kVA, 33/0.433kV LT


Transformer shall be placed at the existing 132/33kV Switchyard and to be
connected to existing 33kV Bus through 33kV bay equipment’s. New LT cables
(1.1kV grade) shall be provide from 630kVA transformer to new Control room
building for interconnection of new MSB under present scope.

(w) Earthmat including measurement of soil resistivity for 400kV switchyard area is in
the scope of Contractor. Earthing design calculation shall be done for the entire
400kV switchyard area including transformer/reactor area and 132kV area. Based
on the earthing design, Earthmat shall be laid in the entire 400kV switchyard area
including transformer/reactor area and new 132kV switchyard area.

All the equipments including 400/132kV Transformers including Auxiliary buses


arrangement, 420kV Bus Reactor, structures, cable trenches, auxiliary earth mat for
isolators etc. shall be earthed by connecting them to main earth mat is in the present
scope.

(x) Fire protection system including HVWS & Hydrant system for 400/132kV, 1-Phase
transformers & 420kV, 3-Phse Reactors and Smoke detection, Fire alarm &
Annunciation System for Switchyard panel Rooms and Control Room Building.

(y) Telecommunication Equipment including PMU for the station as per Technical
specification.

(z) Any other equipment/ material required to complete the specified scope.

(aa) The broad Scope of the procurement of FO based Communication Equipment shall
include planning, designing, engineering, supply, transportation, insurance,
delivery at site, unloading, handling, storage, installation, termination, testing,
training and demonstration for acceptance, commissioning and documentation for :

i. SDH Equipment along with suitable interfaces and line cards.


ii. All cabling, wiring, Digital Distribution frame patch facilities and
interconnection to the supplied equipment at the defined interfaces
iii. System integration of all supplied subsystem
iv. Integration with the existing communication system based on SDH and PDH
of employer
v. Integration of supplied subsystem with SCADA system, PLCC equipment,
PABX of RLDC/NLDC, VOIP (SIP compliant for voice).
vi. Integration of new Communication equipment in the existing regional NMS.
All required support to be provided to the existing NMS vendor for
integration of new Communication equipment.

(bb) The broad Scope of the procurement of PMU shall include planning, designing,
engineering, supply, transportation, insurance, delivery at site, unloading handling,
storage, installation, termination, testing and demonstration for acceptance,
commissioning and documentation for PMU as per BPS at 400/132kV
Surjamaninagar Substation and these PMU shall support IEEE C 37.118 protocols.
These PMUs shall be integrated with Phasor Data Concentrator (PDC) at
RLDC/SLDC for the subject project.

2.2.1.1.2 Mandatory Spares - Design, engineering, manufacture, Testing and Supply including
transportation & insurance, storage at site for items mentioned in the bid price schedule
(BPS). Breakup of lighting and erection hardware spare is attached at Annexure-VI.

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 8 of 13
2.2.1.1.3 Civil Works - The scope of work shall include but shall not be limited to the following:

i) Civil works for the following based on Employer supplied drawings:-

(a) Foundation for 80MVAR, 420kV Bus Reactor along with foundation bolt, Jacking
Pad, pylon supports, rail cum road and unloading platform. The contractor shall
indicate recommended pocket size for placing foundation bolts in their foundation
plan drawing.

(b) Foundation for 7x105MVA, 400/132/33kV Single Phase Transformer along with
foundation bolt, Jacking Pad, pylon supports, rail cum road, common oil pit and
unloading platform. The contractor shall indicate recommended pocket size for
placing foundation bolts in their foundation plan drawing.

(c) Foundation for LT transformer & DG set

(d) Fire resistant walls between 400/132kV transformers and 420kV Bus Reactor.

(e) Fire fighting pump house, fire water tank, Switchyard Panel Room (3.9 x 6Mtr).

(f) Septic tank and Soak pit

(g) Cable trenches along with covers including road/rail crossing, sump pits, culverts
etc. However the cable trench layout including invert levels shall be developed by
the contractor. The existing cable trench layout shall be provided during detailed
engineering.

(h) All roads as shown in GA drawing including culverts. All roads shall be Concrete
road.
(i) Rain water harvesting system

(j) Substation fencing and gate

ii) Civil work including design and drawing by the vendor:-

(a) Design of Control Room Building as per conceptual reference drawing

(b) Soil Investigation & Measurement of soil resistivity

(c) Contouring & Site Leveling.

(d) Foundations for Non Standard Lattice & pipe structures

(e) Foundation for lighting poles/panels, bay marshalling boxes, control cubicles etc.
as required.

(f) Drainage layout using standard sections.

(g) Boundary wall works shall be matched with the existing

(h) Stone spreading and anti-weed treatment along with PCC for the 400kV and 132kV
switchyard area under present scope. The Gravel spreading in the existing 132kV
area is already laid. However, removal & re-spreading of the existing gravel after
cleansing and washing for the area under present scope as per layout requirement
shall be included in the present scope.

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 9 of 13
(i) Permanent water supply for Control Room Building, fire fighting pump house
building and fire fighting system.

(j) Modification in the existing foundation for installation of support structure


associated with new 132kV equipments (except CB) for 2 nos. line bay (Earlier used
for termination of 132kV Pallatana line bays in the existing Switchyard).

2.4 The work to be done under this specification shall include all labour, plant, equipment,
material and performance of all work necessary for the complete installation and
commissioning of switchyard. All apparatus, appliances, material and labour etc. not
specifically mentioned or included, but are necessary to complete the entire work or any
portion of the work in compliance with the requirements implied in this specification is
deemed to be included in the scope of contractor.

2.5 Before proceeding with the construction work the Contractor shall fully familiarize himself
with the site conditions and General arrangements & scheme etc. Though the Owner shall
endeavor to provide the information, it shall not be binding for the Owner to provide the
same. The bidders are advised to visit the substation sites and acquaint themselves with the
topography, infrastructure and also the design philosophy. The bidder shall be fully
responsible for providing all equipment, materials, system and services specified or
otherwise which are required to complete the construction and successful commissioning,
operation & maintenance of the substation in all respects. All materials required for the Civil
and construction/installation work including cement and steel shall be supplied by the
Contractor.

The complete design (unless specified otherwise in specification elsewhere) and detailed
engineering shall be done by the Contractor based on conceptual tender drawings. The
design review for Transformers & Reactors shall be done by the employer or employer’s
appointed consultant at different stages of design, manufacture & testing to ensure that
technical specification has been fully met. Any improvement/modification required due to
design review shall be done by the contractor without any additional cost to the employer.

2.6 Design of substation and its associated electrical & mechanical auxiliaries systems includes
preparation of single line diagram, electrical layout, foundation & cable trench layouts
(including invert levels), erection key diagrams, direct stroke lightning protection, electrical
and physical clearance diagrams, Control and protection schematics, wiring and
termination schedules, design of fire fighting system, outdoor lighting/illumination and
other relevant drawings & documents required for engineering of all facilities within the
fencing to be provided under this contract, are covered under the scope of the Contractor.

2.7 Any other items not specifically mentioned in the specification but which are required for
erection, testing and commissioning and satisfactory operation of the substation are deemed
to be included in the scope of the specification unless specifically excluded.

2.8 Model technical specification for various equipment’s and works for different voltage levels
is enclosed. Items, which are not applicable for the scope of this package as per schedule of
quantities described in Bid Price Schedule (BPS), the technical specification for the items
should not be referred to.

3.0 SPECIFIC EXCLUSIONS

The following items of work are specifically excluded from the scope of the specifications

a) Approach Road up to Sub-station boundary.

4.0 PHYSICAL AND OTHER PARAMETERS

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 10 of 13
4.1 Location of the Substation - The location of substation is indicated below:

S Name of substation Name of State Nearest rail Railway


No Head
1. Surjamaninagar Tripura Kumarghat North Eastern
frontier railway

4.2 Meteorological data

S. Name of Substation Banaskantha S/S


No
1 Snow Fall NIL
2 Wind Zone 55 m/s
3 Seismic Zone 0.5g
4 Design Ambient Temperature 50°C
5 Altitude <1000m
4
Coastal Area consideration
No

4.3 Fault Level

S. Name of Substation 400kV 132kV


No
1 Surjamaninagar 40kA 31.5kA

5.0 SCHEDULE OF QUANTITIES

The requirement of various items/equipments and civil works are indicated in Bid price
Schedules.

All equipments/items and civil works for which quantities has been given in the BPS shall be
payable on unit rate basis. During actual execution, any variation in such quantities shall be
paid based on the unit rate under each item incorporated in Letter of award.

Wherever the quantities of items/works are indicated in Lot/Set, the bidder is required to
estimate the quantity required for entire execution and completion of works and incorporate
their price in respective Bid price schedules. For erection hardware items, Bidders shall
estimate the total requirement of the works and indicate module-wise lump sum price bay
wise and include the same in relevant Bid price schedules. Any material/works for the
modules not specifically mentioned in the description in BPS, as may be required shall be
deemed to be included in the module itself.

Bidder should include all such items in the bid proposal sheets, which are not specifically
mentioned but are essential for the execution of the contract. Item which explicitly may not
appear in various schedules and required for successful commissioning of substation shall be
included in the bid price and shall be provided at no extra cost to Owner.

6.0 BASIC REFERENCE DRAWINGS

6.1 132kV Surjamaninagar s/s is existing Air Insulated Substation with Double main & Transfer
Bus switching scheme and for 400kV Voltage level, Air Insulated Substation with I-type One
and half Breaker bus switching scheme is envisaged. Further, new 132kV switchyard with
Single main & Transfer scheme is envisaged for interconnection of 400kV System with
existing 132kV Substation. Single line diagram and general arrangement (G.A.) arrangements
are enclosed with the bid documents, which shall be further engineered by the bidder.

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 11 of 13
6.2 The reference drawings, which form a part of the specifications, are given at Annexure-I of
Technical Specification. The bidder shall maintain the phase to earth clearance, phase to
phase clearance and sectional clearances, clearances between buses, bus heights but may alter
the locations of equipment to obtain the statutory electrical clearances required for the
substation.

The enclosed drawings give the basic scheme, layout of substation, substation buildings,
associated services etc. In case of any discrepancy between the drawings and text of
specification, the requirements of text shall prevail in general. However, the Bidder is advised
to get these clarified from Owner before bidding.

7.0 DIFFERENT SECTIONS OF TECHNICAL SPECIFICATION

For the purpose of present scope of work, technical specification (Vol. II) shall consist of
following sections and they should be read in conjunction with each other.

1 Section : Project Rev 03

2 Section: General technical Requirement(GTR) Rev 14

3 Section-Transformer (Up to 400kV Class) Rev 11

4 Section- Shunt Reactor Upto 400kV, Neutral Grounding Reactor Rev 10


and Surge Arrester
Section : Switchgear [Rev-11 (Except for
5 chapter ISO) Rev-
10B (for Chapter
ISO)]
6 Section :Lighting System Rev 07

7 Section :Fire Protection System Rev 06

8 Section :Power & Control Cable Rev 06

9 Section :Switchyard Erection Rev 10

10 Section :Structure Rev 06

11 Section :Civil Works Rev 11A

12 Section :Control & Relay Panel Rev 09

13 Section-Substation Automation System Rev.04

14 Section: Air Conditioning System Rev.04

15 Section: LT Switchgear Rev.05


16 Section-Battery and Battery charger Rev.06
17 Section-LT transformer Rev.05
18 Section- DG Set Rev.05
19 Section-PLCC Rev.05
20 Section-PMU Rev 00
21 Section- Telecommunication systems Rev -02

In case of any discrepancy between Section-PROJECT and Section-GTR and other technical
specifications on scope of works, Section-PROJECT shall prevail over all other sections.

In case of any discrepancy between Section-GTR and individual sections for various
equipments, requirement of individual equipment section shall prevail.
Section – Project Rev. 03
Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 12 of 13
8.0 MANDATORY SPARES

The Mandatory Spares shall be included in the bid proposal by the bidder. The prices of these
spares shall be given by the Bidder in the relevant schedule of BPS and shall be considered for
evaluation of bid. It shall not be binding on the Owner to procure all of these mandatory
spares.

The bidder is clarified that no mandatory spares shall generally be used during the
commissioning of the equipment. Any spares required for commissioning purpose shall be
arranged by the Contractor. The unutilized spares if any brought for commissioning purpose
shall be taken back by the contractor.

9.0 SPECIFIC REQUIREMENT

Specific Requirements are enclosed at Annexure-IV

Section – Project Rev. 03


Substation Package (AIS) including Transformers & Reactors for Up-gradation of 132kV
Surjamaninagar Substation of TSECL to 400/132kV Substation (RTN1001014)
Page 13 of 13