5. Direct cost
a) is directly proportional to the duration of time of an event
b) Is inversely proportional to the duration of time of an event
c) Is associated with total project time
d) All of the above
Ans:- Is inversely proportional to the duration of time of an event
6. PERT is-
a) Program evalution and review technique
b) Progress evalution and review test
c) Project evalution and review technique
d) Project estimation and review technique
7. The time which result in the least possible direct cost of an activity is known
as-
a) Normal time b) Slow time
b) Crash time d) Standard time
8. CPM is
a) Time oriented technique b) Event oriented technique
b) Activity oriented technique d) Target oriented
Ans- Beta
c)Beta d) Gaussian
Ans- Gaussian
Ans- Float=0
Ans- 1 or 2
14. The artificial variable are made to leave the base and never to enter in the
further iteration by the application-
a) Big M method b) Two phase method
b) Simplex method d) Both a and b
Ans- d
15. In the simplex method the variable which have not been assigned the value
zero, during an iteration, are called-
a) Basic variable b) Artificial variable
c) Actual variable d) None of the above
18.Simulation is used-
a) To analyse and evaluate a system performance
b) To accommodate a great degree of complexity
c) To determine the system outcome
d) All of above
Ans-c
20. Critical path moves along the activities having total float of-
a) Positive value b) negative value
Ans- c
21.In the graphical method of linear programming problem every corner of the
feasible polygon indicates –
Ans: (a)
22.In an linear programming model there are four discision variable and three
constraints. During an iteration by simplex method the cofficien of base variable
would form
(c)both a& b
(A)2 or 4
(b)1 or 0
(C)1 or 2
(d)0 or 4
(A)proportionality
(b)additive
(c)divisibility
(D)all of above
26.PERT is
(a)activity oriented
(b)event oriented
(C)cost oriented
(d)none of above