Professional Documents
Culture Documents
Satuan
No Uraian Satuan Qty Time Jumlah
(Rp)
1.Honorarium
1.1 Surveyor Org/Hari 3 10 500,000 15,000,000
SUBTOTAL 1 15,000,000
2.Transportasi dan Akomodasi
2.1 Sewa Mobil Trip 1 10 800,000 8,000,000
2.2 Tenaga Lokal + Motor Org/Hari 3 8 250,000 6,000,000
2.3 Penginapan Hari 1 10 300,000 3,000,000
2.4 Tunjangan Makanan Org/Hari 4 10 150,000 6,000,000
2.5 Speedboat PP Trip 3 2 75,000 450,000
SUBTOTAL 2 23,450,000
3. Pelaporan
3.2. Laporan Akhir paket 1 1 6,000,000 6,000,000
SUBTOTAL 3 6,000,000
Jumlah : Lima Puluh Enam Juta Sembilan Ratus Empat Puluh Ribu Rupiah
NEGOSIASI
Satuan
Jumlah
(Rp)
500,000 15,000,000
15,000,000
6,000,000 6,000,000
6,000,000
200,000 800,000
1,250,000 1,250,000
150,000 1,200,000
300,000 2,400,000
50,000 800,000
50,000 800,000
Ini kan ga hrs sewa/beli, standar aset tim survey - -
Ini kan ga hrs sewa/beli, standar aset tim survey - -
25,000 200,000
Ini kan ga hrs sewa/beli, standar aset tim survey - -
100,000 800,000
Nego hrg satuan sewa 75,000 600,000
Ini kan ga hrs sewa/beli, standar aset tim survey - -
160,000 160,000
Ini kan ga hrs sewa/beli, standar aset tim survey - -
200,000 200,000
9,210,000
50,460,000