Para No. 19.9.

8 Annexure: 19-MS4
Maintenance Schedule of Key Locked Checking Relay/Electric Key
Transmitter (KLCR/EKT)

Index
Periodicity Schedule
Code
Monthly K1, K2
Quarterly K1
Half Yearly K1, K2
Yearly K2

Schedule Code: K1
Periodicity: Technician(Signal): Monthly, Sectional
SSE/JE(Signal):Quarterly SSE(Signal)/Inharge: Half-
yearly
S.No. Check the following:
1. Clean and ensure dust free.
2. Visually check the condition of PVC wires is good and intact.
3. Checking the effectiveness of locking, sealing, indication and Buzzer.
4. Voltage across KLCR shall be measured.
(a) Permitted Range for 24 V DC Relay 19.2 to 28.8 V DC.
(b) Permitted Range for 60 V DC Relay 48 to 72 V DC.
5. Check & ensure "KEY IN" and "KEY OUT” indications are functioning properly.
6. Check & ensure that Contact (NO/NC) of KLR key extracting button are functioning properly.

Schedule Code: K2
Periodicity: Technician (Signal):Monthly, Sectional
SSE/JE(Signal):Half yearly,
SSE(Signal/)Incharge: yearly
1. Tail cables meggering with 500 V megger.
2. Check and ensure that relays are in good condition & no dry soldering.

Note:(i) During periodic schedule of SSE Incharge: inspection, section SSE/JE


inspection not required since inspections are repetitive in nature.
(ii) Ensure that independent Power supply is connected to KLCR.