Elevator Installation Instruction Manual (Supplementary sheet) 

KLK1/KLK1-I (Silver Swallow/Swift Swallow) 


Series Passenger Elevators 
Accompanying Document 
(Installation Schematic Diagrams for Main Parts) 
Version No.: V1.1 

Canny Elevator Co., Ltd. 


March, 2013 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 

Preface 
This  supplementary  sheet  is  the  instruction  manual  for  the  selected 
elevator  parts  installation  and  elevator  hoistway  equipments  layout  as  well 
as  the  special  technical  requirements  for  treatment.  Elevator  erectors, 
therefore,  must  carry  out  the  installation  work  in  accordance  with  this 
sheet’s  requirements;  in  addition  to  that  the  elevator  installation  instruction 
manual has been carefully read by the erectors, prior to the installation. 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 

Table of Contents 
1. Elevator Structure...................................................................... 1 
2. Schematic diagram of driving system ..................................... 2 
3. Schematic diagram of Rope Winding Method .......................... 4 
4. Layout of Equipments inside the Hoistway ............................... 5 
5. Testing and Adjustment on Tension Balance of Traction steel wire rope 
................................................................................................... 6 
6. Installation of Guide Rails ......................................................... 8 
7. Schematic Diagram of Car System ........................................... 15 
8. Schematic Diagram of Car Frame Structure ............................. 17 
9. Structural Schematic Diagrams of Car Platform, Car Roof, Car 
Enclosure and Car Roof Guardrail ............................................ 18 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
10. Landing Door System ............................................................ 22 
11. Ultimate Limit Device ............................................................. 25 
12. Buffer Installation ................................................................... 25 
13. Counterweight System .......................................................... 26 
14. Installation and Fixation of Hoistway Traveling Cable ......... 27 
15. Installation of safety gear and Governor ............................. 29 
16. Structural Schematic Diagram of Compensation Device .... 32 
Canny Elevator Co., Ltd. 
 
Elevator Structure 
Control cabinet 
Notes: 1. The installation positions of main elevator parts are as shown in the following 
diagrams; 
2. Any site assembly in case of a special condition can be carried out only after the 
confirmation of our related personnel. 
Traction machine 
Traction machine 
Machine bearing 
rack beam 
Governor Steel wire 
rope 
car 
Car door component 
Counterweight guide rail support 
Landing door 
Counterweight device 
guide rail 
Counterweight Leveling 
frame 
device 
Car guide rail 
Traveling cable 
Car guide rail support 
Pit protection 
Hoistway ladder 
device 
Tensioning device 
Buffer 
Guide rail base 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
Traction machine 
Traction machine hood 
Machine rack 
Damping pad 
Machine bearing beam 
Guiding pulley device 

Schematic diagram of driving system (I) 


Notes: This driving system is applicable to the counterweight rear-mounted passenger elevators 
with the load capacity of 450~1,050KG, the speed ≤1.75m/s and lifting height ≤80m 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Schematic diagram of driving system (II) 
Notes: 1. Pa is applicable to the counterweight rear-mounted passenger elevators with 
the load capacity of 630~1,150KG and the speed ≤2.0m/s 
2. Pb is applicable to the counterweight rear-mounted passenger elevators with 
the load capacity of 1,250~1,600KG and the speed of 2.5m/s 
3The driving structure of the counterweight side-mounted passenger elevators is 
basically same to this diagram, but with the changes to the related dimensions; 
The layout of machine room shall be rotated 90° clockwise if counterweight 
right-mounted, and shall be symmetrical to the right side if counterweight 
left-mounted. 
Canny Elevator Co., Ltd. 
Traction machine 
Traction machine hood 
Machine rack 
Damping pad 
Machine bearing beam 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Traction machine 
Traction rack 
machine 
Machine bearing beam 
Machine RM floor 
Guiding pulley 
Traction wire rope 
steel 
Car 
Car guide rail 
Counterweight guide rail 
Counterweight 
Counterweight buffer 

Canny Elevator Co., Ltd. 


Traction sheave Guiding pulley 
Counterweight rope hitch plate 
Car rope hitch plate 
Car buffer 
Pit bottom 
Car 
Counterweight 

Schematic diagram of Rope Winding Method 


Notes: 1. Pa is applicable to the counterweight rear-mounted passenger elevators with 
the load capacity of 450~1,050KG, the speed ≤1.75m/s and lifting height ≤80m, 
as well as small-tonnage counterweight side-mounted passenger elevators. 
2. Pb is applicable to the counterweight rear-mounted passenger elevators with 
the load capacity of 630~1,150KG and the lifting height>80m as well as 
those with the load capacity of 1,250~1,600KG. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
A B 
C D Notes: a hoistway equipment layout type shall be selected from Method A, B, C 
and D according to the structure of driving system and position of calling board. Code 
Description: 
1.Governor Steel Wire Rope 2. Fixing Rack of Traveling Cable 3.Fixing Rack of Hoistway Cable 
4.Leveling Device 5. Ultimate Limit Device 
Counterweight Rear-mounted Hoistway Equipment Layout 
A B Notes: a hoistway equipment layout shall be selected from Method A and B according to the 
positions of calling board and counterweight 
Code Description:: 
1.Governor steel wire rope 2.Leveling Device 3. Ultimate Limit Device 
4.Fixing Rack of Traveling Cable 5.Fixing Rack of Hoistway Cable 
Counterweight Side-Mounted Hoistway Equipment Layout 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Detection and Adjustment of tension equalization of traction steel 
wire rope 
The uneven tension of traction steel wire rope will cause car shake and wear the 
traction wheel, therefore, it is necessary to conduct tension testing after hanging the 
traction steel wire rope. After the elevator is put into use, regular testing on the tension 
of traction steel wire rope is also required. GB 10060-93 Code for acceptance of 
elevators installation, Article 4.3.3 specifies that the “the deviation between the tension 
and the average value should not exceed 5%”. 
Testing of tension of traction steel wire rope is made by “equidistant tension force” 
method. The measurement tools include one 200N standard dynamometer, one 
300mm steel ruler or one 1 m box ruler. 
1.Testing of the tension of traction steel wire rope of the 
counter-weight side 
1)Move the car to about 1/2 of the whole journey and open one landing door on 
the car with an emergency triangle key, press down the red emergency stop switch on 
the top to access to the top of the car. 
2)Number the traction steel wire rope in sequences, such as A, B, C, D, E, etc. to 
record the data. 
3)Measure the force of each wire rope under the equidistant state with a 200N 
dynamometer; for example: pull the traction steel wire rope A away from the original 
place for 150mm along the horizontal direction, record the force 120N on the 
dynamometer; pull the traction steel wire rope B away from the original place for 
150mm along the horizontal direction with the force 125N; similarly, measure the 
traction steel wire ropes C, D, E,F with the forces respectively 132N, 135N, 135N, 
133N, and make a record. The rope force measurement point should be on the same 
level. Each tensioned point of the ropes when measurement should be at the same 
level. 
4)Calculate the average value of traction force 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
After measuring the equidistant tension of traction steel wire ropes, 
calculate the tensioned average value of the steel wire ropes with the 
following formula: 

=
FFFFFF 

+++++
B C D n 

s E F Where: 
F K 

-The average tension of the traction steel wire 


ropes(N); 
F A 


F E 

-The equidistant tension of the traction steel wire ropes(N); 


n s 

-Number of the traction steel wire ropes to be measured. 


In this case, the number of measured elevator traction steel wire ropes is 6, 
then 

=
120 
+++++ 125 132 135 135 6 
Canny Elevator Co., Ltd. 
133 = 
130 
5) Deviation of the tension of the traction steel wire ropes 
That the average value is subtracted from its equidistant tension should 
equal the deviation of the tension of each rope. 
FFT 

−=−=−= A K 120 130 10 N FFT 


−=−=−= B K 125 130 5 N FFT 


=−=−= C K 132 2130 N FFT 


=−=−= D K 135 5130 N FFT 


=−=−= E K 135 5130 N FFT 


=−=−= F K 133 3130 N 6) Percentage of the deviation between the tension 


and average value of each 
traction wire rope 
A == T F 

− 130 10 
−=
%7.7 

==
T F 

130 


−=
%8.3 
C ===
T F 

2 130 
%5.1 

===
T F 

5 130 
%8.3 
1-Traction steel wire rope 
2-Dynamometer 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
E ===

K E 

5 F 
130 
%8.3 

===

Canny Elevator Co., Ltd. 


3 F 
130 
%3.2 
2.Adjustment of the tension of the traction steel wire rope 
Adjust the tension of the traction wire rope that exceeds the standard according to 
the calculated tension percentage (adjust the nuts on the taper sleeve of the wire 
ropes to allow the force of the traction wire rope to be balanced). Fix the taper sleeve 
when adjusting to prevent the rotation of the traction wire ropes. 
To meet the satisfactory results, it is required to adjust the tension of the traction 
wire rope for several times. Since when releasing or tightening the taper sleeve bolts, 
the traction wire rope cannot be changed in pace, and it is required to repeat for 
several times to adjust the tension on the traction wire rope uniform. 
 
Installation of Guide Rails 
The running speed, stability and noise level of the elevator are directly affected by 
the fabrication precision and installation quality of the guide rails. In regard to the 
installation, it is required that the guide rails shall be upright and vertical and two guide 
rails shall be parallel, and the connections shall be treated smooth etc. Therefore, 
during the elevator installation, the erection of the guide rails shall be handled 
carefully. 
The following attentions shall be paid during the installation of guide rails: 
(1) The connections of the two lines of guide rails for the car shall not be at 
the same level (see to the diagram); 
(2) When the elevator bumps into the top and sits on the bottom, every 
guide shoe shall not exceed the guide rails; 
(3) The working surface of the guide rails shall be free from any scratch, 
burr or bend and the straightness of each guide rail shall have an error 
not more than 1/6000 of its length; the deviation of a single guide rail 
with the installation datum at an interval of 5m shall not be above the 
following values: 
10.6mm for the car guide rails and the counterweight guide rails 
installed with the counterweight safety gear; 
21.0mm for the counterweight guide rails without safety gear; 
1-Connection Plate 2-Connection 
3-Bottom Guide Rail 4-Guide Rail Base 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
 
▲Guide Rail Support 
The guide rail supports are the supporting pieces for the guide rails. It is required 
that at least two sets of guide rail supports shall be minimally installed for each guide 
rail. But for the guide rail on the most top section, when the length of guide rail is below 
800mm, only one set of guide rail supports shall be required for fixing. The distance 
between the guide rail supports shall not exceed 2,500mm. 
1. Car Guide Rail Support 
The car guide rail supports include two types – angle steel and folded steel sheet, 
separately as shown in the diagrams. 
(1) Fix the supporting angle steels with the steel expansion bolts (fixing 
support); 
(2) Cut the length of the support feet according to the actual dimension on site; 
(3) Connect the supporting plate and the supporting feet (fixing support and 
adjustable support) by the bolts; 
(4) Weld the supporting feet and supporting angle steels on site; 
(5) Fix the guide rail and guide rail supports through the rail clips; 
(6) Firmly weld the reinforcement angle steel (if any) with the supporting feet 
and supporting angle steels. 
2. Counterweight Guide Rail Support 
The counterweight guide rail supports also include two types – angle steel and 
folded steel sheet, separately as shown in the diagrams. 
(1) Fix the supporting angle steels with the steel expansion bolts (fixing 
support); 
(2) Cut the length of the support feet according to the actual dimension on site; 
(3) Connect the supporting plate and the supporting feet (fixing support and 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
 
adjustable support) by the bolts; 
(4) Weld the supporting feet and supporting angle steels on site; 
(5) Fix the guide rail and guide rail supports through the rail clips; 
(6) Firmly weld the reinforcement angle steel (if any) with the supporting feet 
and supporting angle steels. 
Note: there is no reinforcement angle steel when L1 is ≤550 
Elevator Installation Instruction Manual (Supplementary sheet) 
Counterweight guide rail distance 
Supporting feet 
Supporting angle steels 

Canny Elevator Co., Ltd. 


Reinforcement angle steels 
 
The unevenness a of the guide rail support shall not exceed 1.5% regardless of any 
type or length (see to the following diagram). 
A – For Car, B – For Counterweight; 1 – Guide Rail, 2- Horizontal Line; 3 – Guide Rail Support 
▲Installation Step for Guide Rails 
1. Clean the articles in the pit that blocks the move-in and lifting of guide rails; 
2. Wash the guide rail joints and the connecting surfaces of the guide rail 
connection plates with the metal cleanser (apply one coat of oil film to prevent 
rusting after being washed by the metal cleanser), and then move the guide 
rails into the hoistway and put them on the wooden boards (note that all 
tongues or grooves of the guide rails shall be in the same direction); 
3. Block up the bottom of 1st set of guide rails about 150mm with the wood blocks 
A B 
Elevator Installation Instruction Manual (Supplementary sheet) 
Counterweight guide rail distance 

Canny Elevator Co., Ltd. 


 
or bricks, 50mm of which will be taken away during the unloading and guide 
rail alignment, and the remaining 100mm of which will be used for the 
installation work of the guide rail base; 
4. Fix the guide rails on the wood blocks that are blocked up as described above 
with the guide rail supports; 
5. Lift the guide rails one by one through the bolt holes on the connection plates 
from the bottom to the up by the hoister or manpower, as shown in the 
diagram; 
6. After the connection components are wiped clean with the cotton yarns, 
connect the tongues and grooves of the upper and lower guide rails together 
separately. Install the fixing bolts for the guide rails and guide rail connection 
plates and turn them tight till the spring washers are slightly compressed; 
fasten them till the alignment of the guide rails; 
7. Fix the guide rails on the guide rail supports tightly with the combination rail 
clips; 
8. Cut the most upper guide rails according to the actually measured dimensions 
to keep the guide rail top 50~100mm away from the machine room floor slab 
bottom, and then fix them on the guide rail support, as shown in the diagram; 
Elevator Installation Instruction Manual (Supplementary sheet) 
connection Guide plate 
rail 
Upper rail 
Guide 
Lower Guide Rail 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Machine room floor 
Guide rail support 
The most top guide rail 

▲Alignment of Guide Rails 


a) The method of calibrating the guide rail by unloading is applied for the 
alignment of guide rail, with the detailed method as follows: 
(a)Start the alignment from the lowest guide rail; 
(b)Tighten the rail clips for the 2nd and above guide rails while calibrating the 1st 
guide rail. Knock the partial wooden blocks (50mm) under the 1st guide rail 
off by the hand hammer, and loosen the connecting bolts for the 1st and 2nd 
guide rails to lower down the 1st guide rail in order to separate the tongue 
and groove at the connection of the guide rails; 
(c)Lower down the 2nd guide rail to align it after the 1st guide rail is aligned; 
(d)Lower down the guide rails by turn from bottom to top for alignment. 
b) The aligned position of the guide rail shall be the connection of the guide rails 
and the guide rail supports. 
c) Align the distance between the guide rails with the guide rail calibrator. 
The standard value of the guide rail distance: RG 
0+

mm for main guide rail, 


RG 
0+

mm for assistant guide rail (RG is the standard rail distance) 


d) When the poor verticality of the support affects the verticalness of the guide 
rail, the guide rail spacers shall be used for adjustment. 
e) Verify that the partial gap a at the connection of the guide rails shall not 
exceed 0.5mm, as shown in the following diagram 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Slicking lengths (A)mm Connection step (D)mm 
Car guide rail 
Counterweight guide rail 
≤0.05 ≥150 ≥150 

f) As shown in the following diagram (left), verify if there is any connection step 
at the connection of the guide rails. When the connection step is above that 
required in Table Q, the guide rail planer shall be used for planning and 
slicking. Please refer to the following diagram for the alignment of slicking 
lengths (right); 
g) For the unevenness of the plane at the connection of the guide rails, a 500mm 
steel ruler can be used against the guide rail surface to check the positions a, 
b, c and d with a feeler. The unevenness shall not exceed those specified in 
the following table (see the following diagram). 
Unevenness of the plane at the connection of the guide rails 
Connection of 
Guide Rails 
a b c d 
Shall not exceed 
(mm) 
0.05 0.15 0.15 0.05 
Canny Elevator Co., Ltd. 
 
Unevenness at Connection of Guide Rails 
A – Working Surface at Guide Rail Side, B – End Surface of Guide Rail, 
1- Guide Rail, 2 – 500mm Steel Rulers 
(1)a and b gap correction: it can be adjusted by the special tool after the bolts of 
the connection plates are completely tightened; 
(2)c and d gap correction: it can be adjusted by inserting 0.1mm thick spacers at 
the position marked with “x” in Diagram B. 
▲Specification for Application of Steel Expansion Bolts: 
A、The steel expansion bolts are only applicable to the cement members with the 
cement strength no less than 180kg/cm2 instead of brick structural members. 
B、The cement wall thickness shall not be below 120mm; 
C、Please refer to the following diagram for the requirements for the distance 
between bolt and cement edge as well as the distance between the bolts; 
Bolt Position and Size Diagram 
Bolt 
Specification 
Distance between Bolt 
and Cement Edge 
Distance between 
Two Bolts 
M12 No less than 100mm No less than 100mm 
M16 No less than 120mm No less than 120mm 
Elevator Installation Instruction Manual (Supplementary sheet) 


M12 above 100 M12 above 100 
M16 above 120 M16 above 120 

Canny Elevator Co., Ltd. 


 
Elevator Installation Instruction Manual (Supplementary sheet) 
Construction Steps: 
1、 Remove the collected dust and uneven positions on the working surface with the 
iron chisel to ensure the good contact between the fastening structural members 
and cement working surface. 
2、 Drill the holes vertical to the cement working surface according to the 
requirements in the following table. The drill hole depth shall be controlled by 
adjusting the distance between the scale bar end on the impact drill and the drill bit 
end; 
Bolt 
Specification 
Drill Hole Diameter Drill Hole Depth 
M12 18mm 65±2mm 
M16 22mm 75±2mm 
3、 Clean the cement dust in the drilled hole with the bamboo branch or small wood 
stick; 
4、 Put the screw rod together with the sleeve into the hole; 
5、 Use the special bolt sleeve hitting tool till the red marker line on the special sleeve 
is flush with the cement surface (the sleeve is sunk into the cement surface with a 
depth of 10mm); 
6、 Fasten M16 bolts by 24# wrench with its arm length no less than 240mm and 
applied force of 40~57kg; fasten M12 bolts by 19# wrench with its arm length no 
less than 190mm and applied force of 20~29kg. The two points on the big washer 
of the expansion bolt shall be welded to the fastening member after being 
tightened, as shown in the diagram. 
Fastening member 
Spot welding on the two points 

Canny Elevator Co., Ltd. 


 
Car roof Guardrail 
Car Frame 
Car Enclosure 
Car platform components 
Limit collision bow 
Car roof Maintenance Box 
Car Magnetic Induction Rack 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
Car roof 
VF Door operator 
Car door 
Schematic Diagram of Car System 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Car guide rail 
Car roof guardrail 
Car roof 
VF door operator 
Car enclosure 
Car door 
Car platform 
Safety gear device 
Guide rail distance DBG 

Schematic Diagram 1 of Car System Installation 


Car Guide Rail 
Car roof Guardrail 
Car roof 
VF door Operator 
Car enclosure 
Car door 
Car platform 
Safety gear device 
Guide rail distance DBG 

Schematic Diagram 2 of Car System Installation 


Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
Car roof sheave Upper beam 
assembly assembly 
Upright beam assembly 
Stay screw rod assembly 
Lower beam assembly 
A B 
Schematic Diagram of Car Frame Structure 
Note: A and B indicate two different structural types of car frames respectively 
 
▲Car Platform Assembly 
The car platform assembly consists of car platform, car bracket, sill assembly, 
skirting board, counterweight block and PVC (marble) floorboard. 
Skirting board PVC (Marble) Floor Board 
Counterweight block 

Sill assembly 
Car bracket 
Schematic Diagram of Wide Car Platform Structure 
Schematic Diagram of Deep Car Platform Structure 
Floorboard Splicing: 
1. When the floorboard is PVC (3mm thick) material, PVC floorboards shall be 
installed first and the skirting board shall be spliced. PVC floorboards shall be 
installed beside the inner side of the skirting board; 
2. When the floorboard is marble (20mm thick) material, the skirting board shall 
be spliced first and the marbles shall be installed. The marble area shall be the 
clear area of the car platform surface. The marbles shall be installed closely 
Car platform 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
 
against the skirting board; 
3. Attention shall be paid to the splicing of the floorboards at the entrance. 
▲Car Roof Assembly 
A B 
Schematic Diagram of Car Roof Structure 
Note: A is for normal car roof structure; B is for integrated Car roof structure 
Caution: 
Adjust the rubber pad on the alignment rack. It shall be in gentle contact with the upright 
beams of the car frame in the front, rear, left and right directions. Adjustment method: to be 
adjusted through the long waist-shaped hole in the following figure. 
Car roof 
Upright beam 
Alignment rack 
Long waist-shaped hole 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
 
▲Car Enclosure 
1 2 



6 7 
A B 
C D Notes: 1. Single-side single-face drilled car wall 2. Double-side drilled car wall, 3. Front car 
wall, 
4. Door header, 5. Right upright column ,6. Integrated operation panel wall, 7. Upright column, 
8. Left upright column, 9. Embedded operation panel wall 
Schematic Diagram of Car Enclosure Structure 
Note: A and B are the schematic diagrams of wide car structure, C and D are the schematic 
diagrams of the deep car structure 
The car enclosure normally consists of single-side single-face drilled car wall, 
double-side drilled car wall, front car wall, operation panel wall, door header and 
upright column etc. 
1. The operation panel wall includes integrated type (left figure) and embedded 
type (right figure) according to the different types of operation panels; 


Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
 
2. 1.5mm thick steel sheets are used for the double-side drilled and single-side 
single-face drilled car walls. The car walls are connected by the bolts. 
As shown in the above figures, the car enclosure and platform are connected by 
the skirting boards and the rivet nuts are embedded on both ends of the car walls. 
5mm gap will be reserved when the car wall and skirting boards are connected to 
achieve a good ventilation effect. 
3. The door headers have two structures – normal straight wall header and slant 
header. The former is as shown in the figure with a simple grand design and easy 
fabrication to provide the elevator with a simple, elegant and grand profile. 
Single-side single-face drilled car wall 
Double-side drilled car wall 
Car wall 
Skirting board 

Elevator Installation Instruction Manual (Supplementary sheet) 


Canny Elevator Co., Ltd. 
Rivet nut Reinforce ment bar 
Car wall Panel 
 
▲Car Roof Guardrail 
The car roof guardrails are connected by angle steels with the left and right fixed 
to the upper beam separately by 4 bolts. Every angle steel is reserved with multiple 
holes in order to provide the guardrails applicable to different loads. 
Schematic Diagram of Car Roof Guardrail Structure 
▲ Landing Door System 
1. Small Door Pocket 
Schematic Diagram of Small Door Pocket 
2. Landing Doors 
The landing doors are the closed doors arranged at the entrance of the landing 
station, driven by the door operator and linearly transmitted by gearless with low noise 
level and failure rate, safe and reliable. It has a heavy-duty structure, compact, stable 
and reasonable, and is an ideal landing door system. 
Hoistway wall 
Steel expansion bolt 

Elevator Installation Instruction Manual (Supplementary sheet) 


Canny Elevator Co., Ltd. 
Cross beam 
Left upright column Right upright column 
Fixing rack 
 
3. Sill Device of Landing Door 
Sill 
Sill fixing device 
Toe guard 
Schematic Diagram of Landing Door Sill Device Structure 
4. Door Operator 
The intelligent door operator system measures the weight of the landing doors at 
each floor, measures the real-time door opening and closing resistance, and 
automatically adjust the door opening and closing speed and torque to ensure a stable 
door opening and closing performance as well as the reliable running of the elevator. 
Installation of Door Operator: 
Put the door operator and car 
door guide rails on the Car roof, 
align them to the centerline of the 
entrance vertically and ensure the 
guide rail level. 
Technical Requirements: 
· The mechanical action of the automatic doors shall be flexible and reliable. 
· If the automatic door mechanism is in the closing operation when selecting the 
safety edge, the safety edge shall order the door in the closing operation to stop 
immediately when it touches any external resistance, and immediately enable the 
doors to run in the door opening direction. 
· When the automatic door mechanism is in the door opening and closing movement, 
there shall not be obvious knocking sound when turning on or off the door lock. 5 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
 
Landing door 
Landing door sill 

Elevator Installation Instruction Manual (Supplementary sheet) 


travel switches on the arc switch rack shall be adjusted to the appropriate position 
and fixed during the installation and commissioning. Grade I deceleration shall be 
used for door opening and Grade II deceleration shall be used for door closing. 
The movable knife blades shall be used in combination with the automatic door 
lock, and the knife blade device shall be installed on the left upper corner of the left 
car door. 
Car door 
Landing door 
Car door 
Car door sill 
Landing door 
Car door sill 
sill 

A B 
Sketch of Horizontal Distance between Car Doors and Landing Doors 
Notes: Figure A is applicable to center opening series door operators of Ningbo Shenling 
TKP131-06 Figure B is applicable to side opening VF door operators of Ningbo Shenling 
THP131-52 
Connection support 
Outer end of car door sill 

Schematic Diagram of Light 


Centerline of entrance and exit Curtain Installation 

Schematic Diagram of Safety Edge Installation 


Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
▲Ultimate Limit Device 
This device consists of two parts - deceleration switch and ultimate limit switch. 
1、The limit collision bow rack is installed on the upright beam and runs along with 
the car up and down; 
2、The limit collision bow rack has used the double connection rack structure in 
order to have sufficient strength. 
Ultimate 
Limit 
Deceleration 2 
Direction A 
Upright column Deceleration 1 
Limit collision bow rack 
Travel switch rack 

Schematic Diagram of Ultimate Limit Device Structure 


▲Buffer Installation 
The buffer is normally installed on the buffer seat in the pit. If the pit is an 
accessible space for people, the counterweight buffer bracket shall be extended to the 
solid ground in the pit if the counterweight is not provided with safety gear. 
The piston verticality of the oil pressure buffer shall not exceed 0.5%. The 
deviation of the buffer center with the corresponding collision plate center of the car 
and counterweight shall not exceed 20mm. The top height difference of two buffers 
installed on the same foundation shall not exceed 2mm. 
Canny Elevator Co., Ltd. 
 
Buffer 
Buffer Seat 
Elevator Installation Instruction Manual (Supplementary sheet) 
Schematic Diagram of Buffer 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Schematic Diagram of Counterweight System Structure 
Canny Elevator Co., Ltd. 
Steel wire rope 
Pit plane 
Counterweight guide rail distance WG 
Pit plane line 
Counterweig ht device 
Pit protection device 
 
▲Installation of Counterweight Blocks: 
Front and rear beams 
Counterweight block 

Schematic Diagram of Counterweight Block Installation Cast Iron type Counterweight Block 
1. Assemble the installation plates, stoppers and studs properly and put them inside 
the rear beam sheet. Adjust the position and dimension properly; 
2. Put the counterweight blocks inside the rear beam. Fix and fasten them tightly 
through the studs; 
3. Tighten the rear beam sheet and installation plate through M16 bolts finally. 
▲ Installation and Fixing of Hoistway Traveling cable: 
The traveling cable shall be fixed to the guide rails through the traveling cable 
fixing support. 
Caution: 
1. The traveling cable shall not be knotted or curved, and shall not scratch or touch the 
hoistway and car articles during the running 
2. The cables shall not touch the pit ground and car bottom frame after the car has 
compressed the buffers 
If  there  is  a  pit  maintenance  platform, its distance with the bottom surface of the pit maintenance platform 
shall be ≥150mm; if there is not, its distance with the buffer base shall be ≥50mm 

Elevator Installation Instruction Manual (Supplementary sheet) 


Car 
Traveling cable 
Suspending diameter of traveling cable 700±50 
Buffer 
Buffer seat 
Pit ground 
Canny Elevator Co., Ltd. 
 
3. When the video cable is provided, the video cable shall be laid parallel beside the 
traveling cable and bound properly. The distance between every two binders in the 
upper part of the hoistway shall not exceed 3,000mm. As the video cables in the 
middle and lower part of the hoistway shall move together with the traveling cable, 
the distance between every two binders shall not exceed 500mm, as shown in the 
following figure. 
Traveling Cable 
Fixing Car Rack Platform of 
Cable 
Binder 
Video Cable 

Schematic Diagram of Traveling cable (including Video Cable) Fixing 


Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
▲Installation of Safety gear 
Installation Precautions: 
(1) The nameplate of safety gear is marked: - guide rail width, - if allowed quality 
matches the installed elevator. 
(2) If the lead seals on the safety gear are intact. The safety gear has been adjusted 
when they leave the factory and shall not be changed without approval. 
(3) Fasten the safety gear with the lower beam by the bolts, and install and tighten the 
pull rod for the safety gear installed on the upright beam. Install the switch of the 
safety gear properly. Adjust the symmetrical action on both sides identical and 
switching action of safety gear reliable to enable it to disconnect the control circuit 
instantly when the safety gear device acts and then screw the pull rod that drives 
the wedges into the wedges till they are tightened. 
(4) Carry out the final inspection and adjustment. 
Type approval test: after the traction rope is dragged broken, when the car 
descending speed exceeds the action speed of the governor, the safety gear shall 
be able to grip the car with the load 125% above the rated load on the guide rails. 
Meanwhile, the safety gear on both sides of the car shall take action 
simultaneously with the uniform action force on both sides to enable the switch of 
safety gear to disconnect the power supply first before the safety gear activates its 
stop function. 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Canny Elevator Co., Ltd. 
Lifting device 
Linkage device 
AQ10 Safety gear 
Guide rail distance DBG 

Schematic Diagram of Safety gear Assembling (AQ10 Safety gear) 


 
Elevator Installation Instruction Manual (Supplementary sheet) 
Fine adjusting tube 
Safety gear 
Guide shoe 
Right position of control rod 
Guide rail top distance 1280-1800 
Left position of control rod 
Schematic Diagram of Safety gear Assembling (AQZIII) 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
▲ Governor 
(1) When the car speed exceeds the 
specified action speed of the 
governor, the governor will activate 
the braking action immediately; 
(2) During the installation of governor 
sheave, its deviation with the 
vertical line shall not exceed 0.5mm; 
the deviations of the governor steel 
wire rope with the guiding surface 
and top surface of the guide rails 
shall neither exceed 10mm; 
(3) The governor shall run stably. Its 
seal on the action speed setting 
shall be intact upon ex-factory. The 
governor shall be installed correctly 
with a firm base, and shall have no 
vibration during its linkage with the 
safety gear. 
Canny Elevator Co., Ltd. 
Machine Room Floor 
Governor 
Car Guide Rail 
Steel wire rope 
Lifting Point 
Tensioner 
Pit Plane 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Bottom plate installation dimension diagram 
Base installation dimension diagram 

Schematic diagram 1 for installation of governor (XS3 governor) 


Tensioner (vertical type) 
Used when lifting height>60m 
Base installation dimension 

Schematic diagram 2 for installation of governor (XS18A governor) 


Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) 
Counterweight device 
Pit protection 
device Pull rod 
Upper support 
Lower support 
Compensation chain guide device 
Compensation chain 
Crossbeam 
DBG (guide rail distance) 
Distance and counterweight CC between car center 
center 

Rated Speed (m/s) 


Canny Elevator Co., Ltd. 
Bending Radius R (mm) 1.0~1.75 125≤R≤175 2.0~2.5 250≤R≤350 Note: cancel the cross 
beam when the plane made by the car centerline and counterweight centerline is parallel to the 
side wall of the hoistway. Meanwhile, the corresponding dimensions shall be taken from the 
values in the parentheses. Installation Description for Compensation Chain: 
The  spirals  and  windings  of  the  balance  compensation  chain  caused  during  the  reeling 
shall  be  removed  during  the  installation  to  prevent  cracking  or  stripping  of  the  externally 
wrapped rubber and plastic layers due to the twisting. 
The  method of removing the spirals and windings: when one end of the compensation chain 
at  the  car  platform  is  hung  properly.  Run  the  elevator  slowly  to  the  top  and  measure  the 
necessary  length  of  the  compensation chain. Cut off the chain, wind and bind the compensation 
chain  properly  that  trails  on  the  bottom.  Keep  it  1m  above  the  ground  and  suspend  it  statically 
for 24 
 
Elevator Installation Instruction Manual (Supplementary sheet) hours. Hang the other end after 
the windings are all removed. Double check if the compensation chain has any spiral or winding 
during its running several days after the elevator runs. Repeat the operation if there is still any. 
The  centerline  of  the  guide  device  shall  be  in  the  same  line  with  the  suspension  point  to 
prevent  the  accidental  failure  of  the  balance  compensation  chain  and  guide  device  due  to  the 
increased friction. 
Schematic Diagram 1 of Compensator Installation (Counterweight Rear-mounted) 
Canny Elevator Co., Ltd. 
 
Compensation chain guide device 

Elevator Installation Instruction Manual (Supplementary sheet) 


Counterweight 
Pit protection device 
device 
Compensation chain suspension device 
Compensation chain 
Distance and counterweight CC between car center 
center 
DBG (guide rail distance) 

Rated Speed (m/s) Bending Radius R (mm) 


1.0~1.75 200≤R≤275 ≥2.0 275≤R≤350 
Installation Description for Compensation Chain: 
The  spirals and windings of the balance compensation chain caused during the reeling shall 
be  removed  during  the  installation  to  prevent  cracking  or  stripping  of  the  externally  wrapped 
rubber and plastic layers due to the twisting. 
The  method of removing the spirals and windings: when one end of the compensation chain 
at  the  car  platform  is  hung  properly.  Run  the  elevator  slowly  to  the  top  and  measure  the 
necessary  length  of  the  compensation chain. Cut off the chain, wind and bind the compensation 
chain  properly  that  trails  on  the  bottom.  Keep  it  1m  above  the  ground  and  suspend  it  statically 
for  24  hours.  Hang  the  other  end  after  the  windings  are  all  removed.  Double  check  if  the 
compensation 
Canny Elevator Co., Ltd. 
 
Elevator Installation Instruction Manual (Supplementary sheet) chain has any spiral or winding 
during its running several days after the elevator runs. Repeat the operation if there is still any. 
The  centerline  of  the  guide  device  shall  be  in  the  same  line  with  the  suspension  point  to 
prevent  the  accidental  failure  of  the  balance  compensation  chain  and  guide  device  due  to  the 
increased friction. 
Schematic Diagram 2 of Compensator Installation (Counterweight Side-mounted) 