You are on page 1of 1

12 11 10 9 8 7 6 5 4 3 2 1

N GENERAL NOTES

1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.


TERMINAL 2
L
2. ALL PAS DRAWINGS SHALL BE READ IN CONJUNCTION WITH
ARCHITECTURAL/ STRUCTURAL & OTHER MEP SERVICES DRAWINGS. Bangalore
3. EQUIPMENT DIMENSIONS FROM THE GRID LINES SHALL BE PART OF
SHOP DRAWINGS.
International Airport
E48 E49 E50 E51 E52 E53 E54 E55 4. ALL TYPICAL INSTALLATION, SUPPORTING DETAILS SHALL BE PART
OF SHOP DRAWINGS.

5. ALL SPEAKERS/SPEAKER CUM STROBES TO SHALL BE CLASS B.


OWNER
9000 9000 9000 9000 9200 8800 12000 6. STROBE CABLE SHALL BE 2C x 1.5 Sqmm, FIRE RESISTANCE
ARMOURED CABLE.

7. SPEAKER CABLE SHALL BE 2C x 1.5 Sqmm, FIRE RESISTANCE


ARMOURED CABLE.

SEE: 1 / F F F
SEE: 1 / 8. TELEPHONE CABLE SHALL BE 2C x 1.5 Sqmm, FIRE RESISTANCE ,
ARMOURED CABLE . Bangalore International Airport Limited
KIA-B03-L&T-R_ 1T74-05 178 m² KIA-B03-L&T-R_
FA-L1-SPD-1174 NON PUBLIC
CIRCULATION
1TPA-02 3455 m²
FA-L1-SPD-1174 9. WALL MOUNTED SPEAKERS/SPEAKER CUM STROBES SHALL BE Project Office
EAST PIER DOM MOUNTED AT 2290mm FROM THE FFL. Kempegowda International
K MATCHLINE MATCHLINE

S
ARRIVAL CIRC

B
12700 3400 Airport Bengaluru
1T75-02 16 m² 10. WALL MOUNTED TELEPHONE JACKS SHALL BE MOUNTED AT Devanahalli, Bangalore 560 300 India
2000 2100 F F 1200mm FROM THE FFL.
L4 RECONCIL. RM 1T75-03 16 m² PSU-45-ST_C-02 PSU-45-ST_C-01

900
MATCHLINE

MATCHLINE
KIA-B03-L&T-R_
FA-L1-SPD-1165
SEE: 1 /

KIA-B03-L&T-R_
FA-L1-SPD-1185
SEE: 1 /
F BAGGAGE 11. FINAL ROUTING OF THE CABLE SHALL BE CLOSELY COORDINATE AT
F F
RECONCIL. PSU-45-ST_C-03 SITE WITH THE IT CABLE TRAY. LEAD CONSULTANT
L1-PSU-43-ZONE AREA-11-STROBE CIRCUIT 1900
L1-FACP_09-AMP-3-Z172-SPEAKER CIRCUIT L1-PSU-45-ZONE AREA 11-STROBE CIRCUIT

2000

1900
PSU-43-ST_C-04 12. 25% SPARE FOR EACH ZONE IS PROVIDED.
1T75-15 10 m²
PSU-43-ST_C-03 DEVICE LOOP CABLE TO FACP_03-TPS-03-HCP-07
DANGEROUS 1TPA-02 3455 m²
13. BOB : BOTTOM OF BEAM.
GOODS BHS
STORAGE EAST PIER DOM TELEPHONE COMMUNICATION CABLE L1-SLC-FACP_03-TPS-ZONE-7
ARRIVAL CIRC
L1-FACP_09-AMP-3-Z193-SPEAKER CIRCUIT 14. HCP FOR SPEAKERS & STROBES SHALL BE CONNECTED WITH
ADDRESSABLE DEVICE LOOP. SOM India LLC
5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE FROM 14 Wall Street, New York, NY 10005
FACP_06 L0 MACHINE ROOM 0T75-16 15. HCP FOR FIRE TELEPHONE CIRCUIT SHALL BE CONNECTED WITH
SEPARATE DEVICE LOOP FROM FACP.
FACP_09-AMP-3-Z172-ESSW-03 MEPF ENGINEER BAGGAGE CONSULTANT
FACP_09-AMP-3-Z172-ESSW-01
DEVICE LOOP CABLE TO FACP_03-TPS-03-HCP-01 DEVICE LOOP CABLE TO FACP_03-TPS-03-HCP-08 16. THE LOCATION OF PROPOSED FIRE ALARM ARUP LTD. BNP Associate s
B CONTROL PANEL IS FROM LEVEL - 1 MECHANICAL EQUIPMENT
S
L1-PSU-95-TELEPHONE POWER CIRCUIT CLOSET (1T76-12). 77 Water Street P.O. Box 32746
Abu Dhabi, UAE
B
S
New York, NY 10005

12000
J
N25 L1-PSU-94-ZONE AREA-11-STROBE CIRCUIT
L1-PSU-44-ZONE AREA 12-STROBE CIRCUIT
17. TOTAL 01 SPEAKERS/STROBES FOR FACP - 09 (AMP-2), ZONE - 170 LIGHTING CONSULTANT LANDSCAPE
TOTAL 03 SPEAKERS/STROBES FOR FACP - 09 (AMP-3), ZONE - 172
L1-PSU-43-ZONE AREA-11-STROBE CIRCUIT TOTAL 05 SPEAKERS/STROBES FOR FACP - 09 (AMP-3), ZONE - 173 BPI Grant Associates
TELEPHONE COMMUNICATION CABLE L1-SLC-FACP_03-TPS-ZONE-8 TOTAL 05 SPEAKERS/STROBES FOR FACP - 09 (AMP-3), ZONE - 174 302 5th Ave, 12th FL 22 Milk Street
L1-FACP_09-AMP-3-Z172-SPEAKER CIRCUIT REFER NOTE 1 FOR MM & HCP
TOTAL 03 STROBES CONNECTED IN PSU - 39 New York, NY 10001 Bath, UK BA1 1UT
TAG & CONNECTION DETAILS
1T75-07 9 m² TOTAL 02 STROBES CONNECTED IN PSU - 40
TELEPHONE COMMUNICATION CABLE L1-SLC-FACP_03-TPS-ZONE-7 NON PUBLIC L1-PSU-46 FOR ZONE AREA 11 TOTAL 05 STROBES CONNECTED IN PSU - 41 IT / SECURITY / PA / FAS SIGNAGE / WAYFINDING
CIRCULATION TOTAL 09 STROBES CONNECTED IN PSU - 42
FACP_09-AMP-3-Z173-ESSW-05 MBII MSD
TOTAL 02 STROBES CONNECTED IN PSU - 43
TOTAL 03 STROBES CONNECTED IN PSU - 45 44 Mobile Drive 2 Young Place
S

Toronto, ON M4A 2P2 East Kilbride, GLA G75 0TD

700
FACP_09-AMP-3-Z174-ESSW-05 B
TOTAL 02 STROBES CONNECTED IN PSU - 46
1500 1100 AS PER DRAWING
1TPA-02 3455 m²
L1-PSU-45 FOR ZONE AREA 11

B
9000

EOL 18. AS PER THE FINAL APPROVED RCP LAYOUT THE BELOW FALSE

400
EAST PIER DOM
ARRIVAL CIRC CEILING SERVICES SHOULD BE CO-ORDINATED.

3400
5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE TO FACP_09-AMP-3-Z174-ESSW-04 L1-PSU-42 FOR ZONE AREA 11 REFERENCE DRAWING: BIAL DESIGN
CUP BUILDING CHECKED BY APPROVED BY

1200
F
PSU-42-ST_C-01

B
1. FOR TYPICAL INSTALLATION DETAILS REFER DWG: NO:

S
I 1T75-09 32 m² KIA-B03-L&T-R_GD-XX-SPD-0002.
L1-PSU-43 FOR ZONE AREA 11
FACP_09-AMP-3-Z174-ESSW-03

2100
ELECTRICAL
2. FOR TYPICAL INTERFACING DETAILS REFER DWG: NO:

1400
STORAGE
KIA-B03-L&T-R_GD-XX-SPD-0003.
1600 ARCHITECTS & ENGINEERS:
B
S
L1-PSU-44 FOR ZONE AREA 11 Engineering Design and Research Center (EDRC),
1T75-13 11 m²
L&T Construction - Buildings & Factories.
LEGEND:
N26
SERVICE
STORAGE

2200
FACP_09-AMP-3-Z174-ESSW-02

1900
1900 DESIGN BY DRAWN BY CHECKED BY APPROVED BY
B SYMBOLS NAME UNIT QTY
S

B
FACP_09-AMP-3-Z173-ESSW-04

S
S Evacuation Speaker (4 watt ) - False
1T75-10 38 m²
Nos. 00 AKR SP PSK PDR
NOTE: 1 PSU-46-ST_W-01 ceiling mounted.

2200
TELECOM. RM MAIN CONTRACTOR:
1T75-08 31 m²
3500 S

11800
PSU : 41 PSU : 45 NON PUBLIC Evacuation Speaker cum Strobe (2 watt ) - 00
Nos.
CIRCULATION False ceiling mounted.
L1-PSU-94 FOR ZONE AREA 11 B
MM - FACP_07-5-MM-140 MM - FACP_07-3-MM-127
5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE TO PSU-46-ST_W-02 S
Evacuation Speaker cum Strobe (2 watt ) - 00
HCP - FACP_07-5-HCP-141 HCP - FACP_07-3-HCP-128 FACP_06 L0MACHINE ROOM 0T75-16 Nos.
H True ceiling mounted.
9000

1T75-12 26 m²
1T75-11 16 m² B
MM_CONNECTED FROM FACP_07-5-CM-091 MM_CONNECTED FROM FACP_07-3-ASD-052 ELECTRICAL 2400 FIRE CONTRACTOR:
CLOSET MECHANICAL S
EQUIP. CLOSET Evacuation Speaker (4 watt ) - True ceiling 00
HCP_CONNECTED TO FACP_07-5-DSD-090 HCP_CONNECTED TO FACP_07-3-CM-051 Nos.
FACP_09-AMP-3-Z174-ESSW-01 mounted. Siemens Ltd.,

S
1TPA-02 3455 m²

B
FACP_09-AMP-3-Z173-ESSW-03

S
EAST PIER DOM #49,Ground Floor, Jyothi Mahal,
ARRIVAL CIRC Evacuation Speaker cum Strobe (2 watt ) - ST.Marks Road, Bangalore -560001,

1900
5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE TO Nos. 14

1700
PSU : 42 S Wall Mounted. P:+91(080) 33299154
PSU : 46 FACP_09 L1-MECHANICAL EQUIPMENT CLOSET 1T76-12 CORECUT 1500 B
150mm x 400mm
MM - FACP_07-3-MM-129 MM - FACP_07-3-MM-125 Evacuation Hooter cum Strobe (2 watt ) -
H Nos. 13
HCP - FACP_07-3-HCP-130 HCP - FACP_07-3-HCP-126 Wall Mounted. DESIGN BY DRAWN BY CHECKED BY APPROVED BY
B
3400
MM_CONNECTED FROM FACP_07-3-MSD-050 MM_CONNECTED FROM FACP_07-3-ASD-055 L1-PSU-95 FOR TELEPHONE POWER CIRCUIT
Evacuation Speaker (4 watt ) - Wall 00
Nos.
F S Mounted.
N27 HCP_CONNECTED TO FACP_07-3-CM-051 HCP_CONNECTED TO FACP_07-3-AASD-056 PSU-42-ST_C-02 1T75-06

ELECTRICAL
CLOSET
37 m² FACP_09-AMP-3-Z173-ESSW-02
L&T RIYAZ RV PG

Evacuation Strobe - Wall Mounted. Nos. 00

S
B
FACP_09-AMP-3-Z173-ESSW-01

1900
PSU : 43 PSU : 94 F KEYPLAN
4600 Evacuation Strobe - Ceiling Mounted. Nos. 13
G MM - FACP_07-3-MM-131 MM - FACP_07-3-MM-135
B
S T00 T10 T20 T30 T40 T50 T60 T70 T80
HCP - FACP_07-3-HCP-132 HCP - FACP_07-3-HCP-136
H
B Phone Jack - Wall Mounted. Nos. 00
MM_CONNECTED FROM FACP_07-3-MSD-049 MM_CONNECTED FROM FACP_07-3-AASD-045 T01 T11 T21 T31 T41 T51 T61 T71 T81
6000
HCP_CONNECTED TO FACP_07-3-MSD-050 HCP_CONNECTED TO FACP_07-3-CM-044 PSU-42-HST_W-06 PSU
Power Supply Unit. 08 T02 T12 T22 T32 T42 T52 T62 T72 T82
Nos.
9000

T03 T13 T23 T33 T43 T53 T63 T83


MM T73
Analogue Addressable Monitor Module. Nos. 08
PSU : 44 PSU : 95

11800
T04 T14 T24 T34 T44 T54 T64 T74 T84

6300
MM - FACP_07-3-MM-133 MM - FACP_07-3-MM-137 HCP
Intelligent Control Point Device Nos. 07 T05 T15 T25 T35 T45 T55 T65 T75 T85
MM_CONNECTED FROM FACP_07-3-MSD-043

B
HCP - FACP_07-3-HCP-134 PSU-42-HST_W-05

H
MM_CONNECTED FROM FACP_07-3-AASD-048 HCP_CONNECTED TO FACP_07-3-CM-042 T06 T16 T26 T36 T46 T56 T66 T76 T86
230VAC UPS Power Outlet (Spur Outlet) Nos. 08
HCP_CONNECTED TO FACP_07-3-MSD-049
T07 T17 T27 T37 T47 T57 T67 T77 T87
2C x 1.5 Sqmm Fire
resistance Armoured cable APPROX
Mtrs.
(Speaker) Zone cable 550 T08 T18 T28 T38 T48 T58 T68 T78 T88
F
N28 PSU-42-HST_W-07 2C x 1.5 Sqmm Fire

H
B
APPROX
resistance Armoured cable Mtrs.
600
1T75-16 259 m² (Strobe) Power cable
2C x 1.5 Sqmm Fire

8200
MER 13
resistance Armoured cable APPROX
Mtrs.
3400 (Telephone) Loop cable 200

2C x 1.5 Sqmm Fire SEAL & SIGNATURE


F
resistance Armoured cable APPROX
PSU-42-ST_C-03 Mtrs.
(Telephone) Power cable 50

2C x 1.5 Sqmm Fire


APPROX
ISSUED FOR SHOP DRAWING
resistance Armoured cable Mtrs.
(Telephone) Communication cable 150
SUBMISSION
9000

9000
2C x 1.5 Sqmm Fire
resistance Armoured cable APPROX
Mtrs. CHECKED BY SIGN DATE CHECKED BY SIGN DATE
(FACP to FACP) Loop cable 800
ARCHITECTURE FPS

B
PSU-42-HST_W-04

H
CIVIL & STRUCTURAL PIPING
APPROX ELECTRICAL PHE
E
1TPA-02 3455 m² Total
2350
L1-PSU-41-ZONE AREA-10-STROBE CIRCUIT EAST PIER DOM ELV SYSTEM AIRPORT SYSTEM
ARRIVAL CIRC
HVAC VHT
PSU-41-HST_W-03
PSU-41-HST_W-02
Revision Schedule

12200
H H
B B
Revision
Revision Date Issued by Issued to
N29 Number Revision Description

H
7500

B
PSU-42-HST_W-08 0 FOR REVIEW 17 OCT SIEMENS L&T
18100 2020
4300

FACP DETAILS:

PSU-42-HST_W-09 PANEL NO. PANEL LOCATION ZONES PART PLANS


1T75-20 898 m² 7300
L1-PSU-41 FOR ZONE AREA 10 REFER NOTE 1 FOR MM & HCP
MER 12
B

FACP - 9 L1- MECHANICAL


D TAG & CONNECTION DETAILS H

(AMP 2) EQUIPMENT CLOSET ZONE 170 75, 76


9000

EOL (1T 76-12)

10200 7000
3400

ZONE 172 64, 74, 75, 76


F F
PSU-39-ST_C-05
PSU-41-HST_W-04

H
B
L1- MECHANICAL ZONE 173 75, 76
PSU-39-ST_C-06 FACP - 9
(AMP 3) EQUIPMENT CLOSET
B

PSU-41-HST_W-01
H

3100
(1T 76-12)
ZONE 174 74, 75, 76
EOL
2500 FACP_09-AMP-2-Z170-ESSW-03
5500

S
H H
B B
B
ZONE 193 75, 76, 85
N30

9700
11500 2400

5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE TO 54, 64, 71, 72, 73, 74,
PSU-40-HST_W-06 PSU-40-HST_W-07 FACP - 3 L1 - TELECOM ROOM
FACP_06 L0MACHINE ROOM 0T75-16 ZONE 3 75, 76, 77, 78, 80, 81,
(TPS) (1T54-09)
1T75-20 898 m²
PSU-41-HST_W-05 83, 84, 85, 86, 87
MER 12
DEVICE LOOP CABLE FROM FACP_03-TPS-03-HCP-10
C L1- ELECTRICAL
1700 PSU - 39 75, 76

FA-L1-SPD-1185
L1-PSU-39-ZONE AREA-10-STROBE CIRCUIT
FA-L1-SPD-1165

CLOSET (1T 76-12)

KIA-B03-L&T-R_
KIA-B03-L&T-R_

B
H
TELEPHONE COMMUNICATION CABLE L1-SLC-FACP_03-TPS-ZONE-8
L1- MER 12

MATCHLINE
MATCHLINE

PSU - 40 75, 76
TELEPHONE COMMUNICATION CABLE L1-SLC-FACP_03-TPS-ZONE-7 (1T 75-20)
L1-PSU-40-ZONE AREA-10-STROBE CIRCUIT L1-PSU-41-ZONE AREA-10-STROBE CIRCUIT 5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE FROM
L1-FACP_09-AMP-3-Z172-SPEAKER CIRCUIT

SEE: 1 /
SEE: 1 /

FACP_09A L1-MECHANICAL EQUIPMENT CLOSET 1T76-12 L1- MER 12


L1-FACP_09-AMP-3-Z193-SPEAKER CIRCUIT PSU - 41 75, 76
EOL (1T 75-20)
L1-FACP_09-AMP-3-Z193-SPEAKER CIRCUIT L1-FACP_09-AMP-3-Z174-SPEAKER CIRCUIT
F
L1-FACP_09-AMP-3-Z173-SPEAKER CIRCUIT PSU-39-ST_C-07 L1- TELECOM ROOM
PSU - 42 75
DEVICE LOOP CABLE TO FACP_03-TPS-03-HCP-08 1900 (1T 75-10)
L1-FACP_09-AMP-2-Z170-SPEAKER CIRCUIT
PSU - 43 L1- TELECOM ROOM
MATCHLINE 64, 65, 74, 75
MATCHLINE 1T75-17 26 m²
(1T 75-10)
H
B

SEE: 1 / MAITENANCE/
STORAGE SEE: 1 /
L1-PSU-40-ZONE AREA-10-STROBE CIRCUIT L1-PSU-40-ZONE AREA-10-STROBE CIRCUIT L1- TELECOM ROOM
KIA-B03-L&T-R_ KIA-B03-L&T-R_ PSU - 44
(1T 75-10)
74, 75
FA-L1-SPD-1176 FA-L1-SPD-1176
L1- TELECOM ROOM
B PSU - 45
(1T 75-10)
74, 75
QRCODE

PSU - 46 L1- TELECOM ROOM


75
(1T 75-10)

DRAWING TITLE

EVACUATION SYSTEM - T2 -
LEVEL 1 -ARRIVAL
LEVEL 1 - ARRIVALS MEZZANINE - T2 PART PLAN - 75 MEZZANINE - PART PLAN

A
1 SCALE 1 : 100
75_SHEET -2 OF 2
DRAWING NUMBER

KIA-B03-L&T-R_FA-L1-SPD-1175
SCALE: 1:100 SHEET SIZE - A0

CONSULTANT JOB NO : O18180

© Copyright Bangalore International Airport


Limited