Pd1096 1. National bldg.

code
RA 9296 2. Architectural law
Pd 957 3. Condominium/Subdivision Law
RA 9293 4. Intellectual Property Law
Construction 5. Di kasama sa scope of work of an architect
contract 6. First thing na sasabihin sa client or first requirement
Informal consultation 7. -If gagawin to dapat may pangmeryenda man lang tapos
--first impression is important and wag tatanggap ng free
consultation
15 years 8. Civil liability on projects
BOQ-bill of quantities 9. under of architect on record
Mediator/representatives of 10. Process of permits
client
Pre-bid meeting 11. -Give drawings, scope, specifications to contractor
-Bidding for to compensate our resources to them
Submission of bids 12. -Placed in an enclosed envelop/folder
-Scaled by the contractor
-bubuksan lang if kasama ang client or representative of
client
Evaluation Process/ Stage 13. -after the bidding process
-estimate, scope, specifications (checking)
Summary of bids 14. -summary [resented to the client (one or two pages)
-putting remarks (if tama or kulang ag gawa ng contractor
Re-submission of Bids 15. Summary then present again to client
Periodical site visits 16. -Responsibility of an architect
-after construction
SPP203 17. Specialized architectural services
Architectural Interior 18. -Fitouts- renovation of interior/complete renovations)
Ano ginagamit sa wall
-Architects-general side ofwalls
-ID-more specific,more in depth
Acoustic design 19. Science of acoustics
Architectural Lighting and Layout 20. -analytical study in the layout or how many lights how
Design are we going to use, interior or exterior
Site Development Planning 21. Specialized only in site planning, how we place and
allocate bldg. and green space
Site and Physical Planning 22. -Deal with the adjacent properties, urban/rural planning,
Services complex and more complex since involve different sites
Comprehensive Development 23. Involves the combination of SDP and Physical Planning
Planning
Cultural Heritage Conservation 24. -Retrofitting old houses, presenting the historical places
and Planning and structures
-ex.vigan ilocos, how they preserve: to preserve integrity
and materials even in surrounding
Security and Evaluation Planning 25. Analysis between the site, security measures of bldg.
itself and safety of the public
Building System Design 26. We specify and propose what are the current structure.
And how do we improve the construction or building
system, what are the bldg. system are we going to
propose if its electrical, mechanical, plumbing etc.
Facilities Maintenance Support 27. –we become building administrator
-Bldg. administrator how to manage the whole bldg.
itself-bldg. admin of facilities maintenance support
Building Testing and 28. We render these services, for 2nd opinion
Commissioning
Building Environment 29. -become a consultant
certification -check if the building if it compliance with the
environmental policies/compliances
Forensic Architecture 30. -deals with the materials of the pre-historic bldgs.,
heritage houses, how do we repair this type of
methodologies and research, what are the causes why
the buildings depreciate
Building Appraisal 31. We identify the value if the bldg., and the property, it is
personal use
Structural Conceptualization 32. Do schematics, columns, beams, or structural elements,
analytical; conceptualization of the bldg.
Preliminary Services 33. Specialize on a specific pre design services, consultaion
services
Contract Documentation and 34. we prepared contract , are the contracts valid and fair,
Review 2nd opinion and can seek a third party to review the
contract
Post Design Services 35. Become a project manager, from the start and the end of
the execution of the project.
Dispute Avoidance and 36. PRC BOA, resolve kung tam aba, mediate the architect,
Resolution and compliance, petitial body
Architectural Research method of 37. We do research on the current methods and come up
the services with new methods, we innovate on what is present and
common
Special building and Facility 38. Deal with special structures ex. Nuclear powerplants and
Planning Design stations
Building components 39. Deal with components of each system, more detailed
specialization, materials for each type of system, how to
operate and control the system
Management of Architectural 40. Legislative body, guideline with regards with our
Practices profession legal aspect of architecture
SPP 204 A- Full time supervision 41. To supervise personally the on going project to monitor
services and supervise
SPP 204 B -Construction 42. -Accomplish and do the role of construction manager
Management Services -Assign diff personnel to manage the projects
SPP 205 – Post Construction 43. -not only limited to one building even the site
Services -Manage the whole management – properties manager
SPP 206-Comprehensive 44. All the discuss services from SPP 201-205 fall into service
architectural Services can be offered
SPP 207- Design and build 45. Design build by administration
services 46. Design build by guaranteed maximum cost

By administrator 47. You have your own team, represent your company
Be the construction manager of your team
Client oriented-everything we do as is in favor to the
owner:tipid and mas mabilis
*budget friendly
*fast project
*profit oriented- contractors
By guaranteed maximum Cost 48. We have a target budget, limited time and limited cost
should be finished by the exact date, no excuses
SPP 208 Architectural Design 49. Producer or organizer of any design competition
Competition Service
SPP 209- Professional 50. We do our services in a professional measures
Architectural Consulting

3 MAIN FACTORS OF CONTRACT OR NILALAMAN NG CONTRACT


 Scope/definition of -services offered
 Clear:
-How much is prof fee/change
-Installment/full-payment
 Time/duration
-clear
-approval; consent from both parties
-fully notarized
ALSO WORKS OF ARCHITECT (RESPONSIBILITY)
 Architect on record
 Mediator/representatives of client

BIDDING PROCESS

 Pipili muna ng contractors


QUALIFICATIONS: (crucial)
1. Financial Capacity
2. Sufficient man power & equipments
3. Background of contractor
 Invitation to Bid
Specify:
1. Time
2. Date
3. Place
 Pre-bid meeting
 Submission of bids
 Evaluation Process/Stage
 Summary of bids
 Re-submission of Bids
 Contract
1. Scope and limitations
2. Budget
3. Time frame / duration
 Responsibility

SPECIALIZED SERVICES

 Architectural Interior
 Acoustic Design
 Architectural Lighting
 Site development Planning
 Site and physical planning service
 Comprehensive development planning
 Cultural heritage and consultation
 Security and evaluation planning
 Building system design
 Facilities, maintenance support
 Building testing and Commissioning
 Building environment certification
 Forensic Architecture
 Building Appraisal
 Structural Conceptualization
 Preliminary Services
 Contract Documentation and Review
 Post Design Services
 Dispute avoidance resolution
 Architectural Research methods
 Special building and facility Planning Design
 Building Components
 Management of architectural practices

3 ASPECT

 Time
 Budget
 Strength

SPP 202- PRE DESIGN


SCHEMATIC DESIGN

DESIGN

BID PROCESS

PERIODIC SITE VISIT

TURN OVER

SPP 203- SPECIALIZED SERVICES

SPP 204 A- FULL TIME SUPERVISION SERVICES

SPP 204 B- CONSTRUCTION MANAGEMENT SERVICES

SPP 205- POST CONSTRCUTION SERVICE

SPP 206- COMPREHENSIVE ARCHITECTURAL SERVICES

SPP 207-DESIGN AND BUILD SERVICES

 Design build by administration


3 aspect or criteria in choosing your team:
o Financial
o Manpower
o Experience
 Design build by guaranteed maximum cost