Professional Documents
Culture Documents
7 ANNUAL RE P O R T 2 0 1 4
CSR Management /
About the Taisei Our Business and Mission Creating New Value Corporate Date Financial section
Group of Companies
A N N U A L RE P O R T 2 0 1 4 8
1873 to 1945
Construction projects to support the modernization of Japan
Under the conviction and passion of our founder, Kihachiro Okura, many pioneering
projects were successfully completed, contributing to modern national construction in
Japan.
Ginza Brick Street Lake Biwa Lock and Tokyo Metro (between
Restoration Tunnel Ueno and Asakusa)
● 1873 ● 1890 ● 1927
This was a project to This was a pioneering This was the first
regenerate and modernization project underground railway in
restore Ginza, which constructed so that the the orient. A pioneering
had been burned water of Lake Biwa construction method
down in a fire, using could be used for water was used for underground
incombustible bricks. transport and power excavation that ensured
generation, etc. that road traffic could
flow above.
1946 to 1969
From restoration to new growth
National Stadium
After passing through the post-war period of chaos, the company ● 1958
made a new star t as Taisei Corporation, under taking post-war This was a major athletics stadium constructed
for the Third Asian Games. After refurbishment
restoration work and the development of the regenerated Japan. it was used as the main stadium for the Tokyo
Olympics (1964).
The Birth of Taisei Corporation
In 1946 the predecessor of the company, Okura Doboku, was thrown into a crisis that
threatened the company's existence, with the order to dissolve zaibatsus (financial
conglomerates). Before this Okura Doboku had changed its name to Taisei
Corporation to make a new start, and in 1947 the President and Directors were elected
by employee vote, an unprecedented method of voting for the President and
Directors. In addition, an employee shareholding system was instituted in which
employees could buy shares in the company.
Hotel Indonesia
● 1962
9 ANNUAL RE P O R T 2 0 1 4
CSR Management /
About the Taisei Our Business and Mission Creating New Value Corporate Date Financial section
Group of Companies
1970 to 1989
Creation of new technologies and the challenges of national projects
We participated in many national projects, and undertook the challenges
of improving our technical and overall capabilities, in order to respond to
diversified construction needs.
currently remains the world's longest This was the largest national project
operational railway tunnel. The in Indonesia at the time. It is still the
construction took 24 years. The scale was largest source of electric power on
unprecedented in the history of civil Java Island.
engineering in Japan, with a total of 14
million workers having been involved in the
work. The company was responsible for the
Yoshioka construc tion sector on the
Hokkaido side. New technologies that
rewrote the history of civil engineering
were successively developed,
demonstrating that our technology for long
tunnels under the sea was at the world s top
level.
A N N U A L RE P O R T 2 0 1 4 10
1990 to 2014
Care for the environment, contributing to safety and security of society
We are contributing to the development of a sustainable society by actively
undertaking measures to solve environmental problems, and providing measures
to protect society and lifestyles from disasters.
Environmental Design that Increases the Local Charm New Kuala Lumpur International
Airport, Malaysia
Sapporo Dome
● 2001 ● 1997
The modern form and functional
Sapporo Dome was developed on the remains of a broad design was carried out by the
Japanese architect, the late Kisho
agricultural testing station on the outskirts of Sapporo. During
Kurokawa. The company constructed
this construction, 8,000 trees were replanted and a waterside
the main terminal.
environment was created to ensure biological continuity with
the broad rich green land, and in addition a natural grassland
was cultivated. In a survey carried out after the construction, it Indus Highway Project (N-55),
was confirmed that there was more flora and fauna inhabiting Kohat Tunnel and Access Roads,
this area compared with before construction. Pakistan
● 2003
We opened a Liaison office in Pakistan
in 2002. At that time our business
expanded mainly with civil
engineering projects, starting with
the Kohat Tunnel.
11 ANNUAL RE P O R T 2 0 1 4
CSR Management /
About the Taisei Our Business and Mission Creating New Value Corporate Date Financial section
Group of Companies
Long-term Business Plan for Sustainable Development In 2010 all the Directors of the Group re-formulated the system of ideals to
enable a sense of unity in the Group, that was clear and easy to understand
Formulation of Taisei Vision 2020 and could be shared. Also, the "Taisei Vision 2020" was formulated as the
● 2010
long-term business plan within the new system of ideals that would serve
as a signpost to achievement of the future aimed for 10 years hence. At
present a Mid-term Business Plan (2012-2014) is being implemented, which
reflects the main policy measures of this vision.
mechanized construc tion and remote control This project is said to have been the
technologies and a tsunami experimental facility, etc., earnest wish of the Turkish people for 150
are being newly established, to promote the creation of years. It was completed by overcoming
innovative technologies. many technical tunneling challenges for
the first time in the world.
A N N U A L RE P O R T 2 0 1 4 12