J
Public Transport
Corporation.
GENERAL CRITERIA FOR
DEVELOPMENT AT RAILWAY
LOCATIONS
RAILWAY OPERATIONS AND
ENGINEERING DESIGN AND
CONSTRUCTION ASPECTS
ENG-AD-STD-0001
VICES:
IGINEERING SEF
ENGINE GROUP
CONTROLLED COPY
APPROVED
Lato) ate. 9/1996
Group Manager, Engineering ServicesPUBLIC TRANSPORT CORPORATION | ENG-AD-STD-0001
INFRASTRUCTURE DIVISION VERSION 2.0
GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS
LIST OF EFFECTIVE PAGES
‘SECTIONS DESCRIPTIONTITIE No.oF | VERSION] DATE
PACES
0100 | Document Gon and ble of cones 10| 20 | 1ei06
1.0 | introduction 2) 20 | 19908
72.0 Definitions 2 | 20 | 19508
73.0 | Approvals Proseases + [20 | 10888
40 [Tracks and Facies 1) 20 | 0808
1.0 [Customer and Sat Reauremens | 20 | 191890
(A2.0 | Safely and Secey 2 | 20 | 19690
23.0 | Operational Gased Gansrants During Conatuton af 20 | 101908
‘A&0 [Coat of Subsite Services +) 20 | 19808
15.0 | Temporary actos Oving Gonaiton 120 | ras08
18.0 [Indus Rettons [20 | as
‘7.0 | Safty Precautions and Praciee | 20 | a8
‘$8.0 [ Faction and Accuss for Disabled + [220 | 10.
729.0 | Vatile Paring Areas/Facities 1) 20 | 19898
7A10.0_—| Post Consructon [20 | es8
1.0 | General 2 [20 | ses06
82.0 | Requslons and PuBiahed Slander 3 [20 | 16508
83.0 | Design Standards | 20 | 12880
840 [clearances 3] 20 | 12868
35.0 | Buling Conston [20 | 1a668
28.0 [eons | 20 | tase:
87.0 | Per Designrotston 2} 20 | 19886
28.0 | Foundations [20 | a6
29.0 | Sxenatene | 20 | a6
810.0 — | Underground Seniens 1) 20 | 12698
3811.0 | tachment of Ovehead Traction Wing 1) 20 | 12898
18120 | Atachment of Commuricalon and Tan infrmaon 120 | reso
13.0. | Venblatin and Exhaust Eracon Resurements 2 [20 | 18808
140 | vzaton re eT TT)
815.0 [Noise and Acoust Leis 1 [20 | 19888
518.0 | senéces 3 [20 | ar508
317.0 | brawings of Pubic Tranapon Rebted Sroties 1} 20 | es08
316.0 | Aesthac Aspects 1 [20 | 12/80[P|
INFRASTRUCTURE DIVISION
PUBLIC TRANSPORT CORPORATION.
ENG-AD-STD-0001
VERSION 2.0
GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS
LIST OF EFFECTIVE PAGES (Cont'd)
‘Appendix | Procedures for Contractors Working on Public Transport Corporation's | 18 20 | (tase
Property and Facies
Figure €1_| Drawing 132/95 Clearance Diagram - Development over Tracks n 20 | 18596
Figure €2_| Drawing P.1SS56 Minimum Clearances to Structures for Tramways 1 20 | sais8
| Figure E3_[ Drawing FS96A Track Formation and Ballast - Single Track 1 20 | 18598
Figure €4_{ Drawing P.1401 Tram Track Design Concrete to Surface, Groave Ral 1 20 | 18/5198
Figure ES | Dosign of Savéooth Bus Bays at Terminals 1 20 | 1858
Figure £6 | Minimum Clearance for Buses at Interchanges or Terminals 1 20 | 1858
Figure €7_| Locomotive Engine Exhaust Emissions Data 1 20 | 1858
Figure €8_| itumination Levels at Metropolitan Stations 1 20 | 188
Figure €9 | Drawing T1403 Tramway Standard Track Design Ballast Construction | 20 | 18808
ar aay ae aes[|
PUBLIC TRANSPORT CORPORATION
INFRASTRUCTURE DIVISION
ENG-AD-STD-0001
VERSION 2.0
GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS.
RECORD OF AMENDMENTICHANGE
“The amendments noted inthe undermenioned Amendment List have been incorporated inthis copy of the publication.
AMENDMENT] VERSION | VERSION ‘SUMMARY OF CHANGE DOCUMENT
LISTNO. DATE, AUTHORITY
10 | 23787 [iniaissue ‘Group Manager,
Engineering Services
1 20 | tae
‘Sectons 82, 83, B4 and B7 revised, Figure E9 added, | Group Manager,
document reformated.
Engineering Services
R.Usray.
(Name)
‘CONFIRMATION OF MANUAL UPDATE:
(Signature)
ie
(pate)
RETURN COPY OF THIS
RECEIPT To:
Manager, Engineering
Support
Level 5, $89 Colts Street
Mebourne
cory No,
io[fe]
PUBLIC TRANSPORT CORPORATION
ENG-AD-STD-0001
INFRASTRUCTURE DIVISION
VERSION 2.0
GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS
TABLE OF CONTENTS (cont'd)
PART A - RAILWAY OPERATIONS:
1.0 CUSTOMER AND STAFF REQUIREMENTS ... 19
1.4 Customer Access : 19
1.2 Access to Station Platforms 19
1.3 Station Facilities General . . 19
1.4 Shared Areas of the Development ...... ~ 20
1.5 Ticket Vending, Validating and Gate Control + 20
4.6 Security of Facilities and Contents 20
1.7 Temporary Station Facilities - 20
1:8 Communication Information Systems . - 20
1.9 Noticeboards . : 24
1:10 Passenger Information Display . 24
1.11 Interchange to Trams (Light Rail) 5 . 24
4:12 Traffic Management in Vicinity of Tram Tracks 24
113 Access to Bus Services ((f applicable) - 22
1.14 Temporary Modal Interchange . . + 22
1.15 Traffic Management to and from Road Network . + 22
1.16 — Driver/Staff Amenities ...... : : + 23
4.47 PermanentAccess ......... - 23
118 Bus Bays...... ua2e
4.49 Access for Railway Personnel an - 23
4.19.1 General .. 5 » 23
419.2 Servicing of Train Platform Areas... p23
1.19.3. Servicing of Modal Interchange Areas .. . : » 24
1.19.4 Servicing of Track Drainage, Signals and Overhead Wire . + 24
20 SAFETY AND SECURITY . 25
24 Construction Phase » 25
24.1 General Requirements . 5 » 28
2.4.2. Site Works ..... + 25
2.4.3 Customers and Staff 25
2.4.4 Protection of Infrastructure 25
22 Final Features .. » 26
2.2.4 Access for Emergency Services Providers 26
2.2.2 DISPLAN Arrangements 26
2.2.3 Jurisdiction of Victoria Police and Security Officers. 26
2.2.4 — Security Surveillance and Patrol + 26
3.0 OPERATIONAL BASED CONSTRAINTS DURING CONSTRUCTION .... 27
34 General.......... aoc sees OT
3.2 Absolute Occupations 27
3.3 Construction Programme . 27
34 Restrictions » 28PUBLIC TRANSPORT CORPORATION | ENG-AD-STD-0001
YY, INFRASTRUCTURE DIVISION VERSION 2.0
GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS
TABLE OF CONTENTS (cont'd)
PART A - RAILWAY OPERATIONS
4.0 COST OF SUBSTITUTE SERVICES ....... 0.0.0.0. 0s eect eee reeee 30
5.0 TEMPORARY FACILITIES DURING CONSTRUCTION 31
6.0 INDUSTRIAL RELATIONS .......... 32
7.0, SAFETY PRECAUTIONS AND PRACTICES
7A General.......
7.2 Track Clearances .-
73 Safety Awareness Training. ;
74 Safety Precautions During Construction
8.0 FACILITIES AND ACCESS FOR THE DISABLED ....... beeeeeeeees 34
9.0 VEHICLE PARKING AREAS/FACILITIES
9.1 Car Parking for PTC Personnel .
92 Car Parking for PTC Customers .....
9.3 Motor Cycle Parking for PTC Customers
9.4 Bicycle Parking and Locking
10.0 POST CONSTRUCTION ...........00005 ee seeees 36
no eae oe FeePUBLIC TRANSPORT CORPORATION | ENG-AD-STD-0001
INFRASTRUCTURE DIVISION VERSION 2.0
GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS.
TABLE OF CONTENTS (cont'd)
PART B - ENGINEERING DESIGN AND CONSTRUCTION ASPECTS
1.0 GENERAL .. 38
44 Development Proposals 38
12 Submissions and Approvals Before Construction - . 38
20 REGULATIONS AND PUBLISHED STANDARDS .
2.4 Regulations ..
2.2 Published Standards
3.0 DESIGN STANDARDS ...
3.1. General Design Loads
32 Traln.........00
3.2.1 Design Loads .
3.2.2 Standard Trackwork Construction - Trains .
3.2.3. Special Trackwork Construction .
3.2.4 Impact on Train Signalling Systems «
3:3 Trams (Where applicable). 50
3.4 Buses ... .
3.4.1 "Design Loads.
3.4.2 Bus Terminal Area
3.4.3 Pavement Design
4.0 CLEARANCES
441 General ..
42 Trains
42.1 Vertical Clearances
42.2 Horizontal Clearances tee
43 Trams 2.0... eee
4.3.1 General .
44 Buses .
4.4.4 General .
4.4.2 Turning Movements .
4.43 Clearances .
4.4.4 Bus Bays
5.0 BUILDING CONSTRUCTION peer 49
6.0 COLUMNS - eee seve 50
6.1 Column Form and Dimensions ...... ac8 seve 50
6.2 Location and Spacing . epee goo pee oO)
7.0 PIER DESIGN/IPROTECTION 2... 206.000 eee eee : 51
8.0 FOUNDATIONS ... eee sees 58PUBLIC TRANSPORT CORPORATION | ENG-AD-STD-0001
a INFRASTRUCTURE DIVISION Sensonaal
GENERAL CRITERIA FOR DEVELOPMENT AT RAILWAYS LOCATIONS:
PART B - ENGINEERING DESIGN AND CONSTRUCTION ASPECTS
9.0 EXCAVATIONS......... eee eee 54
10.0 UNDERGROUND SERVICES «0.0.00. 002 0.0 00c 0s eeeeeeeee ee eee 55
11.0 ATTACHMENT OF OVERHEAD TRACTION WIRING ........... 250255 56
12.0 ATTACHMENT OF COMMUNICATIONS &
TRAIN INFORMATION SERVICES een sae 57
13.0 VENTILATION AND EXHAUST EXTRACTION REQUIREMENTS ....... 58
14.0 VIBRATION .........-
15.0 NOISE AND ACOUSTIC LEVELS ............-055 pees 6
16.0 SERVICES
46.1 General...
16.2 — Stormwater
463 Sewerage ....
16.4 — Water Supply
16.5 Electricity Installations : 62
16.6 Electric Traction . 63
16.7 Cable Ducting - 63
16.8 Fire Protection 63
17.0 DRAWINGS OF PUBLIC TRANSPORT RELATED STRUCTURES os 65
18.0 AESTHETIC ASPECTS ........ “ se eeeeee eee 66
war aay aE Fae