Skanska Status A

KEY

S1-J S1-H S1-N S1-G S1-F S1-E S1-D

S1 Parapet
FFL +58.425

1125
S1 Level 11
FFL +57.300

S1 HOUSEKEEPING
AYUK JAMES - ROOF
RESPONSIBILITIES
3900
S1 Level 10
FFL +53.400
SSL +53.125 m

AA

N
3900

DARNELL S1.09.01
Office
S1.09.01
Office

S1 Level 9
FFL +49.500
SSL +49.150 m
3900

S1.08.01 S1.08.01
Office Office
S1 Level 8
FFL +45.600
SSL +45.250 m
3900

S1.07.01 S1.07.01
Office Office

S1 Level 7
FFL +41.700
SSL +41.400 m

REV DATE DESCRIPTION


3900

S1.06.01 P01 30/11/18 STAGE 3 ISSUE. Revisions as clouded.


Office P02 08/03/19 EARLYINFORMATION RELEASE. Revisions as clouded.
S1.06.01 'DCRF-S1-AHM-0091: Riser door numbers and layout P03 29/04/19 STAGE 4 ISSUE.
Office
S1 Level 6 revised to suit S/C feedback and supplier P04 22/11/19 STAGE 4 UPDATE. Revisions as clouded.
FFL +37.800 requirements
SSL +37.500 m P05 10/07/20 ISSUED FOR INFORMATION. Revisions as clouded.
P06 30/11/20 STAGE 4 UPDATE ISSUE. Revisions as clouded.
C01 20/08/21 ISSUED FOR CONSTRUCTION. Revisions as clouded.

RACHEL LEIGHTON
3900

S1.05.01 S1.05.01
Office Office
S1 Level 5
FFL +33.900
SSL +33.600 m

PROJECT TEAM
S1-M S1-R Client: British Land Acoustic Consultant: Sandy Brown
3900

Contractor: Skanska Cladding Consultant: EOC


S1.04.01 S1.04.01 Structural Engineer: AKT II Plot S1A: Morris+Company
Office Office
MEP Engineer: Arup Plot S1B: DSDHA
S1 Level 4 Cost Consultant: Alinea
FFL +30.000 Plot S1 / S1C / S3: AHMM
SSL +29.700 m
Project Manager: M3 Plot S2: Stanton Williams

NOTE
When this drawing is issued in uncontrolled CAD format it will be accompanied by a PDF
version and is issued to enable the recipient to prepare their own documents / models /
S1.03.08
3900

Office drawings for which they are solely responsible. The recipient should report all drawing errors,

S1 Level 3
S1.03.01
Office
CONNOR
S1.03.01
Office
omissions and discrepancies to the architect. All dimensions should be checked on site by the
contractor and such dimensions shall be the contractor’s responsibility.

Allford Hall Monaghan Morris Limited accepts no responsibility or liability for:-


- any use of this drawing by parties other than the party for whom it was prepared or for
FFL +26.100
SSL +25.750 m purposes other than those for which it was prepared
- any alterations or additions to or discrepancies arising out of changes to the background
information on which the drawings are based that was current at the time of issue, and which
occur to that information after it has been issued by AHMM
- any loss or degradation of the information held in this drawing resulting from the translation
from the original file format to any other file format or from the recipients reading of it in any
3900

other programme or any version of the programme other than that which was used to prepare it
- the accuracy of survey information provided by others or for any costs, claims, proceedings
S1.02.01 S1.02.01 and expenses arising out of reliance on such information
Office Office - any scaling from this drawing other than by the local planning authority solely for the purposes
S1.02.08
Office of the planning application to which it relates
S1 Level 2
FFL +22.200
SSL +21.900 m SSL +21.850 m Existing building information based on received 3D BIM Survey from Plowman Craven and 2D
client supplied survey.

Full scope of repair / modification work to retained existing building elements subject to full
fabric survey.
3900

All drawings to be read in conjunction with other consultants information.

N
S1.01.08
S1 Level 1 Office
FFL +18.300
SSL +18.000 m SSL +17.950 m
4400

PHIL
S1.00.11
Retail A1 JAMES S1.00.01
Reception - Hall

S1 Level 0
FFL +13.900 SSL +13.750 m SSL +13.650 m
4000

S1 Housekeeping
ALLFORD Responsibilities
HALL MONAGHAN MORRIS
S1.B1.19 ARCHITECTS Ltd., MORELANDS, 5-23 OLD STREET LONDON EC1V 9HL
Cycle Store Blossom Street
TEL 020 7251 5261 FAX 020 7251 5123 WEB WWW.AHMM.CO.UK
S1 Level B1 S1.B2.08 S1.B2.07
FFL +9.900 Transformer Room Switch Room SSL +9.900 m job title
BLOSSOM STREET, E1
Rev: 00
1800

S1 Level B2 drawing title / location


FFL +8.100 SSL +8.100 m
Date: 18/11/21
S1 GA SECTION AA

project number drawn checked scale suitability code

12055 GM PM 1 : 100@A1; S4
drawing previously issued as: 12055_S1_(00)_301
drawing no. revision

BS7891-AHM-S1-XX-DR-A-00301 C01