Maintenance Schedule of Colour Light Signal

Index

Periodicity Schedule Code


Monthly CS1
Quarterly CS1
Half Yearly CS1,CS2
Yearly CS2

Schedule Code: CS1


Periodicity: Technician{Signal): Monthly,
Sectional SSE/JE{Signal): Quarterly, SSE{Signal}/ln charge: Half yearly
S.No. Check the following: Earlier Periodicity
(if changed)
1. Cleaning of LED lighting unit & current regulator/integrated LED, all terminations, Tech:- FN to M
housing, signal units & around signal post. (CS1)
SEC. SSE/JE:-
M to Q (CS1)
SSE/IC:-
Q to HY (CS1)
2. Measurement of input voltage & current with clamp type ammeter at input Tech:- Same as
terminals of current regulator/LED signal for all signal aspects and V/I reading shall earlier
be within specified range as below:
SEC. SSE/JE:-
(a) Main signal Voltage: 82.5 to137.5 V and Current: 112 to 154 mA M to Q (CS1)
SSE/IC:-
Q to HY (CS1)
(b) Calling on/ A/ AG Marker Voltage: 88 to 132 V and current: 120 to 165 mA.
(c) Route signal Voltage: 88 to 132 V and Current: 23.75 to 26.25 mA per LED.
(d) Shunt signal Voltage: 88 to 132 V and Current: 52.25 to 57.75 mA per LED.
3. Checking of tightness of all adjusting screws of LED signal unit as well as Tech:- Q to M
Current regulator/integrated LED. (CS1)
SEC. SSE/JE:-
Same as earlier
SSE/IC:-
Same as earlier
4. Ensure condition of signal post is satisfactory. Tech:- Q to M
(CS1)
SEC. SSE/JE:-
Same as earlier
SSE/IC:-
Same as earlier
5. Check condition of Signal foundation, ladder & ensure proper alignment of signal post. New schedule
implemented
Para No. 19.9.2(d)
Annexure: 19-MSl
Maintenance Schedule of Colour Light Signal

6. Ensure Signal unit condition, closing of door & locking arrangements are satisfactory. New schedule
implemented

7. Ensure Signal post & CLS unit should be earthed & screen earthing is effective. Tech:- NIL to M
(CS1)
SEC. SSE/JE:-
NIL to Q (CS1)
SSE/IC:-
Y to HY (CS1)
8. Complete signal unit should be cleaned for removing oxidation, rusting & New schedule
tightened properly. implemented

9. Ensure that there is no opening/access for rain water/rodent entry. Tech:- Q to M


(CS1)
SEC. SSE/JE:-
Q to M(CS1)
SSE/IC:-
No change (CS1)

10. Ensure the cable terminations in location box should be cleaned for removing New schedule
oxidation, rusting & tightened properly. implemented
11. Visual check of insulations of cables, PVC wires, proper termination without Tech:- Q to M
criss cross, condition of rubber gasket arrangement. (CS1)
SEC. SSE/JE:-
Q to M(CS1)
SSE/IC:-
No change (CS1)
12 (a) Check that where signals are Infringing with SOD, their Implantation distance Tech:- NIL to M
is marked on Red colour on white back ground. (CS1)
(b) Blanking off to be done as given in chapter 19 of SEM. SEC. SSE/JE:-
NIL to M (CS1)
(c) Right hand signals to be provided with an arrow mark pointing towards the
SSE/IC:-
relevant track. Y to HY (CS1)
Para No. 19.9.2(d)
Annexure: 19-MSl
Maintenance Schedule of Colour Light Signal

Schedule Code: CS2


Periodicity: Sectional SSE/JE: Half yearly
SSE (signal}/ lncharge : Yearly

S.No. Check the Earlier


following: Periodicity (if
changed)

1. Check infringement of Signal & all it's fitting with respect to schedule of dimensions Tech:- No
jointly with SSE/ P. WAY (infringement to be removed, if found). change (CS2)
SEC. SSE/JE:-
NIL to HY (CS2)
SSE/IC:-
No change
(CS2)
2. Test Route ECR- ensure that route ECR should be dropped if any 3 nos. of LEDs in the given New schedule
route supply is cut for all the routes. implemented

3. Test Shunt ECR - ensure that shunt ECR should be dropped if any one of Shunt LED does not lit. New schedule
implemented

4. Set jumper setting in current regulator as per ECR used & measure current with AC clamp New
meter. The range of current shall be within the limit as per ECR used. schedule
implement
ed
Para No. 19.9.2(d)
Annexure: 19-MSl
Maintenance Schedule of Colour Light Signal

5. Implantation distance from center line of nearest track along with an arrow indicating Tech:- No
towards nearest track should be painted on signal post in following colours. change (CS2)

SEC. SSE/JE:-
NIL to HY (CS2)
SSE/IC:-
No change
(CS2)
(a) Black on white background for normal implantation. Tech:- No
change (CS2)
SEC. SSE/JE:-
NIL to HY (CS2)
SSE/IC:-
No change
(CS2)
(b) Red on white background for implantation distance< 2.36 meters. Tech:- No
change (CS2)
SEC. SSE/JE:-
NIL to HY (CS2)
SSE/IC:-
No change
(CS2)
6 Ensure that Arrow Markers are provided on all RHS signals. New schedule
implemented

7 Painting of Signal post, unit, ladder & number plate are satisfactory. New schedule
implemented

Note: Whenever engineering Machine work is carried out, signal implantation shall be
measured prior/after to commencement/completion of work.