Professional Documents
Culture Documents
0200
Revision: 1
By: DTravis
Utility Requirements - SuperFast TM 2x120L CO 2 Extraction System Date: 10/17/19
Thar Process, Inc. • 150 Gamma Drive • Pittsburgh, PA 15238 • www.tharprocess.com • 412.967.0200
2A CHILLER - OUTDOOR INSTALL ( ON A 6" CONCRETE PAD) 8' X 8' X 7' Carrier - 30RAP060
Thermalcare -
2B CHILLER PUMP STATION 8' X 6' X 5' PTF500(or)PTS450
2C HOT WATER BOILER + PUMP (INDOOR) 7' X 7' X 8' Fulton Pulse HW
Ingersoll-Rand -
2D AIR COMPRESSOR 6' X 3' X 5' 2545E10V-460
CO2 BULK SUPPLY TANK - 6 ton storage (ON A 12" Tomco Systems -
2E CONCRETE PAD) 12' X 6' X 8' 681EA
Tomco Systems -
2F CO2 TRANSFER PUMP 4' X 3' X 3' CM35
*This covers power supply for extraction system, chilled water system, hot water system, and air compressor. This
does not consider power requirement for HVAC, lighting load etc.
These figures given may vary as power requirement depends upon local conditions, equipment and configuration
of utility systems selected by client.
**Natural gas consumption was estimated rated boiler capacity consumption by Industrial Hot water boiler
manufacturers datasheet such as Bock's and Fulton
Revision: 1
By: DTravis
Utility Requirements - SuperFast TM 2x120L CO 2 Extraction System Date: 10/17/19