Input data
Side Slope 0.5 1:0.5
EL @ Start of drain 425.935
EL @ End of drain 424.285
Length of Drain 446.8 Mtr
Bed Slope S 270.7878787879
Area (A) 82085 Sqmtr 8.21 Hectare
Run -off coficient C 0.36
Intensity ( I) 64.23 mm/hr 6.423 Cm/hr
Manning Roughness cefficient N 0.012
Calculation
0.531452 m3/sec 0.028*0.36*8.2085334*
Discharge ( Q) = CIA 6.423
100mm free
100mm free
considering
considering
Final Depth
Width (By
Final Top
board)
board)
(By
Discharge in drain
Q(Cu.m/sec)
Drain Shape
R.L of R.L of Invert Invert
drain drain Level @ Level @ (m)
bottom @ bottom @ Start of End of
start end drain drain
425.335 423.685 0.600 0.600 1.000 0.531 Trapazoidal
423.635 422.204 0.650 0.650 1.200 1.107 Trapazoidal
424.286 423.685 0.600 0.600 1.000 0.406 Trapazoidal
423.585 422.934 0.700 0.700 1.200 0.696 Trapazoidal
422.204 421.043 0.650 0.650 1.300 1.648 Trapazoidal
Block-1 Periphery Drain 0.250 0.250 0.450 0.022 Trapazoidal
Block-2 Periphery Drain 0.250 0.250 0.450 0.009 Trapazoidal
Connection drain 0.350 0.350 0.600 0.066 Trapazoidal
Connection drain 0.250 0.250 0.450 0.024 Trapazoidal
Direct discharge drain 0.250 0.250 0.450 0.021 Trapazoidal