PREP.CHECKED BY CHECKED BY APPROVED BY APPROVED BY
REV. DATE STATUS DESCRIPTION HIDADA DOOSAN DOOSAN PB
OWNER
OWNER'S ENGINEER
CONTRACTOR
SUBCONTRACTOR
31021001/00-Z-RPP2-WE001885 3 1
(HIDADA ref : 31021001/00-Z-RPP20WE009547 - 2 of 2 )
DOCUMENT STATUS
□ FOR INFORMATION ■ FOR APPROVAL □ FOR REVIEW □ FOR CONSTRUCTION □ AS BUILT
Doc.No. 31021001/00-Z-RPP2-WE001885
Inspection & Test Plan for Site
Installation of Bottom Heater (Header coils)
Title
for HFO Tanks
Project Rabigh Power Plant No.2
1 DOCUMENT PREPARATION
Design Calculation,
Review of Inspection & Test Plan - Indication of Hold,
1.1
Review & Witness
Drawings & ASME sec. H R R ITP
VIII, Div. 1
ASME Sec. IX /
1.2 Review of WPS, PQR & WPQ. Drawing
H R R WPS/PQR/ WPQ
Approved NDE
1.3 Review of NDE and Hydrostatic Test Procedure. ASME Sec. V & VIII-1 H R R
Procedure
3 INSTALLATION
DPT Procedure
3.2 MT After Root Welding and Record Welder Numbers H R R YES
3.3 Final welding and Visaul & dimensional check Drawing H W R YES
Drawing / Hyrostatic
3.4 Hydrostatic Pressure Test - Segment Wise H R R YES
Test Procedure.
4 DOCUMENTATION