You are on page 1of 4

FORM 16.

THIS FORM IS NOT CHARGEABLE

(ALL INFORMATION TO BE FILLED IN BLOCK LETTERES.PLEASE TICK WHEREVER APPLICABLE)

NEW CONNECTION CONTRACT DEMAND CHANGE LOAD CHANGE

SHIFTING CHANGE OF NAME CHANGEOVER SUPPLY

SWITCH OVER OF SUPPLY


Note:Please do not staple the
photograph

1. Customer Details
Applicant's Name Mr. VIPUL LAXMICHAND VEERA
(New Name in the event of Change
Of Name)

Existing Account No 102075633 Mob No. 8779522650

Landline No Email veeravipul3167@gmail.com

AADHAR No 874549114310 PAN

GSTN (As per Rule 114B of Income Tax Rules 1962) Refer point 19 from declaration cum
undertaking
(AS per Rule 49 of GST Rules,2017)Refer point 19 from
declaration cum underatking

Bank Name

Bank Branch.
Bank Account Number

2. Customer Power Supply Address


Flat No./Building Name 402 HAJI BAPU RD MALAD E
Lane/Street

Landmark BEHIND AMBAJI TEMPLE

Suburb/City MUMBAI Pin code 400097

Area of premise Sq.mtr.

Existing/Nearest Consumer Account Number 102075633 Meter 8322945

Structure type

Chawl Hut Bungalows Multistoried Bldg. Others(Specify) Flat in registered society

3. Bill Delivery/Correspondence Address


Same as Power Supply Address (In the event of bill Delivery Address diffrent than Power Supply Address)

Flat No/Building Name

Lane/Street

Landmark

Suburb/City Pin code

Preferred Bill Language is Marathi Hindi English

I want my electricity bill E-Bill + Hard Copy Paperless

4. Types of premises

Owned Rented Lease Others(Specify) Flat in registered society

5. Purpose of Supply: (In the event of New Connection)

Residential Commercial Temp-Religious Temp-Others Contsruction Power


Others(Specify)

Peroid of Temp Connection (Max. 1 Year): From : To :

Industrial certificate valid till :


6 Load/Contract Demand (In the event of New Connection,Extention/Reduction of Load Contract Demand)
Particular Existing Required
kW HP kW HP
New Load
Change of Load
Contract demand in kVA(Non-Residentail Load > 20kW)

Number of meters (In case of building application) Single Phase:- 0 Three Phase :- 0

7. The wiring carried out/certified by the following Licensed Electrical Contractor

Name
Address
Telephone Number
E-mail
Licence No

8. Changeover of Supply
Meter Number The Meter will be provided by AEML Self

9. Documents Attached
A. Identity Proof submitted along with this application form :-
> if applicant is a person
>If applicant is an organization (mention Applicable)-Certificate of incorporation/registration issued by the Registrar
B. Proof of ownership or occupancy of premises for which electricity connection is required_____________________

THE APPLICANT HEREBY AGREES AND UNDERTAKES


1. That the Applicant/Consumer is not a minor. issued by Licensing Authority, Government of Maharashtra and the test
....................................................................................................... certificate is available with the Applicant and can be produced as may
be required at any later stage.
.......................................................................................................
2. That in case the applicant is not the sole owner of the premises, 8. That the Premises/building/structure has been constructed as per
no objection certificate has been obtained from the co-owner. prevalent building Bye- Laws and the total height of the
....................................................................................................... Premises/building/structure-
(i) does not exceed 15 (fifteen) metres on the date of seeking
electricity connection, or
.......................................................................................................
3. To abide by the provisions of the Electricity Act,2003, all (ii) is more than 15 (fifteen) metres and has obtained valid Clearance
applicable laws, conditions of Supply/Tariff Orders and any other certificate from appropriate government authority, which is available
Rules or Regulations as may be notified by the with the Applicant.
Commission/Authority, as applicable from time to time. .......................................................................................................
.......................................................................................................
4. That AEML shall be at liberty to adjust the electricity 9. That there is a provision of lift in the Premises and the Applicant has
consumption charges due/outstanding along with any other obtained the valid lift fitness certificate from the Electrical Inspector for
charges against the Consumer Security Deposit paid by the the lift in the said Premises and the same is available with the
Applicant upon permanent disconnection of supply. Applicant and can be produced as may be required at any later stage.
....................................................................................................... .......................................................................................................
5. To indemnify AEML against all proceedings, claims, demands, 10. That the Applicant would let the Distribution Licensee disconnect
costs, damages, expenses that AEML may incur by reason of a the electric connection under reference, in the event of any default,
fresh electricity connection given to the Applicant. non-compliance of statutory provisions and in the event of a legally
....................................................................................................... binding directive by Statutory Authority(ies) to effect such an order.
This shall be without prejudice to any other rights of the licensee
6. That to the best of applicant’s knowledge, all electrical works including that of getting its payment as on the date of disconnection.
done within the premises are as per Central Electricity Authority
(Measures relating to Safety and Electricity Supply) Regulations,
2010 as amended from time to time.
.......................................................................................................
7. That the internal wiring at the premises has been tested by a
Licensed Electrical Contractor having valid license

Name & Applicant's Signature Date 31/Jan/2022


11. That if the premises applied for is falling under CRZ,Forest as may be in force from time to time, regularly, as and when the same
area or any other area where any Court of Law/Statutory Authority becomes due for payment.
has prohibited release of power supply, the Applicant shall submit
a No Objection Certificate (NoC) to seek electricity connection, 19. To deposit the additional security deposit (as applicable) from time
from such Authority. to time, based on the prevailing Orders/rules, directions and
....................................................................................................... Regulations of the Commission.
12. That the applicant is solely and exclusively responsible for the .......................................................................................................
genuineness and correctness of the document/s submitted by him 20. For GSTIN :In compliance of Rule 49 of CGST Rules,2017, I/We
in support of the application and the other documents as indicated shall forthwith submit with AEML my/our Goods and Service Tax
at various points herein. In case any such documents are found to Identification Number or Unique Identity No. a Bill of supply (monthly
be fraudulent and/or fake and/or forged and/or incorrect and/or electricity bill ) shall print Goods and Services Tax Identification
invalid/incomplete, then the applicant/consumer shall be solely and Number or Unique Identity Number, if registered, of the consumer
exclusively responsible for the criminal proceedings and/or any
court proceedings initiated and/or any dispute which arises any For PAN :
time in future and AEML and/or its successors, assignees and/or i.)As per Rule 114B of Income Tax Rules 1962 every person is
any employee thereof, shall not be responsible for the same in any required to quote his PAN in all documents pertaining to the transaction
manner whatsoever. In such a case, AEML reserves the right to of sale or purchase of any nature for a value exceeding Rs. 2 lacs per
disconnect the connection granted and in case of Change of transaction for the purpose of clause (c) of sub-section (5) of Section
Name, re-transfer connection in the name of previous registered 139A
consumer under this declaration cum undertaking, without any .......................................................................................................
notice. ii.)As per section - 206AA of Income-tax Act, 1961, TDS (if
....................................................................................................... applicable)@20% on Security Deposit Interest will be deducted instead
13. That all details mentioned in the application form are correct of 10% for non-availability of valid PAN
and all applicable customer-end obligations (E.g. Documentary and .......................................................................................................
Payment compliance, Site readiness,Way-Leave permits) are 21. Applicable only for applied Industrial/Commercial oad between 100
complete and complied in all respects, at the time of applying for and 150 kW: The Applicant authorizes AEML to debit the approved
new electricity connection, through online/offline mode. In case any connection charges and applicable security deposit in first electricity bill
of these requirements are not ready, or in case of an (as and when enabled by AEML), and undertake to pay the same
objection,AEML reserves the right to cancel the application. within the due date. The Applicant / Consumer may opt to pay such
....................................................................................................... Security Deposit by way of a Bank Guarantee.
14. That the Applicant will provide a copy of any of above .......................................................................................................
applicable documents to the Distribution Licensee pursuant to the 22. That the Applicant shall not hold AEML liable for delay in providing
request from any external Government agency, judicial forum or connection or meeting any Standards of Performance subsequent to
any other authority empowered under statute seeking such grant of connection in case AEML is prevented from doing so on
information. account of any force majeure events/exemptions as specified in the
....................................................................................................... Standards of Performance Regulations, as amended from time to time.
15. That Applicant’s industry/trade has not been declared to be .......................................................................................................
releasing obnoxious hazardous/pollutant by any Government 23. That there are no arrears towards energy or related charges
agency and that no orders of any court or judicial authority would outstanding in his/her name and /or on account of the said premises. In
be breached by running of Applicant’s industry/trade or granting the event of aforesaid declaration/undertaking given by the
any electricity connection to the same. The Applicant shall applicant/consumer is found false in view of any pre-existing liability,
indemnify and keep indemnified AEML against any loss of any the applicant/consumer shall willfully, without demur pay such amount
nature on this account. on demand. The Consumer/applicant shall be duty bound to extend full
....................................................................................................... co-operation to AEML while determining and/or identifying the arrears,
16. The Applicant further agrees to indemnify and hold harmless, if any, of the premises or account no, within a period of 60 days. The
AEML and/or its successors and/or its employees, in case of any applicant/consumer shall make payment of the said arrears
injury or incident on account of any fault in electrical works in the immediately on demand.
Premises and from point of supply to the Premises. AEML shall not .......................................................................................................
be held responsible/liable for any mishap or incident occurring at 24. The Applicant/Consumer shall identify suitable space agreeable to
the Premises or from point of supply to the Premises on account of AEML to install electrical meter and related devices and ensure un-
any faulty/defective/inferior quality wiring/installation, right from the hindered passage to personnel of AEML to access the meter cabin.
time of energizing the new electricity connection.On occurrence of .......................................................................................................
such incident, AEML may disconnect the Applicant’s supply, if 25. That the following terms and conditions are complied with respect
continuance of supply to such installation is threat to the life or to space for meter installation:
property. Such disconnected supply shall be reconnected only after
rectification of faulty installation and submission of test report from a. Metering installation is protected from excessive dust and moisture,
Licensed Electrical Contractor. exposure to direct sunlight, rain and water seepage and vermin. The
....................................................................................................... Applicant/Consumer shall ensure that temperature within the meter
17. The applicant further agrees to bear the expenses towards room shall not be more than 10°C, above ambient. It should not be in
repairing/ replacement of AEML’s assets or works, in case there is proximity of machineries, heating devices,equipment generating high
sufficient proof that the damage/fault has been occurred due to vibration or magnetic fields and areas prone to fire and toxic hazards.
faulty electrical work/ wiring in his premises.
.......................................................................................................
18. To pay the electricity consumption bills and all other charges, at
the rates set out in the licensee’s Tariff Schedule and the MERC
approved Schedule of Charges,

Name & Applicant's Signature Date 31-Jan-2022


b. Meters are not located at an elevated area or a depressed area v.) for laying outgoing feeders (LT/ HT) from their premises as the
that does not have access by means of a stairway of normal rise. The same arrangement is for making interconnection with outside network
meters shall not be installed below/in the stair case or in common which shall further help in arranging alternate supply in case of break
passage or lobby. down on mains. In the event land under way leave permission is sold,
....................................................................................................... leased, rented or otherwise disposed off, while entering to such a
c. Board wiring is carried out preferably on Fire retardant plywood, transaction the applicant/consumer shall ensure by necessary
complying IS 5509. In case of nonavailability of FR plywood, marine covenants that this terms and conditions will be abided by the other
plywood complying IS 710 can be used. The plywood shall be of 19 parties to the said transaction.
mm thickness and the same shall be provided by an applicant. .......................................................................................................
Typically plywood is available in following sizes (7’x4’ , 7’x3’, 28. That the excavated trenches shall be reinstated by the
8’x3’,8’x4’ ).IS mark is printed on the center of either face of the ply Applicant/Consumer at his/her own cost when the cable is laid to
for identification. provide supply to their premises. AEML shall be responsible to
....................................................................................................... reinstate in the event the works is carried out to provide supply to any
26. That the following terms and conditions shall be complied with, for other customer.
applicant/consumer’s installation beyond the point of supply of AEML: .......................................................................................................
29. That AEML shall have full rights to optimally utilize its assets
a. The Applicant/Consumer must install appropriately rate MCB with (Substation/ pillars) in applicant/consumer’s premises and shall not
enclosure near the start of the electricity supply and shall not install object to laying outgoing feeders (LT/ HT) from their premises as the
DP Switch. same arrangement is for making interconnection with outside network
....................................................................................................... which shall further help in arranging alternate supply in case of break
b. The Applicant/Consumer, if having voltage exceeding 250 Volts, down on mains.
shall provide his own earthing system for installation. .......................................................................................................
....................................................................................................... 30. Additional Term and Conditions for Change-over applications:
c. The Applicant/Consumer, if having sanctioned load above 2 KW,
shall install Earth Leakage protective device a. The consumer/applicant shall clear all it's dues with existing
....................................................................................................... distribution licensee and submit the proof.
27. The applicant/consumer shall provide way leave in favour of .......................................................................................................
AEML: b. Changeover is permissible to existing consumer where name and
purpose or classification of category for which the electricity has been
i.) to lay its cables through his/owner’s land/ property provided by previous distribution licensee remains same.
....................................................................................................... .......................................................................................................
ii.) to access AEML’s equipment and work in its premises in c. The meter reading for final billing shall be taken jointly and signed
accordance with the applicable provisions of Supply Code or any off by both distribution licensees in presence of the applicant/ it's
other Regulations, as prevailing from time to time representative.
....................................................................................................... .......................................................................................................
iii.) to provide permanent Right of Way to AEML personnel along with d. In the event the consumer/applicant is not present at the time of
vehicles and cables and/or apparatus, without any further consent (for final meter reading, the readings taken jointly by the previous
now and in future) distribution licensee and AEML shall be final and binding upon the
....................................................................................................... applicant / consumer. The Final meter reading shall be the opening
iv.) for laying, strengthening and maintaining of electrical network and meter reading for AEML.
system

I/We declare and undertake that I/we have complied with all statutory requirements under all Statutes for the time being in force.
I/we shall be solely responsible for any issue arising out of any such non-compliance and further I/we do hereby jointly and severally Indemnify
AEML, its agents and servants against all claims, proceedings, demands, costs, expenses and consequences whatsoever, which may arise on
account of processing my/our application.

Applicatn's Signature (Signed by Second Party where the account is to be


in joint names)

Date 31-Jan-2022 Place

Business Partner Number Account No


For Office Use

Application processed by

You might also like