WALL PROPERTIES: Soil properties considered for sheet pile design are
not matching with borehole data (SI report #
Section z0 EI L B
D G17-3943, attached herewith for reference)
[m] [ kNm² ] [m]
1. AU 20 0.000 93324 1.000 1.00
zf = -14.000 m
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 1
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
DATA
BOUSSINESQ SURCHARGE Phase z x L q
[m] [m] [m] [kN/m²]
1 5 0.000 0.500 10.000 10.00
STRUT Phase za K
[m] [kN/m]
1 2 -2.000 4500.00
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 2
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
STAGED CONSTRUCTION SYNTHESIS
INITIAL PHASE PHASE 1 PHASE 2 PHASE 3
- excavation (left): zh [m] = -3.000 - installation of strut: n° 1 - excavation (left): zh [m] = -6.500
zw [m] = -3.000 za [m] = -2.000 zw [m] = -6.500
- excavation (right): zh [m] = 0.000 K [kN/m] = 4500 - excavation (right): zh [m] = 0.000
zw [m] = -2.000 zw [m] = -4.000
How the GWT will be reduced and monitored during different stages of excavation.
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 3
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
STAGED CONSTRUCTION SYNTHESIS
PHASE 4 PHASE 5
Excavated depth considered as 10m from EGL (+2.35 NSD as per soil report). But as
per dwg # 110247/G.16.16/002, 646587-DST-001 the bottom of blinding will be at
10.37m below EGL. If any further excavation required for ground improvement as
mentioned in SI report (150mm thick granular fill) this depth may increase.
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 4
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
RESULTS (Phase 1)
Dmax = -0.163 M.k max = 3.261 V.k max = 33.840 P max = 55.835
Dmin = -16.432 M.k min = -86.273 V.k min = -38.540 P min = -78.440
Pw max = 120.000
Pw min = -110.000
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 5
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
RESULTS (Phase 2)
Dmax = -0.163 M.k max = 3.261 V.k max = 33.840 P max = 55.835
Dmin = -16.432 M.k min = -86.273 V.k min = -38.540 P min = -78.440
Pw max = 120.000
Pw min = -110.000
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 6
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
RESULTS (Phase 3)
Dmax = -0.508 M.k max = 76.413 V.k max = 52.461 P max = 45.573
Dmin = -27.622 M.k min = -131.457 V.k min = -86.625 P min = -150.752
Pw max = 100.000
Pw min = -75.000
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 7
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
RESULTS (Phase 4)
Dmax = 4.042 M.k max = 515.201 V.k max = 150.819 P max = 264.853
Dmin = -98.815 M.k min = -20.497 V.k min = -164.231 P min = -231.843
Pw max = 75.000
Pw min = -40.000
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 8
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
RESULTS (Phase 5)
Dmax = 4.082 M.k max = 530.548 V.k max = 157.707 P max = 267.055
Dmin = -102.142 M.k min = -16.955 V.k min = -167.146 P min = -231.843
Pw max = 75.000
Pw min = -40.000
Project filename: Y:\FOUNDATIONS\OFFER 2018\PROJECTS\BAHRAIN\FS-BA-XXXX Sitra Pump house\Mammer junction BH-22\04022018 3.5m excavation.KPJ printed on 4/2/2018 at 19:21 calculated on 2/4/2018 at 19:20 Page: 9
PROJECT MAMMER_JUNCTION
v.1.2.3 BAHRAIN DUTCH FOUNDATION
RESULTS (Synthesis)
Phase N° Displac. Displac. Moment Shear force Ratio Strut
Head max max max Earth resist. 1
mm mm kNm kN kN
1 -16.43 -16.43 -86.27 -38.54 7.824 -
2 -16.43 -16.43 -86.27 -38.54 7.824 0.000
3 -27.62 -27.62 -131.46 -86.63 3.664 63.549
4 -17.11 -98.82 515.20 -164.23 1.173 170.040
5 -17.18 -102.14 530.55 -167.15 1.165 176.580
Extrema -27.62 -102.14 530.55 -167.15 1.165 176.580
Deflection seemed to be high, please furnish
supporting documents conforming this
deflection will be safe.