Professional Documents
Culture Documents
1 NjTrrrrij"rl 11111111111111111111111111111
I :c:~:~~r
I I I I I I I I I I I I I I II I I I I I I I II I I II I I I I I
Existing Contract Demand/
Sanctioned Load
Existing Tariff
Name:
Date:
Version-I
J
GENERAL INSTRUCTIONS
3. The Registered Consumer has to give an undertaking to the Licenseein a prescribed format to
effect surrender of power supply
•
INDEMNITY BOND ANNEX -10
'I, the undersigned, the registered Consumer of the installation bearing RRNo write to
undertake on this day month year with the Asst. Executive Engineer
(Elec.), ESCOM......................................................................... . .
............................................ ... that I have applied for surrender of the said installation
permanently. At a later date, if any arrears are found due to audit short claims, etc., I am
prepared to pay the amount in lump sum or the same can also be included in the bills of the
other installation bearing RR No.---- which is standing in my name. If I fail to pay the
demanded amount, legal action as necessarymay be taken against me and also Power Supply
to installation bearing RRNo. may be disconnected.
Signature
Witnesswith address