PEKERJAAN GALIAN TANAH OBSTACLE TH.22 STA. 2+120 sd. 2+350 PROYEK : PEMOTONGAN BUKIT OBSTACLE PENDARATAN TH 22 LOKASI : BANDAR UDARA KELAS III PONGTIKU, KAB. TANA TORAJA KONTRAKTOR : PT. INTER PERSADA ELECTRO NUSANTARA NO. KONTRAK : KU.003/047/PBOP/1/TTR-2021 TANGGAL KONTRAK : 14 JANUARI 2021 SPK : 14 JANUARI 2021 NILAI KONTRAK : Rp. 34.000.000.000,00 KONSULTAN : CV. ADYCITRA CONSULTAN
Name Ground Easting Ground Northing Elevation Keterangan
PEKERJAAN GALIAN TANAH OBSTACLE TH.22 STA. 2+350 sd. 2+420 PROYEK : PEMOTONGAN BUKIT OBSTACLE PENDARATAN TH 22 LOKASI : BANDAR UDARA KELAS III PONGTIKU, KAB. TANA TORAJA KONTRAKTOR : PT. INTER PERSADA ELECTRO NUSANTARA NO. KONTRAK : KU.003/047/PBOP/1/TTR-2021 TANGGAL KONTRAK : 14 JANUARI 2021 SPK : 14 JANUARI 2021 NILAI KONTRAK : Rp. 34.000.000.000,00 KONSULTAN : CV. ADYCITRA CONSULTAN
Name Ground Easting Ground Northing Elevation Keterangan