DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF A SKIDDED 600#, 4 HEADER, 24 SLOTS SEGMENTED
INLET MANIFOLD AT EKULAMA 1 FLOWSTATION
DOCUMENT NUMBER
DATE: DATE:
Date_Today
Document
NWC NWC Comment FODE FODE
Current
Vendor
Document NewCross E&P FODE Rev Transmittal-Out Responsible Transmittal-In Transmittal-In Received
Discipline Document Title Rev Rev Date Transmittal-Out No Response Overdue Response Response Overdue
Type Document Number Document Number Status Date Person No Date Date
Due date days Code Due date days
GENERAL
GEN TS EKUF1-19001-FODE-GEN-TS-1000 19001-NWC-GEN-TS-1000 Document Procedure
DCC MDR EKUF1-19001-FODE-DCC-MDR-1000 19001-NWC-DCC-MDR-1000 Master Document Register R2 IFR 17-Aug-18 N 19001-FODE-NWC-TRE-0008 17-Aug-18 Omobola Dokun N E-Mail 23-Aug-18 23-Aug-18
DCC MDR EKUF1-19001-FODE-DCC-MDR-1000 19001-NWC-DCC-MDR-1000 Master Document Register R3 IFR 24-Aug-18 Y 19001-FODE-NWC-TRE-0011 24-Aug-18 Omobola Dokun N E-Mail 11-Sep-18 11-Sep-18
PROJECT MANAGEMENT
PM PLN EKUF1-19001-FODE-PM-PL-1000 19001-NWC-PM-PL-1000 Project Manangement Plan
PM LS EKUF1-19001-FODE-PM-LS-1000 19001-NWC-PM-LS-1000 Project Organizational Chart R1 IFR 20-Jul-18 N 19001-FODE-NWC-TRE-0002 20-Jul-18 FOSL Y E-Mail 24-Jul-18 24-Jul-18
PM LS EKUF1-19001-FODE-PM-LS-1000 19001-NWC-PM-LS-1000 Project Organizational Chart C1 AFC 8-Aug-18 Y 19001-FODE-NWC-TRE-0006 8-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18 Approved
PM PL EKUF1-19001-FODE-PM-PL-1001 19001-NWC-PM-PL-1001 Project Execution Plan R1 IFR 14-Aug-18 Y 19001-FODE-NWC-TRE-0007 16-Aug-18 FOSL Y
PM PL EKUF1-19001-FODE-PM-PL-1003 19001-NWC-PM-PL-1003 Community Relations Policy and Plan R1 IFR 20-Jul-18 N 19001-FODE-NWC-TRE-0002 20-Jul-18 FOSL Y E-Mail 24-Jul-18 24-Jul-18
PM PL EKUF1-19001-FODE-PM-PL-1003 19001-NWC-PM-PL-1003 Community Relations Policy and Plan C1 AFC 8-Aug-18 Y 19001-FODE-NWC-TRE-0006 8-Aug-18 FOSL Y
PM PL EKUF1-19001-FODE-PM-PLN-1005 19001-NWC-PM-PLN-1005 Water Transport Journey Management Plan R1 IFR 20-Jul-18 N 19001-FODE-NWC-TRE-0002 20-Jul-18 FOSL Y E-Mail 24-Jul-18 24-Jul-18
PM PL EKUF1-19001-FODE-PM-PLN-1005 19001-NWC-PM-PLN-1005 Water Transport Journey Management Plan C1 AFC 8-Aug-18 Y 19001-FODE-NWC-TRE-0006 8-Aug-18 FOSL Y
PM PR EKUF1-19001-FODE-PM-PR-1009 19001-NWC-PM-PR-1009 Decommissioning Dismantling the Existing Manifold & Commisioning new one procedure
PM RE EKUF1-19001-FODE-PM-RE-1018 19001-NWC-PM-RE-1018 Site Visit Report R1 IFR 18-Jul-18 N 19001-FODE-NWC-TRE-0003 3-Aug-18 FOSL Y E-Mail 3-Aug-18 3-Aug-18
PM RE EKUF1-19001-FODE-PM-RE-1018 19001-NWC-PM-RE-1018 Site Visit Report R2 IFR 6-Aug-18 Y 19001-FODE-NWC-TRE-0004 7-Aug-18 FOSL Y
HSE
HS PL EKUF1-19001-FODE-HSE-PL-1000 19001-NWC-HSE-PL-1000 HSE Plan R1 IFR 20-Jul-18 N 19001-FODE-NWC-TRE-0002 20-Jul-18 FOSL Y E-Mail 24-Jul-18 24-Jul-18
HS PL EKUF1-19001-FODE-HSE-PL-1001 19001-NWC-HSE-PL-1001 Job Hazard Analysis R1 IFR 8-Aug-18 Y 19001-FODE-NWC-TRE-0006 8-Aug-18 FOSL Y
HS PL EKUF1-19001-FODE-HS-PL-1002 19001-NWC-HS-PL-1002 Project Security Plan R1 IFR 20-Jul-18 N 19001-FODE-NWC-TRE-0002 20-Jul-18 FOSL Y E-Mail 24-Jul-18 24-Jul-18
HS PL EKUF1-19001-FODE-HS-PL-1002 19001-NWC-HS-PL-1002 Project Security Plan C1 AFC 8-Aug-18 Y 19001-FODE-NWC-TRE-0006 8-Aug-18 FOSL Y
HS PR EKUF1-19001-FODE-HS-PR-1019 19001-NWC-HS-PR-1019 Hazard Identification & Risk Assessment Procedure (HIRA) Manifold Installation
HS PR EKUF1-19001-FODE-HS-PR-1020 19001-NWC-HS-PR-1020 Hazard Identification & Risk Assessment Procedure (HIRA) Manifold Fabrication
HS PL EKUF1-19001-FODE-HS-PL-1002 19001-NWC-HS-PL-1002 Project Security Plan C1 AFC 8-Aug-18 Y 19001-FODE-NWC-TRE-0006 8-Aug-18 FOSL Y
Q PL EKUF1-19001-FODE-QA-PL-1000 19001-NWC-QA-PL-1000 QA/QC Plan C1 AFC 8-Aug-18 Y 19001-FODE-NWC-TRE-0006 8-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18 Approved
PLAN
PL DW EKUF1-19001-FODE-PI-DPP-1003 19001-NWC-PI-DPP-1000 3D Model of Inlet Manifold (Modified) R1 IFR 3-Aug-18 N 19001-FODE-NWC-TRE-0005 8-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
PL DW EKUF1-19001-FODE-PI-DPP-1003 19001-NWC-PI-DPP-1000 3D Model of Inlet Manifold (Modified) R2 IFR 17-Aug-18 Y 19001-FODE-NWC-TRE-0010 24-Aug-18 FOSL Y E-Mail 24-Aug-18 24-Aug-18
PL DW EKUF1-19001-FODE-PI-DPP-1003 19001-NWC-PI-DPP-1000 3D Model of Inlet Manifold (Modified) R3 IFR 27-Aug-18 Y 19001-FODE-NWC-TRE-0012 30-Aug-18 FOSL Y
STRUCTURAL
ST DW EKUF1-19001-FODE-ST-DRD-1002 19001-NWC-ST-DRD-1002 Manifold Skid Base Frame Design/Details
PIPING
PP TS EKUF1-19001-FODE-PP-TS-1000 19001-NWC-PL-SPC-1000 Technical Specifications for Piping, Valves, Material and Service Classification
PP TS EKUF1-19001-FODE-PP-TS-1002 19001-NWC-PP-SPC-1002 Technical Specification for Fabrication, Installation & Testing of Pipework
PP DW EKUF1-19001-FODE-PP-DGA-1004 19001-NWC-PP-PGA-1004 Piping General Arrangement Drawings (Update) R1 IFR 10-Aug-18 N 19001-FODE-NWC-TRE-0007 16-Aug-18 FOSL Y
PP DW EKUF1-19001-FODE-PP-DGA-1004 19001-NWC-PP-PGA-1004 Piping General Arrangement Drawings (Update) R2 IFR 24-Aug-18 Y 19001-FODE-NWC-TRE-0012 30-Aug-18 FOSL Y
PROCESS
P DW EKUF1-19001-FODE-PR-SYM-1000 19001-NWC-PR-SYM-1000 Drawing Symbols & Legend Sheets R1 IFR 3-Aug-18 Y 19001-FODE-NWC-TRE-0005 8-Aug-18 FOSL Y
P DOC EKUF1-19001-FODE-PP-REP-1004 19001-NWC-PP-REP-1004 Header and Slots Sizes Validation and Report
P DW EKUF1-19001-FODE-PR-PEFS-1001-01 19001-NWC-PR-PEFS-1001-01 Process Engineering Flow Scheme (Asbuilt) - EkuF1 Inlet Manifold Skid 1 R1 IFR 3-Aug-18 N 19001-FODE-NWC-TRE-0005 8-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
P DW EKUF1-19001-FODE-PR-PEFS-1001-01 19001-NWC-PR-PEFS-1001-01 Process Engineering Flow Scheme (Asbuilt) - EkuF1 Inlet Manifold Skid 1 R2 IFR 14-Aug-18 N 19001-FODE-NWC-TRE-0007 16-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
P DW EKUF1-19001-FODE-PR-PEFS-1001-01 19001-NWC-PR-PEFS-1001-01 Process Engineering Flow Scheme (Asbuilt) - EkuF1 Inlet Manifold Skid 1 R3 IFR 27-Aug-18 N 19001-FODE-NWC-TRE-0012 30-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
P DW EKUF1-19001-FODE-PR-PEFS-1001-01 19001-NWC-PR-PEFS-1001-01 Process Engineering Flow Scheme (Asbuilt) - EkuF1 Inlet Manifold Skid 1 (R4) R3 IFR 4-Sep-18 Y 19001-FODE-NWC-TRE-0013 6-Sep-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
P DW EKUF1-19001-FODE-PR-PEFS-1001-01 19001-NWC-PR-PEFS-1001-01 Process Engineering Flow Scheme (Existing) - EkuF1 Inlet Manifold Skid 1
P DW EKUF1-19001-FODE-PR-PEFS-1001-02 19001-NWC-PR-PEFS-1001-02 Process Engineering Flow Scheme (Existing) - EkuF1 Inlet Manifold Skid 2
P DW EKUF1-19001-FODE-PR-PEFS-1002-03 19001-NWC-PR-PEFS-1001-03 Process Engineering Flow Scheme (Existing) - EkuF1 Inlet Manifold Skid 3
P DW EKUF1-19001-FODE-PR-PEFS-1003-04 19001-NWC-PR-PEFS-1001-04 Process Engineering Flow Scheme (Existing) - EkuF1 Inlet Manifold Skid 4
P DW EKUF1-19001-FODE-PR-PEFS-1002-01 19001-NWC-PR-PEFS-1002-01 Process Engineering Flow Scheme Upgrade for Construction - EkuF1 Inlet Manifold Skid 1 R1 IFR 3-Aug-18 N 19001-FODE-NWC-TRE-0005 8-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
P DW EKUF1-19001-FODE-PR-PEFS-1002-01 19001-NWC-PR-PEFS-1002-01 Process Engineering Flow Scheme Upgrade for Construction - EkuF1 Inlet Manifold Skid 1 R2 IFR 14-Aug-18 N 19001-FODE-NWC-TRE-0007 16-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
P DW EKUF1-19001-FODE-PR-PEFS-1002-01 19001-NWC-PR-PEFS-1002-01 Process Engineering Flow Scheme Upgrade for Construction - EkuF1 Inlet Manifold Skid 1 R3 IFR 27-Aug-18 N 19001-FODE-NWC-TRE-0012 30-Aug-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
P DW EKUF1-19001-FODE-PR-PEFS-1002-01 19001-NWC-PR-PEFS-1002-01 Process Engineering Flow Scheme Upgrade for Construction - EkuF1 Inlet Manifold Skid (R4) R3 IFR 4-Sep-18 Y 19001-FODE-NWC-TRE-0013 6-Sep-18 FOSL Y E-Mail 10-Aug-18 10-Aug-18
P DW EKUF1-19001-FODE-PR-PEFS-1002-01 19001-NWC-PR-PEFS-1002-01 Process Engineering Flow Scheme Upgrade for Construction - EkuF1 Inlet Manifold Skid 1
P DW EKUF1-19001-FODE-PR-PEFS-1002-02 19001-NWC-PR-PEFS-1002-02 Process Engineering Flow Scheme Upgrade for Construction - EkuF1 Inlet Manifold Skid 2
P DW EKUF1-19001-FODE-PR-PEFS-1002-03 19001-NWC-PR-PEFS-1002-03 Process Engineering Flow Scheme Upgrade for Construction - EkuF1 Inlet Manifold Skid 3
P DW EKUF1-19001-FODE-PR-PEFS-1002-04 19001-NWC-PR-PEFS-1002-04 Process Engineering Flow Scheme Upgrade for Construction - EkuF1 Inlet Manifold Skid 4
INSTRUMENT
I LS EKUF1-19001-FODE-PI-MTO-1001 19001-NWC-PI-MTO-1001 Instrument MTO
Construction
CT DW EKUF1-19001-FODE-PI-MTO-1000 19001-NWC-PI-MTO-1000 Preliminary BOQ for Constructions
Corrosion Prevetion
Commissioning
N/A N/A Newcross EP kick-off Meeting with FODE and FOSL 19001-FODE-NWC-TRE-0001 19-Jul-18 Mensah Blankson
N/A N/A Newcross EP Scope of work (SOW) and Technical Meeting with FODEand FOSL 19001-FODE-NWC-TRE-0001 19-Jul-18 Mensah Blankson
MECHANICAL
MECH EKUF1-19001-FODE-ST-DRD-1004 19001-NWC-ST-DRD-1005 Mechanical Engineering Design R1 IFR 14-Aug-18 Y 19001-FODE-NWC-TRE-0007 16-Aug-18 FOSL Y
0
Status