INTRODUCTION
Over the years, there has been increasing abandonment of building projects and
metropolis.
Recently there has been a lot of research investigations and analysis of which
points unshakeable to the fact that certain features such as client’s perception, cost
and deterioration of building structures (onibokun 1997). There are also the
remote causes of lack maintenance such as force majeur, cultural problems, state
of the economy, the receding global economic meltdown, lack of time and general
illiteracy of the occupants of the building or structure and users of the facilities.
However there has also been growth in the significance of building maintenance
awareness of the need to manage the condition of the nation’s building and
1
Though, it is still the case that such maintenance activity takes place in a context
that does not create a fully integrated approach to managing building performance
and thus the full potential of many buildings and infrastructures are never wholly
realized.
Basically in virtually all the towns and city centers within the Nigerian, buildings
From a normal visual perception in the urban metropolis, it can be noted that
majority of the
these buildings and infrastructures negatively affects the populace which thus
affects the output of the working class, capacity of the populace is thus lost, time
value for achievement of goals and objectives minimized , it also causes all forms
2
of ill-health and psychological effects thereby reducing the economic growth of
the nation.
All three spheres of government, together with the state owned enterprise (SOEs),
emphasis on delivery of infrastructure, delivery does not in fact end with the
and the retention of appropriate staff to maintain the operation of the assets.
the infrastructure, but the appropriate operation and maintenance thereafter for the
There are so many problems associated with the maintenance of buildings and
on its lowest ebb. Most buildings and infrastructures have been neglected by
of their buildings, so long as the buildings affords the owner annual income he
could not care less for the maintenance and so long the interior of the building is
3
conducive for the occupants they could not care for outward appearance or other
welfare of the populace at heart will foster a well finance programme to cater for
the maintenance of certain facilities such as road networks bore hole systems,
bridge construction, elevation of the power grid for alleviation of suffering and
eventual welfare of the populace but certain corrupted officials will channel these
profitability index as regards to income per capita of nations of the world; Nigeria
is rated as fifth poorest country (UN 2010), which implies that the average
Nigerian lives below one dollar per day. As a result of this economic hardship
Also certain buildings in Nigerian cities were constructed during the pre-colonial
era therefore most of these buildings are aged due to wear and tear, weathering
and climatic factors over the years thus resulting in dilapidated nature which
might not respond positively to modern day maintenance day techniques, the
reason for this assertion being 51% repair – replacement strategy, such buildings,
the cost of their repairs might equal over 50% cost of new construction.
Buildings and infrastructural decay also stems from poor workmanship and poor
supervision (Amobi 2003), most of these defects arises from the fact that the skill
4
employed during the production of these buildings are defective, the supervisory
most at times is minimal or left in the hands of unskilled foremen thus creating a
chasm which will be filled by unprofessional ethics thus resulting in failure in the
life of the structure which will eventually be translated to the overall life span of
the building/structure.
This study aims to identify the shortcomings which militate against the effective
maintenance of all these buildings and infrastructures and also identify the
The aim of this research work is to discover how maintenance of buildings and
thus increasing labour efficiency and increasing the income of the nation leading
(a) Have a proper look at the level of maintenance attention that buildings and
(b) Now the current building and infrastructural maintenance practice with a view to
improve on them.
5
(c) To pin-point the various difficulties and problems that hamper the efficient
infrastructure in Nigeria.
(d) To examine the causes that lead to the deterioration and dilapidations of buildings
and infrastructures.
In emphasis, this project will show the need for proper maintenance schemes for
buildings and infrastructures, that will help reduce maintenance cost, minimize
loss of use, improve safety conditions, improve aesthetic values and improve
appearance of buildings thereby reduces the cases of collapse of structures and the
Maintenance of buildings and the general infrastructures has not been given full
and unrelated compromise between the immediate physical needs and the
availability of funds. Thus only about 15% of the total maintenance are remedied.
If serious deterioration are not adequately taken care of future generations will be
6
It is therefore imperative that maintenance activities should be increased/
effectively as possible.
This project work covers the entirety of maintenance as regards to buildings and
infrastructures with requisite effect it has on the Nigerian nation with reference to
From the conception, design, construction and post construction, the various
this project.
1.6 Limitation.
Enough effort has been put to exhaust the scope aforementioned but time and cost
constraint relative to the magnitude of maintenance problems are the major forms
7
1.7 Research questions
(b) What are the direct effects of lack of maintenance to buildings and
infrastructures?
(d) What are the direct causes of poor maintenance value in Nigeria?
(e) Does poor maintenance value affect the Nigerian citizenry? How? And why?
of the occupants?
These and many more are some of the questions this research work aims to
satisfy.
8
infrastructures between 28 march- 1st April 2011 in kuala lumpur, Malaysia.
restore it to, a state in which it can perform its required function. The requirement
for maintenance must not be less than those necessary to meet the relevant
undertaken in order to keep or restore every facility i.e. every part of a building,
terms is one which sustains the utility and value of the facility.
facility i.e. every part of the building, its services and surroundings to agreed
building fabric and services, reflecting changes in pattern of use and technology.
9
operational reliability with maximum design output result, endurance and
stability. This definition has been adapted for building maintenance as work
undertaken to keep or restore every facility, that is, every part of a site, building
requirement and one which sustains the facility and the value of the facilities. This
may include a degree of improvement over the life of the building as acceptable
10
CHAPTER TWO
LITERATURE REVIEW
2.0 Introduction
particularly the building assets and infrastructural facilities, such facilities spread
defense. The spread also extends t\o social sectors such as roads, water supply,
nation’s most valuable assets, providing people with shelter and facilities for work
and leisure. Maintenance starts the day the contractor leaves the site, having
11
stability. This definition has been adapted for building maintenance as work
undertaken to keep or restore every facility, that is, every part of a site, building
be no less than the statutory requirements and one which sustains the utility and
value of the facility. This may include some degree of improvement over the life
of the building for continuous and reliable use. The wear and tear arising from use
care of them. The concept of maintenance involves taking appropriate steps and
headings;
12
2.1.1 Planned maintenance
Planned maintenance is maintenance organized and carried out with fore thought,
control and the use of records to pre-determined plan. It was also defined by BS
each operation properly planned and organized in advance with necessary labour,
plant and materials assembled ready for use when required” if this is properly
applied it leads to a greater margin of safety and reduce the risk of having to
and consequently carrying out of repairs on the building and its facilities. This is
failure. Ivor H. Seeley also stated that this is work directed to the prevention of
failure of a facility, carried out within the expected life of the facility to ensure
13
• The programme is flexible and subject to review.
• It is cost effective.
has occurred and intended to restore an item to state in which it can perform its
restore the component to its original state of performance. It may involve outright
Basically, the first step is to handle the cause of the problems. Because, most
natural defects become critical only slowly and usually evidenced by visible signs
1969).
uninvestigated treatment of defects may not bring lasting solutions rather it may
lead the maintenance personnel treating just the symptoms instead of the causes.
The maintenance personnel must be able to ensure that the structure remain
14
(a) The critical point of disrepair which is recognized as the point at which the on set
of progressive failures occurs. If the structure is before this point is reached its
life may be extended.(Ivor H.S. 1979). If the repairs are not carried out major loss
functional level.
(b) The point at which the rate of expenditure needed to maintain serviceability
defects have been and whatever the extent of careful details in overcoming it, it is
not very possible to foresee the extent of remedial work involved until the defect
15
(a) Avoidable maintenance: Ivor Seeley 1979 defined this as “work required to
rectify failures caused by the use of incorrect or faulty materials, incorrect design
Ivor S. H also defines this as “Regular periodic work that may be necessary to
economy
(a) It ensures the functional requirements of the building are attained at all times.
occupiers
(c) It enhances the quality of building structure to meet modern day requirements.
16
(e) It preserves the physical characteristics of the building associated services so
failure.
(f) To ensure that assets are kept at reasonable standards and at least cost.
(g) To maximize the economic and financial returns from the use of the building.
components;
(b) rectification
(d) renovation
(e) rehabilitation
(f) modernization
(g) adaptation
2.3.1 Servicing
17
schedule becomes necessary. The frequency of cleaning varies but could be
considered thus: floors swept daily and polished weekly, windows washed
monthly, flues swept every six months, painting for decoration and protection
2.3.2 Rectification
Rectification work usually occurs fairly early in the life of the building and arises
avoidable as all that is necessary is to ensure that the component and materials are
2.3.3 Repairs.
Repairs are carried out to restore components and parts to functional standards.
2.3.4 Replacement
deteriorate at different rates. Much replacement work stems not so much from
appearance.
2.3.5 Renovation
Maintenance can also embrace renovation which consist of work done to restore a
structure, service and equipment by a major overhaul to the original design and
18
specification, or to improve on the original design. Renovation may include
As many more new products are introduced into the building industry, it is
envisaged that the annual cost of maintenance may likely increases as a result of
infrastructural facilities.
The aim and objective of maintenance to buildings and related infrastructures had
been examined but there still exists the economic and social significance which
includes:
(a) Dilapidated and unhealthy building depresses the quality of life and in some
abandoned buildings have continued to serve as hide out to criminals and social
miscreants.
(b) Maintenance as has been shown arrests decay and failures thereby extending the
physical life of a building and thereby delays replacement and deters expenditure
on new construction.
(c) The appearance, quality and general physical conditions of a building normally
reflect public pride or indifference, the level of prosperity in the area, social
(d) Certain buildings and infrastructural facilities by their appearance and location in
the vicinity or street add or improve the beauty of the environs. So any actions
19
geared towards the maintenance of such a structure will normally draw public
encompass education, health care, commerce, industry and almost all other facets
of national life. Infrastructures can be said to be the umbrella term for many
providing new infrastructures, the result has been a dramatic increase in social
and telecommunication. Such increase does not really raise productivity and
effective demand. These services are the goals and the measure of development in
a society. These infrastructural assets in Nigeria are not generating the quantity or
the quality demanded. The cost of this waste in foregone economic growth and
cost opportunities for poverty reduction and environmental improvement are high
and unacceptable.
20
It can be stated categorically that good infrastructure raise productivity and lowers
country has too much new investment but too little of maintenance. Inadequate
2003)
processes thereby prolonging the life of the carriage way. Failure to maintain a
vital communication like highway has its effect directly or indirectly on almost
every household in the nation. It can be seen during travelling times, accident
(2005)
There four different reasons to deciding that a road needs to be maintained which
are;
(a) Structural deterioration of the pavement, threatening to impair its load carrying
ability.
(b) Poor riding quality- the riding comfort has deteriorated below acceptable
standard.
(d) Other surface deterioration- surface raveling, pot holes and spalling of joints.
21
It needs not be over-emphasized that design and construction of major highways
its own environment and this environment has a lot of impact with its design and
This is because maintenance of the nation’s highway has not been given the
supposed. More often than not it can be noticed that highway authorities do not
prepare adequately for the wet seasons of the year. It is necessary to have
shoulder and drainage on our highways has contributed to a large extent to the
Early detection and repairs of minor defects are still among the most important
phases of maintenance work. Cracks and other surface problems which are almost
unnoticeable in their early stages may develop if unattended into major repair jobs
after a few heavy rains and heavy traffic for only a few days.
and experienced personnel to pick up these problems in their early stages. The
greater the loads imposed on the pavement, the greater the loading rate, and the
22
Some of the common pavement faults according to Ivor seeley (1979)
(a) Pushing
can cause the material to flow and fold up on itself. This condition may indicate
that the binders are too soft, leading to plastic flow under traffic.
(b) Fretting
Fretting is caused by either aging of the binder with consequent lack of adhesion
joints.
(c) Cracking
The most common form of cracking is reflective cracking, which may occur when
(d) Polishing
will cause loss of skid resistance and increase the risk of accidents. All aggregates
23
(e) Embedment
Embedment is the loss of surface texture when chippings are applied and
compacted into wearing course that is too hot, too rich in binders, a combination
• Drainage inlet.
• Bearing.
• Structural steel members with special attention to areas exposed to joints and
inlets drainage.
• Expansion joints.
24
• At inlets and outlets to culverts.
(e) Replacing or correcting loose or missing structural or anchor nuts, bolts or reverts.
Maintenance of the visibility and reflective of signs, delineators and markings are
are necessity if a smooth traffic is to be ensured and if they are to fulfil their
If the signs has faded to the point where the observer believes visibility is
do not know the purpose or advantages of these reflectors and signs, resulting that
as soon as they are placed in position , they are vandalized. Serious campaign
should be mounted so that the need for these road signs should be realized by all.
system is that a strict and consistent method of keeping records of all cracked and
broken rails and their removal from the track is observed. In addition the cause of
the failures must be noted in order to monitor any specific problems which may
be developing. A standard format is used which gives details of track and their
condition as well as the type of defects. This information is fed into a data base in
25
Again, normal regular examination of the track is carried out by means of an
ultra-sonic rail flaw detection train and also by hand held ultra sonic rail flaw
detectors used by pedestrian operators. The ultra-sonic test train is normally a self
propelled unit consisting of two vehicles. It operates at 30km/hr and uses a series
of probes which are applied to the rail-head either in the form of sliding probes or
wheel probes. the data from these probes are partially analyzed by an on-board
computer and the resulting information is stored on magnetic tapes for subsequent
offline analysis.
The defects detected by this system are sent to the appropriate maintenance
engineers for actions depending on the type of defects. In addition, hand held
ultra-sonic units are used to carry out work in areas not covered by the test train
and also to examine in greater detail defects which have been picked up by the
test train of which requires more detailed study. The hand units are also used for
monitoring defects which cannot be handled immediately for any obvious reasons
until when the time for their handling is up. Basically, this ultra-sonic testing of
rails is carried out at frequency determined by the types and speeds of traffic
carried by it. This ranges from periods of six months to two years for sparingly
used rails. Other test which include gauge measurement, crack size estimation in
In rail maintenance, the strength and inherent stability of the track design and
construction and its foundation, the less the likelihood of incessant maintenance
26
(a) The stiffness of the rail
Formally, normal means of packing ballast under the sleeper to obtain the
required rail level and firmness of support was used. Even the measured shovel
pack (M.S.P) which was also extensive in labour was a manual system of jacking
up the sleeper and packing small stones (ballast) over the bearing area. An
automatic system using a machine known as stone blower is now in place. This
machine automatically measures the voids under the sleeper and using
ballast to produce the correct longitudinal and vertical traffic profile. It is more
cost effective using this method over the traditional method. There are other
machines that also used in association with tamping and stone blowing. These are
ballast regulating machines for properly positioning ballast and providing the
correct ballast profile and for cases where ballast requires cleaning renewal.
Ballast cleaning machines which screens dirty ballast returning usage stone and
rejecting dirt which has accumulated over the years. Experience has shown that
good natural drainage in the ballast bed. The need for this is very high where the
27
As foundation is the most critical element of building fabric. The design and
are designed according to load and bearing capacity of the soil. The requirements
(a) To provide support for the building, that is, such that the total loads must be
(c) To ensure that that the bearing capacity of the soils is sufficient to support the
(d) To prevent settlement or movement that may affect the stability of the building.
This in itself could be due to a number of factors as opined by Amobi 2005 such
as;
28
• Inadequate foundation
• No foundation
• Overloading
Inadequate foundation
This is one of the causes of foundation failure and it simply consist in poor or
small foundation spread, the width of foundation spread is not wide enough to
support the building load or bear the superimposed load from the superstructure.
No foundation
This is situation where foundations were constructed upon loose rubbes or laid
directly upon a clay bed or block footing used to spread the load instead of
concrete footing.
Overloading
already existing building or because the use of the building has changed and the
Conditions may occur below the ground level which may directly affect the
bearing capacity of the soils either improving it or lowering it. These changes may
be as a result of;
29
Changes in the water content of the soil;
The lower the moisture content the greater the bearing capacity and consequently
any increase in moisture content will cause a lowering of the bearing capacity.
Cohesive soils have a high strength but, with an increase in moisture content they
ultimately affect the support of a building and allow settlement movement of the
structure.
Investigations shows that changes in water content of the soil are due to:
• Surface water
• Ground water
• Sloping ground
• Tidal condition
• Flooding
Surface water
This is caused by natural rainfall upon the ground draining into the ground,
cause saturated conditions which will affect the bearing capacity of the soil.
Ground water
30
This is natural ground water found in the ground at and below the water table. The
depth varies according to location and time of the year, though much higher
Sloping ground
If the natural contours of the site are such that the house is at a lowest point,
natural drainage of water to these lower parts may be directed towards building
foundation. The ground conditions will then change and cause structure
movement.
Tidal condition
Soils directly adjacent to tidal water is affected by changing levels of water due to
Flooding
This is caused by rising sea water breaking their normal banks and flooding
adjacent areas of ground. It occurs for a short time and the water then recedes.
However, while the situation exists the ground level and the structure above it are
affected.
Any movement of the ground will affect the support of any building and the
actual structure above it. The movement may be caused by ay of the following;
• Geological faults
31
• Mining subsidence
• Vibrations
• Unequal settlement
• Existing trees
Geological faults
These are occasional movement at a fault in the ground strata. This causes
vibration or earth tremors which are felt in the ground over considerable distance
Mining subsidence
progress. During the removal of the props supporting the mine trenches, the
Vibrations
These are waves of various magnitudes within the soil, though it is normally
slight but over a period of time it could cause movement. These vibrations may be
Unequal settlement
32
In this situation settlement of the grounds around the structure evenly will have
only a slight effect on the structure but when part of the foundation settles relative
to another, unequal settlement occurs and part of the foundation remains stable
while the remainder will move.this can cause a fracture of the foundation and
structure.
These are soils made of fill materials; they tend to settle after they are placed. These
settlements are dependent on the nature of fill, the underlying ground and the
level of compaction of the fill. The settlement causes movement which can result
In this circumstances damage is likely to occur within the first ten years of the life of a
building. It is advisable to obtain all available information bout the history of the
site from local residents, geological maps, site visitation and test.
Existing trees
Existing trees near the buildings may cause foundation movement, where trees
have reached or are close to maturity, seasonal shrinkage and small movement
can be expected, but larger movement can probably occur only in long periods of
dry seasons.
33
Attacks by sulphate or acid substances in natural ground is rarely sufficient
Indications of foundation failures are usually found in the structure above ground
are six steps to successful repair work as stated by Melvin L.A (1973) includes;
Investigation # diagnosis
Preparation # application
The first step floor successful repair is investigation. The comprehensive building
the building.
The following four guidelines relate to effective carrying out of building surveys;
necessary to determine whether the roof is adequately supported and braced, that
34
all structural members in position, that external walls do not lean outwards and
that the interior of the house is sound. If there is evidence of movement in the
main walls particularly below the line of damp proof course, this suggests
(b) All appropriate lines of enquiry concerning the property must be pursued.
(c) Statement about repair and disrepair should be kept in correct perspective
(d) If a fault is found, it must be traced to its causes and actions taken.
maintenance decisions are made. This may be considered as a set of ground rules
for the allocation of resources between the various types of maintenance actions
that can be taken. Maintenance policy should be considered in the widest possible
context throughout all the phases of the life cycle of a building. Furthermore, it
(b) Policy decisions taken with respect to other matters, but which will influence
maintenance.
The attitude of or, stance of a building will have a profound influence. All
building throughout its economic life considered. In simple terms, the building
35
cycle can be described in the following six stages as opined by Barry chanter
(2007):
(a) Brief
(b) Design
(c) Construction
(d) Commissioning
(e) Operation
2.7.1 Briefs
This phase in the building’s life involves establishing a performance model for the
that building, including its maintenance. The model sets a standard against which
the performance of the building in use can be measured. The importance the
building owner attaches to the setting up of this model is indicative of the attitude
2.7.2 Design
Building design will be subject to a policy stance at two levels throughout the
process. Firstly, o position has to be taken at the conceptual level, in terms of the
manifested in a number of ways: for example, the budget allocated to it, the time
36
allocated before occupation is required, a specific statement on maintenance, and
natural consequence of initial policy decisions put into motion at the conceptual
level.
2.7.3 Procurement
The basic requirements for the building, identified at the early stages, will require
adopted. This may have a repercussion on the long-term performance, and hence
may dictate a fast-track approach, which will place constraints on the maintenance
in the future. It is important to emphasize this casual link, and to stress that the
the time of writing any attempt to analyze their effects would rather be
speculative.
2.7.4 Construction
activities, may be judged by assessing how well the building meets the client’s
quality control exercised by all parties during site operations. The analysis of
37
building defects suggests that whilst designers and contractors share the
responsibility more or less equally for building faults, there are instances where
policy makers within the client’s organization must also take some of the blame.
2.7.5 Commissioning
the building. In too many cases the way in which this is performed is exceedingly
but also in relation to the information provided by the occupier/owner on the asset
he has required, often at a great cost. The effectiveness of the handover and
the building, and improvements are only likely to come about when there is an
increased awareness of this link by building owners, which will prompt them to
2.7.6 Operation
The position adopted by management with respect to the occupation and raining
commercial, aesthetics, social and economic. The essential issue is not so much
that maintenance should be given higher priority, but rather that the need for
38
funds cannot all be satisfied, any decision that not fully fund mainteanance work
Maintenance work may be carried out through the following was according to
(c) Combination of the two above (that is effecting general routine work using direct
establishments. Although in some cases, the maintenance manager may not have
an alternative than to use the contract system if the maintenance work is fairly
which includes;
(a) It is usually cost effective, past experiences have that direct labour is cheaper than
(c) It ensures good standard of workmanship by craft operatives who enjoy continuity
39
(d) It enhances self commitment of the employees to their employers.
(g) Continuity of work within an overall plan is one of the biggest economic
(b) If not properly managed it may at the end turn out to be wasteful
(c) At the period of no maintenance work to be done, the salaries of the maintenance
(e) The direct labour may be more expensive than contract work.
said, this method could be chosen under two or four conditions which are:
(a) If the job involves a specialist which the maintenance division may not have
equipment to execute.
40
Advantages of contracting out
(a) It is usually more efficient than the direct labour because the contractor during the
(c) The quality of work done at the end is usually better if the contractor is well
monitored.
(a) It gives room for large scale fraud though inflation of contract price.
(b) Contractors could do a substandard work with smart connivance with the
(c) It may turn out to be a drain on a public fund as some contractors normally
absconds after collecting mobilization fees without doing any job at all.
Direct labour for many years proved more popular for maintenance and repair
work than for new-build work in the public sector. an audit conclusion in 1989
concluded that DLOs are market leaders in maintenance work and other works of
surprise of many, due to the fact that they were not as inefficient as had been
41
2.9 Maintenance planning and programming
The process of planning for maintenance work has much in common with the
but an intellectual process will have been engaged to get from one point to
another.
where it becomes necessary to commit some, or all, of these plans t o paper and
formal programme is produced. At a simple level this may also involve writing
dates to diary, whilst at a more advanced level the use of a powerful computer
imprecise and dependent on a great number of factors, not all of which are
necessarily related to the complexity of the task being planned. The use of the
reality they are only as good as the thought processes underlying them.
42
2.9.1 Objectives of planning
The extent and complexity of planning depends on the size, number and age of
Basically, the answer to the first question is all the buildings- say in the estate or
used by the organization. How it is to be maintained will depend on the use, class
and physical nature of the building in question. Further, still these questions can
infrastructure has been done. This will lead preferably to a job specification,
which will describe fully the task to be carried out at each maintenance interval.
According to J.F Hill (1970) in his book on building maintenance he stated that
43
(e) The work is to be carried out in the same way so that the performance of materials
(f) All workers carry out tasks the same way easing calculation for work study or
(g) A preference standard is available such that additional buildings of the same type
can be rapidly brought into the system as soon as they are billed or acquired.
maintenance planning is the attempt to establish the actual time that a specific
work will be carried out sequentially with all the necessary material or resources
available.
knowing time and money required for any maintenance activity. NIOB journal
44
This focuses on the items listed below;
Annual planning
(b) Identifying the materials and equipment requirement for the year.
(c) Sourcing and making available manpower equipment, materials and money for
the plan.
Daily planning
(b) Establishing a list of materials required for the day including writing of
specification.
(d) Identifying usual and unusual safety hazards. And provision of safety tools and
materials.
45
(e) Preparation of all necessary work orders and and documentation.
Routine maintenance
These are integral parts of preventive maintenance planned for specified period
for some component parts depending on the life span of such materials or
components.
Emergency maintenance
Planned work does not include emergencies. It may not be possible to identify all
breakdown maintenance factors, the best someone can do for planning for
(a) Develop a list, including feedback from supervisory staff, of emergencies typical
(d) Anticipate equipment and materials needs and have then in stock.
is devised to operate in most cases over a five year period. It is normal to carry
out all foreseeable remedial work and decorations in order to achieve the required
46
In the remaining four years expenses should be small, or the only work necessary
should be emergency work and annual servicing. After five years, the cycle
property during this first year of the cycle, as this concentrates all the major work
and therefore major inconveniences to the clients and occupants into as short a
If the client owns more than one property a master programme should be
prepared, staggering the maintenance cycle for each property thus enabling him to
utilize his finances at a constant rate. The same principle can be applied to large
single property by dividing it into floors, rooms or areas and dealing with the
workload on a rational basis over the five year period. The repairs and the re-
For instance, maintenance programme for school buildings and hostels should
47
Each property slotted has a property manual or log book containing all the
details of services, decorative schemes and specialist items, and should be kept up
to date, with any alterations, additional or renewal work carried out. Records
This information will provide a comprehensive record of all work carried out on
the property and so enable the surveyor to make an accurate assessment of any
ascertained.
48
(g) Confirms assts service delivery i.e. condition and functional performance.
(h) Helps in keeping the building in good condition and reduction of rapid
repairs.
A good maintenance manual contains the following sections as opined by Amobi C.O.
This section provides full details of materials, facilities and constructional processes.
This provides maintenance log to permit constant updating and the inclusion of any
changes or additions.
This shows plans of each floor to a small scale with permissible floor loadingss and
49
(d) House keeping
This shows the details of surface finishes and decorations both internally and externally
This provides names, address and telephone numbers of contacts in the event of
servicing.
This includes the design team, contractor and sub contractors, nature of tenure and
denoted by TAM i.e. Turn Around Maintenance revolves. The minimum or least
turn around maintenance of buildings is every five years. The life span of a
building is anticipated during design stage and the maintenance cycle is the
50
different levels and stages in which maintenance is effected in the life span of a
conditions of exposure and use, the periodicity of major renewals might follow a
given pattern. The life of a building could be categorized into physical life,
buildings however have different elemental cost patterns and renewal periods will
vary according to design, location and use. Maintenance costs apart from being
terms taking inflation, taxes and present value of future costs into consideration.
The maintenance cashflow over the life of the building can thus be calculated
even at current prices as percentage of initial cost. If the routine maintenance cost
is assumed to be 0.5% of the initial cost of the building each year, then the overall
acsh flow for every five years should be 2.5% for routine maintenance.
51
Budget according to Ivor H.S. is defined as “a financial and/or qualitative
during that period for the purpose fof obtaining a given objective”
controlling the use of its resources in order to achieve its objective. Most often, a
budgeting is not a matter for accountants- this is because, it must be made at every
stage of budget formation. At the end it is now presented to either the owner or
the estate surveyor or top management as the case may be or whoever has to be in
Speight (1972) stated the following as factors affecting the final budget.
(a) Demand for maintenance and intensification of the use to which the building is to
affects the maintenance budget. For example a company by her annual turnover,
52
This is always necessary and must be adopted. This however, could be disrupting
(a) Setting performance standard at the appropriate level to achieve a given object.
(c) Taken appropriate actions in the event of actual performance deviating from
standard.
To achieve effective total cost control Jarman M.V.(1969) in his book on “selling
(b) A logical breakdown of the budget into specific sections under capital and
(c) Reasonable assessment of the factors affecting the budget including a plan for
maintenance.
53
(g) The use of accurate costing technique including cost coding and classification
providing a pattern of regular and frequent printout given for each level of
In this way performance can be compared with forecast in terms of time and
project can be quickly identified and collective actions taken in good time.
The detail into which each separate project is sub-divided and programmed will depend
on the degree of management control that is required, but it is important that the
printout for the lower level of management should show separate projects, each
with its own sub-budget. A computerized system will meet the over-ridding
quick reaction at the first sign of deviation from the budget or programme.
Accordingly, the whole budget should broken down into control periods ranging
from weekly – 3 monthly at end of each control period examined his figures and
54
(a) If cost are much higher than what is budgeted he should find out why it is so.
(b) It may be that there is an unforeseen item in the emergency repair category which
is usually difficult to forecast or that a large item fails in the particular control
period in question.
(c) It could be that budget figure was low thus the budget could be reviewed
other items where actual cost is lower than budget figure. The analysis should be
done as soon as the figures for the particular control periods are made available.
This is a list of defects and measured quantities upon which the estimated cost of
repairs would based for a given property. A schedule of dilapidation must contain
the location of the property, the date of the inspection of the property and the
Repairs reached between the clients (tenants) and the landlord in respect of the
property during the period of lease indicating who is reliable for what happened
during the effective period of tenant. These are usually in three categories;
(a) Express covenants: they are usually specifically expressed in lease and agreement.
55
(b) Implied covenants: one example of this is the use of the property in a tenant- like
(c) Covenants imposed by status such as local building act and regulations. Usually
express covenants are to avoid any ambiguities precise and direct in their meaning
The initial procedures consist the taken of instructions from clients and putting
same in writing, these instructions usually must be clear for one purpose. The
lease or other documents relevant to the agreement for examination. Has there
been any repair notices earlier and what actions have been thus far taken? These
are necessary initial enquires by the survey from his clients after which he carries
out inspection of the property in question. The survey will now be equipped to
clients/landlord.
(a) Inspection.
Inspection has to be done in accordance with the lease provision either by the
each room, floor or property. Usually, the rooms and its components parts is
56
information. Any potentially dangerous parts of the property which are reliable to
cause damage or injury should be indicated to both the landlord and the tenants
and finally, advice on immediate actions to be taken. In some cases the sketch of
(b) Schedule
The schedule is to clearly, list defects and the necessary repairs as spotted at the
course of inspection. Good schedule do not include generalization since this does
not help to know the extent and location of items needing repairs. Interim
schedules are usually drafted to set out in general terms the amount of works
“Generally, the landlord’s intentions for the future of the property have to be
(a) Inspection
The inspection is conducted like it is in the earlier case, having adequate note with
dimension and is recorded to give details schedule which is more thorough than
schedule in case if such repairs as to be discuss far away from the property site. If
property is still occupied by the tenants as at the time of inspection, any tenant
57
fixture and the cost of any remedial work resulting from its removal should be
noted.
(b) Schedule
This must be produced in a detailed and clear form being both accurate in concise.
The need for it to follow a logical sequence cannot be over emphasized. It should
needing repair. Lay people without much problem- thus should understand the
reason.
However, renewal of component can only be enforced when repair is not feasible.
The schedule must be property titled and must refer specifically to the property in
question and the landlord and the tenants by names. It should also include the date
(b) The schedule administered by the National House Building Council (NHBC
(2007)
58
It is stated according to joint contract tribunal (J.C.T 1972) that “a contractor
using suitable materials. Common law rights permit the building owner to claim
against the contractor up to six years from completion of the work or 12 years in
the case of contract executed under seal. The standard form of building contract
restricts these common law rights and a defects liability period of six months is
short a period. The extension of the liability period would result in higher tenders
and the building owner would suffer were the contractor to become insolvent.
Persons designing building works also have a duty of care to their clients in
carrying out their professional tasks, as they may be held liable for damages
where any negligent act or omission on their part prejudices the client interest.
is the defective premises Act 1973 which came into force on 1st January, 1974.
repair dwellings, and provided an extension in law of the practical step formulated
by the NHBC. It imposed a statutory obligation on all who are involved in the
the design team. They must all do their work properly and effectively and ensure
that the dwelling will be fit for human habitation. Furthermore, a subsequent
59
purchaser of the building who was not a party to any contract with original
The act provided that any person taken on work for or in connection with the
(c) So that, as regards to their responsibilities in the work, the dwelling will be fit for
Furthermore, the provisions of the Act beyond the parties to the dwelling such as
factories Acts and the offices, shops and railways premises Act imposed
wastages”. H.M.S.O.(1970)
to safeguard investment, but to protect persons from risk. Public health Acts
contain provisions for the compulsory repair of houses unfit for human habitation
and also for financial assistance towards the cost of improvements and conversion
to dwellings.
60
Occupiers of commercial and industrial properties are often required to assume
liabilities for structural maintenance and repairs under leases and even with
residential properties, owners and tenants may make such arrangements for
maintenance as they see fit, subject to provisions of the housing Act H.M.S.O
(1969).
maintaining safe plant, system of work and premises, and by ensuring adequate
instruction, training and supervision, under the health and safety at work Act
(1974).
61
CHAPTER THREE
RESEARCH METHODOLOGY
This chapter deals with the various methods or sources of data used in obtaining materials
and information needed by the researcher for writing the project so as to obtain
and achieve meaningful, accurate and correct results in carrying out the research
work. The following measures stated below were taken, the process involved in
this write up include practical test being carried out through direct
inspection were also carried out on selected buildings in shell camp, Housing
Estate, Owerri in order to find out the impact of maintenance of buildings and
infrastructure on the economic wellbeing of the residents within the estate. The
surveys are carried out on residential buildings, shell camp primary school, the
road network within the estate and the water supply facilities.
The descriptive survey of this design carried out consists of the use of structural
the aims and obstacles of this research in form or question and the questions being
The geographical location covered by the study is Shell Camp, Housing Estate, Owerri,
Imo State.
62
3.3 Population of the study
The population of the study consists of buildings infrastructures within Shell Camp Estate
In carrying out the research work, the sampling method used in the collection of data in
all the buildings within the population of the study have equal and same chance of
being selected.
The data used in this research work were collected by hand. The questionnaire was
distributed and collected back by hand. Most of the questions were answered
The major instrument used in collecting data comprised of questionnaire and oral
interview. The oral interview was used in a situation where the respondent was
63
observed incapable of comprehending the ground intents of the questions. Also
where it was suspected that using oral interview would facilitate the respondents
questionnaire.
The secondary sources of data collected here include written materials in similar subject
as Google, Ask.com but most of all in depth case study analysis carried out by the
64
CHAPTER FOUR
Once a building or infrastructure is put to use the initial capital is completed. Though, the
cost, however, does not end there because “house keeping” aspect of maintenance
continues throughout the life cycle of the building. There are items that are
considered significant and the design team must give due consideration to their
implication and it is here that time value should be judged. These items will affect
the cost of maintenance. It is better to spend more at the initial stage to incur
value.
The approach to this project work, as described before, was such that the end it would
give a comprehensive analysis of the problems already set out in the objective.
The study was conducted with the use of questionnaire containing expository questions; it
was directed to the occupants and residents of the buildings at Shell Camp,
people in order to get more facts about buildings and infrastructures in the
vicinity. With these, it was possible to get to the causes of maintenance problems
65
with respect to buildings and infrastructures in Shell Camp, Housing Estate,
Owerri and this method also reveals the various solutions to the various problems
of maintenance.
This case study was carried out in Shell Camp Housing Estate, Owerri metropolis. It can
be accessed from the library junction axis traversing the Imo state Government
Headquarters and the Imo state Police command through to the works sction.(also
According to the residents, Shell Camp Housing Estate was a resident quarters for
expatriate workers in Shell Development Company during the pre-civil war years
(1967-1970) when crude oil was newly discovered in Nigeria. It was set up by the
working in the then eastern region for the exploration and piping of oil resources.
Shell Camp also has other quarters in other parts of Nigeria such as Enugu and
Port-Harcourt.
During the Nigerian-Biafran civil war, it was noted that Shell Camp served as an army
officers residents and offices. Immediately after the civil war, during the
reconstruction and reconciliation era, the federal government took over Shell
Camp Housing Estate as they did to most of the public institutions and eventually
66
allocated them as resident quarters for federal government civil
residential quarters for employees of federal ministry mines and industry which
has been and currently in charge of running the affairs of the quarters.
Between 1999-2007 during the tenure of president Olusegun Obasanjo, the bureau of
were given the legal backing through the promulgation of Public Enterprise
Though, by a recent admission of the Bureau of Public Enterprise (BPE) before senate of
In this regard, Shell Camp Housing Estate according to residents was part of the
interested in owning their property during the exercise were told to obtain the
necessary documents and contribute funds which will eventually spearhead the
Critical information gathered by the researcher on Shell Camp Housing Estate was also
according to the newly appointed director of Ministry of Mines and Industry also
67
legal tussle because unofficial residents are occupying certain properties meant
for the ministry employees. Though, the respondent refused to answer strategic
questions (including her identity). The respondent said the legal battle is still in
Shell Camp Housing Estate, Owerri is a large living quarters located within the Ministry
Education, Owerri.
It has a connecting un-tarred-road (previously tarred road weathered by age and flood),
the road has a width of approximately six metres, which has dilapidated with lots
One remarkable feature on the urban the urban planning was the absence of drainage
channel right round the estate, it might have been buried by earth or it was non-
existent. There are wooden electricity pole at intervals along the road for
transmission of electricity to the buildings within the estate, the buildings within
the estate are pro-to-type colonial style bungalows facing each other across the
road along the estate. These buildings are mostly four or three bedroom bungalow
complex. The buildings do not have boundary demarcations rather they have
flower hedges to serve as boundary between each property. Right round the estate
68
it was noted that the buildings are various stages of disrepair which can be
attributed to negligence.
69
4.4.1 Case study one
a large porch running to one side of the front of the building. It also has an annex
behind the building ( a three row-house annex popularly known as the Boy’s
Quarters which is used as a tenant house by the main occupant of the bungalow.
The roof is pitched roof with aluminum zinc, the walls are stucco white, the doors
are wooden paneled and the windows are casement pane glasses.
70
According to the occupant, Mrs. Alozie, the building was allocated to her husband
who was and still his an employee of federal ministry of industry. They have been
living in headquarter since 1988. According to her, the building has remained in
total state of disrepair because government has not allocated any fund towards
She informed the researcher that these suggestions have not been applied due to
financial constraint and government negligence. She also noted that such
accident in the buildings are to be taken care of by the works department but on
repeated calls and report to the ministry (if nothing is done) can be effected by the
occupants.
In case of budget, according to her there are no allocation for maintenance work for
in Shell Camp Housing Estate, Owerri is carried out solely and exclusively by the
occupants.
71
4.4.2 Case Study two (2)
Photograph of building LH 18
This building is located within the estate; it is a replica of most of the buildings in the
estate. It has a wild entrance porch in front of the building with low honeycombed
wall as baluster, it has no official gate rather the compound is separated from
bungalow affair with milky paints; exposed rendering shows that it is a brick-
building. The roofs are low pitch, with bamboo ceilings in some places and
72
wooden columns supporting the porch beams. It has widows made of casement
pane glass in wooden flames and the doors are wooden paneled.
As the researcher was informed by the occupant, Mr. Igbo Livinus, a graduate of
quarters since he was born in 1981. He observed that the buildings in the estate
has been allocated to employees of ministry of industry and all through the years
he has lived there, it was only in 1999 before the privatization exercise that the
He concurred with the proposition that all the maintenance work carried out on buildings
73
4.4.3 Case Study Three (3)
Photograph showing building LH 21
This building seems to be the most new building in the entire Housing Estate, it
has new paint and it has new fittings and fixtures, it is a bungalow with lean-to
roof pattern in front. It has an enclosed space in front which serves as a sit-out.
The walls are stucco white, the widows are wooden panel pane and the doors are
flush wooden doors. The property is screened from the road and adjacent
Federal University of Technology Owerri. “The state in which his resident is in, is
74
solely done, all the repairs and renovations was carried out exclusively by him,
All maintenance works are carried out exclusively by the occupants but the major set-
back is carrying out maintenance work for buildings and infrastructures which its
tenancy will expire at the end of the civil service (provided the employee was not
sacked or transferred).
He however hinted to the researcher that, had it been the privatization exercise which the
at least the occupant will become home owners as such can effectively effect
He also noted that though Shell Camp is a government owned resident quarters,
such the state of disrepair and dilapidations envisioned throughout the estate.
75
4.4.4 Case Study Four (4)
This is a school buildings for primary school pupils located in shell camp housing
two of the buildings are in used while the third and the fourth has dilapidated
without roof covering, windows and doors.( as showed in the photograph above).
The grounds around the school are pot-holed while the roads are in serious need
of maintenance work.
76
According to the newly appointed headmistress of the school “ the school provides
quality education to the young minds at shell camp quarters”. It was established
The school as regards to maintenance has no allocation from the government to effect
repairs, according to her “all maintenance work carried out by the school as
regards to minor repairs are funded by the school management but in large
maintenance program, the school management solicit the support of the Parents
cases of corrective maintenance program which may have resulted from natural
causes, the school management will solicit funds from the government through
the ministry of education under the auspices of State Public Education Board
(SPEB) which will also take inventory and in time administer funds for such
works. Other maintenance works such as ‘housekeeping’ are carried out by the
pupils within the school under the supervision of the teacher in charge.
77
4.4.5 Case Study Five (5)
The road network in shell camp housing estate is one of the infrastructural
facilities within the estate which this project work tends to take cognizance of.
The road linking the estate is a wide width road (approximately 6metres), it ran
right round the estate linking all the buildings in the estate.
The state of the road is poor, it has deteriorated to the state that all graded surfaces
has worn-off exposing laterite base and pot-holes in almost all surfaces. There are
a lot of stagnant pools at different route on the road, it was noted by the dwellers
78
or the residents that due to the current dry season, the roads are definitely is good
but during the wet months, the roads are definitely not accessible, vehicles slumps
in mud holes and pedestrians have to wade through the murky pools to their
homes.
Notably, the road is not made of the contemporary gravel and cement rather they are
According to the residents, the roads have not received any maintenance work over the
years resulting in its current state of disrepair. They also noted that due to the
current living standard in Nigeria, the residents does not have the necessary to
fund/effect the restoration and repair of government owned roads (as in the case
of Shell Camp Housing Estate) rather during the weekly sanitation they tend to
cut and fill different point on the road to ensure evenness for the time-being.
79
4.4.6 Case Study six (6)
The drainage channel which serves as escape root for surface and sub-surface
water in shell camp housing estate is practically non existence. The drainage
with the road network for effective discharge of water and other effluents has
either been not in existence during the planning, design and construction stage at
shell camp housing estate or they have been blocked totally, covered and
80
consolidated by earth. The lack of drainage system in the estate is the direct cost
The public water supply system provided by the state water board has since
became obsolete. It has stopped flowing. The different steal metal pipes used in
around the estate. The visible water supply fittings in most buildings have
virtually roasted and some are broken while others are no longer in existence.
81
As a result there is no water supply system provided by the government within the estate,
the residents have resorted to draining their private bore-hole water supply
to carry out such project which helps them to obtain water in their premises while
others resort to public bore-hole supply network owned by Christ the King
82
Electricity supply in shell camp housing estate according to the residents “is intermittent,
definitely non constant, it may stay intermittently for six hours a day at interval of
Thus, the residents mostly have generating set for Direct Current (DC) power supply. The
supply and distribution of electricity in shell camp are done from the wooden
electricity pools at the boundary of the buildings. These wooden pools are located
at intervals along the road network of the estate, the property dwellers obtain
their electricity directly from the pool through the three-phase, four wire
connection pattern.
One notable occurrence as told by the residents to the researcher was the high-rate bill
Though the light was never consistence and certainly not steady, the bill presented
to the occupants of the estate at month’s end is definitely high and failure to
comply entails disconnecting the property’s power supply and subsequent seizure
This shows a statistical method of how data was created. It also gives further information
83
The table below shows the number of questionnaires distributed and number that were
returned.
Residents 40 80
Non-residents 10 20
Total 50 100
Residents 30 75
Non-residents 10 25
Total 40 100
Question 1
Does buildings and infrastructural maintenance has impact on the economy of Nigeria?
Table 4.5.3
84
Option Responses Percentage
Yes 30 75%
No 10 25%
Total 40 100%
From question number (1) 75% of the residents, responded that maintenance of buildings
Question (2)
Table 4.5.4
Yes 4 10%
No 36 90%
Total 40 100%
accepted that buildings and infrastructures in Nigeria does not receive adequate
maintenance attention.
Question 3
85
Table 4.5.5
Yes 32 80%
No 8 20%
Total 40 100%
In this table above, 32 responded out of 40 respondents, representing 80% accepted that
Question 4
Would you attribute the deterioration and dilapidation of buildings and infrastructure in
Table 4.5.6
Yes 40 100%
No - -
Total 40 100%
It is seen that 40 respondents responded 1005 total response supporting that buildings and
Question 5
86
Does government has legislation and policies that ensures adequate maintenance of
Table 4.5.7
Yes 16 40%
No 24 60%
Total 40 100%
From the table above 60% of the total respondents were of the opinion that Nigeria
Question 6
Does Nigeria has adequate maintenance professionals as against the number of buildings
Table 4.5.8
Yes 14 35%
No 26 65%
Total 40 100%
87
From the responses above, it can be deduced that the number of maintenance professional
Question 7
Would adequate funding of maintenance work by the government add value to income
Table 4.5.9
Yes 32 80%
No 8 20%
Total 40 100%
From the data above 32 responded out of 40 representing 80%, accepted that adequate
funding of maintenance will add value to the economic life of the citizenry.
Question 8
88
Table 4.5.10
Yes 22 55%
No 18 45%
Total 40 100%
From the above table 55% of the total respondents suggested that maintenance of
Question 9
Does the maintenance industry ascertain job opportunity for Nigerian citizens?
Table 4.5.11
Yes 34 85%
No 6 15%
Total 40 100%
From the table above and the data obtained it was observed that 34 respondents
89
Question 10
Do you believe that the current state of maintenance activity carried out in Nigeria is to
an acceptable standard?
Table 4.5.12
Yes - -
No 40 100%
Total 40 100%
From the data obtained 100% of the respondents believe that the current maintenance
Question 11
Table 4.5.12
Yes 36 90%
No 4 10%
Total 40 100%
90
According to the data 36 responded out of 40 representing 90% accepted that un
Question 12
Would you attribute negligence on the part of the property owner as a direct cause of
Yes 38 95%
No 2 5%
Total 40 100%
From the preceding table, 95% of the total respondents were of the opinion that
negligence on the part of the property owners is a direct cause of defect and
91
Question 13
in Nigeria?
Table 4.5.13
Yes 34 85%
No 6 15%
Total 40 100%
From the table 85% of the respondents suggested that the poor workmanship and
Question 14
Would you attribute user wear and tear as a directed cause of the state of
92
4.2.14
Yes 40 100%
No - -
Total 40 100%
representing 100% total response suggesting 100% that the user wear and tear
Nigeria.
Question 15
Would poor quality material usage result in defects and subsequent high scale
Table 4.5.15
Yes 30 75%
No 10 25%
Total 40 100%
93
From the data obtained, 75% of the respondents responded that poor quality
material usage material usage results in defects and subsequent high scale
Question 16
Would you say that strict adherence to maintenance planning and scheduling will
Nigeria?
Table 4.5.16
Yes 36 90%
No 4 10%
Total 40 100%
accepted that strict adherence to maintenance planning and schedule will increase
Question 17
Does effect of taxation and levies on property owners contribute to lack effective
94
Table 4.5.17
Yes 32 80%
No 8 20%
Total 40 100%
maintenance in Nigeria.
Question 18
Table 4.5.18
Yes 24 60%
No 16 40%
Total 40 100%
From the table above 60% of the total respondents were of the opinion that lack of
95
maintenance manual for buildings affect the efficiency of maintenance work for
buildings.
Question 19
infrastructures in Nigeria?
4.5.19
Yes 40 100%
No - -
Total 40 100%
From the above 100% total responses was obtained showing that the inflation rate
Question 20
Nigeria?
Table 4.5.20
Yes 4 10%
No 36 90%
96
Total 40 100%
From the table above it was accepted that time factor contribute as a constraint to
From all indication almost all the questions answered in the questionnaire,
In question (1) which asked if the buildings and infrastructural maintenance has
impact on the economy of Nigeria. The respondents who answered ‘Yes’ were
thirty(30) which is 75% out of the total number of questions asked. The number
that answered ‘No’ was ten (10) which are 25% of 100 indicates that majority
were of the opinion that maintenance of buildings and infrastructures has impact
constraint in Nigeria.
97
In question (4) 100% which represented 40 supported that the buildings and
infrastructural deterioration and dilapidation are as a result of poor design and old
age.
In question (5) 40%which represents 16 did not agree with the question while
60% representing 24 respondents were of the opinion that Nigeria government has
infrastructures.
maintenance work by the government will add value the economic life of the
citizens.
determine the level of urbanization and civilization in Nigeria metropolis and city
centres.
98
In question (10) 100% representing total respondents do not believe that the
standard.
In question (14) 100% representing total of 40 respondents suggested that the user
wear and tear causes defects and dilapidations of buildings and infrastructural
facilities in Nigeria.
representing 30 agreed that poor quality material usage results in defects and
99
In question (16) 10% representing 4 respondents disagreed while 90%
In question (17) 20% representing 8 respondents did not agree while 80%
In question (18) 40% representing 16 respondents did not support while 60%
manual for buildings affect the efficiency of maintenance work for such buildings.
In question (19) 100% total response were of the opinion that inflation rate
100
CHAPTER FIVE
From the analysis it was discovered that the impact of maintenance of buildings
This is the evidenced by the nature of responses received from the respondents.
For all responses received the opinion of the respondents was that the impact of
5.2 conclusions
attention at the highest level. This attention is of basic importance of which the
It was seen during research process that the level of maintenance activities in
101
could have helped to increase buildings and infrastructural maintenance has not
be properly implemented.
Certain government legislature and policies including taxation and property levies
activities.
The issue of every contractor being involved in project production with few
engage in maintenance has been a major set- back because there are few
the design stage of a project is another factor that negatively affect the efficiency
Poor attitude of workers and poor aptitude of the supervisory personnel during
project development phase has also been a major problem. This has led to serious
defects seen in the life span of buildings and infrastructural facilities which also
Cutting cost in order to maximize profit by contractors through the use of sub-
standard materials causes defects in the long run and subsequent maintenance
requirement with its re-occurent maintenance cost affecting the economic output
of citizens.
102
Lack of effective planning and scheduling also leads re-occurrence of faults due
Inflation regards with regard to over blow appreciation in the value in the value of
material cost and labour cost affects the efficacy of maintenance work
Carelessness and recklessness of the users of the property are also a direct effect
of defects and subsequent maintenance work which will affect the economic life
Even-busy attitude of property owners and residents due to bustling and hustling
maintenance and thus has led to low maintenance attitude and subsequent run-
5.3 Recommendations
activities within Nigeria is at a low ebb and as such many buildings and
parastatals. Even where some attention is given, maintenance activities are left in
works in general. This leads to little or nothing being done as and when due.
103
Therefore the numerous problem associated with maintenance could be solved if
(a) The government should enact legislature mandating individual to maintain their
should also establish and maintain central maintenance authority and create their
offices at federal, state and local government level to ensure proper and adequate
officials. These officials will also ensure compliance to efficient and effective
maintenance standard.
(b) During annual fiscal budget presentation the government through the ministry of
(d) All professionals in the built environment should diversify. Every one of them
should not be competing in project production. They should take all maintenance
cost in order to maximize profit through the use sub-standard materials in both
104
supervision at every stage of project production should be optimal in order to
requirement.
(e) Every facility and property should have a well detailed maintenance plan,
should bear in mind the need for these maintenance activities and as such should
map out a percentage of the initial cost of the property for subsequent
maintenance cost in the life span of the property. Property owners of residents
should also map out days in their busy life to effectively ‘house-keep’ their
property and they should embark carefulness in the use of the property to reduce
materials which have been tested and the property fully known at the design stage.
They should also endeavor to be conversant with the behavior of material over
the merit of primary use of superior materials which are eventually more costly in
the long run. There should also be a bye-law regulating the quality of building
maintenance industry in Nigeria. Each new government for reasons best known to
them prefers such but this attitude should discontinue because it promote
105
negligence and abandonment of quality properties already owned by the
106
REFERENCES
Practice, CIOB.
Ivor H. S (1974) – Building Economics J. Willey and Sons publishers Ltd. New York.
Conference Journal.
Speight B.A (1972) – Property Maintenance and Management. Macmillain Press Ltd,
London.
London.
108
APPENDIX 1
November, 2011.
Questionnaire
to the National Economy (a case study of Shell Camp, Housing Estate, Owerri)
Dear respondent,
the above topic in partial fulfillment of the award of higher national diploma
facilities. I assure you that any information given in this regard will be treated as
Yours faithfully,
109
APPENDIX 2
Questionnaire
Please tick any of the following options
Question 1
Nigeria?
Question 2
attention?
Question 3
Question 4
110
Question 5
Does government has legislation and policies that ensures adequate maintenance
Question 6
Question 7
Question 8
Question 9
Does the maintenance industry ascertain job opportunity for Nigerian citizens?
111
(a) Yes (b) No (c) Doubt
Question 10
Do you believe that the current state of maintenance activity carried out in Nigeria
is to an acceptable standard?
Question 11
Question 12
Would you attribute negligence on the part of the property owner as a direct cause
Question 13
in Nigeria?
Question 14
112
Would you attribute user wear and tear as a directed cause of the state of
Question 15
Would poor quality material usage result in defects and subsequent high scale
Question 16
Would you say that strict adherence to maintenance planning and scheduling will
Nigeria?
Question 17
Does effect of taxation and levies on property owners contribute to lack effective
Question 18
113
(a) Yes (b) No (c) Doubt
Question 19
infrastructures in Nigeria?
Question 20
Nigeria?
114