You are on page 1of 10
HANSEI CORPORATION Electrical Power Transmission, Substations, Distribution and Industrial System, Supply, Engineering Procurement Construction (EPO), Testing and Comnissioning, Operation and Maintenance EQUIPMENT: CU(3x10300) Reason for Tests: Tag: MVSG1 INCOMING - PTR 1 Preventive Maintenance Date of Test: October 18, 2021 Corrective Maintenance Weather: . SLIGHTLY CLOUDY ~ Acceptance Test ‘% Humidity: 57% Commissioning Test Ambient Temp: ae Technical Assistance Type/Rating: CU/KLPE/OVC -8.7/1.5(27 5)KV Location: Tees ae connecson | resrvocrase voc) ["SUMTONRESSTANE vane sue] warn LINE U1 TO SHIELD 2500 V 322M {300 mm*2) SG LUNE U2 TO SHIELD 2500V. [42M [300 mma2]G UNEVTOSHIELD | 2500 1386 f00mnral UNE V2 TOSHIED [2500 1376 fs00mmra] 6 UNE WE To SHLD | 2500 asm fs00mmral —6 TNE W2O SHIELD [730097 1576 fsoommral 6 Uningcrter: egos: New{LOMO) min) frServet MOV min) hema PASSED, TEST SULT LEGEND: Good SeSnsectonPeoor Cc nan conpongrigy] FEN UENCE si Sa a aaseana NAME [vasa SanGUE AMY TENORIA ‘CHRISTIAN PAUL UQUIGAN ome | Vo hrelu t ‘TEST INSTRUMENTS: (apt. 0/Make/ModeVSN}; | MEGGER BY-110/ 6810-869/000300-5247 Calibration Exp.: June 28, 2022 UPS] FLUENCE SIEMENS ‘wees ENEr6Y LINE W1 -SHIELD LINE W2 -SHIELD HANSEI CORPORATION Electrical Power Transmission, Substations, Distribution and industrial Sysiem, Supply, Engineering Procurement Consiruction (EPC), Testing and Commissioning, Operation and Maintenance EQUIPMENT: CU(3x1Cx300) Reason for Tests: ‘Tag: MVSG1 OUTGOING 1 - CORE TRAFO 1 Preventive Maintenance Date of Test: October 18, 2021 Corrective Maintenance Weather: SLIGHTLY CLOUDY Acceptance Test ‘% Humidity: 57% Commissioning Test Ambient Temp: 29°C ‘Technical Assistance ‘Type/Rating: CU/KLPE/PVC - 8.7/1.5(17-S)KV Location: BESS 1 | INSULATION RESISTANCE TESTS : TSULATION Comectin | estvorracewoa] gSVATON Twnesze] earns TRE VTOSHELD_| 25007 7346 oommra| —G INE VTOSHIELD | 2500 £056 [300 mma] 6 LINE W TO SHIELD 2500 V 456M [300 mm”; G Limiting Criteria: Megohms/kv: New(10MQ/KV min.) In-Service(2MQ/kV min.) Remarks: _pASSEDYTEST RESULT LEGEND: GxGood_ SStisfatory P:Poor CeCe vans) conponarion]| Sevens UENCE os Seu Tounoonaareas NAME ganisuz EMMY TENORIA (CHRISTIAN PAUL LIQUIGAN: ome Soh eh ‘TEST INSTRUMENTS: (apt in/vakeftaodeysn Calibration Exp.: [MEGGER BYt-1D/ 5410-865/000300.5247 June 28, 2022 UPS] FLUENCE SIEMENS semen eCrey LINE U - SHIELD © LINEV- SHIELD i LINE W SHIELD OLA ISTIAN INDO DULY / eee ‘CHRISTIAN PAUL FRANCIS ORNGUEZ uouicaN SITE MANAGER ‘OWENERS, SITE ENGINEER SITE MANAGER = ELECTRICAL SUPERVISOR REPRESENTATIVE Lo fe | EQUIPMENT: cufsxaex300) Tag: (MVSGi OUTGOING 2 - CORE TRAFO7 Date of Test: (October 18, 2023, Weather: SLIGHTLY CLOUDY % Humidity: 57% Ambient Temp: 23°C ‘Type/Rating: (CU/RUPE/PVC- 8.7/2 5(87.5)KV Location: BESS 1 |. INSULATION RESISTANCE TESTS HANSEI CORPORATION Electrical Power Transmission, Substations, Distribution and Industrial System, Supply, Engineering Procurement Construction (EPC), Testing and Commissioning, Operation and Maintenance Reason for Tests: Pi reventive Maintenance Corrective Maintenance Acceptance Test c Te “ommissioning Test fechnical Assistance ‘TEST INSTRUMENTS: (capt. D/Make/iaedeVSN: MEGGER BN-120/ 6610-869/000300-3247 Calibration Exp.: June 28, 2022 Connection | TESTVOLTAGE (VDC) | gaveranee a) | WIRESIZE| RATING LINE UTO SHIELD 2500 V_ 452M. 1300 mm*2| G LINE VTO SHIELD 2500 306M___300mm*a] 6 LINE W TO SHIELD 2500 V 278M 300 mm*2] G Limiting Criteria: Megohms/kV: New(10MO/KV min.) In-Service(2MOQ/KV min.) Remarks: _PASSYD, TEST RESULT LEGEND: G=Good SeSatistactory PaPoor C=Crtical HANBEI CORPORATION SIEMENS, FLUENCE UPSL SiGuaTORE UNDO DULAVINANGE. vane commu aawerenona | cmstavrauLugucan DATE to hs HANSEI ‘CORPORATION fLUeNCe ‘tens and Cons UPSI INSULATION RESISTANCE TEST FOR MVSG1 OUTGOING SIEMENS @nerey LINE U - SHIELD LINE V~SHIELD LINE W - SHIELD. TOURDO DULY san i JIMMY S, TENORIA. _ Less anos onncuez guint SITE MANAGER ‘OWENERS ‘SITE ENGINEER e SITE MANAGER : ELECTRICAL SUPERWSOR EoRESENTATVE pare: sbah EQUIPMENT: culsxicx300) Tag: MSGi OUTGOING 3 -CORE TRAFO2 Date of Test: ‘October 18, 2021 Weather: SLIGHTLY CLOUDY % Humidity: 57% Ambient Temp: 29°C Type/Rating: CU/KLPE/PVE -8.7/1.5(27.5)KV_ Location: BESS 1 INSULATION RESISTANCE TESTS HANSEI CORPORATION Electrical Power Transmission, Substations, Distribution and industrial System, Supply, Engineering Procurement Consiruction (EPO), Testing and Commissioning, Operation and Maintenance Reason for Tests: Preventive Maintenance Corrective Maintenance Acceptance Test Commissioning Test Technical Assistance comecuon — resrvoraseqoa] ,SSMATON T wmesve| aan TREUTOSHED_| 0B aEM femal UNEVTOSHELD | 250047 Laa6——poomnra] —e UNE WTO SHELD-[_—2500¥ 1406 foomnral —e Limiting Criteria: Megohms/kV: New(1OMA/KV min.) In-Service(2MO/KV min.) Remarks: PASSED, TEST RESULT LEGEND: GeGood_S-Satsfactory P=Poor CeCritical IANSEI FORRORATION] SIEMENS FLUENCE Urs sarong ik T a NAME: ORTISUIZ: JIMMY TENORIA LPAUL UOUIGAN DATE Jolt hy t TEST INSTRUMENTS: (Capt o/Make/ModeVSN): MEGGER BV-110/ $810-859/000300-3247 Calibration Exp June 28, 2022 UPS] zLUENCe ENS SIEM rimomsnes ONCIGY LINE V- SHIELD. LINE W - SHIELD FOLANDO DULAY Pau (D0 DULAY / eet ‘CHRISTIAN FRANCIS ORNGUEZ uauiGAN SITE MANAGER / OweNeRs STTEENGINEER SITE MANAGER PaEeen IL ance at EQUIPMENT: Tag: Date of Test: Weather % Humidity: Ambient Temp: Type/Rating: Location: HANSEI CORPORATION Electrical Power Transmission, Substations, Distribution and Industrial Sysiem, Supply, Engineering Procurement Construction (EPO), Testing and Commissiontng, Operation and Maintenance CUlsx10.300) MVSG1 OUTGOING 4 CORE TRAFO 8 October 19, 2021 ‘CLOUDY 57% 27°C ‘CUPALPE/PVC- 8.7/3.5(17.5)KV BESS 1 INSULATION RESISTANCE TESTS Reason for Tests: Preventive Maintenance Corrective Maintenance Acceptance Test, Commissioning Test Technical Assistance Connection ‘TEST VOLTAGE (V DC) | INSULATION RESISTANCE (0) | WIRE SIZE] RATING LINE UTO SHIELD 2500 V 338M [300 mm2} GS LINE V TO SHIELD 2500V 222M [300 mmaa]__6 LUNE W TO SHIELD 2500 V_ 141M [300 mm} G Limiting Criteria: Megohms/kv: New(1OMO/KV min.) In-Service(2MO/KV min.) Remarks: _PASSGD, TEST RESULT LEGEND: G=Good SeSatistactory PaPoor C=Crtical HANEEI CORPORATI SIEMENS FLUENCE UPSI SignaToRe i nce. fey nouawoo puLAY/aNos oRcU name avaenauix snnavsexona | cumin ravLuauican = my peepee | __ seen ‘TEST INSTRUMENTS: {apt 0/Mke nodes Calibration Exp.: (MEGGER BW-110/ 6410-865/000300-3267 June 28, 2022 UPS] FLUENCE SIEMENS ‘Shen an AES Conny INSULATION RESISTANCE TEST FOR MVSG 1 OUTGOING 4- CORE TRAFOB. LINE U - SHIELD SiGuATORE —— + ae cr ann acts onrcuez guint fms STE MANAGER owenens ‘SITE ENGINEER ie ‘SITE MANAGER ELECTAL SUPERVISOR seresenave oars | 1 hOFat

You might also like