You are on page 1of 108

g

a
X
o
M
s
n
m
ie
S

Emotion (2007) / Spirit


CT

Replacements of Parts
IMS

Instructions for replacement or installation of parts

This document is valid for:


SOMATOM Emotion 6-slice Configuration
SOMATOM Emotion 16-slice Configuration
SOMATOM Spirit (Power)
SOMATOM Spirit © Siemens 2007
10165885
10165566
10161837
10161836
10161835
10161834
10143563
10143560
10045714
08879814
08879806
08879582
07734556
03089208
The reproduction, transmission or use
of this document or its contents is not
permitted without express written
authority. Offenders will be liable for
damages. All rights, including rights
created by patent grant or registration
of a utility model or design, are
reserved.

Print No.: CT02-025.841.04.09.02 English


Replaces: CT02-025.841.04.08.02 Doc. Gen. Date: 01.10
2 Revision / Disclaimer
1Revision / Disclaimer

Document revision level


The document corresponds to the version/revision level effective at the time of system
delivery. Revisions to hardcopy documentation are not automatically distributed.
Please contact your local Siemens office to order current revision levels.

Disclaimer
The installation and service of equipment described herein is to be performed by qualified
personnel who are employed by Siemens or one of its affiliates or who are otherwise autho-
rized by Siemens or one of its affiliates to provide such services.
Assemblers and other persons who are not employed by or otherwise directly affiliated with
or authorized by Siemens or one of its affiliates are directed to contact one of the local
offices of Siemens or one of its affiliates before attempting installation or service proce-
dures.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 2 of 108 Siemens


01.10 SSME CS
Table of Contents 3
0Table of Contents

1 _______ General ________________________________________________________ 8

Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
IMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Console. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

2 _______ ICS - Tower 6B _________________________________________________ 11

Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Options implemented in ICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Field replaceable units of the ICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Prerequisites for replacements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Tools and auxiliary Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Documentation references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
ICS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Main memory kit installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
ICS tower installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Final steps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Keyboard change . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Opening the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Closing the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
BIOS installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Install BIOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Correcting the drive letter of the CD/DVD drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
CD/DVD recorder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Preliminary steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Removing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Final steps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Function pack for improved DVD burner compatibility . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Software versions that require the Function Pack. . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Procedure for replacing the Tower DVD burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Dongle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Final steps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

3 _______ ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E _____________________ 31

Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Options implemented in ICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Field replaceable units of the ICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

Siemens CT02-025.841.04.09.02 Page 3 of 108 Emotion (2007) / Spirit


01.10 SSME CS
4 Table of Contents

Prerequisites for replacements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32


Tools and auxiliary Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Documentation references. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Tower 7 - Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Opening the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Closing the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Tower 8/8D/8E / Tower 8B/9B/9B2- Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Opening the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Closing the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Removing the side fan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
ICS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Keyboard change . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
BIOS installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Install BIOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Correcting the drive letter of the CD/DVD drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
DVD recorder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Preliminary steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Removing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Function Pack for improved DVD burner compatibility . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Software versions that require the Function Pack . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Procedure for replacing the Tower DVD burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Battery on the motherboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Preliminary steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Removing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Dongle. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Optional components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
Ethernet Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55

4 _______ IRS - Tower 5B _________________________________________________ 56

Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Tools and auxiliary Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 4 of 108 Siemens


01.10 SSME CS
Table of Contents 5

Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Removing the defective IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Installing the new IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Final steps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
BIOS installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Install BIOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Final Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59

5 _______ IRS - Tower 7B/8B/8F/8G _________________________________________ 60

Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Tools and auxiliary Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Documentation references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Removing the defective IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Installing the new IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Final steps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
BIOS installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Create the BIOS CD / CD, DVD Firmware update CD . . . . . . . . . . . . . . . . . . . . . . . 63
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Install BIOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Final Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

6 _______ Monitor Replacement ___________________________________________ 69

Monitor Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Monitor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69

7 _______ Changes to previous version _____________________________________ 74

8 _______ IRS - Tower 10B/F/G_____________________________________________ 75

Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Tools and auxiliary Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Documentation references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Removing the defective IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Installing the new IRS tower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Final steps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
BIOS installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
Create the BIOS CD / CD, DVD Firmware update CD . . . . . . . . . . . . . . . . . . . . . . . 78
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Install BIOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Final Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82

Siemens CT02-025.841.04.09.02 Page 5 of 108 Emotion (2007) / Spirit


01.10 SSME CS
6 Table of Contents

9 _______ UPS - Uninterruptible Power Supply _______________________________ 83

UPS replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Prerequisites for replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Removing the defective UPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Installing the new UPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
UPS parameter settings (only for HenDan UPS). . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Replacing the battery pack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Prerequisites for replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Preliminary steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Removal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

10 ______ ICS - Tower 10B& IES - Tower 10D/E _______________________________ 89

Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
Options implemented in ICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
Field replaceable units of the ICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
Prerequisites for replacements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Tools and auxiliary Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Documentation references. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Tower 10B &Tower 10D/E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Opening the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Closing the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Removing the side fan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93
ICS tower 10B & IES Tower 10D/E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
Keyboard change . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
BIOS installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96
Install BIOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
Correcting the drive letter of the CD/DVD drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98
DVD recorder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Preliminary steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Removing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102
Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
Battery on the motherboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
Dongle. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
Final steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 6 of 108 Siemens


01.10 SSME CS
Table of Contents 7

Optional components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107


Ethernet Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108

Siemens CT02-025.841.04.09.02 Page 7 of 108 Emotion (2007) / Spirit


01.10 SSME CS
8 General
1-
Safety Information
1General

General 0

Only qualified and trained personnel are allowed to perform CT system installation, service,
maintenance and quality assurance.
To avoid any risk of injury to personnel or damage to the system, the safety instructions
must be read and observed in the:
General Safety Notes (TD00-000.860.01.xx.xx)
and
Product-specific safety notes (CT02-025.860.02.xx.xx)
The product-specific safety notes contain important information about:
• General safety information about the gantry, patient table, and laser products.
• Attachment of screws and nuts, adjustment instructions for torque wrench and use of
Loctite.
• Safety advice (hazard keys)

High voltage

NOTE Dangerous voltages may be present.

Switch off the main power supply before working on the sys-
tem and secure the system against unintended switch-on.

Allow at least two minutes discharge time after switching off


the system. Prior to starting work on the components indi-
cated below, measure the voltage level in the PDS (right gan-
try stand) between D450 X7 and X9 for Spirit, or between fuse
holders F3.2(+) and F4.2(-) for Emotion 6/16 (2007). The volt-
age must be below 40 V DC.

Working in the gantry


• Prior to starting work in the gantry:
- Wait until rotation has stopped
- Disable gantry rotation via service switch S5 on MAS D301
- Use the mechanical brake to prevent gantry rotation while working in the gantry.
- Connect the stationary and rotating part of the gantry with a ground cable before
working in the gantry.

NOTE Remove the cable prior to rotating the gantry.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 8 of 108 Siemens


01.10 SSME CS
General 9

Automatic procedures

NOTE Do not leave the system unattended when a program is run-


ning with automatic movements or automatic radiation.

Radiation protection

NOTE Observe radiation protection regulations.

Bloodborne pathogens

NOTE Take appropriate precautions against exposure to blood-


borne pathogens when handling parts of the system that may
have come into contact with patients.

Siemens CT02-025.841.04.09.02 Page 9 of 108 Emotion (2007) / Spirit


01.10 SSME CS
10 General

IMS 1.1

Console 0

Fig. 1: Overview - operator's console with IMS components


Pos. 1 Monitor (TFT)
Pos. 2 UPS (Uninterrupted power supply)
Pos. 3 Container with ICS and IRS
Pos. 4 Keyboard
Pos. 5 Control box

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 10 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 11
2-
Overview
2ICS - Tower 6B

Options implemented in ICS 0

Depending on the system, the following options may be installed in the ICS:
• Additional monitors

Field replaceable units of the ICS 0

The field-replaceable units of the ICS comprise the following components:


• ICS tower - spare part delivered without keyboard, mouse, dongle or options
• CD/DVD recorder
• Dongle

Siemens CT02-025.841.04.09.02 Page 11 of 108 Emotion (2007) / Spirit


01.10 SSME CS
12 ICS - Tower 6B

Prerequisites for replacements 2.1

Tools and auxiliary Equipment 0

• Standard service kit & case


• Anti-static wristband and grounded tabletop pad

Safety 0

NOTE Read and observe the safety information contained in the


"Safety information" section of this document.(Safety
Information / p. 8)

Documentation references 0

Depending on the component to be replaced, the following supplementary documentation


is required:
• Installation of Options
• Installation of Software
• System Installation

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 12 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 13

ICS tower 2.2

Preparation 0

• Supplementary documentation:
To generate the backup and install the software, refer to “Installation of Software” (if
requested).
Detailed cabling information (interconnections) may be found under “System Installa-
tion”.
• If possible, clarify whether patient data have to be archived.
• Delete all patient data on the tower to be replaced.
• If possible, create an up-to-date software backup.
• If possible, note data, e.g. host name, static SRS routes, autoreports, service key,
regional settings. This information will be required for software installation.
• Shut down the software and switch off the system.
• Disconnect all cable connections at the rear.
• Remove the tower from its location.
• Remove the dongle.
• If installed, remove the optional components (refer to “Installation of Options”).

NOTE Some replaced ICS Tower 6B computers may have 2GB mem-
ory modules. There are 2 methods for checking the memory
size.

• If it is possible to log into the Windows system


- Go to the Windows Start menu, select Settings > Control Panel
- Double-click the System icon
- Under the General item, check the memory size.
• Otherwise:
- Switch off ICS Tower 6B
- Open the casing (Opening the casing / p. 17), and check the memory size.
- Close the casing(Closing the casing / p. 18).

NOTE If the replaced ICS Tower 6B has 2GB memory modules, per-
form the main memory kit installation(Main memory kit
installation / p. 14) prior to the ICS Tower installation(ICS
tower installation / p. 14).
If it has only the 1GB memory module, perform the ICS Tower
installation directly.

Siemens CT02-025.841.04.09.02 Page 13 of 108 Emotion (2007) / Spirit


01.10 SSME CS
14 ICS - Tower 6B

Main memory kit installation 0

• Open the casing of new ICS Tower 6B(Opening the casing / p. 17)
• Remove the 1GB memory module from replaced ICS Tower 6B, and plug it in next to
the module already installed in new ICS Tower 6B.

NOTE If the 1GB memory module from replaced ICS Tower 6B is not
in accordance with the original memory module in new ICS
Tower 6B, remove the original memory module, and plug in
the 2GB memory modules from replaced ICS Tower 6B.

Fig. 2: Memory location - Tower 6


• Close the casing of new ICS Tower 6B(Closing the casing / p. 18).

ICS tower installation 0

• Reinstall the available options to the new tower.


• Insert the dongle on the printer port.
• Position the new tower in the previous location.
• Connect the cable connectors in the back, ensuring that they are connected at the
appropriate location.

NOTE After replacing the parts and reattaching all the covers,
reconnect all ground cables.

• Switch on and reboot the system.


• Install the software according to the current “Installation of Software.”
• Restore the backup (this will also restore the available licences)

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 14 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 15

Final steps 0

• Install the BIOS, if necessary(BIOS installation / p. 19) .


• If the Tower has been delivered with the CD 10357545 CD Som/5 PX820 Support,
check(Function Pack for improved DVD burner compatibility / p. 49). If necessary, per-
form this installation following the procedure provided.
• Check that all application and customer options are available.
• Ensure that the system is operating properly.

Siemens CT02-025.841.04.09.02 Page 15 of 108 Emotion (2007) / Spirit


01.10 SSME CS
16 ICS - Tower 6B

Keyboard change 2.3

General 0

NOTE If a keyboard extension is installed, make sure to keep it. The


spare part is delivered without extension.

Keyboard change for Tower 6


Replacing the keyboard
• Switch off the system
• Disconnect the old keyboard
• Connect the new keyboard.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 16 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 17

Opening the casing 2.4

NOTE Make sure that the computer is switched off and that the
power plug and all other connections are removed.

1. Unscrew the two knurled screws (1) on the back of the casing.

Fig. 3: Screws of side cover


2. Slide the side cover approximately 2 cm (a) in the direction of the arrow (1), until the end
stop is reached.
Unhook the upper edge of the side cover from the casing.
Pull the side cover in the direction of the arrow (2).

Fig. 4: Opened cover

Siemens CT02-025.841.04.09.02 Page 17 of 108 Emotion (2007) / Spirit


01.10 SSME CS
18 ICS - Tower 6B

Closing the casing 2.5

1. Hook the side cover into the lower guide rail in the casing (1). Make sure that the side
cover is offset by approximately 2 cm (a).
Engage the top edge of the side cover on the casing.
Push the side cover as far as it will go in the direction of the arrow (2).

Fig. 5: Closed cover


2. Press the side cover onto the casing (1) in the back and tighten the two knurled screws
(2).

Fig. 6: Screws of side cover

NOTE After replacing the parts and reattaching the covers, make
sure to reconnect all ground cables!

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 18 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 19

BIOS installation 2.6

General 0

The BIOS installation applies to the following Tower types:


• All ICS and IES Tower 6

Create the BIOS CD / CD, DVD Firmware update CD


Download the necessary BIOS file from the intranet. Navigate to “http://cs.med.sie-
mens.de/cms/en/home/default.asp” and follow path “For Service > Product
Information > CT Systems > Software download”(, Software down-
load,https://cs.med.siemens.de/cms/productinfo/default.asp?start-
folder=8bd95977e70107fde60d2a5aeebc0049).
Download the BIOS/CD, DVD Firmware file
• In the “CT-Software Update Page”, left-click the file to be downloaded.
• Save the file to the hard drive c:\temp. When finished, close the window.

Extract the zipped file


• Go to c:\temp in the Windows Explorer.
• Right-click the BIOS file you just saved and select “Winzip > Extract to ...”
• Select c:\temp in the window that appears, and click Extract.
¹ The file will be extracted to c:\temp.

Label a blank CD-R/FD with the file name of the downloaded file
• For ICS and IES Tower 6, e.g., “10142438 VA01A Tower 6 CS”
• CD/DVD Firmware, e.g., “10304223 VA01B PlextorUpdate”

Burn the BIOS/CD, DVD Firmware CD


• Write the files to CD using a standard burning software, e.g. Nero, WinON CD.

NOTE Do not use the XP burn SW, it can create problems when
installing the update.

• For the CD, it is recommended that you burn the iso.file as an Image CD. As an exam-
ple, here are the work steps for creating the CD using the Nero Burn Software:
- Insert the labeled CD into the CD drive.
- Open Nero Burning Rom.
- Close the “New compilation” window that pops up
- Select Records > Burn Image... (in some cases select: File > Burn Image)
¹ an Explorer Window is displayed.

Siemens CT02-025.841.04.09.02 Page 19 of 108 Emotion (2007) / Spirit


01.10 SSME CS
20 ICS - Tower 6B

- Select the file that was extracted previously under c:\temp\


- Click Open
¹ The Burn Compilation window is displayed.
- On the Burn tab card, under Action, select the following two actions:
write & finalize CD.
- Click Burn (in some case it is Write, depending on the version)
¹ The Burn process starts.
- When finished an information window is displayed: “ Burning process com-
pleted successfully at xxx.”
- Click OK (in some case it is Done or Discard, depending on the version)
¹ The CD will be ejected automatically.
- Remove the update CD-R from the CD drive.

Virus Check
• After the CD has been burned successfully, perform a virus scan of the CD after having
updated the virus scanning software with the latest versions of the virus patterns.
• Once you perform the virus scan without any problems, the CD is ready and the BIOS
update can be performed on the customer system.

Summary
The following steps are automatically performed:
1. System BIOS flash
2. Set System BIOS settings
3. Set SCSI BIOS settings

Install BIOS 0

Worksteps:
• Insert the BIOS setup- CD, power the computer off and power it up to reboot from CD.
Make sure to use the correct CD, see above for part numbers.
• The computer boots from the setup-CD.

NOTE If the computer does not boot from CD, check the boot
sequence in the BIOS.

• First, the screen shows the booting process of Windows 98, next the progress of the
hardware detection is displayed and then the BIOS is flashed.
If the system BIOS is already the current version, the installer will directly go to loading
the BIOS settings.
¹ The message "BIOS xxx flashed” indicates the success (xxx = version of the
BIOS, e.g.,”107” for “BIOS version 1.07”)

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 20 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 21

• The computer reboots from CD-ROM.


Next, the System BIOS settings are loaded.
¹ The message “Operation completed successfully” indicates suc-
cess.
• Then, the SCSI BIOS settings are set.
¹ The message “Update of xxxxx successful” indicates success.
¹ The BIOS update is completed.

CD/DVD Firmware installation


Worksteps
• Insert the Firmware update CD, switch off the computer, then switch it on to reboot from
CD. To create the CD refer to (Create the BIOS CD / CD, DVD Firmware update
CD / p. 19)
Make sure to use the correct CD.

NOTE If the CD contains a newer version, it displays “New Firm-


ware Version for Plextor <type> available”.

• A menu appears.
a) Leave Version<old#>
b) Update to version <new#> - Please check drive letter
Select “1 ↵” to keep the prior firmware on the drive
or select “2 ↵” to update.

NOTE If the CD drive FW is updated, the drive letter has to be cor-


rected after the reboot.
“Windows plug and play” tries to assign the next free drive
letter instead of the letter R
See the following instructions.

Correcting the drive letter of the CD/DVD drive 0

Perform only if drive FW was updated in addition to the tower BIOS


• Log in as Administrator- Select System > End > Restart Application- Click yes
and press the left Shift key until the login window appears- Log in as administrator.
Select System > End > Restart Application
Click yes and press the left Shift key until the login window appears
Log in as administrator.
• Select Start > Settings > Control Panel
• Double-click Administrative Tools
• Double-click Computer Management

Siemens CT02-025.841.04.09.02 Page 21 of 108 Emotion (2007) / Spirit


01.10 SSME CS
22 ICS - Tower 6B

• Double-click Disk Management


• Right-click CD-ROM to select "change drive letter"
• Click Change
• Change drive letter to R
• Click OK
• Click the Start button on the task bar and perform Shutdown -> Restart.
• After restart, check to ensure that the CD drive letter is R.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 22 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 23

CD/DVD recorder 2.7

NOTE This replacement of the CD/DVD recorder is valid for ICS


Tower 6.

NOTE If the replacement drive is a Plextor PX820A, please check


(Function pack for improved DVD burner
compatibility / p. 28).
If necessary, perform this installation following the proce-
dure provided.

Prerequisites 0

Time and manpower


• 1 person
• Estimated repair time: 1 hour

Tools and auxiliary equipment


• Standard service kit

Preliminary steps 0

1. Shut down the software and switch off the tower.


2. Disconnect all cable connections at the rear.
3. Remove the tower from its position and find an adequate working place for the follow-
ing steps:
4. Remove the left side cover of the tower according to (Opening the casing / p. 17)

Siemens CT02-025.841.04.09.02 Page 23 of 108 Emotion (2007) / Spirit


01.10 SSME CS
24 ICS - Tower 6B

5. Remove the front panel

Fig. 7: Removing the front panel


- Detach the three locking tabs on the left side of the front panel (1).
- Open the left side of the front panel approximately 2 - 3 cm (a).
- Pull off the front panel in the direction of the arrow (2).

Removing 0

1. Unplug the cable connections on the CD/DVD recorder.


2. Press the two levers on both sides of the drive and slide the CD/DVD recorder in for-
ward direction out of the tower.

Fig. 8: Removing the drive


3. Loosen the screws (1).

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 24 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 25

4. Remove the rails from the drive (2).

Fig. 9: Removing the rail

Installation 0

1. Check the jumpers of the new CD/DVD. It must be jumpered as “Master”. Correct, if
required.
2. Place the rails onto the new CD/DVD recorder such that the holes in them align with the
screw holes (1).
3. Attach the rails with the screws (2).

Fig. 10: Attaching the rails

Siemens CT02-025.841.04.09.02 Page 25 of 108 Emotion (2007) / Spirit


01.10 SSME CS
26 ICS - Tower 6B

4. Slide the new CD/DVD recorder into the casing.

Fig. 11: Inserting the drive


5. Connect all cables at the CD/DVD recorder

Start-up 0

1. Attach the front panel

Fig. 12: Attaching the front panel


- Engage the three hinges on the right side of the front panel (1).
- Close the front panel on the casing so that the three locking tabs on the left side of the
front panel engage (2).

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 26 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 27

NOTE Make sure that the LCD cable is not pinched.

2. Close the right side cover according to (Closing the casing / p. 18)

Final steps 0

1. Power on.
2. Reboot the system.
3. Perform the (BIOS installation / p. 19) to make sure that the disk drive has the current
firmware version.
4. Execute Tune CD Burning:
- Go to Local Service > Utilities > Tune CD Burning.
- Select Tune CD Burning for current hardware and click Go.
¹ A message is displayed: “ Tune CD Burning for current hardware was selected.
This may take some minutes.”
- Click Yes.
¹ After Tune CD Burning is finished the message “Driver has been successfully
installed” is displayed.
- Select Home and reboot the system.
5. Test the CD/DVD recorder by storing and reading data within the application software.

Siemens CT02-025.841.04.09.02 Page 27 of 108 Emotion (2007) / Spirit


01.10 SSME CS
28 ICS - Tower 6B

Function pack for improved DVD burner compatibility 2.8

For the new PX820A Plextor drive, a function pack has to be installed. This Function Pack
improves the compatibility of PX820A with several versions of Somaris.

Software versions that require the Function Pack 0

The following software versions require a Function Pack to make the PX820A DVD burner
work properly (other software versions already have this functionality without the Function
Pack).

Somaris version Function pack


VB10B Function Pack 8
VB15A/B Function Pack 2
VB19C Function Pack 4
VB20B Function Pack 16
VB27C/D Function Pack 4
VB 28B Function Pack 13
VB35B Function Pack 2

Procedure for replacing the Tower DVD burner 0

NOTE Always install the newest DVD burner firmware as follows


(CD/DVD Firmware installation / p. 21)

NOTE Trying to install the Function Pack on any other software ver-
sion than those listed at (Software versions that require the
Function Pack / p. 28)will not create an error. It will only
waste a few minutes of your time.

Installing the Function Pack


• Check whether the Function Pack (see list above) is already installed at Options > Ver-
sion.
If the Function Pack is already installed, skip the following steps.
• Switch on the system and insert the CD delivered with the Tower DVD burner into the
optical drive (e.g. [-R]).
• Go to Options > Service > Local Service and select Utilities.
• Select as sourece Escape to OS and Command select NT Command Interpreter
• Type in R:\install.bat as the parameterand confirm by clicking Go.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 28 of 108 Siemens


01.10 SSME CS
ICS - Tower 6B 29

• After a short time, the message window The FuncPack XX is successfully


installed will appear.
XX => see (Software versions that require the Function Pack / p. 28)
• Remove the CD after automatic system shutdown and restart.

Finish and check the installation


Select Options > Version and check to make sure the correct Function Pack has been
installed. See the list at (Software versions that require the Function Pack / p. 28)for ver-
sion information.

Backup
• Insert a backup media into the CD/DVD burner
• In the service software, select Backup & Restore and the drive
• Select the Package CT-Settings and click Go.
• Wait for the Ready message.
• Select the Package SW-Settings02 and click Go
• Wait for the Ready message.
• Remove the backup disk.

Siemens CT02-025.841.04.09.02 Page 29 of 108 Emotion (2007) / Spirit


01.10 SSME CS
30 ICS - Tower 6B

Dongle 2.9

Preparation 0

• When replacing the dongle, the corresponding new licenses also have to be available.

NOTE A dongle defect should always be escalated to the Licensing


Center of CS HSC 1 in Erlangen, tel.+49 9191 18 8080.

Installation 0

• Shut down the software and power off the tower.

NOTE Always switch off the computer system before replacing the
dongle.

• Move the tower to access it from the back.


• Loosen the two fastening screws and remove the dongle from the printer port.
• Insert the new dongle at the printer port and attach it with screws.
• Position the tower at its previous location and ensure that all cables are connected
properly.
• Switch on the tower.
• Install the new licenses according to “Installation of Options.”

Final steps 0

• Check to ensure that all licenses and customer options are available.
• The replaced dongle has to be returned.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 30 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 31
3-
Overview
3ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

Options implemented in ICS 0

Depending on the system, the following options may be installed in the ICS:
• Additional monitors

Field replaceable units of the ICS 0

The field replaceable units of the ICS comprise the following components:
• ICS tower - spare part delivered without keyboard, mouse, dongle or options
• Dongle
• Fuse (1A) on CIB D31 PCI
• Ethernet Switch
• Optional components
• DVD recorder
• Battery on motherboard

Siemens CT02-025.841.04.09.02 Page 31 of 108 Emotion (2007) / Spirit


01.10 SSME CS
32 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

Prerequisites for replacements 3.1

Tools and auxiliary Equipment 0

• Standard service kit & case


• Anti-static wristband and grounded tabletop pad

Safety 0

NOTE Read and observe the safety information contained in the


"Safety information" section of this document.(Safety
Information / p. 8)

Documentation references 0

Depending on the component to be replaced, the following supplementary documentation


is required:
• Installation of Options
• Installation of Software
• System Installation

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 32 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 33

Tower 7 - Overview 3.2

Opening the casing 0

NOTE Make sure that the computer is switched off and that the
power plug and all other connections are removed.

1. Unscrew the two knurled screws (1) on the back of the casing.

Fig. 13: Screws of side cover


2. Slide the side cover approximately 2 cm (a) in the direction of the arrow (1), until the
stop is reached.
Unhook the upper edge of the side cover from the casing.
Pull the side cover in the direction of the arrow (2).

Fig. 14: Opened cover

Siemens CT02-025.841.04.09.02 Page 33 of 108 Emotion (2007) / Spirit


01.10 SSME CS
34 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

Closing the casing 0

1. Hook the side cover into the lower guide rail in the casing (1). Make sure that the side
cover is offset by approximately 2 cm (a).
Engage the top edge of the side cover on the casing.
Push the side cover as far as it will go in the direction of the arrow (2).

Fig. 15: Closed cover


2. Press the side cover onto the casing (1) in the back and tighten the two knurled screws
(2) .

Fig. 16: Screws of side cover

NOTE After replacing the parts and reattaching the covers, make
sure to reconnect all ground cables!

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 34 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 35

Tower 8/8D/8E / Tower 8B/9B/9B2- Overview 3.3

Opening the casing 0

NOTE Make sure that the computer is switched off and that the
power plug and all other connections are removed.

1. Unscrew the two knurled screws on the back of the casing, if applicable

Fig. 17: Screws of side cover


2. Pull the locking lever (1).
This side panel is now free and can be detached.

Closing the casing 0

1. Hook the side panel into the cutouts in the upper and lower guide rails.
2. Close the locking lever in the direction of the arrow (1).

Fig. 18: Closing the housing

Siemens CT02-025.841.04.09.02 Page 35 of 108 Emotion (2007) / Spirit


01.10 SSME CS
36 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

3. Tighten the locking bolt for the side cover on the rear panel of the housing, if applicable.

NOTE After replacing the parts and reattaching the covers, make
sure to reconnect all ground cables!

Removing the side fan 0

Fig. 19: Removing the side fan

1. Release the side fan by pressing the locking hook (a) in the direction of the arrow (1).
2. Pull the bottom edge of the side fan out of the housing in the direction of the arrow (2).
3. Disconnect the cable of the fan from the main board.
4. Remove the side fan from the housing.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 36 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 37

ICS tower 3.4

Preparation 0

• Supplementary documentation:
In order to generate the backup and to install the software, refer to “Installation of Soft-
ware” (if requested).
Detailed cabling information (interconnections) may be found under “System Installa-
tion.”
• If possible, clarify whether patient data has to be archived.
• Delete all patient data on the tower to be replaced.
• If possible, create an up-to-date software backup.
• If possible, note data, e.g. host name, static SRS routes, autoreports, service key,
regional settings. This information will be required for software installation.
• Shut down the software and switch off the system.
• Disconnect all cable connections at the rear.
• Remove the tower from its location.
• Remove the dongle.
• If installed, remove the optional components (refer to “Installation of Options”).

Installation 0

• Reinstall the available options to the new tower.


• Insert the dongle at the printer port (for Tower 7) or USB port (for Tower 8 and higher).
• Position the new tower in the previous location.
• Connect the cable connectors at the rear, ensuring that they are connected at the
appropriate location.

NOTE After replacing the parts and reattaching all the covers,
reconnect all ground cables.

• Power on and reboot the system.


• Install the software according to the current “Installation of Software.”
• Restore the backup (this will also restore the available licences)

Final steps 0

• Install the BIOS, if necessary(BIOS installation / p. 40).


• If the Tower has been delivered with CD 10357545 CD Som/5 PX820 Support,
check(Function pack for improved DVD burner compatibility / p. 28) . If necessary, per-
form this installation following the procedure provided.
• Check that all application and customer options are available.

Siemens CT02-025.841.04.09.02 Page 37 of 108 Emotion (2007) / Spirit


01.10 SSME CS
38 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

• Ensure that the system is operating properly.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 38 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 39

Keyboard change 3.5

General 0

There are different types of spare parts:


PS 2-keyboards:
• Keyboards for all ICS 7.
USB-keyboards:
• Keyboards for all ICS and IES Towers 8/8D/8E and higher

NOTE If a keyboard extension is installed, make sure to keep it. The


spare part is delivered without extension.

Keyboard change for Tower 7


Replacing the keyboard
• Switch off the system
• Disconnect the old keyboard
• Connect the new keyboard.

Keyboard change for Tower 8 and higher


Replacing the keyboard
• Switch off the system
• Disconnect the old USB-keyboard.
• Connect the new USB-keyboard.

Siemens CT02-025.841.04.09.02 Page 39 of 108 Emotion (2007) / Spirit


01.10 SSME CS
40 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

BIOS installation 3.6

General 0

The BIOS installation applies to the following Tower types:


• All ICS Tower 7
• All ICS 8B/9B/9B2 and IES 8/8D/8E towers

Create the BIOS CD / CD, DVD Firmware update CD


Download the necessary BIOS file from the Intranet. Navigate to “http://cs.med.sie-
mens.de/cms/en/home/default.asp” and follow the path “For Service > Prod-
uct Information > CT Systems > Software download”(,
https://cs.med.siemens.de/cms/productinfo/default.asp?start-
folder=c0cbfe3b3a34314406febf236e20f8f1).
Download the BIOS/CD, DVD Firmware file
• In the “CT-Software Update Page”, left-click the file to be downloaded.
• Save the file to the hard drive c:\temp. When finished, close the window.

Extract the zipped file


• Go to c:\temp in the Windows Explorer.
• Right-click the BIOS file you just saved and select “ Winzip > Extract to ...”
• Select c:\temp in the window that appears, and click Extract.
¹ The file will be extracted to c:\temp.

Label a blank CD-R/FD with the file name of the downloaded file
• For ICS Tower 7, e.g., “10142439 VA01B Tower 7 CS”
• For all types of ICS and IES Tower 8 e.g., “10143567 VA01G Tower 8 CS”
• For all types of ICS Tower 9, e.g., “ 10392570 VA01B Tower 9 CS”
• CD/DVD Firmware, e.g., “10304223 VA01B PlextorUpdate”

Burn the BIOS/CD, DVD Firmware CD


• Write the files to CD using a standard burning software, e.g. Nero, WinON CD.

NOTE Do not use the XP burn SW, it can create problems when
installing the update.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 40 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 41

• For the CD, it is recommended that you burn the iso.file as an Image CD. As an exam-
ple, here are the work steps for creating the CD using the Nero Burn Software:
- Insert the labeled CD into the CD/DVD drive.
- Open Nero Burning Rom.
- Close the “New compilation” window that pops up
- Select Records > Burn Image... (in some cases select: File > Burn Image)
¹ an Explorer Window is displayed.
- Select the file that was extracted previously under c:\temp\
- Click Open
¹ The Burn Compilation window is displayed.
- On the Burn tab card, under Action, select the following two actions:
write & finalize CD.
- Click Burn (in some case it is Write, depending on the version)
¹ The Burn process starts.
- When finished an information window is displayed: “ Burning process com-
pleted successfully.”
- Click OK (in some case it is Done or Discard, depending on the version)
¹ The CD will be ejected automatically.
- Remove the update CD-R from the CD/DVD drive.

NOTE Once the files are extracted to the CD, they must not be cop-
ied to another CD for distribution (e.g. no CD-to-CD copies,
as it cannot be verified that the SW is virus-free).

Virus Check
• After the CD has been burned successfully, perform a virus scan of the CD after having
updated the virus scanning software with the latest versions of the virus patterns.
• Once you perform the virus scan without any problems, the CD is ready and the BIOS
update can be performed on the customer system.

Summary
The following steps are automatically performed:
1. System BIOS flash
2. Set System BIOS settings
3. Set SCSI BIOS settings

Install BIOS 0

Worksteps:
• Insert the BIOS setup- CD, power the computer off and power it up to reboot from CD.
Make sure to use the correct CD, see above for part numbers.

Siemens CT02-025.841.04.09.02 Page 41 of 108 Emotion (2007) / Spirit


01.10 SSME CS
42 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

• The computer boots from the setup-CD.

NOTE If the computer does not boot from CD, check the boot
sequence in the BIOS.

• First, the screen shows the booting process of Windows 98, next the progress of the
hardware detection is displayed and then the BIOS is flashed.
If the system BIOS is already the current version, the installer will directly go to loading
the BIOS settings.
¹ The message "BIOS xxx flashed” indicates success (xxx = version of the
BIOS, e.g.,”107” for “BIOS version 1.07”)
• The computer reboots from CD-ROM.
Next, the System BIOS settings are loaded.
¹ The message “Operation completed successfully” indicates suc-
cess.
• Then, the SCSI BIOS settings are set.
¹ The message “Update of xxxxx successful” indicates success.
¹ The BIOS update is completed.

CD/DVD Firmware installation


Worksteps
• Insert the Firmware update CD, switch off the computer, then switch it on to reboot from
CD. To create the CD refer to (Create the BIOS CD / CD, DVD Firmware update
CD / p. 19)
Make sure to use the correct CD.

NOTE If the CD contains a newer version, it displays “New Firm-


ware Version for Plextor <type> available”.

• A menu appears.
a) Leave Version<old#>
b) Update to version <new#> - Please check drive letter
Select “1 ↵” to keep the prior firmware on the drive
or select “2 ↵” to update.

NOTE If the CD drive FW is updated, the drive letter has to be cor-


rected after the reboot.
“Windows plug and play” tries to assign the next free drive
letter instead of the letter R
See the following instructions.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 42 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 43

Correcting the drive letter of the CD/DVD drive 0

Perform only if drive FW was updated in addition to the tower BIOS


• Log in as Administrator- Select System > End > Restart Application- Click yes
and press the left Shift key until the login window appears- Log in as administrator.
Select System > End > Restart Application
Click yes and press the left Shift key until the login window appears
Log in as administrator.
• Select Start > Settings > Control Panel
• Double-click Administrative Tools
• Double-click Computer Management
• Double-click Disk Management
• Right-click CD-ROM to select "change drive letter"
• Click Change
• Change drive letter to R
• Click OK
• Click the Start button on the task bar and perform Shutdown -> Restart.
• After restart, check to ensure that the CD/DVD drive letter is R.

Siemens CT02-025.841.04.09.02 Page 43 of 108 Emotion (2007) / Spirit


01.10 SSME CS
44 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

DVD recorder 3.7

NOTE This replacement of the DVD recorder is valid for ICS Tower
7, IES Tower 8, and up.

NOTE If the replacement drive is a Plextor PX820A, check (Function


Pack for improved DVD burner compatibility / p. 49).
If required, perform this installation following the procedure
provided.

Prerequisites 0

Time and man power


• 1 person
• Estimated repair time: 1hour

Tools and auxilliary equipment


• Standard service kit

Preliminary steps 0

1. Shut down the software and switch off the tower.


2. Disconnect all cable connections at the rear.
3. Remove the tower from its position and find an adequate working place for the follow-
ing steps:
4. Remove the left side cover of the tower according to (Opening the casing / p. 33)
5. Remove the front panel

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 44 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 45

NOTE The cable length of the LCD panel is long enough so that you
can carefully place it to one side with the front panel. You do
not need to unplug the cable before removing the front panel.

Fig. 20: Removing the front panel


- Detach the three locking tabs on the left side of the front panel (1).
- Open the left side of the front panel approximately 2 - 3 cm (a).
- Pull off the front panel in the direction of the arrow (2).

Removing 0

1. Unplug the cable connections on the DVD recorder.


2. Loosen the related screws, if necessary.
3. Slide the DVD recorder in forward direction out of the tower.

Fig. 21: Removing the drive

Siemens CT02-025.841.04.09.02 Page 45 of 108 Emotion (2007) / Spirit


01.10 SSME CS
46 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

4. Loosen the screws (1) and remove the rails from the drive (2), if it has any.

Fig. 22: Removing the rail

Installation 0

1. Check the jumpers of the new DVD. It must be jumpered as “Master”. Correct, if
required.
2. Place the rails (if it has any) onto the new DVD recorder so that the holes in them align
with the screw holes (1), and attach the rails with the screws (2).

Fig. 23: Attaching the rails

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 46 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 47

3. Slide the new DVD recorder into the casing.

Fig. 24: Inserting the drive


4. Fasten the related screws, if necessary.
5. Connect all cables on the DVD recorder.

Start-up 0

1. Attach the front panel

Fig. 25: Attaching the front panel

Siemens CT02-025.841.04.09.02 Page 47 of 108 Emotion (2007) / Spirit


01.10 SSME CS
48 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

- Engage the three hinges on the right side of the front panel (1).
- Close the front panel on the casing so that the three locking tabs on the left side of the
front panel engage (2).

NOTE Make sure that the LCD cable is not pinched.

2. Close the right side cover according to (Closing the casing / p. 34)

Final steps 0

1. Power on.
2. Reboot the system.
3. Perform the (BIOS installation / p. 40) to make sure that the disk drive has the current
firmware version.
4. Execute Tune CD Burning:
- Go to Local Service > Utilities > Tune CD Burning.
- Select Tune CD Burning for current hardware and click Go.
¹ A message is displayed: “ Tune CD Burning for current hardware was selected.
This may take some minutes.”
- Click Yes.
¹ After Tune CD Burning is finished the message “Driver has been successfully
installed” is displayed.
- Select Home and reboot the system.
5. Test the DVD recorder by storing and reading data within the application software.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 48 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 49

Function Pack for improved DVD burner compatibility 3.8

For the new PX820A Plextor drive, a Function Pack has to be installed. This Function Pack
improves the compatibility of PX820A with several versions of Somaris.

Software versions that require the Function Pack 0

The following software versions require a Function Pack to make the PX820A DVD burner
work properly (other software versions already have this functionality without the Function
Pack).

Somaris version Function Pack


VB10B Function Pack 8
VB15A/B Function Pack 2
VB19C Function Pack 4
VB20B Function Pack 16
VB27C/D Function Pack 4
VB 28B Function Pack 13
VB35B Function Pack 2

Procedure for replacing the Tower DVD burner 0

NOTE Always install the newest DVD burner firmware as follows


(CD/DVD Firmware installation / p. 42)

NOTE Trying to install the Function Pack on any other software ver-
sion than those listed at (Software versions that require the
Function Pack / p. 49)will not create an error. It will only
waste a few minutes of your time.

Installing the Function Pack


• Check whether the Function Pack (see list above) is already installed at Options > Ver-
sion.
If the Function Pack is already installed, skip the following steps.
• Switch on the system and insert the CD delivered with the Tower DVD burner into the
optical drive (e.g. [-R]).
• Go to Options > Service > Local Service and select Utilities.
• Select as sourece Escape to OS and Command select NT Command Interpreter
• Type in R:\install.bat as the parameterand confirm by clicking Go.

Siemens CT02-025.841.04.09.02 Page 49 of 108 Emotion (2007) / Spirit


01.10 SSME CS
50 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

• After a short time, the message window The FuncPack XX is successfully


installed will appear.
XX => see (Software versions that require the Function Pack / p. 49)
• Remove the CD after automatic system shutdown and restart.

Finish and check the installation


Select Options > Version and check to make sure the correct Function Pack has been
installed. See the list at (Software versions that require the Function Pack / p. 49)for ver-
sion information.

Backup
• Insert a backup media into the CD/DVD burner
• In the service software, select Backup & Restore and the drive
• Select the Package CT-Settings and click Go.
• Wait for the Ready message.
• Select the Package SW-Settings02 and click Go
• Wait for the Ready message.
• Remove the backup disk.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 50 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 51

Battery on the motherboard 3.9

NOTE This replacement of the battery is valid for ICS Tower 7, IES
Tower 8, and up. For ICS Tower 9B/9B2, refer to service doc-
ument TD00-400.841.40.XX

Prerequisites 0

Time and man power


• 1 person
• Estimated repair time: 1hour

Tools and auxilliary equipment


• Standard service kit
• Anti-static wristband and grounded tabletop pad
• BIOS setup CD

Preliminary steps 0

1. Shut down the software and switch off the tower.


2. Disconnect all cable connections at the rear.
3. Remove the tower from its position and find an adequate working place for the follow-
ing steps:
4. Remove the left side cover of the tower according to(Opening the casing / p. 33)

Removing 0

NOTE The lithium battery holder comes in different designs that


function the same way.

Siemens CT02-025.841.04.09.02 Page 51 of 108 Emotion (2007) / Spirit


01.10 SSME CS
52 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

Fig. 26: Replacing the battery

1. Press the catch in the direction of the arrow (1).


¹ The battery jumps out of the holder.
2. Remove the battery (2).

Installation 0

• 1. Push the new lithium battery into the holder (3) and press it downward until it
engages (4).
2. Close the right side cover according to (Closing the casing / p. 34)

Start-up 0

1. Power on.
2. Perform the BIOS installation.

Final steps 0

• Check the functionality of the system.


• Please make sure that the system date and the system time are correct.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 52 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 53

Dongle 3.10

Preparation 0

• When replacing the dongle, the corresponding new licenses also have to be available.

NOTE A defective dongle should always be escalated to the Licens-


ing Center of CS HSC 1 in Erlangen, tel.+49 9191 18 8080.

Installation 0

• Shut down the software and power off the tower.

NOTE Always switch off the computer system before replacing the
dongle.

• Move the tower to access it from the back.


• Remove the dongle from the printer port (for Tower 7) or USB port (for Tower 8/8D/8E,
Tower8B/9B/9B2).
• Insert the new dongle into the printer port or USB port, and attach it with the screws.
• Position the tower at its previous location and ensure that all cables are connected
properly.
• Switch on the tower.
• Install the new licenses according to “Installation of Options.”

Final steps 0

• Check that all licenses and customer options are available.


• The replaced dongle has to be returned.

Siemens CT02-025.841.04.09.02 Page 53 of 108 Emotion (2007) / Spirit


01.10 SSME CS
54 ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E

Optional components 3.11

• For replacement of optional components, refer to “Installation of Option.”

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 54 of 108 Siemens


01.10 SSME CS
ICS - Tower 7B/8B/9B/9B2 & IES - Tower 8/8D/8E 55

Ethernet Switch 3.12

• For replacement of Ethernet switch, refer to “System Installation”and/or to “Installation


of Options.”

Siemens CT02-025.841.04.09.02 Page 55 of 108 Emotion (2007) / Spirit


01.10 SSME CS
56 IRS - Tower 5B
4-
Prerequisites
4IRS - Tower 5B

Tools and auxiliary Equipment 0

• Standard service kit & case


• Anti-static wristband and grounded tabletop pad

Safety 0

NOTE Read and observe the safety information contained in the


"Safety information" section of this document.(Safety
Information / p. 8)

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 56 of 108 Siemens


01.10 SSME CS
IRS - Tower 5B 57

IRS tower 4.1

Removing the defective IRS tower 0

• Power off the system


• Disconnect all cables from the back of the IRS tower

Installing the new IRS tower 0

• Power off the system


• Connect the cables to the back of the new IRS tower, ensuring that the connections are
made at the appropriate location.

Final steps 0

• Switch on and reboot the system.


• Install and configure the software.
• Install the BIOS, if necessary(BIOS installation / p. 58)
• Ensure that the system is operating properly.

Siemens CT02-025.841.04.09.02 Page 57 of 108 Emotion (2007) / Spirit


01.10 SSME CS
58 IRS - Tower 5B

BIOS installation 4.2

General 0

NOTE Select the correct BIOS CD. The BIOS CD is delivered:


- with SOMATOM Spirit with serial number 31455 and up.
- if ordered through the SPC.

Summary
The following steps are automatically performed:
1. System BIOS flash
2. Set System BIOS settings
3. Set SCSI BIOS settings

Install BIOS 0

Worksteps:
• Insert the BIOS setup- CD - Make sure to use the correct CD, see above for part num-
bers.
• Power off the ICS and IRS computer.
• Switch the keyboard and the monitor plug from the ICS tower to the IRS tower.
• Power on the IRS computer to reboot from CD.
• The computer boots from the setup-CD.

NOTE If the computer does not boot from CD, check the boot
sequence in the BIOS.

• First, the screen shows the booting process of Windows 98, next the progress of the
hardware detection is displayed and then the BIOS is flashed.
If the system BIOS is already the current version, the installer will directly go to loading
the BIOS settings.
¹ The message "BIOS xxx flashed” indicates the success (xxx = version of the
BIOS, e.g.,”107” for “BIOS version 1.07”)
• The computer reboots from CD-ROM.
Next, the System BIOS settings are loaded.
¹ The message “Operation completed successfully” indicates suc-
cess.
• Then, the SCSI BIOS settings are set.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 58 of 108 Siemens


01.10 SSME CS
IRS - Tower 5B 59

• Then, the firmware of the CD/DVD drive is tested.


If the CD contains a newer version, it displays “New Firmware Version for Plex-
tor <type> available”.
A menu appears:
1 Leave Version<old#>
2 Update to version <new#> -Please check drive letter (see
"replacement of parts")
Select “1 ↵” to keep the prior firmware on the drive
or select “2 ↵” to update.
• After setup is finished, the message shows: Please remove the CD.
¹ The BIOS update is complete.

Final Steps 0

• Power off the IRS computer.


• Switch back the keyboard and monitor plug to the ICS tower.
• Power on the ICS and IRS computer.

Siemens CT02-025.841.04.09.02 Page 59 of 108 Emotion (2007) / Spirit


01.10 SSME CS
60 IRS - Tower 7B/8B/8F/8G
5-
Prerequisites
5IRS - Tower 7B/8B/8F/8G

Tools and auxiliary Equipment 0

• Standard service kit & case


• Anti-static wristband and grounded tabletop pad

Documentation references 0

Depending on the component to be replaced, the following supplementary documentation


is required:
• Installation of Options
• Installation of Software
• System Installation

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 60 of 108 Siemens


01.10 SSME CS
IRS - Tower 7B/8B/8F/8G 61

Safety 5.1

NOTE Read and observe the safety information contained in the


"Safety information" section of this document.(Safety
Information / p. 8)

Siemens CT02-025.841.04.09.02 Page 61 of 108 Emotion (2007) / Spirit


01.10 SSME CS
62 IRS - Tower 7B/8B/8F/8G

IRS tower 5.2

Removing the defective IRS tower 0

• Power off the system


• Disconnect all cables from the back of the IRS tower

Installing the new IRS tower 0

• Power off the system


• Connect the cables to the back of the new IRS tower, ensuring that the connections are
made at the appropriate location.

Final steps 0

• Switch on and reboot the system.


• Install and configure the software.
• Install the BIOS, if necessary(BIOS installation / p. 63)
• Ensure that the system is operating properly.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 62 of 108 Siemens


01.10 SSME CS
IRS - Tower 7B/8B/8F/8G 63

BIOS installation 5.3

General 0

NOTE The BIOS CD is delivered:


- with Tower computer.

Summary
The following steps are automatically performed:
1. System BIOS flash
2. Set System BIOS settings
3. Set SCSI BIOS settings

Create the BIOS CD / CD, DVD Firmware update CD 0

Download the necessary BIOS file from the intranet. Navigate to “http://cs.med.sie-
mens.de/cms/en/home/default.asp” and follow path “For Service > Product
Information > CT Systems > Software download”(, Software down-
load,https://cs.med.siemens.de/cms/productinfo/default.asp?start-
folder=8bd95977e70107fde60d2a5aeebc0049).
Download the BIOS/CD, DVD Firmware file
• In the “CT-Software Update Page”, left-click the file to be downloaded.
• Save the file to the hard drive c:\temp. When finished, close the window.

Extract the zipped file


• Go to c:\temp in the Windows Explorer.
• Right-click the BIOS file you just saved and select “ Winzip > Extract to ...”
• Select c:\temp in the window that appears, and click Extract.
¹ The file will be extracted to c:\temp.

Label a blank CD-R/FD with the file name of the downloaded file

Burn the BIOS/CD, DVD Firmware CD


• Write the files to CD using a standard burning software, e.g. Nero, WinON CD.

NOTE Do not use the XP burn SW, it can create problems when
installing the update.

Siemens CT02-025.841.04.09.02 Page 63 of 108 Emotion (2007) / Spirit


01.10 SSME CS
64 IRS - Tower 7B/8B/8F/8G

• For the CD, it is recommended that you burn the iso.file as an Image CD. As an exam-
ple, here are the work steps for creating the CD using the Nero Burn Software:
- Insert the labeled CD into the CD drive.
- Open Nero Burning Rom.
- Close the “New compilation” window that pops up
- Select Records > Burn Image... (in some cases select: File > Burn Image)
¹ an Explorer Window is displayed.
- Select the file that was extracted previously under c:\temp\
- Click Open
¹ The Burn Compilation window is displayed.
- On the Burn tab card, under Action, select the following two actions:
write & finalize CD.
- Click Burn (in some case it is Write, depending on the version)
¹ The Burn process starts.
- When finished an information window is displayed: “ Burning process com-
pleted successfully.”
- Click OK (in some case it is Done or Discard, depending on the version)
¹ The CD will be ejected automatically.
- Remove the update CD-R from the CD drive.

NOTE Once the files are extracted to the CD, they must not be cop-
ied to another CD for distribution (e.g. no CD-to-CD copies,
as it cannot be verified that the SW is virus-free).

Virus Check
• After the CD has been burned successfully, perform a virus scan of the CD after having
updated the virus scanning software with the latest versions of the virus patterns.
• Once you perform the virus scan without any problems, the CD is ready and the BIOS
update can be performed on the customer system.

Summary 0

The following steps are automatically performed:


• System BIOS flash.
• Set System CMOS settings.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 64 of 108 Siemens


01.10 SSME CS
IRS - Tower 7B/8B/8F/8G 65

Install BIOS 0

Worksteps:
• Remove keyboard and mouse connectors from the ICS and move them to the IRS. For
the monitor connection, you need the adapter that was delivered with the system

Fig. 27: Monitor Adapter


Pos. 1 DVI outputs of adapter (only output 1 used)
Pos. 2 DVI to VGA adapter (used if required)

• Select the correct CD (IRS 7A, 7B, 7G, 8A, 8B, 8F or 8G). Switch on the IRS, or restart
the IRS, if it is already running.
When the IRS starts to display text, press the Pause key to stop booting from the hard
disk. Insert the CD into the drive and press Return to continue booting. When a boota-
ble CD is in the drive, the IRS will boot from CD automatically, not from hard disk.
• The BIOS is installed only if the version currently in the IRS is older than the version on
CD. Therefore, quite often, this step is skipped - most spare parts are already delivered
with the newest BIOS.
The screen shows the booting process of Windows 98, next the progress of the hard-
ware detection is displayed and then the BIOS is flashed.

Fig. 28: BIOS installed via "Phoenix Phlash utility"


The computer reboots from CD-ROM.

Siemens CT02-025.841.04.09.02 Page 65 of 108 Emotion (2007) / Spirit


01.10 SSME CS
66 IRS - Tower 7B/8B/8F/8G

• Next, the system CMOS settings are loaded. This is briefly displayed (approx. 3 secs.)
by some kind of "matrix of numbers" filling most of the screen:

Fig. 29: Restoring CMOS settings


• Finally, the so- called "chassis- asset- tag" has to be entered.
- First, the 7or 8 digit part number has to be entered (example: 10144232 for IRS 8A).
The correct part number should already be default, unless it was changed by error or
fault, e.g., battery empty.
The part number of the IRS tower can be found on the label on the tower housing. For
the list of part numbers, see table below, column "Part number".
- Then, the IRS revision level is entered.
- Next, the 5-digit serial number is entered (example: 01234). Again, the proper serial
number should be the default, it can be found on the label.
- Then, the IRS ID is entered. Attention, this is NOT the "name" of the IRS. Exam-
ple:"8A" is the wrong ID since "20" stands for this IRS version.
See table below for "IRS ID". As before, the ID should already default to the correct
value unless it was previously changed manually or by error.
- When all values have been entered, the 20 character "Chassis Asset Tag String" is
displayed, see example:

Fig. 30: Example of chassis asset tag string of IRS 8A serial# 01287
For informational purposes, find the complete syntax of the string in the table below.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 66 of 108 Siemens


01.10 SSME CS
IRS - Tower 7B/8B/8F/8G 67

- Finally, a summary screen displays various parameters, including the BIOS version,
followed by "installation done". The CD is automatically ejected.

IRS MED ID Part num- Revision Serial BIOS IRS ID PC Type


ber Number revision
T5A m 3817017 xx xxxxx *06 9 R610
T5B m 7733418 xx xxxxx *06 0E R610
T7A m 7734663 xx xxxxx *09 1B R630
T7B m 7734556 xx xxxxx *09 1A R630
T7G n 8879707 xx xxxxx 09 1D V830
T8A n 10144232 xx xxxxx 05 20 R640
T8B n 10144233 xx xxxxx 05 1F R640
T8F n 8879806 xx xxxxx 05 25 R640
T8G n 8879814 xx xxxxx 05 26 R640
T8A n 10144232 xx xxxxx 07 20 R640
T8B n 10144233 xx xxxxx 07 1F R640
T8F n 8879806 xx xxxxx 07 25 R640
T8G n 8879814 xx xxxxx 07 26 R640

Example n 10144232 00 01234 08 20

Siemens CT02-025.841.04.09.02 Page 67 of 108 Emotion (2007) / Spirit


01.10 SSME CS
68 IRS - Tower 7B/8B/8F/8G

Final Steps 5.4

• Power off the IRS computer.


• Switch back the keyboard and monitor plug to the ICS tower.
• Power on the ICS and IRS computer.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 68 of 108 Siemens


01.10 SSME CS
Monitor Replacement 69
6-
Monitor Replacement
6Monitor Replacement

Monitor 0

Cable connects to: Cable-ID: Connection:


Power connector W3 From UPS to monitor
17" monitor VGA W58 From the ICS to the monitor
19" monitor DVI
Ground cable n.a from UPS to monitor

Rewiring after monitor replacement (for 120VAC users only)

NOTE This description is only valid for the monitor replacement for
120VAC customers, because the power cable delivered with
the monitor cannot be connected to 120VAC UPS. For all 230
VAC users, this rewiring step can be ignored.

• If a 17" monitor (P/N: 07733393) is replaced by a 19" monitor


- Switch off the imaging system and the UPS.
- Remove the power cable from the UPS.
- Remove the video cable from the ICS.
- Remove the old 17" monitor and its connected cables.
- If the part no. of the new 19" monitor is 08675402, remove the power cable from the
new 19" monitor.
(Fig. 31 / p. 69)(Fig. 32 / p. 69)(Fig. 33 / p. 70)(Fig. 34 / p. 70)(Fig. 35 / p. 70)

Fig. 31: Extending the display stand to the fully enlongated Fig. 32: Taking the cover at the positions
position specified and removing it from the
display

Siemens CT02-025.841.04.09.02 Page 69 of 108 Emotion (2007) / Spirit


01.10 SSME CS
70 Monitor Replacement

Fig. 33: Removing the four screws and removing the stand Fig. 34: Disconnecting the cables from the
display

Fig. 35: Removing the cables by routing them through the cable duct of the stand.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 70 of 108 Siemens


01.10 SSME CS
Monitor Replacement 71

- If the part no. of the new 19" monitor is 08598919, remove the power cable from the
new 19” monitor. (Fig. 36 / p. 71)(Fig. 37 / p. 71)(Fig. 38 / p. 71)(Fig. 39 / p. 72)

Fig. 36: Removing the screw, opening the little cover and removing it

Fig. 37: Removing the two screws on top of the stand, and taking the cover off.

Fig. 38: Sliding the side cover upward and removing it.

Siemens CT02-025.841.04.09.02 Page 71 of 108 Emotion (2007) / Spirit


01.10 SSME CS
72 Monitor Replacement

Fig. 39: Disconnecting the power cable


- Connect a spare power cable to the new 19" monitor (Fig. 40 / p. 72).

Fig. 40: Spare monitor power cable

NOTE All systems using a 17” monitor (P/N:07733392) have a spare


power cable(Fig. 40 / p. 72) delivered together with the UPS:
one end (monitor side) is a straight connector and the other
end (UPS side) is a male connector.

- Recover and attach the display stand.


- Position the new 19 monitor on the desk.
- Connect the new video cable to the ICS.
- Connect the new power cable to the UPS.
• If a 19" monitor (P/N:08675402 or 08598919) is replaced by a new one
(P/N:08675402 or 08598919)
- Please follow the normal replacement procedure.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 72 of 108 Siemens


01.10 SSME CS
Monitor Replacement 73

NOTE The power cable delivered with the new 19" monitor may not
be connected to the UPS. In this case, please reuse the power
cable from the old 19" monitor.
Please refer to the previous steps for removing the power
cable.

Siemens CT02-025.841.04.09.02 Page 73 of 108 Emotion (2007) / Spirit


01.10 SSME CS
74 Changes to previous version
7Changes to previous version 7-

Chapter Change Reason


4,7 Add: Chapter 4 & 7 ECR
• ICS Tower 10B 518192/P18

• IES Tower 10D/E


• IRS Tower 10B/F/G
9 Add replacing the battery pack ECR539702
9 Add UPS parameter setting ECR539702

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 74 of 108 Siemens


01.10 SSME CS
IRS - Tower 10B/F/G 75
8-
Prerequisites
8IRS - Tower 10B/F/G

Tools and auxiliary Equipment 0

• Standard service kit & case


• Anti-static wristband and grounded tabletop pad

Documentation references 0

Depending on the component to be replaced, the following supplementary documentation


is required:
• Installation of Options
• Installation of Software
• System Installation

Siemens CT02-025.841.04.09.02 Page 75 of 108 Emotion (2007) / Spirit


01.10 SSME CS
76 IRS - Tower 10B/F/G

Safety 8.1

NOTE Read and observe the safety information contained in the


"Safety information" section of this document.(Safety
Information / p. 8)

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 76 of 108 Siemens


01.10 SSME CS
IRS - Tower 10B/F/G 77

IRS tower 8.2

Removing the defective IRS tower 0

• Power off the system


• Disconnect all cables from the back of the IRS tower

Installing the new IRS tower 0

• Power off the system


• Connect the cables to the back of the new IRS tower, ensuring that the connections are
made at the appropriate location.

Final steps 0

• Switch on and reboot the system.


• Install and configure the software.
• Install the BIOS, if necessary(BIOS installation / p. 78)
• Ensure that the system is operating properly.

Siemens CT02-025.841.04.09.02 Page 77 of 108 Emotion (2007) / Spirit


01.10 SSME CS
78 IRS - Tower 10B/F/G

BIOS installation 8.3

General 0

Summary
The following steps are automatically performed:
1. System BIOS flash
2. Set System BIOS settings
3. Set SCSI BIOS settings

Create the BIOS CD / CD, DVD Firmware update CD 0

Download the necessary BIOS file from the intranet. Navigate to “http://cs.med.sie-
mens.de/cms/en/home/default.asp” and follow path “For Service > Product
Information > CT Systems > Software download”(, Software down-
load,https://cs.med.siemens.de/cms/productinfo/default.asp?start-
folder=8bd95977e70107fde60d2a5aeebc0049).
Download the BIOS/CD, DVD Firmware file
• In the “CT-Software Update Page”, left-click the file to be downloaded.
• Save the file to the hard drive c:\temp. When finished, close the window.

Extract the zipped file


• Go to c:\temp in the Windows Explorer.
• Right-click the BIOS file you just saved and select “ Winzip > Extract to ...”
• Select c:\temp in the window that appears, and click Extract.
¹ The file will be extracted to c:\temp.

Label a blank CD-R/FD with the file name of the downloaded file

Burn the BIOS/CD, DVD Firmware CD


• Write the files to CD using a standard burning software, e.g. Nero, WinON CD.

NOTE Do not use the XP burn SW, it can create problems when
installing the update.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 78 of 108 Siemens


01.10 SSME CS
IRS - Tower 10B/F/G 79

• For the CD, it is recommended that you burn the iso.file as an Image CD. As an exam-
ple, here are the work steps for creating the CD using the Nero Burn Software:
- Insert the labeled CD into the CD drive.
- Open Nero Burning Rom.
- Close the “New compilation” window that pops up
- Select Records > Burn Image... (in some cases select: File > Burn Image)
¹ an Explorer Window is displayed.
- Select the file that was extracted previously under c:\temp\
- Click Open
¹ The Burn Compilation window is displayed.
- On the Burn tab card, under Action, select the following two actions:
write & finalize CD.
- Click Burn (in some case it is Write, depending on the version)
¹ The Burn process starts.
- When finished an information window is displayed: “ Burning process com-
pleted successfully.”
- Click OK (in some case it is Done or Discard, depending on the version)
¹ The CD will be ejected automatically.
- Remove the update CD-R from the CD drive.

NOTE Once the files are extracted to the CD, they must not be cop-
ied to another CD for distribution (e.g. no CD-to-CD copies,
as it cannot be verified that the SW is virus-free).

Virus Check
• After the CD has been burned successfully, perform a virus scan of the CD after having
updated the virus scanning software with the latest versions of the virus patterns.
• Once you perform the virus scan without any problems, the CD is ready and the BIOS
update can be performed on the customer system.

Summary 0

The following steps are automatically performed:


• System BIOS flash.
• Set System CMOS settings.

Siemens CT02-025.841.04.09.02 Page 79 of 108 Emotion (2007) / Spirit


01.10 SSME CS
80 IRS - Tower 10B/F/G

Install BIOS 0

Worksteps:
• Remove keyboard and mouse connectors from the ICS and move them to the IRS. For
the monitor connection, you need the adapter that was delivered with the system

Fig. 41: Monitor Adapter


Pos. 1 DVI outputs of adapter (only output 1 used)
Pos. 2 DVI to VGA adapter (used if required)

• Select the correct CD. Switch on the IRS, or restart the IRS, if it is already running.
• The screen shows the booting process of Windows 98, next the progress of the hard-
ware detection is displayed and then the BIOS is flashed.

Fig. 42: BIOS installed via "Phoenix Phlash utility"


The computer reboots from CD-ROM.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 80 of 108 Siemens


01.10 SSME CS
IRS - Tower 10B/F/G 81

• Next, the system CMOS settings are loaded. This is briefly displayed (approx. 3 secs.)
by some kind of "matrix of numbers" filling most of the screen:

Fig. 43: Restoring CMOS settings


• Finally, the CD ejects automatically. The message appears: “......Installation Done.
Please Remove CD! Please turn off Power or reset system”.

Fig. 44: End of installation


• Take out the CD and restart the computer.

Siemens CT02-025.841.04.09.02 Page 81 of 108 Emotion (2007) / Spirit


01.10 SSME CS
82 IRS - Tower 10B/F/G

Final Steps 8.4

• Power off the IRS computer.


• Switch back the keyboard and monitor plug to the ICS tower.
• Power on the ICS and IRS computer.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 82 of 108 Siemens


01.10 SSME CS
UPS - Uninterruptible Power Supply 83
9-
UPS replacement
9UPS - Uninterruptible Power Supply

Prerequisites for replacement 0

Tools and auxiliary equipment


• Standard service kit & case

Removing the defective UPS 0

• Power off the system


• Disconnect all cables from the back of the UPS

Installing the new UPS 0

• Power off the system


• Connect the cables to the back of the new UPS, ensuring that connections are made at
the appropriate location.

UPS parameter settings (only for HenDan UPS) 0

NOTE This chapter is only for a HenDan UPS. (230V HenDan UPS
(P/N:10049948) and 120V HenDan UPS (P/N:10049944))

NOTE We recommend comparing the UPS settings with the coun-


try-specific voltage during system installation. If needed,
please set the UPS parameters accordingly.

NOTE You can also refer to the “QH Series UPS User’s Manual” to
set the UPS parameters. The UPS user manual is delivered in
the UPS package.

Useful info
• To enter the configuration mode: Press and hold both the main on switch “I” and the
main off switch “O” more than 3 seconds while the UPS is in the off status.

Siemens CT02-025.841.04.09.02 Page 83 of 108 Emotion (2007) / Spirit


01.10 SSME CS
84 UPS - Uninterruptible Power Supply

Fig. 45: HenDan UPS front panel


Pos. 1 6th level LED
Pos. 2 5th level LED

• To exit the configuration mode: Press and hold both the main on switch “I” and off
switch “O” for more than 3 seconds.
• Display and control the switch
- When the UPS enters into the configuration mode,six different status indicator LEDs
turn on and represent the programming of different parameters.
- Different parameters can be selected by pressing and holding the main off switch “O”
for more than 3 seconds.
- Different settings can be selected by pressing and holding the main on switch “I” for
more than 3 seconds.

UPS output voltage setting


There are 4 types of output voltages for the UPS. Please select one voltage setting close
to the local country-specific voltage.
• Press and hold the main off switch “O” to select the output voltage setting mode.
• Press and hold the main on switch “I” for more than 3 seconds to select different output
voltage settings (see picture below).

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 84 of 108 Siemens


01.10 SSME CS
UPS - Uninterruptible Power Supply 85

Fig. 46: Output voltage setting

Fig. 47: Output voltage setting

Final steps 0

• Switch on and reboot the system.


• Ensure that the system is operating properly.

Siemens CT02-025.841.04.09.02 Page 85 of 108 Emotion (2007) / Spirit


01.10 SSME CS
86 UPS - Uninterruptible Power Supply

Replacing the battery pack 9.1

NOTE The battery pack can be replaced at UPS types MGE Pulsar
M2200 (material no. 7735090)

Prerequisites for replacement 0

Tools and auxiliary equipment


• Standard service kit & case

Time and manpower


• 1 person
• 0,5 hour

Preliminary steps 0

1. Switch off the system.


2. Check if the UPS is switched off.
3. Remove all related cables to the UPS.

Removal 0

1. Remove the front cover.

Fig. 48: UPS (front view)


Pos. 1 Cover screws
Pos. 2 Cover

- Remove the two cover screws(1/Fig. 48 / p. 86).


- Remove the cover(2/Fig. 48 / p. 86).

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 86 of 108 Siemens


01.10 SSME CS
UPS - Uninterruptible Power Supply 87

2. Remove the metal cover.

Fig. 49: UPS


Pos. 1 Screws for metal cover
Pos. 2 Battery pack connector
Pos. 3 Metal cover

- Remove the two metal cover screws(1/Fig. 49 / p. 87).


- Disconnect the battery pack connector(2/Fig. 49 / p. 87).
- Feed the battery pack cable through the hole in the metal cover.
- Remove the metal cover(3/Fig. 49 / p. 87).
3. Remove the battery pack.

Fig. 50: UPS


Pos. 1 Battery pack

- Pull out the battery pack to the front and remove it(1/Fig. 50 / p. 87).

Installation 0

1. Install the new battery pack in the reverse order.


2. Connect all related cables to the UPS.

Siemens CT02-025.841.04.09.02 Page 87 of 108 Emotion (2007) / Spirit


01.10 SSME CS
88 UPS - Uninterruptible Power Supply

Final steps 0

1. Switch on the system.


2. Perform test scans.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 88 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 89
10-
Overview
10ICS - Tower 10B& IES - Tower 10D/E

Options implemented in ICS 0

Depending on the system, the following options may be installed in the ICS:
• Additional monitors

Field replaceable units of the ICS 0

The field replaceable units of the ICS comprise the following components:
• ICS tower - spare part delivered without keyboard, mouse, dongle or options
• Dongle
• Fuse (1A) on CIB D31 PCI
• Ethernet Switch
• Optional components
• DVD recorder
• Battery on motherboard

Siemens CT02-025.841.04.09.02 Page 89 of 108 Emotion (2007) / Spirit


01.10 SSME CS
90 ICS - Tower 10B& IES - Tower 10D/E

Prerequisites for replacements 10.1

Tools and auxiliary Equipment 0

• Standard service kit & case


• Anti-static wristband and grounded tabletop pad

Safety 0

NOTE Read and observe the safety information contained in the


"Safety information" section of this document.(Safety
Information / p. 8)

Documentation references 0

Depending on the component to be replaced, the following supplementary documentation


is required:
• Installation of Options
• Installation of Software
• System Installation

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 90 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 91

Tower 10B &Tower 10D/E 10.2

Opening the casing 0

NOTE Make sure that the computer is switched off and that the
power plug and all other connections are removed.

1. Unscrew the two screws in back of the casing, if applicable


1.

Fig. 51:
2. Pull the locking lever.
This side panel is now free and can be detached.

Siemens CT02-025.841.04.09.02 Page 91 of 108 Emotion (2007) / Spirit


01.10 SSME CS
92 ICS - Tower 10B& IES - Tower 10D/E

Closing the casing 0

1. Hook the side panel into the cutouts in the upper and lower guide rails.
2. Close the locking lever in the direction of the arrow .

Fig. 52: Closing the housing


3. Tighten the locking bolt for the side cover on the rear panel of the housing, if applicable.

NOTE After replacing the parts and reattaching the covers, make
sure to reconnect all ground cables!

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 92 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 93

Removing the side fan 0

Fig. 53:

1. Release the side fan by pressing the locking hook (1) in the direction of the arrow .

Fig. 54: Removing the side fan


2. Pull the bottom edge of the side fan out of the housing in the direction of the arrow .
3. Disconnect the cable of the fan from the main board.
4. Remove the side fan from the housing.

Siemens CT02-025.841.04.09.02 Page 93 of 108 Emotion (2007) / Spirit


01.10 SSME CS
94 ICS - Tower 10B& IES - Tower 10D/E

ICS tower 10B & IES Tower 10D/E 10.3

Preparation 0

• Supplementary documentation:
In order to generate the backup and to install the software, refer to “Installation of Soft-
ware” (if requested).
Detailed cabling information (interconnections) may be found under “System Installa-
tion.”
• If possible, clarify whether patient data has to be archived.
• Delete all patient data on the tower to be replaced.
• If possible, create an up-to-date software backup.
• If possible, note data, e.g. host name, static SRS routes, autoreports, service key,
regional settings. This information will be required for software installation.
• Shut down the software and switch off the system.
• Disconnect all cable connections at the rear.
• Remove the tower from its location.
• Remove the dongle.
• If installed, remove the optional components (refer to “Installation of Options”).

Installation 0

• Reinstall the available options to the new tower.


• Insert the dongle at the USB port.
• Position the new tower in the previous location.
• Connect the cable connectors at the rear, ensuring that they are connected at the
appropriate location.

NOTE After replacing the parts and reattaching all the covers,
reconnect all ground cables.

• Power on and reboot the system.


• Install the software according to the current “Installation of Software.”
• Restore the backup (this will also restore the available licences)

Final steps 0

• Install the BIOS, if necessary(BIOS installation / p. 96).


• Check that all application and customer options are available.
• Ensure that the system is operating properly.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 94 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 95

Keyboard change 10.4

General 0

Replacing the keyboard


• Switch off the system
• Disconnect the old USB-keyboard.
• Connect the new USB-keyboard.

Siemens CT02-025.841.04.09.02 Page 95 of 108 Emotion (2007) / Spirit


01.10 SSME CS
96 ICS - Tower 10B& IES - Tower 10D/E

BIOS installation 10.5

General 0

Create the BIOS CD / CD, DVD Firmware update CD


Download the necessary BIOS file from the Intranet. Navigate to “http://cs.med.sie-
mens.de/cms/en/home/default.asp” and follow the path “For Service > Prod-
uct Information > CT Systems > Software download”(,
https://cs.med.siemens.de/cms/productinfo/default.asp?start-
folder=c0cbfe3b3a34314406febf236e20f8f1).
Download the BIOS/CD, DVD Firmware file
• In the “CT-Software download”, left-click the file to be downloaded.
• Save the file to the hard drive c:\temp. When finished, close the window.

Extract the zipped file


• Go to c:\temp in the Windows Explorer.
• Right-click the BIOS file you just saved and select “ Winzip > Extract to ...”
• Select c:\temp in the window that appears, and click Extract.
¹ The file will be extracted to c:\temp.

Label a blank CD-R/FD with the file name of the downloaded file
• For all types of ICS and IES Tower 10 e.g., “10498380 VA01A Tower 10”
• CD/DVD Firmware, e.g., “10304223 VA01E PlextorUpdate”

Burn the BIOS/CD, DVD Firmware CD


• Write the files to CD using a standard burning software, e.g. Nero, WinON CD.

NOTE Do not use the XP burn SW, it can create problems when
installing the update.

• For the CD, it is recommended that you burn the iso.file as an Image CD. As an exam-
ple, here are the work steps for creating the CD using the Nero Burn Software:
- Insert the labeled CD into the CD/DVD drive.
- Open Nero Burning Rom.
- Close the “New compilation” window that pops up
- Select Records > Burn Image... (in some cases select: File > Burn Image)
¹ an Explorer Window is displayed.
- Select the file that was extracted previously under c:\temp\
- Click Open
¹ The Burn Compilation window is displayed.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 96 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 97

- On the Burn tab card, under Action, select the following two actions:
write & finalize CD.
- Click Burn (in some case it is Write, depending on the version)
¹ The Burn process starts.
- When finished an information window is displayed: “ Burning process com-
pleted successfully.”
- Click OK (in some case it is Done or Discard, depending on the version)
¹ The CD will be ejected automatically.
- Remove the update CD-R from the CD/DVD drive.

NOTE Once the files are extracted to the CD, they must not be cop-
ied to another CD for distribution (e.g. no CD-to-CD copies,
as it cannot be verified that the SW is virus-free).

Virus Check
• After the CD has been burned successfully, perform a virus scan of the CD after having
updated the virus scanning software with the latest versions of the virus patterns.
• Once you perform the virus scan without any problems, the CD is ready and the BIOS
update can be performed on the customer system.

Summary
The following steps are automatically performed:
1. System BIOS flash
2. Set System BIOS settings
3. Set SCSI BIOS settings

Install BIOS 0

Worksteps:
• Insert the BIOS setup- CD, power the computer off and power it up to reboot from CD.
Make sure to use the correct CD, see above for part numbers.
• The computer boots from the setup-CD.

NOTE If the computer does not boot from CD, check the boot
sequence in the BIOS.

• First, the screen shows the booting process of Windows 98, next the progress of the
hardware detection is displayed and then the BIOS is flashed.
If the system BIOS is already the current version, the installer will directly go to loading
the BIOS settings.
¹ The message "BIOS xxx flashed” indicates success (xxx = version of the
BIOS, e.g.,”107” for “BIOS version 1.07”)

Siemens CT02-025.841.04.09.02 Page 97 of 108 Emotion (2007) / Spirit


01.10 SSME CS
98 ICS - Tower 10B& IES - Tower 10D/E

• The computer reboots from CD-ROM.


Next, the System BIOS settings are loaded.
¹ The message “Operation completed successfully” indicates suc-
cess.
• Then, the SCSI BIOS settings are set.
¹ The message “Update of xxxxx successful” indicates success.
¹ The BIOS update is completed.

CD/DVD Firmware installation


Worksteps
• Insert the Firmware update CD, switch off the computer, then switch it on again to
reboot from CD. To create the CD, refer to (Create the BIOS CD / CD, DVD Firmware
update CD / p. 96)
Make sure to use the correct CD.

NOTE If the CD contains a newer version, it displays “New Firm-


ware Version for Plextor <type> available”.

• A menu appears.
a) Leave Version<old#>
b) Update to version <new#> - Please check drive letter
Select “1 ↵” to keep the prior firmware on the drive
or select “2 ↵” to update.

NOTE If the CD drive FW is updated, the drive letter has to be cor-


rected after the reboot.
“Windows plug and play” tries to assign the next free drive
letter instead of the letter R
See the following instructions.

Correcting the drive letter of the CD/DVD drive 0

Perform only if drive FW was updated in addition to the tower BIOS


• Log in as Administrator- Select System > End > Restart Application- Click yes
and press the left Shift key until the login window appears- Log in as administrator.
Select System > End > Restart Application
Click yes and press the left Shift key until the login window appears
Log in as administrator.
• Select Start > Settings > Control Panel
• Double-click Administrative Tools
• Double-click Computer Management

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 98 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 99

• Double-click Disk Management


• Right-click CD-ROM to select "change drive letter"
• Click Change
• Change drive letter to R
• Click OK
• Click the Start button on the task bar and perform Shutdown -> Restart.
• After restart, check to ensure that the CD/DVD drive letter is R.

Siemens CT02-025.841.04.09.02 Page 99 of 108 Emotion (2007) / Spirit


01.10 SSME CS
100 ICS - Tower 10B& IES - Tower 10D/E

DVD recorder 10.6

NOTE This replacement of the DVD recorder is valid for ICS & IES
Tower 10 and up.

NOTE If the replacement drive is a Plextor PX820A, check (Function


pack for improved DVD burner compatibility / p. 28).
If required, perform this installation following the procedure
provided.

Prerequisites 0

Time and man power


• 1 person
• Estimated repair time: 1hour

Tools and auxilliary equipment


• Standard service kit

Preliminary steps 0

1. Shut down the software and switch off the tower.


2. Disconnect all cable connections at the rear.
3. Remove the tower from its position and find an adequate working place for the follow-
ing steps:
4. Remove the left side cover of the tower according to (Opening the casing / p. 91)
5. Remove the front panel

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 100 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 101

NOTE The cable length of the LCD panel is long enough so that you
can carefully place it to one side with the front panel. You do
not need to unplug the cable before removing the front panel.

Fig. 55: Removing the front panel


- Detach the three locking tabs on the left side of the front panel (1).
- Open the left side of the front panel approximately 2 - 3 cm (a).
- Pull off the front panel in the direction of the arrow (2).

Removing 0

1. Unplug the cable connections on the DVD recorder.


2. Loosen the related screws, if necessary.

Siemens CT02-025.841.04.09.02 Page 101 of 108 Emotion (2007) / Spirit


01.10 SSME CS
102 ICS - Tower 10B& IES - Tower 10D/E

3. Slide the DVD recorder in forward direction out of the tower.

Fig. 56: Removing the drive

Installation 0

1. Check the jumpers of the new DVD. It must be jumpered as “Master”. Correct, if
required.
2. Slide the new DVD recorder into the casing.

Fig. 57: Inserting the drive

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 102 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 103

3. Fasten the related screws, if necessary.


4. Connect all cables on the DVD recorder.

Start-up 0

1. Attach the front panel

Fig. 58: Attaching the front panel


- Engage the three hinges on the right side of the front panel (1).
- Close the front panel on the casing so that the three locking tabs on the left side of the
front panel engage (2).

NOTE Make sure that the LCD cable is not pinched.

2. Close the right side cover according to (Closing the casing / p. 92)

Final steps 0

1. Power on.
2. Reboot the system.
3. Perform the (BIOS installation / p. 96) to make sure that the disk drive has the current
firmware version.
4. Execute Tune CD Burning:

Siemens CT02-025.841.04.09.02 Page 103 of 108 Emotion (2007) / Spirit


01.10 SSME CS
104 ICS - Tower 10B& IES - Tower 10D/E

- Go to Local Service > Utilities > Tune CD Burning.


- Select Tune CD Burning for current hardware and click Go.
¹ A message is displayed: “ Tune CD Burning for current hardware was selected.
This may take some minutes.”
- Click Yes.
¹ After Tune CD Burning is finished the message “Driver has been successfully
installed” is displayed.
- Select Home and reboot the system.
5. Test the DVD recorder by storing and reading data within the application software.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 104 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 105

Battery on the motherboard 10.7

Please refer to service document TD00-400.841.40.XX, CB-DOC -> Service -> Celsius
PC Tower -> Replacement.

Siemens CT02-025.841.04.09.02 Page 105 of 108 Emotion (2007) / Spirit


01.10 SSME CS
106 ICS - Tower 10B& IES - Tower 10D/E

Dongle 10.8

Preparation 0

• When replacing the dongle, the corresponding new licenses also have to be available.

NOTE A defective dongle should always be escalated to the Licens-


ing Center of CS HSC 1 in Erlangen, tel.+49 9191 18 8080.

Installation 0

• Shut down the software and power off the tower.

NOTE Always switch off the computer system before replacing the
dongle.

• Move the tower to access it from the back.


• Remove the dongle from the USB port .
• Insert the new dongle into the USB port, and attach it with the screws.
• Position the tower at its previous location and ensure that all cables are connected
properly.
• Switch on the tower.
• Install the new licenses according to “Installation of Options.”

Final steps 0

• Check that all licenses and customer options are available.


• The replaced dongle has to be returned.

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 106 of 108 Siemens


01.10 SSME CS
ICS - Tower 10B& IES - Tower 10D/E 107

Optional components 10.9

• For replacement of optional components, refer to “Installation of Option.”

Siemens CT02-025.841.04.09.02 Page 107 of 108 Emotion (2007) / Spirit


01.10 SSME CS
108 ICS - Tower 10B& IES - Tower 10D/E

Ethernet Switch 10.10

• For replacement of Ethernet switch, refer to “System Installation”and/or to “Installation


of Options.”

Emotion (2007) / Spirit CT02-025.841.04.09.02 Page 108 of 108 Siemens