You are on page 1of 1

Notes:

WINDOW AND DOOR SCHEDULE ROOF

Pitch 23.5 Degrees


D01 D02 D03 W01 W02 IBR Chromadeck Roof sheets
38 mm x 38 mm sw brandering at 400 c/c
Level 2 38 mm x 114 mm sw wall plate tied down by hoop wire ties

2800
IBR Chromadek roofing sheets @ 23.5° pitch
fixed to timber trusses and purlins by
specialist. CEILING

910
900
9 mm Plasterboard ceiling fixed on
Level 2

2000
2100

2100
38 mm x 38 mm sw brandering at 400 c/c
Window Level 2800 EXTERNAL WALLS
2100

1851

100
23.50
Wood float plastered and and painted ext quality pva paint
950 900 813 870
600
INTERNAL WALLS

°
Window Level
NGL 2100
Render and set for paint 2 coats int. quality pva

0 8
EXTERNAL CILL

2800
1/A0153-26 Burnt Clay Cill Brick

NGL Door & Window Schedule LINTOLS

0 1 : 100 Precast concrete lintols on all openings

FLOOR
700 500 500 500 700

40 mm cement sand screesd on


100 mm concrete slab on
250 micron black polythene D.p.m on
150 mm well compacted hardcore
West Section 1
4 5 FOUNDATION
1 : 100 1 : 100 1/A0153-26 Minimum Depth 800 mm
Strip Footing 700 x 230 mm
r.w 3 TYPE AND DEPTH TO BE DETEMINED BY ENGINEER
Chromadeck Roof Sheets rainwater down
Timber trusses by specialist
pipe 230
8087
3857
38 x 38 mm fixing batterns at 400 mm ctrs

230
Level 2

1000
150 x 150 mm seamless chromadeck eaves gutters 3655

Level 2 2800 a.b

aa.b.b
230

115
2800
9 mm Plasterboard 114 x 38 mm wallplate
w.c
a.b

1000
38 x 38 mm sw brandering 220 x 19 mm sw fascia board for wood prime and paint

Window Level

r.w
75mm Coved Cornice Precast Concrete Lintol

2100

115

a.b
Window Level

237
964
w.c w.c

a.b
BLED
2100

115

a.b
900

Y
Burnt clay cill brick
w.c
w.c

LOBB
115
19 x 120 mm blockboard int. cill

a.b

DISA
NGL w.c rainwater

3993
900
230 mm Plastered and Painted walls

a.b
downpipe
0

115

a.b
Precast Concrete Paving

900
w.c
75 mm Skirting
a.b

150
NGL r.w

115

a.b
Minimum Foundation depth 700 mm 50
0 w.c

115
Actual depth to be determined on

900
Ceramic Tile

115

a.b
.
40 mm Cement Sand Screed
rainwate w.c
r down

900
pipe
100 mm Concrete Slab

230

115

a.b
150 mm well Compacted 700 230 x 700 mm Strip footings

site
Hardcore

900
w.c 2185

a.b
115

a.b
1471
East Section 1 - Callout 1 w.c
2 8

1015
2077
1 : 100 1 : 50

115
1/A0153-26 w.c

a.b
4

900

a.b
rainwater downpipe

115

a.b
w.c w.c
Level 2

1015

a.b
37

115
.5M

2800 BO

115
w.c
UN
w.c

a.b
DA
R

900
WA
YL
IN 100M BO

900
E UNDARY

RE TER
LINE
PROJE

a.b

115
CT NO

SE
RTH

115
w.c

a.b
VO 5
Window Level IR w.c 2

900
S

900
1/A0153-26
2100 1/A0153-26

a.b
LINE
LINE

115
900
150 M

115
BOUN

DARY
w.c

DARY

a.b
DARY

w.c
LINE

900
CHU

E WA

BOUN
BOUN

900
RCH

a.b
DRIV

115
27.5M
75M

115

BOYS
a.b
w.c w.c

900
NGL

900
50M
SCHO BOUN

a.b
OL O DARY

115
0
RCHA LINE
RD

115

a.b
w.c w.c

900
900
K
LOC

a.b
S

115
IN B

115

a.b

GIRL
ADM
w.c w.c

900
EXIS
T
CAR ING

900
TING
ASSE PARK
POIN MBLY

a.b

115
T

EXIS

115

a.b
w.c

900
INE

w.c
RY L

a.b
1551
RE

115
A
OUND

ST SIDE

t to
w.c

id to

900
AN NT
B

OCK

g conn 0 to connec
200M

DS IAL

a.b
230

a.b
ECD BL

115
point
la
South w.c

@ grad c sewer pipe

900
3

77
1530

a.b
1 : 100

ection

115
a.b w.c

ient 1:4

900
230

LINE

a.b
3857
a.b

115
EXIS

DARY
T
COT ING
TAG
E
115 a.b

v
BOUN

900
110 Up
1955
EXIS
TING

existin
163M
CLAS
SROO
rainwater downpipe

230
M BL 1700
OCKS
230
PROP 1

ETS
TOIL OSED NE
ETS W

TOIL
rainwater down pipe
TING
PLAY 1/A0153-26
EXIS
.30000
ING G .
ROUN
DS

r.w
REV DESCRIPTION BY DATE

STATUS:

N DA
R YL
INE
Project Status
Level 2
OU
MB
200
Floor Plan
215M
B OUND

2800 7
ARY
LINE

Window Level 1 : 100


2100 Esperer Building Solutions (EBS)
SITE PLAN 34 Trafalgar Road
Mabelreign
Harare
0719 184 610
NGL benefitsesperer@gmail.com
0

CLIENT:

TAFARA PRIMARY SCHOOL

ARCHITECT:

North
1 ESPERER BUILDING SOLUTIONS
1 : 100

SITE:
Stand Number 3309 Chiedza Township
Karoi

TITLE:
PROPOSED NEW TOILET BLOCK

SCALE AT A1: DATE: DRAWN: CHECKED:

As indicated Issue Date I.C T.M.


PROJECT NO: DRAWING NO: REVISION:

A0153-21 1/A0153-26

You might also like