You are on page 1of 1

NOTE:

SLAB EDGE PLANS HAVE A TYPICAL OFFSET DIMENSION STAMP:


OF 21" (UNLESS NOTED OTHERWISE) FROM THE WALL
FRAMING TO ACCOUNT FOR EXTERIOR SHEATHING PER
DETAIL 1/AD4-01.

610-108 610-107 610-106 610-105


UNIT 3X UNIT 2X UNIT 1X UNIT 3
1 2 3 4 5 6

101'-7"
1"
41'-112 1"
41'-112
6'-7" 11'-1"
1"
13'-52 1"
13'-52
13'-10" 14'-8" 6'-11" 4'-4" 12'-7" 4'-8" 5'-4" 3'-10" 11" 1'-0"

2'-9" 8'-4" 2'-9" 185'' x 48'' 2'-9" 9'-4" 2'-9" 9'-4" 2'-9"
78'' x 48''
1.4 1.4
8"

6"
6"
8"
0" 0" 0"

2'-0"

2'-0"
1"
22
1"
18'-102

14'-8"
18 R
UP +0''

DLNEO
IFRKIS
OTKO
SNA
RIC
S
B

5-2495-K
1.1 1.1
1'-9" 3'-2" 1'-8"

MAYFAIR

BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O
4TK
O
9
SN5R
A-IC
S
B
K

BROOKFIELD
CAST IRON
K-5942-5
SINKS
DLNEO
IFRKIS
OTKO
SNA
RIC
S
B

5-2495-K
CU. FT.
1.4 288

6"
78" x 42''

LOTS 4 & 10

2'-8"
+2.5''
48'' x 78''

DYNAMETRIC
CAST IRON
K-519
BATH

CIR
NTOERMI A
9
T
H1N
S
T5Y
A-D
C
B
K

DYNAMETRIC
CAST IRON
K-519
BATH
A 0" A
1.4

3'-10"

14'-2"
5"
8" 0" 0" 0"
16 R
UP

BUILDINGS 4-6

BROOKFIELD
CAST IRON
K-5942-5
SINKS
1.3

5'-0"

5'-5"
1"
27'-102 1"
21'-92 0"
20'-0" 19'-8"

BROOKFIELD
CAST IRON
K-5942-5
SINKS
1"
28'-52
89'-4"

22'-10"
1"
23'-102

19'-2"
1.2

DLNEO
IF
5RK
-2
IS
O
4TKO
9
SN
5R
A-IC
S
B
K

6"

6"
9'-2"
8"

IF
DLNEO -2
5RK 4
O
IS SN
O
9
TK A-IC
5R S
B
K

SLOPE: 1/2"/ FT.


DLNEO
IF
5RK
-2
IS
O
4TK
O
9
SN5R
A-IC
S
B
K

13'-3"
DLNEO
IF
5RK
-2
IS
O
4TKO
9
SN
5R
A-IC
S
B
K
+2.5''

BROOKFIELD
CAST IRON
K-5942-5
SINKS
1.3

0"
10" 1'-2" 3'-5"
4" 4'-94"
1
2.1

08-12-2020 - 2019 CODE UPDATE BUILDINGS 4-6


8"

NORISTKSNAIC
S

DLEIF
5K-2O
4O95R-K
B
OAKWOOD COMMUNITES, INC.

11"
B B

CIR
NTOERMI A
9
T
H1N
S
T5Y
A-D
C
B
K
1"
53'-62

1'-3"

DYNAMETRIC
CAST IRON
K-519
BATH
2.1 2.1

BROOKFIELD
CAST IRON
K-5942-5
SINKS
DLNEO
IF
5RK
-2
IS
O
4TK
O
9
SN5R
A-IC
S
B
K

BROOKFIELD
CAST IRON
K-5942-5
SINKS
1" 64 MAXWELL

12
1" 52 6"

9
1'-02

98'-5"

98'-5"
'-4
2.1 IRVINE, CA 92618

12'-9"
"
DLNEO
IF
5RK
-2
IS
O
4TKO
9
SN
5R
A-IC
S
B
K
PHONE: (949) 719-9040

13'-3"
12'-9"

11'-11"
CIR
NTOERMI A
9
T1
H N
S
T5Y
A-D
C
B
K

8"
1"
5'-62 1"
21'-112 1"
21'-112 1"
3'-92 1"
5'-42
20'-0" 20'-0" FAX: (949) 861-8696
5"

1"
67'-52
' -9 8

DLNEO
IF
5RK
-2
IS
O
4TK
O
9
SN5R
A-IC
S
B
K

BROOKFIELD
CAST IRON
K-5942-5
SINKS
6

BROOKFIELD
CAST IRON
K-5942-5
SINKS
20'-11"

20'-11"
11

63'-9"
0"

3'-2" 92" 112" 6'-2" 1'-102"5" 3'-2" 11"

3'-0"
SLOPE: 1/2"/ FT.

0"
BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O
4TKO
9
SN
5R
A-IC
S
B
K

3'-1" 1'-7" 4'-6" 1'-7" 3'-1" 1'-7" 4'-6" 1'-7" 3'-1"


DYNAMETRIC
CAST IRON
K-519
BATH

CIR
NTOERMI A
9
T
H1N
S
T5Y
A-D
C
B
K

1
12'-9"

12'-9"

0"
1'-3"
2.1 2.1

BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O
4TK
O
9
SN5R
A-IC
S
B
K
3.1
4"4" 1'-4"

BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O4
TKO
9
SN5R
A-IC
S
B
K

1
2.1 2.1

4"
4'-2"

BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O4
TKO
9
SN5R
A-IC
S
B
K
DYNAMETRIC
CAST IRON
K-519
BATH

CIR
NTOERMI A
9
T1
H N
S
T5Y
A-D
C
B
K
C C

30'-02"
1
1"

1
8" 8" 8"

24'-7"

30'-7"
4'-94
2'-3"
1.2

8"

8"
BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O4
TKO
9
SN5R
A-IC
S
B
K
BUILDING DEPARTMENT SUBMITTAL:

0"
1.31.4 1.31.4 1.31.4

6"

6"
9th SUBMITTAL 09/05/2018

BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O4
TKO
9
SN5R
A-IC
S
B
K
BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O4
TKO
9
SN5R
A-IC
S
B
K
+2.5'' +2.5'' +2.5'' 1"

1"
1" 62 10th SUBMITTAL 09/25/2018

7'-82
2'-12

4"
19'-2"

19'-2"
6"

9'-43
17'-11"
11th SUBMITTAL 10/16/2018

8"
85'-5" 12th SUBMITTAL 12/21/2018
1"
20'-112
20'-10" 20'-0" 20'-0"

3'-2"
13th SUBMITTAL 02/06/2019

26'-0"

1"
BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O4
TKO
9SN
5R
A-IC
S
B
K

3'-0"
REVISIONS:

1'-82
5'-0"
6" 0" 6" 0" 0" 6" 0"

1"
1'-92
1.3

SINKSCAST IRON
K-5942-5
BROOKFIELD

DLNEO5RK
IF SKNIS
IO
-2 TO
4 A-C
9S5R B
K

1"
D D

3'-72
6" 6" 6"
1.4

10'-0"
36'' x 78''

3'-8"
0"
78'' x 48''

1"
22
+0'' +2.5''

1"
1.4 1.4 78'' x 48'' 78'' x 48''

2'-82
1.1 1.1

BROOKFIELD
CAST IRON
K-5942-5
SINKS

DLNEO
IF
5RK
-2
IS
O4
TK
O9
SN5R
A-IC
S
B
K

1'-7" 6"
1'-7" 6"
48''x42" 1.4 1.4

2'-1"

2'-1"
6"
2'-11"

2'-11"
4"

1"
8"

1'-0"
52

621"
4"

10"
10"
8"

1"
4'-52 1"
4'-52 1 1" 1 1"
3'-8" 2'-6" 3'-52" 3'-7" 3'-52 2'-3" 3'-52" 3'-7" 3'-52 2'-6"
1"
2'-112 1"
3'-02
4'-8" 12'-7" 4'-5" 6'-2" 28'-3" 6'-2" 4'-5" 12'-7" 4'-8" 4'-1"
1"
41'-112 1"
41'-112 1'-0"
6'-7" 10'-1"

101'-7"
1 2 3 4 5 5.1 6 PROJECT DIRECTOR: EB, NC, JM
610-101 610-102 610-103 610-104 JOB CAPTAIN:
UNIT 3 UNIT 2 UNIT 2 UNIT 3 SENIOR ASSOCIATE: SA
ASSOCIATES: HK, MG, RK
PROJECT NUMBER: 15020
PROJECT CAD FILE: 15020_A6_B1-01

SHEET TITLE:

SLAB EDGE PLAN BLDG 6


SCALE: 1/8" = 1'-0" BUILDING 6
SLAB EDGE PLAN

SLAB EDGE PLAN NOTES GENERAL NOTES


2.1 HATCHING INDICATES PLUMBING FIXTURES AT 1. THIS DOCUMENT IS GENERATED FOR 5. ALL MECHANICAL EQUIPMENT, GRILLS AND 10. ALL ELEVATIONS SHOWN ARE FOR REFERENCE
SYMBOL LEGEND: SECOND AND THIRD FLOOR. ARCHITECTURAL NOTES AND DIMENSION CONTROLS ARE FOR REFERENCE ONLY REFER TO AND TO BE VERIFIED BY CONTRACTOR WITH CIVIL
ROBERT HIDEY ARCHITECTS, INC. © 2020 - ALL RIGHTS
X.X KEY NOTE 2.2 EDGE OF APRON. PURPOSES ONLY. CONTRACTOR SHALL REFER TO MECHANICAL DRAWINGS FOR DESIGN, DETAILS DRAWINGS AND ASSEMBLY DETAILS RESERVED THE DRAWINGS, DESIGNS, INFORMATION,
2.3 3" DIAMETER CONCRETE FILLED PIPE BOLLARD. ALL STRUCTURAL AND FOUNDATION DRAWINGS AND DIMENSIONS. CONTENT AND PROCEDURES DESCRIBED HEREIN ARE
MIN.

3.1 CONCRETE ENCASED GROUNDING ELECTRODE. FOR ACCURATE FOUNDATION INFORMATION 11.REFER TO CIVIL ENGINEERING AND LANDSCAPE
3"

FOR THE EXCLUSIVE USE OF ROBERT HIDEY


PROVIDE (1) 20 FOOT LONG #4 BAR IN FOOTING PRIOR TO STARTING ANY FOUNDATION WORK. 6. ALL ELECTRICAL FIXTURES, OUTLETS AND DRAWINGS FOR CONCRETE SLAB AND DRAINAGE ARCHITECTS, INC., OR AFFILIATES, AND, AS SUCH, ARE
STEP IN SLAB
AND EXTEND OUT OF CURB 12 INCHES FOR ANY DISCREPANCY WITH THE DRAWINGS EQUIPMENT ARE FOR REFERENCE ONLY REFER PLANS. NOT TO BE REPRODUCED IN ANY FORM OR MEDIA,
GROUNDING OF ELECTRICAL SYSTEM (VERIFY PREPARED BY THE STRUCTURAL ENGINEER SHALL TO ELECTRICAL DRAWINGS FOR DESIGN, DETAILS CURRENT OR FUTURE, OR DISCLOSED TO OTHERS
LOCATION). BE BROUGHT TO THE ARCHITECT'S AND OWNER'S AND DIMENSIONS BY OTHERS. 12.REFER TO CIVIL ENGINEERING AND LANDSCAPE WITHOUT THE WRITTEN CONSENT OF ROBERT HIDEY
ACCESSIBLE/ADAPTABLE UNIT DRAWINGS FOR EXACT COURTYARD WALL ARCHITECTS, INC. DISTRIBUTION OR DUPLICATION OF
3.2 PROVIDE VENT, GAS, WATER AND/OR IMMEDIATE ATTENTION.
ELECTRICAL 7. ALL STRUCTURAL MEMBERS AND ELEMENTS ARE LOCATIONS. THESE DOCUMENTS IS NOT TO BE CONSTRUED AS
SHOWN FOR REFERENCE ONLY REFER TO PUBLICATION IN DEROGATION OF THESE RIGHTS.
CONDUIT UNDER FLOOR AT ISLAND AS NEEDED. 2. HORIZONTAL AND VERTICAL DIMENSIONS SHOWN
SLAB EDGE VISUAL CONTACT WITH THESE DOCUMENTS SHALL
3.3 PROVIDE UNDER GROUND ELECTRICAL CONDUIT ARE FROM FACE OF STUD, FACE OF CONCRETE, STRUCTURAL ENGINEERS DRAWINGS FOR DESIGN, 13. SLOPE CONCRETE A MINIMUM OF 2% BELOW ALL
1.1 CONCRETE HOUSE SLAB - S.S.D. CONSTITUTE EVIDENCE OF ACCEPTANCE OF THESE
TO FRONT OF UNIT FOR IRRIGATION OR FACE OF CMU, UNLESS NOTED OTHERWISE DETAILS AND DIMENSIONS. THRESHOLDS WHERE LOCATED ON THE RESTRICTIONS.
1.2 CONCRETE GARAGE SLAB - S.S.D. CONTROLLER. CONCRETE SLAB. THE SLOPE SHALL BE FOR THE
1.3 CONCRETE CURB AT GARAGE. 4.1 PROVIDE SLEEVE FOR HANDRAILS AT STEPS IN 3. ALL EXTERIOR PAVING AND SITE ELEMENTS ARE 8. DRAINS AND SLAB PENETRATIONS SHOWN ON ENTIRE WIDTH OF THE THRESHOLD
1.4 CONCRETE STOOP - 36" DEEP (U.N.O.) BY THE GARAGE WHERE OCCURS. FOR REFERENCE ONLY REFER TO LANDSCAPE THIS SHEET ARE FOR ARCHITECTURAL PURPOSES SHEET NUMBER:
WIDTH OF THE DOOR AS A MIN. (U.N.O.). SLOPE 5.1 OPENING FOR MECHANICAL DUCT WORK AND CIVIL DRAWINGS FOR DESIGN, DETAILS AND AND DO NOT REFLECT ALL REQUIRED
1/4":12" AWAY FROM BUILDING. PROVIDE STEPS DIMENSIONS. CONDITIONS. CONTRACTOR TO REFER TO

A6B1-01
TO GRADE AS REQUIRED. REFER TO CIVIL AND PLUMBING, MECHANICAL AND STRUCTURAL
LANDSCAPE DRAWINGS FOR STOOP and ENTRY 4. PLUMBING FIXTURES ARE SHOWN FOR PLANS. ALL PENETRATIONS ARE TO BE IN
WALK LAYOUT. REFERENCE ONLY, SEE FLOOR PLAN AND COMPLIANCE WITH THE STRUCTURAL PLANS.
1.5 CONCRETE STEPS MAY OCCUR- REFER TO PLUMBING PLANS.
CIVIL DRAWINGS FOR EXACT LOCATION AND 9. ALL EQUIPMENT, APPLIANCES, AND FIXTURES TO
NUMBER BE INSTALLED PER MFR'S RECOMMENDATIONS.
1.6 CONCRETE PODIUM SLAB 9''
1.7 WOOD FRAMED AREAS, NOT A PART OF THE
PODIUM. S.S.D. PLOT REFERENCE DATE: 08/11/2020

You might also like