You are on page 1of 61
J Public Transport Corporation. GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAY LOCATIONS RAILWAY OPERATIONS AND ENGINEERING DESIGN AND CONSTRUCTION ASPECTS ENG-AD-STD-0001 VICES: IGINEERING SEF ENGINE GROUP CONTROLLED COPY APPROVED Lato) ate. 9/1996 Group Manager, Engineering Services PUBLIC TRANSPORT CORPORATION | ENG-AD-STD-0001 INFRASTRUCTURE DIVISION VERSION 2.0 GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS LIST OF EFFECTIVE PAGES ‘SECTIONS DESCRIPTIONTITIE No.oF | VERSION] DATE PACES 0100 | Document Gon and ble of cones 10| 20 | 1ei06 1.0 | introduction 2) 20 | 19908 72.0 Definitions 2 | 20 | 19508 73.0 | Approvals Proseases + [20 | 10888 40 [Tracks and Facies 1) 20 | 0808 1.0 [Customer and Sat Reauremens | 20 | 191890 (A2.0 | Safely and Secey 2 | 20 | 19690 23.0 | Operational Gased Gansrants During Conatuton af 20 | 101908 ‘A&0 [Coat of Subsite Services +) 20 | 19808 15.0 | Temporary actos Oving Gonaiton 120 | ras08 18.0 [Indus Rettons [20 | as ‘7.0 | Safty Precautions and Praciee | 20 | a8 ‘$8.0 [ Faction and Accuss for Disabled + [220 | 10. 729.0 | Vatile Paring Areas/Facities 1) 20 | 19898 7A10.0_—| Post Consructon [20 | es8 1.0 | General 2 [20 | ses06 82.0 | Requslons and PuBiahed Slander 3 [20 | 16508 83.0 | Design Standards | 20 | 12880 840 [clearances 3] 20 | 12868 35.0 | Buling Conston [20 | 1a668 28.0 [eons | 20 | tase: 87.0 | Per Designrotston 2} 20 | 19886 28.0 | Foundations [20 | a6 29.0 | Sxenatene | 20 | a6 810.0 — | Underground Seniens 1) 20 | 12698 3811.0 | tachment of Ovehead Traction Wing 1) 20 | 12898 18120 | Atachment of Commuricalon and Tan infrmaon 120 | reso 13.0. | Venblatin and Exhaust Eracon Resurements 2 [20 | 18808 140 | vzaton re eT TT) 815.0 [Noise and Acoust Leis 1 [20 | 19888 518.0 | senéces 3 [20 | ar508 317.0 | brawings of Pubic Tranapon Rebted Sroties 1} 20 | es08 316.0 | Aesthac Aspects 1 [20 | 12/80 [P| INFRASTRUCTURE DIVISION PUBLIC TRANSPORT CORPORATION. ENG-AD-STD-0001 VERSION 2.0 GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS LIST OF EFFECTIVE PAGES (Cont'd) ‘Appendix | Procedures for Contractors Working on Public Transport Corporation's | 18 20 | (tase Property and Facies Figure €1_| Drawing 132/95 Clearance Diagram - Development over Tracks n 20 | 18596 Figure €2_| Drawing P.1SS56 Minimum Clearances to Structures for Tramways 1 20 | sais8 | Figure E3_[ Drawing FS96A Track Formation and Ballast - Single Track 1 20 | 18598 Figure €4_{ Drawing P.1401 Tram Track Design Concrete to Surface, Groave Ral 1 20 | 18/5198 Figure ES | Dosign of Savéooth Bus Bays at Terminals 1 20 | 1858 Figure £6 | Minimum Clearance for Buses at Interchanges or Terminals 1 20 | 1858 Figure €7_| Locomotive Engine Exhaust Emissions Data 1 20 | 1858 Figure €8_| itumination Levels at Metropolitan Stations 1 20 | 188 Figure €9 | Drawing T1403 Tramway Standard Track Design Ballast Construction | 20 | 18808 ar aay ae aes [| PUBLIC TRANSPORT CORPORATION INFRASTRUCTURE DIVISION ENG-AD-STD-0001 VERSION 2.0 GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS. RECORD OF AMENDMENTICHANGE “The amendments noted inthe undermenioned Amendment List have been incorporated inthis copy of the publication. AMENDMENT] VERSION | VERSION ‘SUMMARY OF CHANGE DOCUMENT LISTNO. DATE, AUTHORITY 10 | 23787 [iniaissue ‘Group Manager, Engineering Services 1 20 | tae ‘Sectons 82, 83, B4 and B7 revised, Figure E9 added, | Group Manager, document reformated. Engineering Services R.Usray. (Name) ‘CONFIRMATION OF MANUAL UPDATE: (Signature) ie (pate) RETURN COPY OF THIS RECEIPT To: Manager, Engineering Support Level 5, $89 Colts Street Mebourne cory No, io [fe] PUBLIC TRANSPORT CORPORATION ENG-AD-STD-0001 INFRASTRUCTURE DIVISION VERSION 2.0 GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS TABLE OF CONTENTS (cont'd) PART A - RAILWAY OPERATIONS: 1.0 CUSTOMER AND STAFF REQUIREMENTS ... 19 1.4 Customer Access : 19 1.2 Access to Station Platforms 19 1.3 Station Facilities General . . 19 1.4 Shared Areas of the Development ...... ~ 20 1.5 Ticket Vending, Validating and Gate Control + 20 4.6 Security of Facilities and Contents 20 1.7 Temporary Station Facilities - 20 1:8 Communication Information Systems . - 20 1.9 Noticeboards . : 24 1:10 Passenger Information Display . 24 1.11 Interchange to Trams (Light Rail) 5 . 24 4:12 Traffic Management in Vicinity of Tram Tracks 24 113 Access to Bus Services ((f applicable) - 22 1.14 Temporary Modal Interchange . . + 22 1.15 Traffic Management to and from Road Network . + 22 1.16 — Driver/Staff Amenities ...... : : + 23 4.47 PermanentAccess ......... - 23 118 Bus Bays...... ua2e 4.49 Access for Railway Personnel an - 23 4.19.1 General .. 5 » 23 419.2 Servicing of Train Platform Areas... p23 1.19.3. Servicing of Modal Interchange Areas .. . : » 24 1.19.4 Servicing of Track Drainage, Signals and Overhead Wire . + 24 20 SAFETY AND SECURITY . 25 24 Construction Phase » 25 24.1 General Requirements . 5 » 28 2.4.2. Site Works ..... + 25 2.4.3 Customers and Staff 25 2.4.4 Protection of Infrastructure 25 22 Final Features .. » 26 2.2.4 Access for Emergency Services Providers 26 2.2.2 DISPLAN Arrangements 26 2.2.3 Jurisdiction of Victoria Police and Security Officers. 26 2.2.4 — Security Surveillance and Patrol + 26 3.0 OPERATIONAL BASED CONSTRAINTS DURING CONSTRUCTION .... 27 34 General.......... aoc sees OT 3.2 Absolute Occupations 27 3.3 Construction Programme . 27 34 Restrictions » 28 PUBLIC TRANSPORT CORPORATION | ENG-AD-STD-0001 YY, INFRASTRUCTURE DIVISION VERSION 2.0 GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS TABLE OF CONTENTS (cont'd) PART A - RAILWAY OPERATIONS 4.0 COST OF SUBSTITUTE SERVICES ....... 0.0.0.0. 0s eect eee reeee 30 5.0 TEMPORARY FACILITIES DURING CONSTRUCTION 31 6.0 INDUSTRIAL RELATIONS .......... 32 7.0, SAFETY PRECAUTIONS AND PRACTICES 7A General....... 7.2 Track Clearances .- 73 Safety Awareness Training. ; 74 Safety Precautions During Construction 8.0 FACILITIES AND ACCESS FOR THE DISABLED ....... beeeeeeeees 34 9.0 VEHICLE PARKING AREAS/FACILITIES 9.1 Car Parking for PTC Personnel . 92 Car Parking for PTC Customers ..... 9.3 Motor Cycle Parking for PTC Customers 9.4 Bicycle Parking and Locking 10.0 POST CONSTRUCTION ...........00005 ee seeees 36 no eae oe Fee PUBLIC TRANSPORT CORPORATION | ENG-AD-STD-0001 INFRASTRUCTURE DIVISION VERSION 2.0 GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS. TABLE OF CONTENTS (cont'd) PART B - ENGINEERING DESIGN AND CONSTRUCTION ASPECTS 1.0 GENERAL .. 38 44 Development Proposals 38 12 Submissions and Approvals Before Construction - . 38 20 REGULATIONS AND PUBLISHED STANDARDS . 2.4 Regulations .. 2.2 Published Standards 3.0 DESIGN STANDARDS ... 3.1. General Design Loads 32 Traln.........00 3.2.1 Design Loads . 3.2.2 Standard Trackwork Construction - Trains . 3.2.3. Special Trackwork Construction . 3.2.4 Impact on Train Signalling Systems « 3:3 Trams (Where applicable). 50 3.4 Buses ... . 3.4.1 "Design Loads. 3.4.2 Bus Terminal Area 3.4.3 Pavement Design 4.0 CLEARANCES 441 General .. 42 Trains 42.1 Vertical Clearances 42.2 Horizontal Clearances tee 43 Trams 2.0... eee 4.3.1 General . 44 Buses . 4.4.4 General . 4.4.2 Turning Movements . 4.43 Clearances . 4.4.4 Bus Bays 5.0 BUILDING CONSTRUCTION peer 49 6.0 COLUMNS - eee seve 50 6.1 Column Form and Dimensions ...... ac8 seve 50 6.2 Location and Spacing . epee goo pee oO) 7.0 PIER DESIGN/IPROTECTION 2... 206.000 eee eee : 51 8.0 FOUNDATIONS ... eee sees 58 PUBLIC TRANSPORT CORPORATION | ENG-AD-STD-0001 a INFRASTRUCTURE DIVISION Sensonaal GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS: PART B - ENGINEERING DESIGN AND CONSTRUCTION ASPECTS 9.0 EXCAVATIONS......... eee eee 54 10.0 UNDERGROUND SERVICES «0.0.00. 002 0.0 00c 0s eeeeeeeee ee eee 55 11.0 ATTACHMENT OF OVERHEAD TRACTION WIRING ........... 250255 56 12.0 ATTACHMENT OF COMMUNICATIONS & TRAIN INFORMATION SERVICES een sae 57 13.0 VENTILATION AND EXHAUST EXTRACTION REQUIREMENTS ....... 58 14.0 VIBRATION .........- 15.0 NOISE AND ACOUSTIC LEVELS ............-055 pees 6 16.0 SERVICES 46.1 General... 16.2 — Stormwater 463 Sewerage .... 16.4 — Water Supply 16.5 Electricity Installations : 62 16.6 Electric Traction . 63 16.7 Cable Ducting - 63 16.8 Fire Protection 63 17.0 DRAWINGS OF PUBLIC TRANSPORT RELATED STRUCTURES os 65 18.0 AESTHETIC ASPECTS ........ “ se eeeeee eee 66 war aay aE Fae

You might also like