Professional Documents
Culture Documents
MAIN
ENTRY
5.08
TANK
High Pressure
Cascade
H2 BUFFER
TANK
Reformer
Reformer
H2 comp.
Room
& PSA
Future High
Pressure PSA
Cascade
23235
ENTRY
H2 GENERATON PLANT
MCC &
Control
Room
2235
3960 6889 10346
C1
5
METHANOL STORAGE
METHANOL STORAGE
METHANOL STORAGE
4
13070
TANK-2
TANK-1
18460
3
1
METHANOL TANKER
POINT
2
ENTRY
C1
1
3155
4480
C
4485 B
4486 A
0.9
41903
8000
9.0mt WIDE ROAD
19.5
7.4
1.5
CENTER
OF THE
PLOT
0.32
0.54
4.5
STORAGE AREA
8
756M2
45000
8.97 LIFT
35
7 7 7 7 7
CHANGE
1
0.70.7 1.5
2.15
2
2
FORK LIFT
4
8
6.5
13.43 PACKING
4
1.5
1 4
PASSAGE
0.5
DRUM SPARE
5.0X5.0M.
6 16
6000
10.51
MAINTENANCE BAY &
6.0Mtr. wide road
ISMC 200
C2 C2
41968
T1
T2 A B C D E F
C2 2.99 1
2.4
N/E
C1 C1 OPENING
6.89 2
ENTRY
30.54
6.28
3
13.51
3.52 19
4
6 4 6.5 7 6 2.5
1.11
1.5
1.19 1.83
4
4
ENTRY
14.12
6.04
13.62
FOR
EQUIP.
CENTER OF
5
BUILDING
53857
5
2.5
9.81
0.79
73.7
1.5
1.5 12.26
3.06
7.91
5.62
6
2.98
3
6
2.32
11.41
10.46
8.72
Sludge
3.03
7.65 Hopper 7
2 4.3 2.5
1.2 HOT OIL SYSTEM
7
FUEL GODOWN
3.16
11.5 X 5.7
9
9.47
3.16
9.47
3.16
1.44
2.25
14.31
6.16
25.47
6.61
11.54