PUBLIC TRANSPORT CORPORATION
INFRASTRUCTURE DIVISION
TECHNICAL SPECIFICATION No. TM15
FOR
MANUFACTURE AND SUPPLY OF
STEDEF CONCRETE SLEEPERS
REVISION 1
ISSUE DATE: JULY 1995
Revision 1, July, 1995 - Re numbered from TM 12 and reformatted
(Original issue February 1995)
Track Materials Engineer
2 5 Engineering Services GroupCONTENTS
GENERAL. See
1.1 Nature and Scope of Works ..
1.2 Technical Se
1.3 Details and illustrations
1.4 Compliance with Specification and Standards...
4.5 Technical rt.
1.6 Moulds.
1.7 Material Su tion
MANUFACTURING DETAILS
QA TYPO ernnnnnnn
2.2 Manufactur —
2.3 Concrete Testing During Production .
24 Rails psseeceseeees
2.5 Track Gauge.
QUALITY ASSURANCE ..
INSPECTION.
WARRANTY...
RESOLUTION OF DISPUTES.
SUPPLY AND DELIVERY ......
7A Supply...
72 Delivery.
APPENDIX "A"DRAWINGS AND TECHNICAL DOCUMENTS
APPENDIX "B"MATERIAL SUPPLIED BY THE CORPORATION ..
APPENDIX "G”PRICING SCHEDULE ...PUBLIC TRANSPORT CORPORATION
INFRASTRUCTURE DIVISION
TECHNICAL SPECIFICATION No. 15
FOR MANUFACTURE AND SUPPLY OF
STEDEF CONCRETE SLEEPERS
4. GENERAL
1.1 Nature and Scope of Works
12
13
14
15
16
Ww
TMISSTOF
‘The work to be carried out under this contract comprises the manufacture, supply and delivery
of 120 No, STEDEF concrete sleepers,
Technical Representative
‘The Corporation's Technical Representative shall be the Track Materials Engineer, Telephone
No. (03) 619-4436 or 619-4434, who will be responsible for all technical matters including that
for Quality Assurance.
Details and Illustrations
A fully detailed drawing of the STEDEF sleeper shall be supplied to the tenderer.
‘Any proposed modifications to the original design shall be submitted to the Superintendent
Engineer for his approval before any modifications are undertaken.
A complete set of drawings showing the proposed modifications shall be submitted to the
‘Superintendent Engineer.
‘The STEDEF sleeper is shown on Drawing No. E360/Ill Rev C.
‘The following Technical Documents are to be read in conjunction with this drawing:-
i Concrete Sleepers TSA 396
STEDEF Specification NFF 51-101
Compliance with Specification and Standards.
‘The tenderer shall state whether it is possible for him to conform to all requirements of these
‘Specifications, Drawings, referenced Technical Documents and all other relevant Australian or
International Standards.
Technical Support
Preference will be given to a well established firm with long experience in the manufacture and
‘supply of concrete sleepers which is capable of providing technical and general advice.
Moulds
‘All moulds produced for this contract shall become the property of the Public Transport
Corporation. The moulds shall be manufactured and tested in accordance with Technical
Document TSA 396.
‘The price of fabricating these moulds shall be listed separately.
Material Supplied by the Corporation
The Contractor shall obtain from the Corporation all material fisted in Appendix “B". This
material ordered by and delivered to the Contractor shall, for all purposes, be valued at and
Revision 1, July 1995 Page 1%
PUBLIC TRANSPORT CORPORATION
INFRASTRUCTURE DIVISION
TECHNICAL SPECIFICATION No. 15
FOR MANUFACTURE AND SUPPLY OF
STEDEF CONCRETE SLEEPERS
charged to the Contractor at the rates specified in Appendix “B”
MANUFACTURING DETAILS
24
22
23
24
25
Type
‘The STEDEF sleepers shall be suitable for a high volume rail trafic with axle loads up to 16
tonnes.
Manufacture
‘The STEDEF Concrete sleepers shall be manufactured in accordance with Drawing No. E
360/111 Rev. C and Technical Documents TSA 396 and NFF 51-101.
The concrete used to manufacture the sleepers shall be of high quality low permeability
concrete as detailed in Technical Document TSA 396. The compaction of the concrete shall
be by immersion poker vibrators and the product shall be steam cured prior to discharge from
the moulds.
The STEDEF concrete sleepers shall be manufactured with the tie bar hot dipped galvanised
to AS 1650 with the minimum average thickness of 84 microns. The galvanised bar shall be
tested in accordance with AS 1650. The galvanised coating shall be sufficiently adherent to
withstand normal handling during transport and installation. Scratched or slightly damaged
areas of galvanised coating shall be repaired by low melting paint, zinc alloy repair rods or
powders specially for the above purpose. All costs associated, with testing and repairs shall
be bome by the Contractor.
Concrete Testing During Production
‘The Contractor shall arrange for all tests as required in Technical Documents TSA 396 and NFF
51-101. The tests shall be carried out by a laboratory registered by the National Association
of Testing Authorities, Australia (NATA).
All test certificates shall be approved by a NATA endorsed Officer and forwarded to the Track
Materials Engineer Fax (03) 619 4440 Phone (03) 619 4436 or 619 4434 prior to delivering of
the STEDEF sleepers.
‘All costs associated with these tests shall be borne by the Contractor.
Rails
‘The concrete sleepers shall be manufactured to utilise 60kg rail to AS 1085.1.
Track Gauge
‘The concrete sleepers shall be manufactured to achieve a track gauge of
1600 + 2, - 4mm,
QUALITY ASSURANCE
‘The Contractor shall maintain a Quality System in accordance with AS3902/ISO9002 and as detailed
in the attached document PTC Quality Assurance Requirements SQA 3902.2 Rev "0" (See Appendix
A).
TMISSTOF
Revision 1, July 1995 Page 2PUBLIC TRANSPORT CORPORATION
INFRASTRUCTURE DIVISION
TECHNICAL SPECIFICATION No. 15
FOR MANUFACTURE AND SUPPLY OF
STEDEF CONCRETE SLEEPERS:
‘As part of the tender evaluation process the PTC document Suppliers Quality Assurance Survey SQA
3900.1 shall be completed and returned with the tender.
For this Contract the Corporation's Quality Assurance Representative shall be the Track Materials
Engineer.
‘The Contractor shall maintain records of all inspection and testing operations performed and results
obtained. As applicable, the records shall include:
- concrete test certificates
= allrelevant dimensional and tolerance criteria
- concrete compressive strength test results
These records shall be certified by the Contractor's Quality Assurance Officer and a copy shall be
provided to the Superintendent at the time of inspection.
Certificates of Conformance and other documentation as required by document SQA 3902.2 Revision
*O" shall be included with packing and delivery documentation and shall be addressed to Manager,
Permanent Way Materials Depot, Spotswood.
‘The Certificates of Compliance shall include statement that all testing were performed in accordance
with the approved procedures, utilising approved materials and by approved personnel. These
certificates shall be submitted to the Corporation's Quality Assurance Representative prior to delivery
of the sleepers.
INSPECTION
The Contractor shall permit the Superintendent, or his approved representative, access at all
reasonable times to all places where the work is being carried out and shall afford all the necessary
facilities for inspection and testing of materials and workmanship. These facilies shall include suitable
benches. Faciities shall be to the satisfaction of the Superintendent and shall permit inspections to be
conducted in all weather conditions.
All assemblies and also individual components shall be subject to a provisional inspection, by the
‘Superintendent, at the contractors works to ensure conformity with this Specification.
‘Such provisional inspection and/or approval shall not be a bar to rejection of the material at the specified
point of delivery in the event of it not being delivered and received in good order and condition and fully
complying with these Specifications.
All costs incurred by the Contractor to provide labour, equipment and gauges necessary for the
performance, dimensional, hardness, and general inspections at the Contractor's works, shall be borne
by the Contractor. Inspection gauges shall be solely used for inspection purposes by the Contractor's,
‘Quality Assurance Officer and the Superintendent.
‘The fabricated moulds shall be provisionally inspected at the Contractors works by the Superintendent
prior to the production of the STEDEF Sleepers.
‘The first three production samples shall be provisionally inspected at the works of the Contractor by the
‘Superintendent. These inspections will consist primarily of the following:-
a) __ Reinforcement inspection of the STEDEF sleeper (prior to concrete) and,
b) Concrete compressive strength inspection. The Contractor shall provide all
compressive strength reading equipment at his own expense.
‘TMISSTOF Revision 1, July 1995 Page 3PUBLIC TRANSPORT CORPORATION
INFRASTRUCTURE DIVISION
‘TECHNICAL SPECIFICATION No. 15
FOR MANUFACTURE AND SUPPLY OF
STEDEF CONCRETE SLEEPERS
‘The first six production samples shall be provisionally inspected by the Superintendent for track gauge
in accordance with AS1085.14 Clause 6.3.5.
Concrete test certificates in accordance with the above Clause 2.3 shall be provided to the
Superintendent during intial inspection.
‘Subsequent production shall be inspected by the Contractor using @ sampling plan of 1 in 10 for
‘concrete hardness and track gauge. The Contractor shall, provide the inspection results to the
‘Superintendent prior to delivery.
% WARRANTY
‘The Corporation reserves the right to reject any material which within one (1) year of delivery, is found
‘not to conform to this Specification. Any rejected material shall be repaired or replaced by and at the
cost of the Contractor.
6. RESOLUTION OF DISPUTES
In the event of a dispute arising between the Contractor and the Corporation regarding the test results
of any component, the Contractor and the Corporation shall agree to have the specified tests and if
necessary additional tests, carried out by an independent testing authority. This authority shall be
registered by N.A.T.A. for the field and classification of tests concerned at the time of testing.
‘The results of such independent testing shall be considered as being final and the costs of testing shall
be borne by the loser of the dispute
7. SUPPLY AND DELIVERY
7.4 Supply
‘The Sleepers shall be supplied at the following rate:-
40 No. Sleepers within 4 months from commencement of contract
an
80 No. Sleepers over the following 24 months.
‘The supply commencement, delivery schedule and completion times shall be specified by the
tenderer.
72 Delivery
7.2.1. The concrete sleepers shall be delivered F.1.S. to: Manager, Permanent Way Materials
Depot, McLister Street, Spotswood, Vic.
7.22 Delivery shall be deemed to be provisional until the Superintendent certifies that the
whole of the service is in accordance with this Specification and its appended
documents and is in every respect to his satisfaction.
TMISSTOF Revision 1, July 1995, Page 4f PUBLIC TRANSPORT CORPORATION
_ INFRASTRUCTURE DIVISION
) TECHNICAL SPECIFICATION No. 15
FOR MANUFACTURE AND SUPPLY OF
| STEDEF CONCRETE SLEEPERS
APPENDIX “A”
DRAWINGS AND TECHNICAL DOCUMENTS:
1 SUPPLIED BY THE CORPORATION
As referred to in this Specification.
DRAWING NO REVISION
: 360/111 c ‘Australia Melbourne Loop
STEDEF Ballastiess Track
- with SC Sleepers.
‘ TECHNICAL DOCUMENT
| TSA 306 Concrete Sieepers
: NF 51-101 ‘STEDEF Specification
QUALITY ASSURANCE DOCUMENT
‘SQA 3902.2 Rev O Quality Assurance
} Requirements,
: APPENDIX "B”
MATERIAL SUPPLIED BY THE CORPORATION
As specified in Clause 1.7 of this Specification
MATERIAL QUANTITIES RATE
7 Rail, 60kg A.S, 4m length 2No. Free of Charge
Rail fastenings to 12 Sets Free of Charge
‘Suit STEDEF Sleepers.
TMISSTOF Revision 1, July 1995, Page 5PUBLIC TRANSPORT CORPORATION
INFRASTRUCTURE DIVISION
) ‘TECHNICAL SPECIFICATION No. 15
FOR MANUFACTURE AND SUPPLY OF
STEDEF CONCRETE SLEEPERS
DESCRIPTION
STEDEF Sleeper 120
Moulds 1 Set
ADDITIONAL INFORMATION TO BE SUPPLIED BY TENDERER
1. Delivery commencement... NO.
2. Delivery Schedule
3. Delivery Completed
4, Percentage of Imported Content
5. Country Of Origin if Imported Content.
‘TMISSTOF
APPENDIX
PRICING SCHEDULE
DELIVERY SCHEDULE
sve» Months from Receipt of Order.
Months from Receipt of Order.
Revision 1, July 1995
ESTIMATED REQUIREMENT PRICE PER UNIT
%
Page 6