Professional Documents
Culture Documents
PEREZ
PROFESSIONAL SUMMARY
Accomplished Civil Engineer with extensive work experience in construction works and project managements of various projects for more than 15 years;
project involvements include combined cycle power plant, coal fired power plant, nickel plants, ports, bridges, viaducts, and roads / pavements. Has full
understanding of proposal stages including thorough knowledge in bid preparation; bid clarification, evaluation and selection; projects base amount
calculation, quantity surveying, and shop drawings / method statements preparation. Possesses excellent communication and interpersonal skills, duly
trained in computer software’s; MS Office (word, excel, power point), AutoCAD, Primavera Project Planner, Google Sketch up and Revit Architecture as
well as its application in actual engineering works.
SKILLS
• Oral and written communication • Work dedication, commitment and can-do attitude
• Team player plus good leadership skills • Exceptional negotiation and settlement skills
WORK HISTORY
Civil & Building Cost Engineer July 03, 2014 to June 29, 2017
Daelim Malaysia Sdn. Bhd. (Fast Track 3A 1000MW Coal Fired Power Plant Project) 32040 Seri Manjung, Perak, Malaysia
Work Responsibilities
• Setting of Civil Work Packages in accordance and subjected to the limitations of the Main Contract by clearly defining the full scope of works
between the Main Contractor and the Subcontractor including proficiency in determining the Civil Work Package execution amount.
• Have the authority in pre-selecting the best suited subcontractors; task includes the subcontractor evaluation / selection, responses to
queries/clarifications and disseminating additional project requirements, persuasively obtaining bid proposal amounts ahead of deadlines.
Competent in lessening the subcontractor’s initial bid amount by close clarification and negotiation.
• Able obtain cost effective construction material prices for concrete / rebar, equipment supply / rental, and manpower supply by thorough
evaluation, and sound clarification.
• With the in-depth knowledge of the Main Contract, able to effectively respond to Client correspondences, site instructions / variation orders,
and other additional requirements with minimal cost impact.
• Attained and maintained good relation with the Client/Owner, Subcontractors, Suppliers and Local Authorities by doing effective
communication in making clear of what must be done, what is the target schedule, and what is currently available.
• Administered and verified the Subcontractors Monthly Interim Statement, issuance of Site Instruction (SI), Variation Orders (VO), Non
Compliance Report (NCR) / letter correspondences, and settlement of quantity/cost disputes.
Daelim Industrial Company Limited (Daelim HQ: Plant Cost Estimation Team) Jongno-gu, Seoul Korea
Work Responsibilities
• Performs calculation of New-Project in-house budget amount; includes breaking down the Bill of Quantities in to individual work activities and
supplying costs of labor, manpower, tools / consumables, and equipment’s; and cross checking in-house unit prices with the current market.
• Thorough review of Client’s Invitation to Bid Documents (ITB) to plan the proposal strategy and define special requirements (if there is) that
may have significant impact in the proposal amount.
• Maintaining good relation plus open communication with several reliable / competent Subcontractors, Suppliers; and keeping track of market
trends ensuring up to date and competitive unit prices.
• Significant contribution in obtaining bid proposals; such includes issuing, updating, maintaining bid documents for Subcontractor proposal
basis; achievement of good returns on Invitation to Bids (ITB) and Requests for Quotation (RFQ); and obtaining competitive within the budget
bid proposals on time.
• Effectively review/ evaluates the correctness and competitiveness of the subcontractor’s proposal; done by careful comparison with
competing subcontractors / in-house previous project references; and performs credible price negotiation, and bargaining with the
subcontractors to determine the winning bid.
• Manage daily correspondences and presentations to the Client/ Owners, Suppliers, and the Subcontractors.
• Performs corporate team presentation that focuses on the proposed counter measures or possible solutions to be taken in a problematic
project scenario.
Asia Konstrukt/ Taisei Construction Corporation (Algerian East-West Motorway Project (Eastern Said Bousba, Skikda, Algeria
Package)
Work Responsibilities
• Conducts site visits to monitor site work progress and performs actual work quantity calculations; and verify that on-site work executions are
done according the project specification and contract requirements.
• Directly evaluates and approves Subcontractors Monthly Interim Statement for piling works, road works and bridges / viaducts; issuance of
Site Instruction (SI), Non Compliance Report (NCR) / letter correspondences; and settlement of quantity/cost disputes.
• Resolves quantities and amount disputes, work variations and additional job orders by effective negotiation, calculation / contracts
justifications with the Client and Subcontractor
• Maintains good relation with the client, subcontractors, suppliers and local authorities through good communication and presentation.
Vinci Construction Grands Projets (Koniambo Nickel Plant Project) 98895 Noumea Cedex, New Caledonia
• Conducts site visits, site measurements and gathers survey report’s to perform earthworks quantity calculation / re-measurements, monitors
the actual site progress and checks the work execution on site to whether the works are done according the project specification and contract.
• Designs and secures clients approval on General Standard Drawings for miscellaneous and additional work items and follow-ups actual site
implementation.
• Maintains Overall Plot Drawings containing different information’s such as the actual location and elevation of sedimentation basin, silt fence,
sand bags and silt curtains.
Method Statement/ Office Engineer June 15, 2006 to December 27, 2007
Vinci Construction Grands Projets (Goro Nickel Plant Project) 98895 Noumea Cedex, New Caledonia
• Establish work method statements for various works including work sequence narrations and construction stages, shop drawings indicating
heavy equipment positioning at different work levels, supplying the manpower requirements / work schedules and establishing / integration
of Health and Safety Analysis, and Environmental Risk Analysis.
• Performs presentation on civil works method statements comprising of construction procedures indicating concrete stages, design of
necessary platforms, formworks and shoring systems to match the concrete stages and scaffolding design.
• Performs in-house quantity calculation, re-measurements and conducts site visits to monitor the actual site progress and checks the work
execution on site to whether the works are done according the project specification and contract.
• Maintains the Overall Project Plot Plans in a single cad drawing and raised engineering queries regarding structure coordinates, locations,
dimensions & elevations and performs site modifications of approved for construction drawings subject to the Consultants/Clients approval.
• Administered as built drawings prior to project turnover.
Hyundai Engineering and Const. Co. Ltd. (Jebel Ali Free Port Project) 18280 Jebel Ali Free Zone, Dubai UAE
• Manage the preparation and submission of 3-Week Look ahead Schedule and Monthly Work Progress; such necessitates site visits for work
progress monitoring, collection of inspection &survey reports and gathering necessary information from site representatives.
• Updates daily work monitoring log and maintains & circulate Weekly Work Progress Report internally and provides separate submission to the
Client.
• Generates and run the Overall Project Schedule (Target Progress, Actual Progress and Baseline) using Primavera Project Planner and produce
schedule print outs as required on site.
• Formulates and recommends corrective action measures such as schedule revisions, manpower adjustments, fund allocations, and work
requirements.
Daelim Industrial Company Limited (Massawa Port Reclamation Project) Massawa, Eritrea North West Arfrica
• Designs and secures clients approval on shop drawings and bar bending schedules of reinforced concrete piles, manholes, gullies, oil separator
and miscellaneous concrete structures.
• Directs and controls manpower and equipment’s in several work areas including the fabrication of 30m RC pile, various manholes and gullies,
oil separator and other pre cast items, and the fabrication/ installation of 27m lighting mast tower with a total weight of 41 tons.
• Manage the timely completion of 20 tons rail crane foundation with a total length of 369m and laying of heavy duty pavements (sub-base,
base coarse, cement stabilized base coarse and heavy duty bricks).
• Performs office work duties like preparation and follow-up of inspection report for consultant acceptance, quantity calculations, responses to
letter correspondence and work progress monitoring both internal and to the client.
• Initiate, performs and hosts weekly & monthly work progress presentation and any other meetings as required by the client and other
statutory authorities.
RMB Builders & General Contractor (Plant Dismantling & Demolition Works) Davao del Norte, Philippines
Kane/Chiara Joint Ventures (Pasig River Rehabilitation Project_Package 1) Mandaluyong City, Philippines
• Manage the works of the bored piling crew that includes barge w/ mounted crane (35T), hydraulic boring machine, service barge with
mounted excavator and truck mixer, service boat and piling crew.
• Directs bored piling work activities such as; driving of steel casing 0.80m dia. to a max depth of 25m, pile boring up to 35m deep, rebar
fabrication and installation for bored piles reaching a depth of -30m that requires splicing of 3nos. 12m cage rebars, and bored pile concrete
pouring.
• Responsible for the temporary construction of 3.0m x 40.0m coffer dam works for exploration purposes and obstruction removal.
• Performs office work duties such as preparation and follow-up of inspection report for consultant acceptance, quantity calculations, responses
to letter correspondence, and work progress monitoring both internal and to the client.
Daelim Philippines Incorporated (Ilijan 1200MW Combined Cycle Power Plant Project) Ilijan, Batangas City, Philippines
• Manage the early completion of sheet pilling works by directing the 20T vibro hammer, 5T drop hammer, and crew to meet the works daily
target.
• Successfully completes pile cap works includes direct controls of grading preparation, rebar installation, formworks setting, and concrete
pouring activity.
• Supervised and completes the dredging works along the temporary and permanent unloading jetty. Includes giving instructions and controlling
the crew of 3T clamshell mounted on a 50T crane.
• Able to close civil and architectural punch list items on finishing, fiber reinforced plastic grating installation and sealant application on selected
construction joints.
• Supervised sheet pile driving for 37.0m x 42.0m at 18.0m depth cofferdam w/ the aid of a 150T crane mounted by a 50T vibro hammer and a
5T drop hammer w/ guide as an alternate.
• Manage and completes the L.W./ JSP grouting works that includes 4 units of hydraulic injecting grouting machine covering the approx. area of
1,800sq.m. within the allotted schedule.
• Supervised massive excavation inside the 37.0m x 42.0m cofferdam starting from elevation +1m to –18m and simultaneously directing the de-
watering work with the aid 4-submmersible pump continuously running 24hrs.
• Monitoring of offshore soil investigation team at different borehole location to see if proper procedure was done using mechanical boring
machine and presentation of soil samples.
MC-Ack Builders and Landscaping (Various Housing Projects) Batangas, Sta. Rosa & Quezon, Philippines
• Preparation of housing detailed plans with close communication with the client to secure approvals.
• Scheduling of manpower and resources to meet the project deadlines.
• Preparation of weekly/ monthly accomplishment reports.
• Preparation of monthly billing.
EDUCATION
TRAININGS
AFFILIATION
I hereby certify that all the above information is true and correct to the best of my knowledge.
_____________________