gen_data =[ 1 150 455 NaN NaN 9000

NaN 8 8 +8 4500 5
NaN NaN 1000 16.19 0.00048 0
NaN
2 150 455 NaN NaN 10000
NaN 8 8 +8 5000 5
NaN NaN 970 17.26 0.00031 0
NaN
3 20 130 NaN NaN 1100
NaN 5 5 -5 550 4
NaN NaN 700 16.60 0.00200 0
NaN
4 20 130 NaN NaN 1120
NaN 5 5 -5 560 4
NaN NaN 680 16.50 0.00211 0
NaN
5 25 162 NaN NaN 1800
NaN 6 6 -6 900 4
NaN NaN 450 19.70 0.00398 0
NaN
6 20 80 NaN NaN 340
NaN 3 3 -3 170 2
NaN NaN 370 22.26 0.00712 0
NaN
7 25 85 NaN NaN 520
NaN 3 3 -3 260 2
NaN NaN 480 27.74 0.00079 0
NaN
8 10 55 NaN NaN 60
NaN 1 1 -1 30 0
NaN NaN 660 25.92 0.00413 0
NaN
9 10 55 NaN NaN 60
NaN 1 1 -1 30 0
NaN NaN 665 27.27 0.00222 0
NaN
10 10 55 NaN NaN 60
1 1 -1 30 NaN
0 NaN NaN 670 27.79
0.00173 0 NaN
];

function DP_v8()
%------------------------------------------------------------------------
------------------------
% UNIT COMMITMENT BY DYNAMIC PROGRAMMING METHOD
%
% Program versions development:
% version v1 - basic DP algorithm with simple quick dispatch (linear,
one segment generation curve)
% based on the book:
% A. J. Wood and B. F. Wollenberg, Power Generation
Operation and Control,
% 1984, John Wiley, New York
% version v2 - minimum up and down times taken into account: this is
based on the following
% article (with slight modification since cooling time is
not taken into account)
% C.Li, R.B.Johnson, and A.J.Svoboda: "A new unit
commitment method",
% IEEE Transactions on Power Systems, Vol. 12, No. 1,
1997, pp. 113–119, 1997.
% version v3 - generators dispatch based on LINPROG
% version v4 - ramp up and down constraints taken into account,
dispatching based on LINPROG
% version v4_b - same as v4 with either simple quick dispatch or linprog
based one
% version v5 - enhanced DP method (keep track of several predecessors,
not only one)
% Version 5 is based on the article:
% W.J.Hobbs, et.al., “An enhanced dynamic programming
approach for unit commitment,”
% IEEE Trans. Power Syst., Vol. 3, No. 3, pp. 1201-
1205, August 1988.
% version v6 - deterministic spinning reserve added; also QUADPROG
option included
% version v7 - shut down cost taken into account; start-up costs can
now be cold/hot or
% exponential.
% version V8 - some basic check up on data availability added on.
%
% Program can use either:
% - priority list of generators to be commited
% - complete enumeration (all possible combinations)
% Priority list is based on the no load cost and incremental heat rate
data.
%
% This program, uses a forward DP technique, and does not
% take into account time resolution different from 1h.
%
% Program features are controlled by a set of the switches (flags).
%
% THINGS THAT SHOULD BE IMPROVED/CHANGED IN THE CODE:
% - modify the code so it can deal with any time resolution (not only 1h)
% - since there is a relation between coefficients in linear cost methods
and coefficients in
% quadratic cost method, it is possible to estimate the former one (if
not given)
% based on the latter one. This can be done off-line (using for
example, least square method)
% and it would offer more versatility to the program (eg. using quick
dispatch or priority list
% even if only quadratic coefficients are given).
% - ... whatever else pops in your mind.
%
% Author: Vladimir Stanojevic, March 2011
%------------------------------------------------------------------------
------------------------
%%
%tic % initialize timer
%clc
%warning off
%------------------------------------------------------------------------
------------------------
% read input data from a file
%DP_input_data

GMIN = gen_data(:, 2); % generator min power


[MW]
GMAX = gen_data(:, 3); % generator max. power
[MW]
GINC = gen_data(:, 4); % incremental heat rate
[BTU/kWh]
GNLC = gen_data(:, 5); % generator no load cost
[£/h]
GSC = gen_data(:, 6); % generator start up cost
(cold), also BETA [£]
GFC = gen_data(:, 7); % generator fuel cost
[£/MBTU]
GMINUP = gen_data(:, 8); % generator min. up time
[h]
GMINDOWN = gen_data(:, 9); % generator min. down time
[h]
GSTATINI = gen_data(:,10); % generator initial status
(time on/off) [h]
GSH = gen_data(:,11); % generator start up cost
(hot), also ALPHA [£]
GCSTIME = gen_data(:,12); % generator cold start time
[h]
GRAMPUP = gen_data(:,13); % generator ramp up rate
[MW/h]
GRAMPDOWN = gen_data(:,14); % generator ramp down rate
[MW/h]
COEF_A = gen_data(:,15); % free term in quadratic-cost
function [£]
COEF_B = gen_data(:,16); % linear term in quadratic-
cost function [£/MWh]
COEF_C = gen_data(:,17); % 2nd order term in
quadratic-cost function [£/(MW^2)h]
GSDC = gen_data(:,18); % generator shut down cost
[£]
TAU = gen_data(:,19); % generator shut up cost exp.
coef. [£]
%------------------------------------------------------------------------
------------------------
NG = size(gen_data,1); % no. of generators
NT = size(DEMAND,1); % number of time periods
(hours)
%------------------------------------------------------------------------
------------------------

%------------------------------------------------------------------------
------------------------
% check up the availability of data for certain cases:
if (DISPATCH_METHOD == 2 | DISPATCH_METHOD == 3) & (any(isnan(GNLC)) |
any(isnan(GFC)) | any(isnan(GINC)))
STR = ['To use linear cost model, you must provide data for NO LOAD
COSTS,'...
'FUEL COSTS and INCREMENTAL COSTS.']; % there are no data for
quick dispatch method,
msgbox(STR,'DATA AVAILABILITY CHECK FAILURE!','warn'); % write
a message
return
elseif DISPATCH_METHOD == 1 & (any(isnan(COEF_A)) | any(isnan(COEF_B)) |
any(isnan(COEF_C)))
STR = ['To use quadratic cost model, you must provide data for the
cost coefficients:,'...
'COEFF_A (£), COEFF_B (£/MWh) and COEFF_C (£/MW^2h).']; % there
are no data for quick dispatch method,
msgbox(STR,'DATA AVAILABILITY CHECK FAILURE!','warn'); % write
a message
return
end
if MIN_UP_DOWN_TIME_FLAG == 1 & (any(isnan(GMINUP)) |
any(isnan(GMINDOWN)))
STR = ['To use minimum up and down time constraints, you must provide
data for GMINUP'...
' and GMINDOWN.'];
msgbox(STR,'DATA AVAILABILITY CHECK FAILURE!','warn');
return
end
if RAMP_UP_DOWN_FLAG == 1 & (any(isnan(GRAMPUP)) | any(isnan(GRAMPDOWN)))
STR = ['To use rump constraints, you must provide data for GRAMPUP
'...
'and GRAMPDOWN.'];
msgbox(STR,'DATA AVAILABILITY CHECK FAILURE!','warn');
return
end
if COMPLETE_ENUMERATION_FLAG == 0 & (any(isnan(GNLC)) | any(isnan(GFC)) |
any(isnan(GINC)))
STR = ['To use priority list, you must provide data for NO LOAD
COSTS,'...
'FUEL COSTS and INCREMENTAL COSTS.'];
msgbox(STR,'DATA AVAILABILITY CHECK FAILURE!','warn');
return
end
if START_UP_COST_METHOD == 2 & (any(isnan(GSH)) | any(isnan(GCSTIME)) )
STR = ['To use cold/hot start up cost method, you must provide data
for GSH '...
'and GCSTIME.'];
msgbox(STR,'DATA AVAILABILITY CHECK FAILURE!','warn');
return
elseif START_UP_COST_METHOD == 3 & (any(isnan(GSH)) | any(isnan(TAU)) )
STR = ['To use exponential start up cost method, you must provide
data for GSH '...
'and TAU.'];
msgbox(STR,'DATA AVAILABILITY CHECK FAILURE!','warn');
return
end
%------------------------------------------------------------------------
------------------------

% enabling / disabling some of the constraints


if MIN_UP_DOWN_TIME_FLAG == 0 % minimum up and down time
enabled/disabled
GMINUP(:) = 1; % if disabled, all min up and
down times
GMINDOWN(:) = 1; % are set to 1
end
if RAMP_UP_DOWN_FLAG == 0 % ramping constraints
enabled/disabled
GRAMPUP(:) = Inf; % if disabled, ramp rates are
GRAMPDOWN(:) = Inf; % set to a large number
end
if COMPLETE_ENUMERATION_FLAG == 0 % use either priority list
or...
[GMAXlst,GMINlst,LIST_STATES,GEN_ORDER] =
priority_list(GNLC,GFC,GMAX,GMIN,GINC,NG);
else % ...complete enumeration
(consisting of all possible combinations)
[GMAXlst,GMINlst,LIST_STATES,GEN_ORDER] =
complete_enumeration(GNLC,GFC,GMAX,GMIN,GINC,NG);
end
if RESERVE_FLAG == 1
if exist('RES_UP','var') ~= 1 | isempty(RES_UP) % if reserve-up
vector is not defined or if it is empty
RES_UP = K_RES_UP * DEMAND; % create reserve-up
vector in proportion to demand
end
if exist('RES_DN','var') ~= 1 | isempty(RES_DN) % if reserve down
vector is not defined or if it is empty
RES_DN = K_RES_DN * DEMAND; % create reserve down
vector in proportion to demand
end
else
RES_UP = zeros(size(DEMAND)); % if reserve not
required,
RES_DN = zeros(size(DEMAND)); % set it to zero.
end
if START_UP_COST_METHOD == 3 % if start-up costs
are exponential
ALPHA = GSH; % then define ALPHA
BETA = GSC; % and BETA
else
ALPHA = NaN*ones(NG,1); % otherwise, just
define the names for variables
BETA = NaN*ones(NG,1); % since they will be
passed to the functions
end
%------------------------------------------------------------------------
------------------------

% Determines the initial status (ON/OFF = 1/0) for each generator, based
on the input data (GSTATINI).
% (GSTATINI contains the number of hours that a generator was ON/OFF
before the 1st time step)
% INI_STATE [NG x 1] - initial states of generators (1-commited, 0-not
commited)
% INI_STATE_NUM - position (column) of vector INI_STATE in the list
of states
INI_STATE = (GSTATINI > 0);
[I, INI_STATE_NUM]= ismember(INI_STATE',LIST_STATES','rows');

%------------------------------------------------------------------------
------------------------
% main loop of the program - search for optimal commitment by dynamic
programming
%------------------------------------------------------------------------
------------------------
% Here is the brief explanation of the algorithm:
% State is a unique combination of commited and non-commited generators.
% Commited generators are designated with "1" and non-commited generators
are designated with "0".
%
% For each hour, program finds the potentially feasible states.
Potentially feasible states are
% the states where demand (and reserve) can be supplied by the commited
generators.
% If there are no potentially feasible states, program displays the error
message and terminates.
%
% For each potentially feasible state, program takes all feasible states
from the previous hour
% and checks if the transition to the current state (in current hour) is
possible.
% If it is not possible, the corresponding transition (start-up) cost is
set to Inf.
% However, if the transition is possible, calculated are the transition
costs. Production for
% the current hour is calculated based on demand taking into account
production at previous hour (ramp-up and
% down constraints). Finally, total cost is the sum of the transition
cost, production cost, and
% the total cost at the state in previous hour. This procedure is
repeated for all the states in
% previous hour. Total costs are then sorted and MN of them are saved
(this is enhancement comparing
% to the classical dynamic program where only 1 previous state is saved).
If the transition to
% a state in current hour is not possible from any of the states in
previous hour, then current state is
% regarded as infeasible and is not considered anymore. If all the states
in an hour are infeasible,
% program displays the error message and terminates.
%------------------------------------------------------------------------
------------------------
for HOUR = 1:NT
fprintf('Currently processing hour: %2d \n',HOUR)
if HOUR == 1
PREV_STATES_NUM = INI_STATE_NUM; % Positions (columns)
of feasible states in the list of states, for previous hour
X_PREV = GSTATINI; % number of hours
generators are ON (>0) or OFF (<0).
PRODUCTION_PREV = zeros(size(X_PREV)); % generator outputs
TR_PREV = PREV_STATES_NUM; % transition path
matrix
FC_PREV = 0; % cumulative cost
vector
else
X_PREV = X_CURR; % keep the number of
gen. working hours for each state (at previous hour)
PRODUCTION_PREV = PRODUCTION_CURR; % and the gen.
outputs for previous hour states
TR_PREV = TR; % rows of matrix TR
define the transition path
FC_PREV = FC; % save the cumulative
cost vector from the previous hour
PREV_STATES_NUM = TR_PREV(1:COUNTER,end); % states in the
previous hour are given in the last column of TR
end
% FEASIBLE_STATES_NUM = positions (columns) of potentially feasible
states in the list of states, for current hour.
[FEASIBLE_STATES_NUM,SUCCESS] =
find_feasible_states(GMINlst,GMAXlst,DEMAND,HOUR,RES_UP,RES_DN);
if SUCCESS == 0 % if unable to find
any feasible state to match demand,
return % quit the program
end
MN = min(length(PREV_STATES_NUM),N_PRED); %
number of predecessors to be examined
X_CURR = zeros(NG,MN*length(FEASIBLE_STATES_NUM)); %
prepare the number of gen. working hours for each state (at current hour)
PRODUCTION_CURR = zeros(NG,MN*length(FEASIBLE_STATES_NUM)); %
prepare generator outputs for each state at current hour
TR = zeros(MN*length(FEASIBLE_STATES_NUM),HOUR+1); %
prepare transition path matrix
FC = zeros(MN*length(FEASIBLE_STATES_NUM),1); %
prepare cumulative cost vector
COUNTER = 0;
% take each feasible (current hour) state and...
for J = 1: length(FEASIBLE_STATES_NUM)
GEN_START_SHUT_COST = zeros(NG,1); %
start up (shut down) costs
TOTAL_COST = zeros(1,length(PREV_STATES_NUM)); %
total cost (production cost + start up cost + total cost of previous
hour)
% X_TEMP - temporarily stores number of gen. working hours for
combination of current state and all previous hour states
X_TEMP = zeros(NG,length(PREV_STATES_NUM));
% PRODUCTION_TEMP - temporarily stores gen. outputs for
combination of current state and all previous hour states
PRODUCTION_TEMP = zeros(NG,length(PREV_STATES_NUM));
% take a state (from all feasible states), one by one; let it be
CURRENT_STATE
CURRENT_STATE = LIST_STATES(:,FEASIBLE_STATES_NUM(J));
%----------------------------------------------------------------
------------------
% ... compare it with each feasible state at previous hour
for K = 1: length(PREV_STATES_NUM)
if HOUR == 1;
PREVIOUS_STATE = INI_STATE;
else
PREVIOUS_STATE = LIST_STATES(:,PREV_STATES_NUM(K));
end
% check if the transition from previous state to the current
state is possible regarding min up and down times
[X,SUCCESS] =
check_up_down_time(CURRENT_STATE,PREVIOUS_STATE,X_PREV(:,K),GMINUP,GMINDO
WN,NG);
if SUCCESS==0
% if it is not possible,
GEN_START_SHUT_COST(:,K) = Inf;
% mark the transition cost and
PROD_COST = ones(NG,1)*Inf;
% production cost as extremely high
GEN_PRODUCTION = ones(NG,1)*NaN;
else
% othervise, calculate the transition cost
STATE_DIFF = CURRENT_STATE - PREVIOUS_STATE;
% STATE_DIFF = 1 means unit is commited
% STATE_DIFF = -1 means unit is decommited
if START_UP_COST_METHOD == 1 % start-up costs are
constant and equal to cold start cost
GEN_START_SHUT_COST(:,K) = (STATE_DIFF > 0) .* GSC;
elseif START_UP_COST_METHOD == 2
GEN_START_SHUT_COST(:,K) =
((STATE_DIFF > 0) & (-X_PREV(:,K) >= (GMINDOWN + GCSTIME))) .* GSC; %
cold start-up cost
GEN_START_SHUT_COST(:,K) = GEN_START_SHUT_COST(:,K) +
((STATE_DIFF > 0) & (-X_PREV(:,K) < (GMINDOWN + GCSTIME))) .* GSH; %
hot start-up cost
else
GEN_START_SHUT_COST(:,K) = (STATE_DIFF > 0) .* (ALPHA
+ BETA .* (1-exp(X_PREV(:,K) ./ TAU))); % exponential start-up costs
end
GEN_START_SHUT_COST(:,K) = GEN_START_SHUT_COST(:,K) +
(STATE_DIFF < 0) .* GSDC; % shut down cost

% find the generation [MW] and production cost for each


unit
[GEN_PRODUCTION,PROD_COST] =
production(CURRENT_STATE,PREVIOUS_STATE,GMIN,GMAX,DEMAND,HOUR,GNLC,GFC,GI
NC,NG,GRAMPUP,GRAMPDOWN,PRODUCTION_PREV(:,K),GEN_ORDER,COEF_A,COEF_B,COEF
_C,DISPATCH_METHOD);
end
X_TEMP(:,K) = X; % save the updated gen. work. times when
moved from previous state to the current one
PRODUCTION_TEMP(:,K) = GEN_PRODUCTION; % also save the
updated gen. outputs
if HOUR == 1
TOTAL_COST(K) = sum(PROD_COST) +
sum(GEN_START_SHUT_COST(:,K));
else
TOTAL_COST(K) = sum(PROD_COST) +
sum(GEN_START_SHUT_COST(:,K)) + FC_PREV(K);
end % if HOUR
end % K

% among all transitions from each feasible state at previous hour


% to the current state (at current hour), save up to MN with
minimal total cost
[MM,II] = sort(TOTAL_COST(TOTAL_COST ~= 0));
for K = 1:MN
if MM(K) ~= Inf
COUNTER = COUNTER +1;
FC(COUNTER,1) = MM(K);
TR(COUNTER,1:size(TR_PREV,2)) = TR_PREV(II(K),:);
TR(COUNTER,end) = FEASIBLE_STATES_NUM(J);
X_CURR(:,COUNTER) = X_TEMP(:,II(K));
PRODUCTION_CURR(:,COUNTER) = PRODUCTION_TEMP(:,II(K));
end % if MM(K)
end % if K
end % J

if COUNTER == 0;
% If the rest of the list is empty, then it means
STR = ['NO FEASIBLE STATES FOR HOUR ',num2str(HOUR),'! PROGRAM
TERMINATES!']; % there are no feasible states,
msgbox(STR,'NO FEASIBLE STATES','warn');
% and program terminates
return
end
end % HOUR

%============================================
% END OF SEARCHING PROCEDURE
% ============================================
% The search is complete. Now program finds the best solution (least
expensive state) at the last hour of the optimization horizon.
[M,I]=min(FC(1:COUNTER));
BEST_PATH = TR(I,:).'; % find the best transition path
% evaluate the solution and print the results
evaluate_solution(NT,BEST_PATH,LIST_STATES,GMIN,GMAX,DEMAND,GEN_ORDER,GNL
C,GFC,GINC,GSC,INI_STATE,NG,...

GRAMPUP,GRAMPDOWN,COEF_A,COEF_B,COEF_C,DISPATCH_METHOD,DETAIL_PRINT_FLAG,
GSDC,GSTATINI,...
GMINUP,GMINDOWN,START_UP_COST_METHOD,GCSTIME,GSH,ALPHA,BETA,TAU)
warning on
t=toc;
fprintf('\n Elapsed time: %15.4f sec.\n\n',t)
end
%========================================================================
=======================================
% FUNCTIONS DEFINITIONS
%========================================================================
=======================================
function [GMAXcum,GMINcum,LIST_STATES,LIST_INDEX] =
priority_list(GNLC,GFC,GMAX,GMIN,GINC,NG)
%% ----------------------------------------------------------------------
----------------------
% Creates the list of states, where each state has one unit commited more
than
% the previous state. Generators are ordered according to their full load
average cost,
% the least expensive coming first.
% The list is column-based: the 1st column contains only the cheapest
gen.;
% the 2nd column contains two cheapest etc.; the last one containts all
NG gen.
% OUTPUT:
% LIST_STATES [NG x NG] - matrix of states; each column represents one
state
% LIST_INDEX [NG x 1] - order of generator indices (least expensive
gen. is the first)
% GMINcum [NG x 1] - total min. generator output for each state
% GMAXcum [NG x 1] - total max. generator output for each state
% Example: if the order of generators average costs gives G3,G1,G2, then:
% LIST_INDEX = 3,1,2
% LIST_STATES = [0 1 1 - 1st column has only G3 commited
% 0 0 1 - 2nd column has commited G3+G1
% 1 1 1] - 3rd column has commited G3+G1+G2
%------------------------------------------------------------------------
--------------------
GFULLAVECOST = (0*GNLC + GFC.*GMAX.*GINC/1000)./GMAX; % Calculate full
load average cost for each unit
[M,LIST_INDEX] = sort(GFULLAVECOST); % sort them (make
a priority list)
LIST_STATES = triu(ones(NG)); % prepare matrix
of the states [NGxNG]
LIST_STATES(LIST_INDEX,:) = LIST_STATES(1:NG,:); % create the list
of states
LIST_STATES = logical(LIST_STATES); % not
neccessarily, but it is a good manner
GMAXcum = cumsum(GMAX(LIST_INDEX)); % create total
max. generator output for each state
GMINcum = cumsum(GMIN(LIST_INDEX)); % create total
min. generator output for each state

prints_states(NG,GMINcum,GMAXcum,LIST_STATES)
end

function [GMAXlst,GMINlst,LIST_STATES,GEN_ORDER] =
complete_enumeration(GNLC,GFC,GMAX,GMIN,GINC,NG)
%% ----------------------------------------------------------------------
----------------------
% Creates the complete list of states (for NG generators, there are
totally 2^NG states)
% The list is column-based (each column represents a state).
% OUTPUT:
% LIST_STATES [NG x 2^NG] - matrix of states; each column represents one
state
% GEN_ORDER [NG x 1] - order of generators to be commited (least
expensive gen. the first)
% GMINlst [2^NG x 1] - total min. generator output for each state
% GMAXlst [2^NG x 1] - total max. generator output for each state
% Example: if there are 3 generators, then there are totally 8 states:
% LIST_STATES = [0 0 0 0 1 1 1 1
% 0 0 1 1 0 0 1 1
% 0 1 0 1 0 1 0 1]
%------------------------------------------------------------------------
--------------------
GFULLAVECOST = (0*GNLC + GFC.*GMAX.*GINC/1000)./GMAX; % Calculate full
load average cost for each unit
[M,GEN_ORDER] = sort(GFULLAVECOST); % sort them (make a
priority list of gen. commitment)
LIST_STATES=dec2bin(0:2^NG-1)'; % all possible
combinations of NG generators
LIST_STATES = logical(sscanf(LIST_STATES,'%1d',size(LIST_STATES)));

GMINlst = LIST_STATES.' * GMIN; % for each state (combination of


generators) in the list,
GMAXlst = LIST_STATES.' * GMAX; % find the min. and max. power of the
combination

% next 3 lines are not neccessary, but it is nice to see max. posisble
output of generators in increasing order
[GMAXlst,INDEX]=sort(GMAXlst); % sort the states according to
increasing total max. power
GMINlst = GMINlst(INDEX); % re-order min. power accordingly
LIST_STATES = LIST_STATES(:,INDEX); % and re-order the list of states as
well

prints_states(NG,GMINlst,GMAXlst,LIST_STATES)
end

function [FEASIBLE_STATES_NUM,SUCCESS] =
find_feasible_states(GMINlst,GMAXlst,DEMAND,HOUR,RES_UP,RES_DN)
%% ----------------------------------------------------------------------
----------------------------------------
% Determines all feasible states from the list of possible states
% Feasable states are the states where demand is between total min and
total max output of commited generators
% If no feasible states found, program prepares termination
% OUTPUT:
% FEASIBLE_STATES_NUM - vector of positions (columns) of feasible
states in the list of states for current hour
% SUCCESS - indicator: 1 - found at least one feasible
states; 0 - no feasible states found
%------------------------------------------------------------------------
----------------------------------------
FEASIBLE_STATES_NUM = find((GMINlst <= DEMAND(HOUR)-RES_DN(HOUR)) &
(DEMAND(HOUR)+RES_UP(HOUR) <= GMAXlst));

if isempty(FEASIBLE_STATES_NUM) % if there are no feasible states


found
SUCCESS = 0; % prepare for program termination
STR = ['NO FEASIBLE STATES FOR HOUR ',num2str(HOUR),'! PROGRAM
TERMINATES!'];
msgbox(STR,'NO FEASIBLE STATES','warn');
return
else
SUCCESS = 1;
end
end

function [GENERATION,PROD_COST] =
production(CURRENT_STATE,PREVIOUS_STATE,GMIN,GMAX,DEMAND,HOUR,GNLC,GFC,GI
NC,NG,GRAMPUP,GRAMPDOWN,PRODUCTION_PREV,GEN_ORDER,COEF_A,COEF_B,COEF_C,DI
SPATCH_METHOD)
%% ----------------------------------------------------------------------
----------------------------------------
% For the given state, calculates the MW output for each commited
generator
% so the total production costs are minimal.
% INPUT: DISPATCH_METHOD
% DISPATCH_METHOD = 3 - uses quick linear generator dispatch (one segment
cost curve)
% DISPATCH_METHOD = 2 - same as previous, just using linprog from
optimization toolbox
% DISPATCH_METHOD = 1 - generator dispatch using quadprog from
optimization toolbox;
% in this case cost curve is quadratic: GEN_COST
= A + B*PG + C*PG^2
% where A,B,C are the coefficents and PG is
generator output.
% OUTPUT:
% GENERATION [NG x 1] - vector of power output for each generator
% PROD_COST [NG x 1] - vector of generation cost for each generator
% -----------------------------------------------------------------------
----------------------------------------
if DISPATCH_METHOD == 3 % DISPATCH_METHOD = 3
means quick linear dispatch
lb = zeros(size(GMIN));
ub = zeros(size(GMAX));
if HOUR ==1
lb = GMIN .* CURRENT_STATE; % lower bounds for
generator output
ub = GMAX .* CURRENT_STATE; % upper bounds for
generator output
else
lb(CURRENT_STATE == 1) = max([GMIN(CURRENT_STATE ==
1),PRODUCTION_PREV(CURRENT_STATE == 1)-GRAMPDOWN(CURRENT_STATE ==
1)],[],2)...
.* CURRENT_STATE(CURRENT_STATE == 1); % upper
bounds for generator output

ub(PREVIOUS_STATE == 0) = min([GMAX(PREVIOUS_STATE ==
0),max([GRAMPUP(PREVIOUS_STATE == 0),GMIN(PREVIOUS_STATE ==
0)],[],2)],[],2)...
.* CURRENT_STATE(PREVIOUS_STATE == 0);
ub(PREVIOUS_STATE == 1) = min([GMAX(PREVIOUS_STATE ==
1),PRODUCTION_PREV(PREVIOUS_STATE == 1)+GRAMPUP(PREVIOUS_STATE ==
1)],[],2)...
.* CURRENT_STATE(PREVIOUS_STATE == 1); %
upper bounds for generator output
end

if (sum(lb) > DEMAND(HOUR)) | (sum(ub) < DEMAND(HOUR)) | any((ub-lb)


< 0)
GENERATION = ones(NG,1)*NaN;
PROD_COST = ones(NG,1)*Inf;
else
GENERATION = dispatch(CURRENT_STATE,lb,ub,DEMAND,HOUR,GEN_ORDER);
PROD_COST = GNLC .* CURRENT_STATE + GFC .* GINC .* GENERATION .*
CURRENT_STATE / 1000; % and calculate their costs
end
return
else
Aeq = double(CURRENT_STATE.'); % sum of output of
commited generators
beq = DEMAND(HOUR); % must match demand

lb = zeros(size(GMIN));
ub = zeros(size(GMAX));
if HOUR ==1
lb = GMIN .* CURRENT_STATE; % lower bounds for
generator output
ub = GMAX .* CURRENT_STATE; % upper bounds for
generator output
else
lb(CURRENT_STATE == 1) = max([GMIN(CURRENT_STATE ==
1),PRODUCTION_PREV(CURRENT_STATE == 1)-GRAMPDOWN(CURRENT_STATE ==
1)],[],2)...
.* CURRENT_STATE(CURRENT_STATE == 1); % upper
bounds for generator output

ub(PREVIOUS_STATE == 0) = min([GMAX(PREVIOUS_STATE ==
0),max([GRAMPUP(PREVIOUS_STATE == 0),GMIN(PREVIOUS_STATE ==
0)],[],2)],[],2)...
.* CURRENT_STATE(PREVIOUS_STATE == 0);
ub(PREVIOUS_STATE == 1) = min([GMAX(PREVIOUS_STATE ==
1),PRODUCTION_PREV(PREVIOUS_STATE == 1)+GRAMPUP(PREVIOUS_STATE ==
1)],[],2)...
.* CURRENT_STATE(PREVIOUS_STATE == 1); %
upper bounds for generator output
end
options = optimset('Display','Off'); % supress displays of
linprog function
if DISPATCH_METHOD == 2 % economic dispatch
using linprog
f = GFC .* GINC .* CURRENT_STATE / 1000; % vector of fuel cost
for each generator
[GENERATION,FVAL,EXITFLAG] =
linprog(f,[],[],Aeq,beq,lb,ub,[],options); % calculate the optimal
production for each generator
if EXITFLAG > 0
PROD_COST = GNLC .* CURRENT_STATE + GFC .* GINC .*
GENERATION .* CURRENT_STATE / 1000; % and calculate their costs
else
GENERATION = ones(NG,1)*NaN;
PROD_COST = ones(NG,1)*Inf;
end
end
if DISPATCH_METHOD == 1 % economic dispatch
using quadrog
%----------------------------------------------------------------
---------
% If quadprog is called with all set of generators, no matter if
they are commited or not,
% then the dimension of the quadratic programming problem is NG
(NG decision variables), even
% though some of generators can not generate (lb = ub = 0). This
approach can lead quadprog to
% infeasible solution (EXITFLAG = -2). With some experimenting,
it is concluded that initial
% guess is of crucial importance for this case. If X0 is
determined by a quick dispatch function,
% no infeasibility has reported.
%----------------------------------------------------------------
---------
% H = 2*diag(COEF_C .* CURRENT_STATE);
% f = COEF_B .* CURRENT_STATE; % vector of fuel cost
for each generator
% X0 =
dispatch(CURRENT_STATE,GMIN,GMAX,DEMAND,HOUR,GEN_ORDER);
% find approximate initial conditions
% [GENERATION,FVAL,EXITFLAG] =
quadprog(H,f,[],[],Aeq,beq,lb,ub,X0,options); % calculate the
optimal production for each generator
% if EXITFLAG > 0
% PROD_COST = COEF_A.*CURRENT_STATE +
COEF_B.*GENERATION.*CURRENT_STATE + COEF_C.*GENERATION.^2.*CURRENT_STATE;
% and calculate their costs
% else
% GENERATION = ones(NG,1)*NaN;
% PROD_COST = ones(NG,1)*Inf;
% end
%----------------------------------------------------------------
---------
% However, in order to avoid call to a quick dispatch function
and therefore to speed up
% the program, only commited generators should be provided to
quadprog. (where CURRENT_STATE=1)
% In this case, the size of the problem reduces (size <= NG) and
no infeasibility has encountered.
GENERATION = zeros(NG,1);
X0 = [];
H = 2*diag(COEF_C(CURRENT_STATE));
f = COEF_B(CURRENT_STATE);
Aeq = Aeq(:,CURRENT_STATE);
lb = lb(CURRENT_STATE);
ub = ub(CURRENT_STATE);
[GENERATION1,FVAL,EXITFLAG] =
quadprog(H,f,[],[],Aeq,beq,lb,ub,X0,options); % calculate the
optimal production for each generator
if EXITFLAG > 0
GENERATION(CURRENT_STATE) = GENERATION1;
PROD_COST = (COEF_A.*CURRENT_STATE) +
(COEF_B.*GENERATION.*CURRENT_STATE) +
(COEF_C.*GENERATION.^2.*CURRENT_STATE); % and calculate their costs
else
GENERATION = ones(NG,1)*NaN;
PROD_COST = ones(NG,1)*Inf;
end
%----------------------------------------------------------------
---------
end
end
end

function prints_states(NG,GMINcum,GMAXcum,LIST_STATES)
%% ----------------------------------------------------------------------
----------------------------------------
% Prints out the list of all possible states
% Note that priority list consists of NG states and the enumeration lists
contains 2^NG states
% -----------------------------------------------------------------------
----------------------------------------
fprintf(' State No. MW min MW max
Units\n')
fprintf('%s',repmat(' ',1,23))
fprintf([' ',repmat(' %5d ', 1, NG)],1:NG)
fprintf('\n %s \n',repmat('-',1,80'))
for I=1:size(LIST_STATES,2)
fprintf(' %2d %8.1f %8.1f ',I,GMINcum(I),GMAXcum(I))
fprintf([repmat(' %2d ', 1, size(LIST_STATES,1)) '\n'],
LIST_STATES(:,I));
end
end

function
evaluate_solution(NT,BEST_PATH,LIST_STATES,GMIN,GMAX,DEMAND,GEN_ORDER,GNL
C,GFC,GINC,GSC,INI_STATE,NG,...

GRAMPUP,GRAMPDOWN,COEF_A,COEF_B,COEF_C,DISPATCH_METHOD,DETAIL_PRINT_FLAG,
GSDC,GSTATINI,...
GMINUP,GMINDOWN,START_UP_COST_METHOD,GCSTIME,GSH,ALPHA,BETA,TAU)
%% ----------------------------------------------------------------------
----------------------------------------
% For the given set BEST_PATH of the states in each time step, calculates
production costs, transition costs
% total costs etc.
% In the end, this function calls function to print the results in a
tabulated form.
% This function follows pretty much the same fashion as the main
procedure and will not be described in details.
% The only difference is that now the optimal path is known, so there is
no need for searching.
% For each state in the path this procedure calculates the costs and
finally calls the printing routine.
% -----------------------------------------------------------------------
----------------------------------------
GEN_START_SHUT_COST1 = zeros(NG,NT);
GEN_PRODUCTION1 = zeros(NG,NT);
PROD_COST1 = zeros(NG,NT);
FCOST1 = zeros(NT,1);
GENERATING_COST1 = zeros(NT,1);
GEN_PRODUCTION = zeros(NG,1);
X = GSTATINI;
for HOUR = 1:NT
PREV_STATES_NUM = BEST_PATH(HOUR);
FEASIBLE_STATES_NUM = BEST_PATH(HOUR+1);
X_PREV = X;
if HOUR==1 & PREV_STATES_NUM == 0
PREVIOUS_STATE = INI_STATE;
else
PREVIOUS_STATE = LIST_STATES(:,PREV_STATES_NUM);
end
CURRENT_STATE = LIST_STATES(:,FEASIBLE_STATES_NUM);
PRODUCTION_PREV = GEN_PRODUCTION;
[GEN_PRODUCTION,PROD_COST] =
production(CURRENT_STATE,PREVIOUS_STATE,GMIN,GMAX,DEMAND,HOUR,GNLC,GFC,GI
NC,NG,GRAMPUP,GRAMPDOWN,PRODUCTION_PREV,GEN_ORDER,COEF_A,COEF_B,COEF_C,DI
SPATCH_METHOD);

STATE_DIFF = CURRENT_STATE - PREVIOUS_STATE;


[X,SUCCESS] =
check_up_down_time(CURRENT_STATE,PREVIOUS_STATE,X_PREV,GMINUP,GMINDOWN,NG
);
if START_UP_COST_METHOD == 1 % start-up costs are constant and
equal to cold start cost
GEN_START_SHUT_COST = (STATE_DIFF > 0) .* GSC;
elseif START_UP_COST_METHOD == 2
GEN_START_SHUT_COST = ((STATE_DIFF > 0) &
(-X_PREV >= (GMINDOWN + GCSTIME))) .* GSC; % hot start-up cost
GEN_START_SHUT_COST = GEN_START_SHUT_COST + ((STATE_DIFF > 0) &
(-X_PREV < (GMINDOWN + GCSTIME))) .* GSH; % cold start-up cost
else
GEN_START_SHUT_COST = (STATE_DIFF > 0) .* (ALPHA + BETA .* (1-
exp(X_PREV ./ TAU)));
end

GEN_START_SHUT_COST = GEN_START_SHUT_COST + (STATE_DIFF < 0 ) .*


GSDC; % shut down cost

if HOUR == 1
TOTAL_COST = sum(PROD_COST) + sum(GEN_START_SHUT_COST);
else
TOTAL_COST = sum(PROD_COST) + sum(GEN_START_SHUT_COST) +
FCOST1(HOUR-1);
end % if HOUR
FCOST1(HOUR) = TOTAL_COST;
GENERATING_COST1(HOUR) = sum(PROD_COST);
GEN_PRODUCTION1(:,HOUR) = GEN_PRODUCTION;
PROD_COST1(:,HOUR) = PROD_COST;
GEN_START_SHUT_COST1(:,HOUR) = GEN_START_SHUT_COST;

end % HOUR = 1:NT


GEN_START_SHUT_COST_TOTAL = sum(GEN_START_SHUT_COST1).';

print_results(BEST_PATH,LIST_STATES,INI_STATE,NT,NG,GMIN,GMAX,DEMAND,FCOS
T1,GENERATING_COST1,GEN_PRODUCTION1,PROD_COST1,GEN_START_SHUT_COST1,DETAI
L_PRINT_FLAG)
end

function
print_results(BEST_PATH,LIST_STATES,INI_STATE,NT,NG,GMIN,GMAX,DEMAND,FCOS
T1,GENERATING_COST1,GENERATION,PROD_COST,START_COST,DETAIL_PRINT_FLAG)
if DETAIL_PRINT_FLAG == 0
S = ['Hour '
'Demand '
'Tot.Gen '
'Min MW '
'Max MW '
'ST-UP Cost '
'Prod.Cost '
'F-Cost '
'State '
'Units ON/OFF '];
fprintf('\n%s',repmat('=',1,150'))
fprintf('\n HOURLY RESULTS:')
fprintf('\n%s \n',repmat('=',1,150'))
fprintf([repmat('%12s ', 1, size(S,1))], S');
fprintf('\n%s\n',repmat('-',1,150'))
else
S = ['UNITS '
'ON/OFF '
'GENERATION '
'MIN MW '
'MAX MW '
'ST-UP Cost '
'PROD.COST '];
end

if BEST_PATH(1) == 0
LIST_STATES = [LIST_STATES,INI_STATE];
BEST_PATH(1) = size(LIST_STATES,2);
end

for HOUR = 1:length(BEST_PATH)-1


CURRENT_STATES_NUM = BEST_PATH(HOUR+1);
CURRENT_STATE = LIST_STATES(:,CURRENT_STATES_NUM);

MIN_MW = CURRENT_STATE.*GMIN;
MAX_MW = CURRENT_STATE .*GMAX;
if HOUR ==1 & DETAIL_PRINT_FLAG == 0
fprintf('%3d %12s %12s %12.0f %12.0f %12.0f %12.0f %12.0f
%10.0f ',HOUR-1, '-','-
',sum(LIST_STATES(:,BEST_PATH(HOUR)).*GMIN),sum(LIST_STATES(:,BEST_PATH(H
OUR)).*GMAX),0,0,0,BEST_PATH(HOUR))
fprintf([' ',repmat('%2d', 1,
size(LIST_STATES(:,BEST_PATH(HOUR)),1)),'\n'],
LIST_STATES(:,BEST_PATH(HOUR)));
end

if DETAIL_PRINT_FLAG == 0;
fprintf('%3d %12.0f %12.0f %12.0f %12.0f ',HOUR, DEMAND(HOUR),
sum(GENERATION(:,HOUR)), sum(MIN_MW), sum(MAX_MW))
fprintf('%12.0f %12.0f %12.0f %10d
',sum(START_COST(:,HOUR)),sum(PROD_COST(:,HOUR)),FCOST1(HOUR),CURRENT_STA
TES_NUM)
fprintf([' ',repmat('%2d', 1, size(CURRENT_STATE,1)),'\n'],
CURRENT_STATE);
else
TEMP =
[(1:NG).',CURRENT_STATE,GENERATION(:,HOUR),MIN_MW,MAX_MW,START_COST(:,HOU
R),PROD_COST(:,HOUR)];
fprintf('\n\n\nHOUR: %2d DEMAND:%7.1f MW F-
COST: %6.1f £',HOUR,DEMAND(HOUR),FCOST1(HOUR))
fprintf('\n%s \n',repmat('-',1,120'))
fprintf([repmat('%15s ', 1, size(S,1)) '\n\n'],
S');fprintf('\n');
fprintf(['%3d %15d ',repmat('%15.1f', 1, size(TEMP,2)-2) '\n'],
TEMP.');
fprintf('%s \n',repmat('-',1,120'))
fprintf('TOTAL: %12d %14.1f %14.1f %14.1f %14.1f
%14.1f\n',sum(CURRENT_STATE),sum(GENERATION(:,HOUR)), sum(MIN_MW),
sum(MAX_MW),sum(START_COST(:,HOUR)),sum(PROD_COST(:,HOUR)))
end
end
end

function [X_CURR,SUCCESS] =
check_up_down_time(CURRENT_STATE,PREVIOUS_STATE,X_PREV,GMINUP,GMINDOWN,NG
)
%% ----------------------------------------------------------------------
----------------------------------------
% Checks wether the transition from previous state to the current state
is feasible
% from the minimum up and down times point of view.
% OUTPUT:
% X_CURR [NG x 1] - vector of working hours for the new state (NaN if
transition is not possible)
% SUCCESS - indicator: 1 - transition is possible; 0 -
transition is not possible
%------------------------------------------------------------------------
----------------------------------------
X_CURR = zeros(NG,1 );
SUCCESS = 1;
% for the current state of generators, first check if any generator
% has been ON less than GMINUP or been OFF less than GMINDOWN
if all((X_PREV - GMINUP).*(PREVIOUS_STATE - CURRENT_STATE) >=0 & (-X_PREV
- GMINDOWN).*(CURRENT_STATE - PREVIOUS_STATE) >=0)
for I=1:NG
% current state is feasible regarding min up and down times; now
calculate X_CURR - working times for each unit
if (X_PREV(I) >= 1) & (CURRENT_STATE(I) == 1)
X_CURR(I) = X_PREV(I) + 1;
elseif (X_PREV(I) <= -GMINDOWN(I)) & (CURRENT_STATE(I) == 1)
X_CURR(I) = 1;
elseif (X_PREV(I) <= -1) & (CURRENT_STATE(I) == 0)
X_CURR(I) = X_PREV(I) - 1;
elseif (X_PREV(I) >= GMINUP(I)) & (CURRENT_STATE(I) == 0)
X_CURR(I) = -1;
end
end
else % current state violates min up and
down times
SUCCESS = 0; % set the indicator to zero (failed),
X_CURR = ones(NG,1 )*NaN; % also set the working times to NaNs
return % and stop further working time
calculation
end
end

function GENERATION =
dispatch(CURRENT_STATE,GMIN,GMAX,DEMAND,HOUR,GEN_ORDER)
%% ----------------------------------------------------------------------
----------------------------------------
% For the given state, calculates the MW output for each commited
generator
% Generators are dispatched in a merit order (first the least expensive,
last the most expensive)
% Note: GEN_ORDER is based on No Load Cost, Fuel Cost and Incremental
costs.
% OUTPUT:
% GENERATION [NG x 1] - vector of power output for each generator
% -----------------------------------------------------------------------
----------------------------------------
GENERATION = GMIN.*CURRENT_STATE; % first set the output
for each commited generator to their minimal stable generation
LOAD = DEMAND(HOUR) - sum(GENERATION); % then reduce the load
for the total minimal generation
for K = 1:length(CURRENT_STATE); % note that CURRENT_STATE
is the feasible one, ie. demand may be supplied by commited generators
L = GEN_ORDER(K);
% GEN_ORDER is the merit list of dispatching generators
GENERATION(L) = GENERATION(L) + min(GMAX(L)-
GMIN(L),LOAD)*CURRENT_STATE(L); % increase the power of the next
generator in the list
LOAD = LOAD - min(GMAX(L)-GMIN(L),LOAD)*CURRENT_STATE(L);
% either to their max. or to match the load
end
% whenever generation increases, load reduces, until they match
end