No Deskripsi (Issued For Returned (Issued For Returned (Issued For Return Returned
Review) (Revision) Approval) (Revision) Construction) (Revision) (Revision)
3 Planning
3.1 SMN-V-LJS-M-RE-31-001 S-Curve ü ü
3.2 SMN-V-LJS-M-RE-31-002 Monthly Progress Report ü ü ü
3.3 SMN-V-LJS-M-RE-31-003 Weekly Progress Report ü ü ü
3.4 SMN-V-LJS-M-RE-31-004 Daily Progress Report ü ü ü
3.5 SMN-V-LJS-M-RE-31-005 Milestone Project ü ü
4 Procurement
4.1 SMN-V-LJS-U-PR-31-001 Material Handling, Storage and Traceability Procedure ü ü
5 Construction/Fabrication
5.1 SMN-V-LJS-Q-PR-31-001 Welding Procedure ü ü ü ü ü ü ü
5.2 SMN-V-LJS-Q-PR-31-002 Painting Touch Up Procedure ü
5.3 SMN-V-LJS-Q-PR-31-003 Welding Repair Procedure ü ü ü ü ü ü ü
5.4 SMN-V-LJS-Q-PR-31-004 Fabrication and Erection Procedure ü ü ü ü ü ü ü
5.5 SMN-V-LJS-Q-PR-31-005 Blasting and Painting Procedure ü ü ü
5.6 SMN-V-LJS-Q-PR-31-006 Construction Excecution Procedure ü ü ü ü ü ü ü
5.7 SMN-V-LJS-Q-PR-31-007 Vacuum Test Procedure ü ü ü ü ü ü
5.8 SMN-V-LJS-Q-PR-31-008 Hydrostatic Test Procedure ü ü ü
5.9 SMN-V-LJS-Q-PR-31-009 Paint Test Procedure ü ü ü
5.10 SMN-V-LJS-Q-PR-31-010 Roundness Test Procedure ü ü ü ü ü
5.11 SMN-V-LJS-Q-PR-31-011 Plumbness Test Procedure ü ü ü ü ü
5.12 SMN-V-LJS-Q-PR-31-012 Rolled Plate Delivery Procedure ü ü ü
5.13 SMN-V-LJS-Q-PR-31-013 Commisioning And Maintenance Procedure ü ü ü
5.14 SMN-V-LJS-Q-PR-31-014 NDT (RT & PT) Procedure
5.15 SMN-V-LJS-Q-PR-31-015 Pneumatic Procedure ü
5.16 SMN-V-LJS-Q-PR-31-016 Peaking Banding Prosedur ü
5.17 SMN-V-LJS-Q-PR-31-017 Grounding Prosedur
7.1
Calculation
7.1.1 SMN-V-LJS-M-CC-31-001 Strength Calculation For Condensate Tank (SMN-ABJ-401 A/B) ü ü ü ü ü ü ü
7.1.2 SMN-V-LJS-M-CC-31-001-1 Allowable External Loads on Tank Shell Opening ü ü ü
7.1.3 SMN-V-LJS-M-CC-31-002 Venting Calculation For Condensate Tank (SMN-ABJ-401 A/B) ü ü ü ü ü ü
7.1.4 SMN-V-LJS-E-CC-31-003 Calculation for Cathodic Protection ü ü ü ü ü ü ü
7.1.5 SMN-V-LJS-E-CC-31-004 Calculation for Lightning Protection ü ü ü
Data Sheet
7.1.6 SMN-V-LJS-M-DS-31-001 Data Sheet For Condensate Tank (SMN-ABJ-401 A/B) ü ü
SMN-V-LJS-M-DS-31-002 Data Sheet For Flame Arrestor
7.1.7 SMN-V-LJS-M-DS-31-003 Data Sheet For Valve ü ü ü
7.1.8 SMN-V-LJS-M-DS-31-004 Data Sheet For Breather Valve ü ü ü ü
7.1.9 SMN-V-LJS-M-DS-31-004-1 Data Sheet For Emergency Vent ü ü ü
7.1.10 SMN-V-LJS-I-DS-31-001 Data Sheet For Level Trasmitter ü ü
7.1.11 SMN-V-LJS-I-DS-31-002 Data Sheet For Level Indicator ü ü
7.1.12 SMN-V-LJS-I-DS-31-003 Data Sheet For Temperature Indicator ü ü
7.1.13 SMN-V-LJS-E-DS-31-001 Data Sheet For Cathodic Protection ü ü
7.1.14 SMN-V-LJS-E-DS-31-002 Data Sheet For Lightning Protection
No Deskripsi (Issued For Returned (Issued For Returned (Issued For Return Returned
Review) (Revision) Approval) (Revision) Construction) (Revision) (Revision)
7.1.83 SMN-V-LJS-I-GA-31-001 - Level Indicator/Level Gauge Detail HOLD Update Data Sheet
7.1.84 SMN-V-LJS-I-GA-31-002 - Hookup for LT HOLD Update Data Sheet
7.1.85 SMN-V-LJS-I-GA-31-003 - Hookup for TI HOLD Update Data Sheet
7.1.86 SMN-V-LJS-I-GA-31-004 - Hookup for PVSV HOLD Update Data Sheet
7.1.87 SMN-V-LJS-I-GA-31-005 - Hookup for Emergency Vent HOLD Update Data Sheet
MTO
7.1.88 SMN-V-LJS-M-MT-31-001 MTO ü ü
2 HSSE 5 Files 5 5 4 4 18
3 Planning 5 Files 5 5 3 13
4 Procurement 1 Files 1 1 2
5 Construction/Fabrication 17 Files 15 12 12 7 7 5 4 62