10/4/21, 3:36 PM Report: Project Product Data - SAP Business ByDesign

Access Context
* (No Restrictions)
Values Selected for Selection
Project : 19FO0008 (PID124_New Road Constn Morocborrocan)

Project Project Tasks Product Type Product Billa Actual Work (h) Planned Work (h) Remaining Work (h) Planned Quantity Actual Quantity Remaining Quantity

19FO0008 PID124_New Road Constn PID124_New Road Constn Morocborrocan Material Struc Conc. ClassA with Cover X 125.00 CuM 125.00 CuM 0.00 CuM

CASH ADVANCE -SUBCON Material CASH ADVANCE -SUBCON_124 # 1.00 lot 0.00 lot 1.00 lot
Freight Material Cutting of Trees # 1.00 lot 1.00 lot 0.00 lot
Sheet Piles, Steel (Cofferdamming) Material STRUCTURAL STEEL CHANNEL BAR (A36) # 2,304.00 KG 0.00 KG 2,304.00 KG
STEEL SHEET PILES FY36 # 68.00 KG 0.00 KG 68.00 KG

Steel Sheet Pile X 235.00 LM 0.00 LM 235.00 LM


Service Backhoe/Wheel Type/1.10m³ Bucket Cap X 0.00 h 50.40 h 50.40 h
Cutting Outfit X 0.00 h 50.40 h 50.40 h

Crane/Crawler Type/36-40 Tons Capacity X 0.00 h 50.40 h 50.40 h


Removal of actual/Obstruction, 0.20m Service Backhoe/Wheel Type/1.10m³ Bucket Cap X 0.00 h 94.93 h 94.93 h
Dump Truck/20m³ Dump Box Capacity X 0.00 h 23.73 h 23.73 h

Removal of Actual Structures Service LABOR WORKER X 0.00 h 151.30 h 151.30 h


MASON X 0.00 h 75.65 h 75.65 h
Disposal/Hauling Service LABOR WORKER X 0.00 h 151.30 h 151.30 h

Structure Excavation, Common Soil Service Backhoe/Wheel Type/1.10m³ Bucket Cap X 0.00 h 127.75 h 127.75 h
Dump Truck/20m³ Dump Box Capacity X 0.00 h 255.50 h 255.50 h
Excavation Works_Pi-103 (2)a-1 Service SKILLED WORKER X 0.00 h 1,690.67 h 1,690.67 h

LABOR WORKER X 0.00 h 5,072.00 h 5,072.00 h


Disposal/Hauling_Pi-103 (2)a-2 Service LABOR WORKER X 0.00 h 3,381.33 h 3,381.33 h
Foundation Fill Material SELECTED BORROW # 96.60 CuM 0.00 CuM 96.60 CuM
LUMBER COCO (2x2x12) # 0.00 PC 0.00 PC 0.00 PC

Service Vibro Plate Compactor X 0.00 h 77.52 h 77.52 h


Foundation Fill_Pi-103 (3)-1 Service LABOR WORKER X 0.00 h 278.88 h 278.88 h
Embankment from Borrow, Common Soil Material SELECTED BORROW # 6,493.75 CuM 0.00 CuM 6,493.75 CuM

BLACK SAND # 0.00 CuM 0.00 CuM 0.00 CuM


Service Grader/10Tons Capacity X 0.00 h 104.00 h 104.00 h
Vibratory Roller/0.77Tons Capacity X 0.00 h 104.00 h 104.00 h

Spreading/Grading_Pi-104 (1)a_1.1 Service LABOR WORKER X 0.00 h 101.24 h 101.24 h


Compaction _Pi-104 (1)a_2 Service LABOR WORKER X 0.00 h 80.99 h 80.99 h
Watering_Pi-104 (1)a_3 Service LABOR WORKER X 0.00 h 91.12 h 91.12 h

Embankment from Roadway Excavation Service Bulldozer/24.5Tons Capacity X 0.00 h 62.27 h 62.27 h
Backhoe/Crawler Type/1.10m³ Bucket Cap X 0.00 h 62.27 h 62.27 h
Dump Truck/20m³ Dump Box Capacity X 0.00 h 124.55 h 124.55 h

Grader/10Tons Capacity X 0.00 h 73.28 h 73.28 h


Vibratory Roller/0.77Tons Capacity X 0.00 h 73.28 h 73.28 h

https://my354367.sapbydesign.com/sap/public/ap/ui/repository/SAP_UI/HTMLOBERON5/client.html?client_type=html&app.component=/SAP_UI_CT/Main/root.uiccwoc&rootWindow=X&redirectUrl=/sap/public/ap/ui/runtime#n=eyJpblBvcnQiOiJBbmFseXNpc1Bhd… 1/6
10/4/21, 3:36 PM Report: Project Product Data - SAP Business ByDesign

Spreading/Grading_Pi-104 (1)b_1 Service LABOR WORKER X 0.00 h 22.88 h 22.88 h


Compaction _Pi-104 (1)b_2 Service LABOR WORKER X 0.00 h 18.30 h 18.30 h

Watering_Pi-104 (1)b_3 Service LABOR WORKER X 0.00 h 57.19 h 57.19 h


Subgrade Preparation, Common Soil Service Grader/10Tons Capacity X 0.00 h 24.55 h 24.55 h
Vibratory Roller/10Tons Capacity X 0.00 h 24.55 h 24.55 h

Spreading/Grading_Pi-105 (1)a_1.1 Service LABOR WORKER X 0.00 h 16.25 h 16.25 h


Compaction _Pi-105 (1)a_2 Service LABOR WORKER X 0.00 h 13.00 h 13.00 h
Watering_Pi-105 (1)a_3 Service LABOR WORKER X 0.00 h 38.03 h 38.03 h

Mooring Fixtures, Cleat with Accessories Material STEEL SHEET PILES FY36_PID124 # 1.00 lot 0.00 lot 1.00 lot
Installation of Mooring Fixtures, Cleat Service LABOR WORKER X 0.00 h 75.00 h 75.00 h
MASON X 0.00 h 75.00 h 75.00 h

Installation of Accessories Service LABOR WORKER X 0.00 h 8.00 h 8.00 h


MASON X 0.00 h 8.00 h 8.00 h
Rock Works, Class I Rock Material ROCKS # 8,616.95 CuM 0.00 CuM 8,616.95 CuM

Rock Works, Class I # 235.00 LM 0.00 LM 235.00 LM


Service Backhoe/Crawler Type/1.10m³ Bucket Cap X 0.00 h 345.76 h 345.76 h
Preparation of Base Service LABOR WORKER X 0.00 h 208.14 h 208.14 h
MASON X 0.00 h 208.14 h 208.14 h

Install Weep Holes & Filter Cloth Service LABOR WORKER X 0.00 h 208.14 h 208.14 h
MASON X 0.00 h 208.14 h 208.14 h
Laying of Boulders & Grouting Service LABOR WORKER X 0.00 h 4,145.50 h 4,145.50 h

MASON X 0.00 h 2,072.75 h 2,072.75 h


One Bagger Mixing of Mortar Service LABOR WORKER X 0.00 h 4,663.69 h 4,663.69 h
Aggregate Subbase Course Material AGGREGATE SUBBASE COURSE MATERIAL # 1,727.30 CuM 0.00 CuM 1,727.30 CuM

Service Backhoe/Crawler Type/1.10m³ Bucket Cap X 0.00 h 32.00 h 32.00 h


Dump Truck/25m³ Dump Box Capacity X 0.00 h 32.00 h 32.00 h
Grader/10Tons Capacity X 0.00 h 32.00 h 32.00 h

Vibratory Roller/10Tons Capacity X 0.00 h 32.00 h 32.00 h


Spreading/Grading_Pi-200-1 Service LABOR WORKER X 0.00 h 18.78 h 18.78 h
Compaction _Pi-200-2 Service LABOR WORKER X 0.00 h 15.02 h 15.02 h

Portland Cement Concrete Pavement 0.15m Material SAND # 21.15 CuM 0.00 CuM 21.15 CuM
REINFORCING STEEL BARS PLAIN GRADE # 93.06 KG 0.00 KG 93.06 KG
GRAVEL G1 # 42.30 CuM 0.00 CuM 42.30 CuM
PORTLAND CEMENT TYPE 1 - 40KGS/BAG # 338.40 bag 0.00 bag 338.40 bag

ASPHALT SEALANT # 33.84 L 0.00 L 33.84 L


PCCP, 150mm thk. (W=1.50m) # 282.00 SQM 0.00 SQM 282.00 SQM
Service Backhoe/Wheel Type/1.10m³ Bucket Cap X 0.00 h 18.26 h 18.26 h

Concrete Screeder (5.5 Hp) X 0.00 h 7.27 h 7.27 h


Concrete Vibrator X 0.00 h 7.27 h 7.27 h
Dump Truck/25m³ Dump Box Capacity X 0.00 h 13.37 h 13.37 h

https://my354367.sapbydesign.com/sap/public/ap/ui/repository/SAP_UI/HTMLOBERON5/client.html?client_type=html&app.component=/SAP_UI_CT/Main/root.uiccwoc&rootWindow=X&redirectUrl=/sap/public/ap/ui/runtime#n=eyJpblBvcnQiOiJBbmFseXNpc1Bhd… 2/6
10/4/21, 3:36 PM Report: Project Product Data - SAP Business ByDesign

Transit Mixer / 9m³ Ball Drum Capacity X 0.00 h 7.27 h 7.27 h


Base Preparation_Pi-311 (1)a.1_1 Service LABOR WORKER X 0.00 h 23.50 h 23.50 h
Formworks_Pi-311 (1)a.1_2 Service LABOR WORKER X 0.00 h 15.79 h 15.79 h

CARPENTER X 0.00 h 10.53 h 10.53 h


Installation of Rebars_Pi-311 (1)a.1_3 Service STEELMAN X 0.00 h 11.28 h 11.28 h
Batching_Pi-311 (1)a.1_4 Service LABOR WORKER X 0.00 h 78.96 h 78.96 h

Concrete Pouring _Pi-311 (1)a.1_5 Service LABOR WORKER X 0.00 h 315.84 h 315.84 h
MASON X 0.00 h 157.92 h 157.92 h
Concrete Sawing_Pi-311 (1)a.1_6 Service LABOR WORKER X 0.00 h 10.44 h 10.44 h
Application of Sealant_Pi-311 (1)a.1_7 Service LABOR WORKER X 0.00 h 3.13 h 3.13 h

Removal of Formworks_Pi-311 (1)a.1_8 Service CARPENTER X 0.00 h 13.16 h 13.16 h


Portland Cement Concrete Pavement 0.28m Material SAND # 917.28 CuM 0.00 CuM 917.28 CuM
REINFORCING STEEL BARS PLAIN GRADE # 2,162.16 KG 0.00 KG 2,162.16 KG

GRAVEL G1 # 1,834.56 CuM 45.50 CuM 1,789.06 CuM


PORTLAND CEMENT TYPE 1 - 40KGS/BAG # 12,138.98 bag 13.00 bag 12,125.98 bag
PORTLAND CEMENT TYPE 1 - 1 TONNER BA# 103.00 Tonner 11.00 Tonner 92.00 Tonner

ASPHALT SEALANT # 786.24 L 0.00 L 786.24 L


FUEL GASOLINE REGULAR # 100.00 L 0.00 L 100.00 L
PCCP, 280mm thk. (W=3.35m) # 2,138.50 SQM 0.00 SQM 2,138.50 SQM

PCCP, 150mm thk. (W=1.50m) # 282.00 SQM 0.00 SQM 282.00 SQM
Service Backhoe/Wheel Type/1.10m³ Bucket Cap X 0.00 h 1,018.24 h 1,018.24 h
Concrete Screeder (5.5 Hp) X 0.00 h 118.70 h 118.70 h

Concrete Vibrator X 0.00 h 237.39 h 237.39 h


Dump Truck/20m³ Dump Box Capacity X 0.00 h 1,007.52 h 1,007.52 h
Transit Mixer / 9m³ Ball Drum Capacity X 0.00 h 118.70 h 118.70 h
Base Preparation_Pi-311 (1)b.3-1 Service LABOR WORKER X 0.00 h 546.00 h 546.00 h

Formworks_Pi-311 (1)b.3-2 Service LABOR WORKER X 0.00 h 366.91 h 366.91 h


CARPENTER X 0.00 h 244.61 h 244.61 h
Installation of Rebars_Pi-311 (1)b.3-3 Service STEELMAN X 0.00 h 262.08 h 262.08 h

Batching_Pi-311 (1)b.3-4 Service LABOR WORKER X 0.00 h 1,834.56 h 1,834.56 h


Concrete Pouring _Pi-311 (1)b.3-5) Service LABOR WORKER X 0.00 h 7,338.24 h 7,338.24 h
MASON X 0.00 h 3,669.12 h 3,669.12 h

Concrete Sawing_Pi-311 (1)b.3-6 Service LABOR WORKER X 0.00 h 242.67 h 242.67 h


Application of Sealant_Pi-311 (1)b.3-7 Service LABOR WORKER X 0.00 h 72.80 h 72.80 h
Removal of Formworks_Pi-311 (1)b.3-8 Service CARPENTER X 0.00 h 305.76 h 305.76 h

Reinforcing Steel Bars, Grade 40 Material RSB PLAIN GRADE 33 (12mmx12.0m) # 5.00 PC 0.00 PC 5.00 PC
REINFORCING STEEL BARS PLAIN GRADE # 78,046.15 KG 0.00 KG 78,046.15 KG
RSB PLAIN GRADE 40 (32mmx6.0m) # 1.00 PC 0.00 PC 1.00 PC

RSB DEFORMED GRADE 33 (25mm6.0m) # 23.00 PC 0.00 PC 23.00 PC


GI TIE WIRE #16 - OLD # 1,599.70 KG 0.00 KG 1,599.70 KG

https://my354367.sapbydesign.com/sap/public/ap/ui/repository/SAP_UI/HTMLOBERON5/client.html?client_type=html&app.component=/SAP_UI_CT/Main/root.uiccwoc&rootWindow=X&redirectUrl=/sap/public/ap/ui/runtime#n=eyJpblBvcnQiOiJBbmFseXNpc1Bhd… 3/6
10/4/21, 3:36 PM Report: Project Product Data - SAP Business ByDesign

Service Bar Bender X 0.00 h 220.11 h 220.11 h


Bar Cutter X 0.00 h 220.11 h 220.11 h

Dump Truck/20m³ Dump Box Capacity X 0.00 h 234.00 h 234.00 h


Rebar Cutting, Bending, & Instal Service STEELMAN X 0.00 h 6,094.08 h 6,094.08 h
Structural Concrete, 20.8 Mpa, Class A Material G.I. PIPES (76mm D) # 7.00 PC 0.00 PC 7.00 PC

SAND # 300.00 CuM 0.00 CuM 300.00 CuM


BLACK SAND # 268.00 CuM 0.00 CuM 268.00 CuM
RSB DEFORMED GRADE 33 (12mmx6.0m) # 359.00 PC 102.00 PC 257.00 PC

RSB DEFORMED GRADE 33 (16mmx6.0m) # 37.00 PC 37.00 PC 0.00 PC


RSB DEFORMED GRADE 33 (10mmx6.0m) # 13.00 PC 13.00 PC 0.00 PC
GRAVEL G1 # 1,037.00 CuM 30.00 CuM 1,007.00 CuM

LUMBER COCO (2x2x12) # 62.00 PC 62.00 PC 0.00 PC


LUMBER COCO (2x2x10) # 11.00 PC 11.00 PC 0.00 PC
Lumber Coco (2x3x10) # 3,109.00 PC 27.00 PC 3,082.00 PC

LUMBER GOOD # 10,365.02 BDFT 0.00 BDFT 10,365.02 BDFT


PLYWOOD MARINE (0.01625m x 1.2m x 2.44m# 330.84 PC 0.00 PC 330.84 PC
PORTLAND CEMENT TYPE 1 - 40KGS/BAG # 8,296.00 bag 0.00 bag 8,296.00 bag
PHENOLIC BOARD 1/2 # 25.00 PC 0.00 PC 25.00 PC

Structural Concrete ClassA X 945.35 CuM 0.00 CuM 945.35 CuM


Struc Conc. ClassA with Cover_LM X 91.80 CuM 0.00 CuM 91.80 CuM
Service Backhoe/Crawler Type/1.10m³ Bucket Cap X 0.00 h 343.36 h 343.36 h

Concrete Vibrator X 0.00 h 744.00 h 744.00 h


Dump Truck/20m³ Dump Box Capacity X 0.00 h 382.21 h 382.21 h
One Bagger Mixer X 0.00 h 744.00 h 744.00 h

Lean Concrete Material SAND # 2.80 CuM 0.00 CuM 2.80 CuM
GRAVEL G1 # 5.60 CuM 0.00 CuM 5.60 CuM
PORTLAND CEMENT TYPE 1 - 40KGS/BAG # 28.00 bag 0.00 bag 28.00 bag

Service Concrete Vibrator X 0.00 h 38.19 h 38.19 h


One Bagger Mixer X 0.00 h 38.19 h 38.19 h
Preparation Service LABOR WORKER X 0.00 h 112.00 h 112.00 h

Concrete Pouring Service LABOR WORKER X 0.00 h 28.00 h 28.00 h


MASON X 0.00 h 28.00 h 28.00 h
Grouted Riprap, Class A Material SAND # 91.00 CuM 0.00 CuM 91.00 CuM
GRAVEL G1 # 54.60 CuM 0.00 CuM 54.60 CuM

FILTER CLOTH_4mx100mx150gsm(White) # 6.35 SQM 0.00 SQM 6.35 SQM


PORTLAND CEMENT TYPE 1 - 40KGS/BAG # 163.80 bag 0.00 bag 163.80 bag
BOULDERS # 382.20 CuM 0.00 CuM 382.20 CuM

WEEP HOLES # 119.93 M 0.00 M 119.93 M


Grouted Riprap, Class A X 364.00 CuM 0.00 CuM 364.00 CuM
Service Backhoe/Wheel Type/1.10m³ Bucket Cap X 0.00 h 31.03 h 31.03 h

https://my354367.sapbydesign.com/sap/public/ap/ui/repository/SAP_UI/HTMLOBERON5/client.html?client_type=html&app.component=/SAP_UI_CT/Main/root.uiccwoc&rootWindow=X&redirectUrl=/sap/public/ap/ui/runtime#n=eyJpblBvcnQiOiJBbmFseXNpc1Bhd… 4/6
10/4/21, 3:36 PM Report: Project Product Data - SAP Business ByDesign

Dump Truck/20m³ Dump Box Capacity X 0.00 h 31.81 h 31.81 h


One Bagger Mixer X 0.00 h 292.00 h 292.00 h
Preparation of Base Service LABOR WORKER X 0.00 h 50.56 h 50.56 h

MASON X 0.00 h 50.56 h 50.56 h


Install Weep Holes & Filter Cloth Service LABOR WORKER X 0.00 h 25.28 h 25.28 h
MASON X 0.00 h 25.28 h 25.28 h

Laying of Boulders & Grouting Service LABOR WORKER X 0.00 h 910.00 h 910.00 h
MASON X 0.00 h 910.00 h 910.00 h
Mixing of Grout Service LABOR WORKER X 0.00 h 112.35 h 112.35 h
MASON X 0.00 h 56.17 h 56.17 h

Sheet Piles, Steel, Slope Protection Material STEEL PLATE 0.2cm x 80cm x 240cm # 42.00 PC 42.00 PC 0.00 PC
STEEL SHEET PILES FY36 # 251,280.00 KG 0.00 KG 251,280.00 KG
Steel Sheet Pile # 5,235.00 LM 0.00 LM 5,235.00 LM

Service Backhoe/Crawler Type/1.10m³ Bucket Cap X 0.00 h 520.00 h 520.00 h


Cutting Outfit X 0.00 h 264.41 h 264.41 h
Crane/Crawler Type/35 Tons Capacity X 0.00 h 520.00 h 520.00 h

Sht Piles Stl (Slope Protection)_PID124 X 0.00 h 5,235.00 h 5,235.00 h


Installation of Steel Sheet Pile Service FOREMAN X 0.00 h 373.93 h 373.93 h
SKILLED WORKER X 0.00 h 747.86 h 747.86 h

LABOR WORKER X 0.00 h 1,495.71 h 1,495.71 h


Installation of Steel Sheet Pile Service FOREMAN X 0.00 h 685.71 h 685.71 h
SKILLED WORKER X 0.00 h 685.71 h 685.71 h

LABOR WORKER X 0.00 h 685.71 h 685.71 h


Curb and Gutter, Cast in Place Material PRECAST CONCRETE CURB & GUTTER(300 # 1,055.00 M 0.00 M 1,055.00 M
Concrete Curb and Gutter X 1,055.00 LM 0.00 LM 1,055.00 LM
Service Concrete Vibrator X 0.00 h 64.00 h 64.00 h

One Bagger Mixer X 0.00 h 64.00 h 64.00 h


Metal Guardrails,Metal Beam inc Post Material SAND # 3.67 CuM 0.00 CuM 3.67 CuM
REINFORCING STEEL BARS PLAIN GRADE # 789.43 KG 0.00 KG 789.43 KG

GRAVEL G1 # 7.11 CuM 0.00 CuM 7.11 CuM


LUMBER COCO # 237.89 BDFT 0.00 BDFT 237.89 BDFT
PLYWOOD MARINE (0.01625m x 1.2m x 2.44m# 7.36 PC 0.00 PC 7.36 PC

GUARDRAIL METAL BEAM (254mm) WIDTH # 281.94 M 0.00 M 281.94 M


PORTLAND CEMENT TYPE 1 - 40KGS/BAG # 64.97 bag 0.00 bag 64.97 bag
Service Backhoe/Wheel Type/1.10m³ Bucket Cap X 0.00 h 2.60 h 2.60 h

Concrete Vibrator X 0.00 h 33.47 h 33.47 h


Dump Truck/20m³ Dump Box Capacity X 0.00 h 4.59 h 4.59 h
One Bagger Mixer X 0.00 h 33.47 h 33.47 h

Rebar Installations Service STEELMAN X 0.00 h 56.39 h 56.39 h


Formworks Service CARPENTER X 0.00 h 375.92 h 375.92 h

https://my354367.sapbydesign.com/sap/public/ap/ui/repository/SAP_UI/HTMLOBERON5/client.html?client_type=html&app.component=/SAP_UI_CT/Main/root.uiccwoc&rootWindow=X&redirectUrl=/sap/public/ap/ui/runtime#n=eyJpblBvcnQiOiJBbmFseXNpc1Bhd… 5/6
10/4/21, 3:36 PM Report: Project Product Data - SAP Business ByDesign

Concrete Pouring Service LABOR WORKER X 0.00 h 88.11 h 88.11 h


MASON X 0.00 h 29.37 h 29.37 h

Remove Forms Service LABOR WORKER X 0.00 h 23.50 h 23.50 h


CARPENTER X 0.00 h 23.50 h 23.50 h
Excavation for Rail Post Service LABOR WORKER X 0.00 h 197.36 h 197.36 h