What is Planning and Scheduling
BELLY BERTO
Planning and scheduling are distinct but
inseparable aspects of managing the successful
project. The process of planning primarily deals
with selecting the appropriate policies and
procedures in order to achieve the objectives of
the project. Scheduling converts the project
action plans for scope, time cost and quality into
an operating timetable.
4
THE BIG PROBLEM IN PLANNING AND SCHEDULING
BELLY BERTO
2. TOO MANY INTERUPTION
4
THE 6 ELEMENT OF PLANNING AND SCHEDULING
BELLY BERTO
Identify Review
Close
and Plan Schedule Execute and
Out
Prioritize Improve
4
PROBLEM#1
BELLY BERTO
It’s meant only 30 – 40 % is Productive Time in a day and 60 – 70 % is Waste Time
4
▪ Finding Tools
PROBLEM#1 ▪ Getting Spare Part and Materials
▪ Locating additional Spares/Material
Common Causes Of Waste
▪ Having to Organize Access e.g. scaffolding
In Maintenance
▪ Having to Organize Lifting / Rigging
▪ Having to Find another Support
BELLY BERTO
▪ Waiting in Instructions
▪ Going to/ from
▪ Waiting on permit
▪ Waiting on isolation or de – isolation
▪ Excessive break time
4
PROBLEM#1 Team Member/Crew:
▪ 20 Technician
▪ Productive Time only 30%
BELLY BERTO
Can Reduce Waste And Can
Increase The Productive Time Team Member/Crew:
▪ 1 Planner, 1 Scheduler, 18 Technician
▪ Productive Time will be going to 45%
4
PROBLEM#2
TOO MANY INTERUPTION
BELLY BERTO
Identify Review
Close
and Plan Schedule Execute and
Out
Prioritize Improve
4
PROBLEM#2
BELLY BERTO
3. Say….NO
4
PROBLEM#2
BELLY BERTO
3. Ranking Index (RIME)
4. Based on Potential Risk by Risk
Assessment
4
RIME CHART ( RANKING INDEX FOR MAINTENANCE EXPENDITURES
BELLY BERTO
4
RISK ASSESSMENT MATRIX
BELLY BERTO
4
RISK – BASED MAINTENANCE FLOW CHART
BELLY BERTO
4
PROBLEM#3 1. Plan Is First And Then Schedule What Has
Been Planed
2. Planning And Scheduling Are Different,
But Working Together
MISSINGUNDERSTANDING
BETWEEN PLANNING AND 3. Planning To Eliminate Waste Time And
SCHEDULING Improve Effectiveness To Ensure
BELLY BERTO
Everything What We Need In Place Before
Star The Job
BELLY BERTO
6. Standard Operating Procedures
7. Safety Analysis
8. Spares or Material
9. Crate Work Order
10. Create Work Pack
4
PROBLEM#4
SCHEDULING FOR
WORK/TASK THAT IS NOT
READY
BELLY BERTO
Identify Review
Close
and Plan Schedule Execute and
Out
Prioritize Improve
4
PROBLEM#5
STRUGGLE IN PROCESS OR 1. Process does not work
DOING THE WRONG WAY 2. People are not trained
3. Wasting time for preparation. “Too Busy
Fighting Fires
4. Wasting time for Argumentation
BELLY BERTO
4
COURAGE IS A SPECIAL KIND OF
KNOWLEDGE: The Knowledge Of How To
Fear What Ought To Fear And How Not To THANK YOU
Fear What Ought Not To Be Feared