Professional Documents
Culture Documents
Vacuum Box Testing
Vacuum Box Testing
KASHAGAN DEVELOPMENT
EXPERIMENTAL PROGRAMME PROJECT
Page : 3 of 8
Hook-up and Commissioning of Complex D and Island
A - Offshore Facilities
Doc. No.: 268129-SA-PR-8039-00 Rev. C01
KASHAGAN DEVELOPMENT
EXPERIMENTAL PROGRAMME PROJECT
Page : 4 of 8
Hook-up and Commissioning of Complex D and Island
A - Offshore Facilities
Doc. No.: 268129-SA-PR-8039-00 Rev. C01
INDEX
1 SCOPE 5
2 REFERENCE DOCUMENTS 5
4 PERSONNEL 5
5 EQUIPMENT 6
6 TESTING 6
7 ACCEPTANCE CRITERIA 6
8 REPORTING 7
9 ATTACHMENT 8
ANNEX –VACUUM BOX TESTING REPORT
KASHAGAN DEVELOPMENT
EXPERIMENTAL PROGRAMME PROJECT
Page : 5 of 8
Hook-up and Commissioning of Complex D and Island
A - Offshore Facilities
Doc. No.: 268129-SA-PR-8039-00 Rev. C01
1.0 SCOPE
This procedure describes the general requirements, method, technique and acceptance
criteria for Vacuum Box Testing of welds in welded Storage tanks in accordance with API
650 and the extent shall be in accordance with an approved QCP
4.0 PERSONNEL
Personnel performing and witnessing Vacuum Box Testing shall have past experience in
the activity.
Specific Training to the Operators and Inspectors shall be given by NDT / QC Supervisor
and shall be documented.
KASHAGAN DEVELOPMENT
EXPERIMENTAL PROGRAMME PROJECT
Page : 6 of 8
Hook-up and Commissioning of Complex D and Island
A - Offshore Facilities
Doc. No.: 268129-SA-PR-8039-00 Rev. C01
5.0 EQUIPMENT
A. Vacuum Box of dimension 150mm wide by 750mm long with a clear window in
the top with gaskets , seals etc
B. Torch
C. Soap Solution
D. Vacuum Pump / Hoses
E. Calibrated Vacuum Guage
F. Calibrated Temperature guage
G. Calibrated Light Intensity meter
6.0 TESTING
Perform a good visual inspection of the surface / weld to be vacuum box tested. And check
the temperature of the surface. Metal surface temperature shall be between 4°C to 52°C.
Place the open bottom portion of the vacuum box against the tank surface so that the weld to
be inspected is in the centre of the box. Check for the proper fit and seal.
Apply a partial vacuum of 650mBar, for a minimum period of 5 seconds or the time required
to view the area under test.
The test shall have at least 50mm overlap of previously inspected surface on each
application.
The presence of a large opening leak, indicated by a quick bursting bubble or spitting
response at the initial setting of the vacuum box is Not Acceptable
KASHAGAN DEVELOPMENT
EXPERIMENTAL PROGRAMME PROJECT
Page : 7 of 8
Hook-up and Commissioning of Complex D and Island
A - Offshore Facilities
Doc. No.: 268129-SA-PR-8039-00 Rev. C01
8.0 REPORTING
After completion of the inspection of activity, prepare the report as the form in Annex 1
9.0 Attachment
KASHAGAN DEVELOPMENT
EXPERIMENTAL PROGRAMME PROJECT
Page : 8 of 8
Hook-up and Commissioning of Complex D and Island
A - Offshore Facilities
Doc. No.: 268129-SA-PR-8039-00 Rev. C01