FABRICATION STATUS REPORT - PREFABRICATED STEEL TRUSS PEDESTRIAN BRIDGE

Wisconsin Department of Transportation


DT2335 12/2018

Complete, sign and submit this form to the corresponding structure folder in the SharePoint Fabrication Library
This form shall be submitted to the Fabrication Library on a weekly basis. Create additional lines as needed.

I certify to the best of my knowledge that the information below is correct.

X
(Fabricator’s QC Manager – E-Signature)

Last Updated mm/dd/yyyy


Project ID XXXX-XX-XX
Structure ID B-XX-XXXX
Fabricator Company Name
Job Number ####
QC Manager First Last Name

MATERIAL AT @ GALVANIZER OR
SHOP FLOOR CUTTING WELDING ASSEMBLY SURFACE PREPARATION PAINTER SHIPPED
Member
Description or
Date Date Date Date Date
Number Delivery Date Delivered Started/
Date
Started/
Date
Started/
Date
Started/
Date Date Date Date
Date Shipped
Designation Completed Completed Completed Completed Shipped Returned Anticipated
Anticipated mm/dd/yy Anticipated mm/dd/yy Anticipated mm/dd/yy Anticipated mm/dd/yy Anticipated mm/dd/yy mm/dd/yy mm/dd/yy mm/dd/yy mm/dd/yy
mm/dd/yy mm/dd/yy mm/dd/yy mm/dd/yy mm/dd/yy