You are on page 1of 2

Thar Process, Inc. • 150 Gamma Drive • Pittsburgh, PA 15238 • www.tharprocess.com • 412.967.

0200

Summary of Utility Requirements for


SuperFastTM 2x120L CO2 Extraction System
Operating Design
Power supply 3 Phase, 480 volts, 60 Hz, 4 wire system - One point supply for Thar equipment - 38 amps
approximately. SCADA Computer powered separately.
Power Consumption for Thar Supplied Components
Estimated consumption / day (kWh) 283 N/A
Connected load (kW) 36 N/A
Estimated maximum demand (kW) 11.81 N/A
Hot water supply parameters
Capacity - Btu/h (kW) 213094 ( 63 ) 319640 ( 93.8 )
Hot water flow rate - Liters / min (US gpm ) 93 ( 27 ) 139 ( 40 )
Inlet temperature -°C (°F) 80 (176) 80 (176)
Outlet temperature -°C (°F) 70 (158) 70 (158)
Supply pressure (psig) 50 65
Chilled water supply parameters
Capacity - Btu/h (kW) 212360 ( 72 ) 318540 ( 94 )
Chiller Capacity Sizing (TR) 36
Chilled Water flow rate - Liters / min (US gpm ) 193 ( 54 ) 289 ( 80 )
Inlet temperature -°C (°F) 0 (32) 0 (32)
Outlet temperature -°C (°F) 5 (41) 5 (41)
Supply Pressure (psig) 50 65
Instrument air requirement
Nominal Pressure, bar 7.5 N/A
Minimum Pressure, bar 5 N/A
Free Air Delivery, CFM 50 N/A
Quality N/A
- Dew Point -40°C N/A
- Oil Free Air Required N/A
Power supply 3 Phase, 480 volts, 60 Hz, 4 wire system - Disconnect to be provided for each utility equipment
(Compressor, Boiler, Chiller and Extraction System) - 141 amps approximately
Electrical power requirement for utilities. FOR GUIDANCE ONLY.*
Estimated consumption / day (kWh) 1,355 N/A
Connected load (kW) 104 N/A
Estimated maximum demand (kW) 74 N/A
Estimated natural gas requirement for hot water boiler. FOR GUIDANCE ONLY.**
Estimated consumption / day (MCF) 7
Estimated CO2 consumption. FOR GUIDANCE ONLY*
CO2 Consumption per batch (kg/vessel/batch) 12 kg/vessel/batch N/A
CO2 Consumption per day assuming 21 batches/day 247 kg/day

Revision: 1
By: DTravis
Utility Requirements - SuperFast TM 2x120L CO 2 Extraction System Date: 10/17/19
Thar Process, Inc. • 150 Gamma Drive • Pittsburgh, PA 15238 • www.tharprocess.com • 412.967.0200

Summary of Utility Requirements for


SuperFastTM 2x120L CO2 Extraction System
Recommended
ESTIMATED LAYOUT SPACING REQUIRMENTS
System
TM
SuperFast 2x120L CO2 Extraction System
1A (L x W X H) IN FEET 45' x 10' x 16'
FOOTPRINT FOR THAR SFE ACCESS PLATFORM AND
1B UTILITY HEADER PIPING 45' X 5' X 7'

APPROXIMATE FOOTPRINT FOR UTILITY SYSTEM - CLIENT'S SCOPE


2

2A CHILLER - OUTDOOR INSTALL ( ON A 6" CONCRETE PAD) 8' X 8' X 7' Carrier - 30RAP060
Thermalcare -
2B CHILLER PUMP STATION 8' X 6' X 5' PTF500(or)PTS450

2C HOT WATER BOILER + PUMP (INDOOR) 7' X 7' X 8' Fulton Pulse HW
Ingersoll-Rand -
2D AIR COMPRESSOR 6' X 3' X 5' 2545E10V-460
CO2 BULK SUPPLY TANK - 6 ton storage (ON A 12" Tomco Systems -
2E CONCRETE PAD) 12' X 6' X 8' 681EA
Tomco Systems -
2F CO2 TRANSFER PUMP 4' X 3' X 3' CM35

*This covers power supply for extraction system, chilled water system, hot water system, and air compressor. This
does not consider power requirement for HVAC, lighting load etc.
These figures given may vary as power requirement depends upon local conditions, equipment and configuration
of utility systems selected by client.

**Natural gas consumption was estimated rated boiler capacity consumption by Industrial Hot water boiler
manufacturers datasheet such as Bock's and Fulton

Revision: 1
By: DTravis
Utility Requirements - SuperFast TM 2x120L CO 2 Extraction System Date: 10/17/19

You might also like