You are on page 1of 4

THREEYA SERVICES

Quotation

To From
Threeya Services
M/s.. 1-34,Doremon Complex,
Gamplagudem,
Attn: Mr.Dhayalan Natarajan, Krishna(dt)
Pin:521403

Tel + 91 9299992212
Email:dhana@threeya.com;drkongala@gmail.com
Subject : Instruments
calibration works for (Unit-3)
Ref.No : 3YA/SVCS/2021/055 – R1
seetanagaram, W.G.District,A.P
as per Annexure -1,2,3 & 4
Prepared by : Eng. DhanaRaju
Date : 29/12/2021
Kongala

Dear Sir,
Based on the above references regarding the subjected enquiry, we are pleased to submit
our offer for carrying out the Subjected scope of services.
Scope Included:

1. Minimum Tools & Tackles.


Scope Excluded:

1. Arranging Safety Induction, HSE Training &security passes/gate pass for


employees & Vehicle, work permit, loading/unloading note and Insurance for
work site.
2. Cost impact due to COVID-19 /Similar Conditions.
3. Any mechanical/Electrical & Civil related works other than scope.
4. Obtaining the necessary approval for the works from concerned authority.
5. Third party vendor coordination if required.
6. Installation of panels, shifting material to site, etc.,
7. Scaffolding for working area.
8. All major items, Permanent & Consumables.
9. Printed Ferrules and Tags.
10. Arranging heavy equipment like boom truck/fork lift/man lift etc.,
11. Excavation, Backfilling, Soft sand filling, Cable tiles fixing & Route markers
installation.
THREEYA SERVICES
General Terms & Conditions

1. Any loss of man-hours due to delay in work permit/Safety/ Non- availability of


the materials and other approvals, idle man power charges @5000 INR/day
(8Hrs) per person will be applicable.
2. Manpower will be mobilized as per the work front available.
3. Quantities are re-measurable as actual at site.
4. Client (Godrejagrovet) supervisor or their representative should always be
accompany with our team.
5. Threeya Services is not responsible for Damage to any equipment or device while
executing the work.
Pricing Summary:

Instruments calibration works for (Unit-3) seetanagaram, W.G.District,A.P


SL.NO DESCRIPTION ANNEXURE PRICE(INR)
1 CO-GEN ( BOILER,TURBINE,ACC,R.O PLANT ANNEXURE-1 2,45,420.00
2 PROCESS PLANT ( CPO & PKO ) ANNEXURE-2 46,235.00
3 MEE PLANT ANNEXURE-3 63,945.00
4 ETP PLANT ANNEXURE-4 16,240.00
TOTAL IN INR 3,71,840.00
In words: Three lakhs Seventy one thousand Eight hundred and forty rupees only.

Payment terms:

➢ 10%advanced along with the PO.


➢ Progressive Invoice will be raised as per the work done against to the Annexure on
weekly basis.
➢ Payment should be done within 15 Days of invoice submittal.

We hope the offer is in line with your requirements. Should you need any clarifications /
information, please feel free to contact us.
We look forward to this proposal developing into a mutually acceptable business.

Thanks & Regards,

Dhanaraju Kongala
Engineer

Encl:
1. Annexure – 1
2. Annexure – 2
3. Annexure – 3
4. Annexure – 4
THREEYA SERVICES

ANNEXURE-1 CO-GEN ( BOILER,TURBINE,ACC,R.O PLANT )


UNIT
SL.NO MATERIAL DESCRIPTION QTY.NOS RATE TOTAL
1 PRESSURE GAUGES 210 315.00 66150.00
2 PRESSURE SWITCHES 45 665.00 29925.00
TRANSMITTERS
3 (PRESSURE,FLOW,LEVEL,VACCUME) 53 875.00 46375.00
4 TEMPERATURE GAUGES 49 315.00 15435.00
5 TEMPERATURE TRANSMITTERS 13 875.00 11375.00
6 TEMPERATURE SWITCHES 4 665.00 2660.00
7 RTD (PT-100 DUPLEX) 48 525.00 25200.00
THERMOCOUPLES (K-TYPE,
8 DUPLEX) 42 525.00 22050.00
CONTROL VALVES WITH
POSITIONERS OVERHAULING &
9 MOV( MOTERIZED VALVES)-10NO 26 875.00 22750.00
PNUEMATIC CYLINDER WITH
10 POSITIONERS 4 875.00 3500.00
11 O2 ANALIZER 1
12 INDICATORS 33 315.00 10395.00
13 SIGNAL ISOLATORS 20 315.00 6300.00
14 MAGNETIC FLOW METERS 3 NA
INR
245,420.00
ANNEXURE-2 PROCESS PLANT ( CPO & PKO )
QTY. UNIT
SL.NO MATERIAL DESCRIPTION NOS RATE TOTAL
1 PRESSURE GAUGES 59 315.00 18585.00
2 PRESSURE SWITCHES 5 665.00 3325.00
TRANSMITTERS
3 (PRESSURE,FLOW,LEVEL,VACCUME) 5 875.00 4375.00
4 TEMPERATURE GAUGES 25 315.00 7875.00
CONTROL VALVES WITH
5 POSITIONERS OVERHAULING 6 875.00 5250.00
6 RTD (PT-100 DUPLEX) 13 525.00 6825.00
7 MAGNETIC FLOW METERS 11
8 INDICATE CUM CONTROLLER 5 315.00 1575.00
INR
46,235.00
THREEYA SERVICES

ANNEXURE-3 MEE PLANT


UNIT
SL.NO MATERIAL DESCRIPTION QTY.NOS RATE TOTAL
1 PRESSURE GAUGES 34 315.00 10710.00
2 PRESSURE SWITCHES 3 665.00 1995.00
TRANSMITTERS
3 (PRESSURE,FLOW,LEVEL,VACCUME) 30 875.00 26250.00
4 TEMPERATURE GAUGES 6 315.00 1890.00
CONTROL VALVES WITH
5 POSITIONERS OVERHAULING 12 875.00 10500.00
6 RTD (PT-100 DUPLEX) 24 525.00 12600.00
7 MAGNETIC FLOW METERS 5 NA
INR
63,945.00
ANNEXURE-4 ETP PLANT
UNIT
SL.NO MATERIAL DESCRIPTION QTY.NOS RATE TOTAL
1 PRESSURE GAUGES 36 315.00 11340.00
2 TEMPERATURE GAUGES 10 315.00 3150.00
3 TRANSMITTERS 2 875.00 1750.00
4 ELECTRO MAGNETIC FLOW METERS 4 NA
5 INDICATOR CUM CONTROLLER 3 1050.00 3150.00
INR
16,240.00

You might also like