You are on page 1of 29

Petroconst S.A.

I.C. Bratianu BLVD, no. 45, Constanta, Romania


Phone: +40 241 618 771; Fax: +40 241 618 694
Web: www.petroconst.ro, E-mail: office@petroconst.ro

Access Gate Petroconst S.A. – head offices


GENERAL PRESENTATION OF “PETROCONST” SA
CONSTANTA COMP.
1. FIELD OF ACTIVITY

BACKGROUND
PETROCONST S.A. – a joint stock company – has been established since 1960 being a major
company with a large experience in the wide sphere of oil industry and performing both on-shore, and
off-shore construction-assembly works.

Petroconst S.A. Head offices

COMPANY NAME: PETROCONST S.A.


ADDRESS, PHONE, FAX, AND E-MAIL: 45 I.C. BRATIANU STR., CONSTANTA, ZIP CODE
900263, ROMANIA
TEL. NO.: 0040 241 614356
FAX NO.: 0040 241 618694
E-MAIL: office@petroconst.ro
CONTACT PERSON : Eng. CONSTANTINESCU VIOREL – GENERAL MANAGER
2. COMPANY PROFILE
COMPANY PROFILE:
Onshore & Offshore Construction-assembly works
within the Oil & Gas Industry.

SCOPE OF WORK:
Our company has the required capability, experience and
endowment in order to provide high quality and
competitive works and services, such as:
 Installation of pipelines, tools and equipment for
Refinery and Petrochemistry (capacity of weld
performance – 1000 inch / working day).
 Assembly construction works within oil industry for
distribution systems of the oil products – crude oil,
natural gas, water injection deposits, etc. Mild hydrocracking plant

 The erection of steel and HDPE pipelines (with operating pressures from 6 to 350 bar) both
underground, and above-ground for the distribution of
various oil products.

Offshore oil activity on the continental plateau of the


Black Sea has been developed since 1976, our
company being the sole Romanian constructor
specialized in offshore assembly works, that is:

Side booms for pipelines

 Laying out on site of the steel structures which are integral parts
of the crude oil and natural gas production platforms, such as:
Jacket type structures, bridges, tie-in platforms, duty cranes,
dwelling and electric blocks.
 Completion of the offshore drilling platforms for commencement
of the development of crude oil and natural gas production
reservoirs by using oil separators, water treatment plants, water
pumping stations for water injection into deposits, gas
compressing stations, social units.
 Onshore putting-into-readiness and offshore installing of the
undersea main pipelines with 4” – 16” in diameter.
 Preparation and manufacturing in pipeline spool workshop for
crude oil and gas, air, water, foam technological spools, steel
ladders, bridges, hand rails, protective shields, hall steel
structures, steel structures for flare support. Offshore Central Platform
Furthermore, besides the works above mentioned we also have in our scope of work the execution
of construction-assembly works for automation and electric plants, works have been carried out
for some of the largest companies in Romania: Petrom OMV, Transgaz, Rompetrol, etc.
 Overground and underground cable routes
 Cable layout
 Execution of process tie-ins for instrumentation with
stainless steel isometrics and/or Ol, with couplings by
ermetto fittings and/argon welding• Installation of
complex automation systems assisted by high
performance process computers with software able to
ensure the following: Installation of field
instrumentation and/or control panels, junction boxes in
normal and/or explosion dangerous environments
 Installation of panels, automation boards,
programmable automatic devices, etc.
Generator’s container

 Installation of electrical heating facilities in normal and explosion dangerous environments, to


instrumentation isometrics, technological pipelines,
technological vessels
 Installation of fire, smoke, and gas detection systems
 Testing and commissioning of low and medium
voltage electrical facilities
 Aerial low and medium electric voltage lines
 Underground lines of low and medium voltage
 Lighting networks
 Aerial and/or underground derivations of 0.4kv

 Aerial and
undergrou Transmitter’s room
nd networks for the
electrical power distribution in normal and explosion
dangerous environments
 Indoor and outdoor power plants in normal and explosion
dangerous environments
 Weak current electric facilities
 Passive and/or active cathodic protection facilities to
overground and underground steel constructions
 Earthing and lightning installations
 Testing and commissioning
 All electrical and automation installations to the offshore
platforms from the continental plateau of the Black Sea -
PFCP;PFS3;PFS6;PFS7 ; PFSU
Control room
 Fitting out with electrical and automation
installations of gas regulation and measurement
stations along the territory of Romania within the
distribution systems of TRANSGAZ
 Fitting out with electrical and automation
installations of potable water pumping stations
 Fitting out with electrical and automation
installations of thermal heating plants, etc
Construction works for the development of crude oil
and natural gas fields from the continental plateau of
the Black Sea. Metallic manufactures, concrete and
metallic strength structures, thermal insulations.
GMS Constanta

Over the last 25 years have been mounted approx. 400 Km of submarine pipes (6”-20”) at a depth of
60 m under the sea level (crude oil, natural gas,
and flooding water). Have been executed central
platforms of crude oil and natural gas
development on the Black Sea.
 Pipeline insulations both for onshore, and
offshore types of work.
 Cathodic protections for pipelines.
 Construction of storage tanks with capacities of
50 c.m. – 100,000 c.m.
 Construction of natural gas transmission lines
(trunk lines), with diameters between Φ 168 mm
şi Φ 1,200 mm.

Water treatment control station

 Construction of crude oil transmission lines (trunk lines), with diameters between Φ 168 mm şi Φ
1,000 mm.
 Electrical and automation installations.
 Pumping stations and waste water treatment stations, treatment plants for oil and natural gas cleaning,
oil terminals, gas measuring stations, etc.
 Construction works within the fields of: hydro-urban public works, hydrotechnical works, land
reclamation works.
 Construction of protection embankments.
 Protection of river banks for the undercrossing with
oil and gas pipeline of channels and rivers.
 Protection of shores for the installation of the
undersea pipelines.
 Recovery of hydrotechnical works damaged by
water floods.
 For the above mentioned type of works our
company has the ability to provide our clients with
complete projects on turn-key basis.
50 000 c.m. tank – Oil Terminal
3. CERTIFICATIONS
For all fields of activities our company secured the necessary permits, licenses and certificates, a
highly qualified personnel (approx. 360 employees), and owns the suitable and competitive endowment
for the successful completion of works.
ISSUING AUTHORITY AUTHORIZATION & PERMIT TYPE
SR EN ISO 9001: 2008, or equivalent, implemented and
Quality Management System
maintained
SR EN ISO 14001: 2008, or equivalent, implemented and
Environment Management System
maintained
SR EN ISO 18001: 2008, or equivalent, implemented and
OHSAS Management System
maintained
Authorization aimed for engineering of objectives for surface
technological installations afferent to production activity and/or
ANRE Authorization no.14019
of natural gas storage (compression stations, connections,
regulation-measurement stations and upstream pipelines), type PP
Authorization aimed for engineering of compression stations, of
pipelines, connections and regulation-measurement stations
ANRE Authorization no.14020 afferent to natural gas transmission systems, as well as natural gas
utilization installations having working pressures higher than 6
bar, type PCTRI
Authorization aimed for execution of natural gas transmission
ANRE Authorization no.14021 lines and of natural gas compression stations, afferent to natural
gas transmission systems, type ETC
Authorization aimed for execution of connections and natural gas
regulation-measurement stations having working pressures higher
ANRE Authorization no.14022
than 6 bar, afferent to natural gas transmission systems, type
ETRI
Authorization aimed for execution of afferent objectives to
surface technological installations, natural gas compression
ANRE Authorization no.11506 stations, including connections to supply pipelines from
upstream, from the field of natural gas production and storage,
type EP
Authorization aimed for execution of natural gas distribution
ANRE Authorization no.11657
systems, type EDS
Authorization aimed for engineering of natural gas utilization
ANRE Authorization no.11658 installations working with pressure lower than, or equal to 6 bar,
type PDI
Authorization aimed for execution, verification and revision of
ANRE Authorization no.11659 natural gas utilization installations working with pressure lower
than, or equal to 6 bar, type EDI
Authorization aimed for engineering of natural gas distribution
ANRE Authorization no.11747
systems, type PDS
Permit type Be for “ Execution of indoor electrical installations
ANRE Authorization no.8447 for civil and industrial constructions, aerial and underground
connections, at nominal voltage of 0,4 KV “
INSEMEX Authorization no. Permit regarding the capacity of performing specific activities to
GANEx.Q.2012.(25).12.1199 Norm NEx01-06
ISC Authorization no.2339 Laboratory of gr. III – NDT lab for profiles: CO, INM, IGN, PC

ANR Accreditation no. 3/229/7DD Accreditation of non-destructive examinations (lab. END)


Authorization for development of activities within atomic field –
CNCAN Authorization no. AI 1963 to use radiological installations within: CND-GAMMA
Laboratory
Authorization for developing activities within atomic field – to
CNCAN Authorization no. AI 1964 transport radiation and radiological installation sources within:
CND-GAMMA Laboratory
ISCIR Authorization no. Authorization for RT- Penetrant radiation examinations,
CT/PTCR6/TIPA/001 specialty(ɤ)
ISCIR Authorization no.
Authorization for UT(t,s) – Ultrasound measurement
CT/PTCR6/TIPF/012
ISCIR Authorization no. Authorization for UT(g) – Measurement of thicknesses with
CT/PTCR5/TIPE/003 ultrasounds
ISCIR Authorization no.
Authorization for PT – Penetrant liquid examintations
CT/PTCR6/TIPA/001
ISCIR Authorization no. Authorization for Installation and / or repair of steam and hot
DISPR/CR4/B,C/19/1771/0/2011 water piping (Pmax≤100 bar, Tmax≤440 °C)
ISCIR Authorization no. Authorization for Installation and / or repair of fluid piping
DISPR/CR4/B,C/13/1770/0/2011 (Pmax≤200 bar, -50°C <Tmax≤440°C)
Authorization for Installation and repair of steam and hot water
ISCIR Authorization no. vessels having the following parameters:
DISPR/CR4/A,B,C/4,5/1772/0/2011 STEAM VESSEL: Qmax≤30 t/h, Pmax≤120 bar, Tmax≤350 °C ;
HOT WATER VESSEL: Dmax≤50 Gcal, Pmax≤20 bar
Authorization for Installation and/or repair of stable pressurized
ISCIR Authorization no.
steel vessels, having the following parameters: Vmax≤1.000.000
DISPR/CR4/C/8/1769/0/2011
l, Pmax≤100 bar, -50°C ≤ Tmax ≤ +440°C
GL Certificate no.WF 0710032 HH Authorization GL for welding of pipelines within production
and Appendix Rev.01 to Certificate workshop in BICS Midia
GL Certificate no.WF 0910348 HH Authorization GL for welding of pipelines within production
and Appendix to Certificate workshop in Constanta, Caraiman street
- Manufacture and mounting for pressure equipment
TUV Austria - Certificate EN ISO
- Manufacture and mounting of metallic structures and storage
3834-2 no.Pz/11/s/009/ful
tanks for oil products and water
Agreement regarding the suitable re-marking of materials and
TUV Austria - Certificate
products for pressurized equipment as per Instruction 97/23/EG
NOBOBUK00011/FUL
and Regulation AD2000
Fire fighting authorization PSI, for execution of works for
MAI – IGSU - CNSIPC installation and maintenance of systems and installations of fire
Authorization Series:A, No.0354 fighting and restricting except of those containing certain
fluorinated gas with greenery effect
4. EXPANSION ON LONG TERM
Our company has refurbished the production base of CARAIMAN, having in view the following
structure:

- Workshops: mechanical (steel manufactures and


welding), electrical, painting, sand blasting with an
area of 1,619 sq.m.
- Radiology building and laboratory for radiography
processing with an area of 173 sq.m.

Concrete plant

- Welding training school


- Locksmith training school
- Concrete station with an area of 110 sq.m.,
capacity of 60 c.m./h
- Paddocks with an area of 690 sq.m.
- Storage spaces with covered area of 2,500 sq.m.
and open area of 30,000 sq.m.

Storage areas – BICS Midia

All these objectives are insured and monitored by a guard


and protection agency having also provided an outdoor
lighting system improved with video monitoring cameras.

All these new production capacities have replaced the


existing ones which shall be demolished, step by step, over the
time. Steel manufacture workshop

Most of these objectives have been finalized until the end


of 2014.
Mechanical Workshop in Caraiman
5. PRESENCE ON BUSINESS MARKET
Our company is developing the current activity on national level and
onshore.

Capacity / Workload

Our average workload and capacity for site works/services – with


figures from previous and present year)

Past year Current year


Welders 40 37
Fitters 85 78
Electricians 20 30
NDT 7 7
Engineers 40 40

Our average workload and capacity for fabrication (per day, week or month – with figures from
previous years and actual figures from present year)

available for available for


fabrication last fabrication this
year year
Welders 40 37
From which certified 25 23
Fitters 85 78
Mechanics 30 28
Electricians 20 30
NDT 7 7
Warehouse keeper for materials and tools 3 3
TOTAL WORKERS 185 183
FOREMEN AND TECHNICAL 13 12
ECONOMICAL ADIMINISTRATION STAFF

Last year we had an average workload of 177 man-hour/month and present year is
178 man-hour/month
Current workload is 15” welded/welder/day
Maximum number of employees - 1.000 employees

Permanent employees (with medium level of experience) at present: - 362 employees

6. TURNOVER
1. Turnover 2009 – 141,340,625 Lei
Netto Profit = 26,760,858 Lei
Gross Profit = 33,361,921 Lei

2. Turnover 2010 – 57,047,322 Lei


Netto Profit = 1,227,140 Lei
Gross Profit = 1,259,390 Lei

3. Turnover 2011 – 61,487,985 Lei


Netto Profit = 2,002,135 Lei
Gross Profit = 2,002,135 Lei

4. Turnover 2012 – 59,429,117 Lei


Netto Profit = 2,424,715 Lei
Gross Profit = 2,424,715 Lei

5. Turnover 2013 – 55,864,876 Lei


Loss = - 9,996,632 Lei

6. Turnover 2014 – 47,099,833 Lei


Netto Profit = 447,303 Lei
Gross Profit = 447,303 Lei

7. Turnover 2015 – 46,496,567 Lei


Netto Profit = 9,652,447,792 Lei
Gross Profit = 9,652,447,792 Lei
7. TRADITIONAL PARTNERS
Among traditional partners, well known, of PETROCONST S.A. CONSTANTA we mention hereby:
OMV PETROM S.A., TRANSGAZ S.A., ROMPETROL S.A., GDF SUEZ Energy, S.A., R.A.J.A.

8. PROJECTS (TYPE, LOCATION, CHALLENGES)

Offshore Oil and Gas Brownfield Project Experience and Capability

Description/ Total contract price Contract period


Crt. Object of the contract Beneficiary’s
No. name/ Address
1 2 3 4 5
Delta Offshore Field Development
Engineering, Procurement, Construction and
Commissioning, for installation of tools,
equipment, piping, instrumentation and
automation on offshore platforms:
- Platform PFCP – works of Engineering,
Procurement, Construction and
Commissioning for Pigging trap, Slug
Catcher, Extension of steel structure Jacket OMV Petrom SA,
1, Extension of steel structure block A - PFS Calea Dorobantilor
3 – works of Engineering, Procurement, 90.884.238,05 LEI 29/02/2008
1. Construction and Commissioning for chemical
Str., No. 239, without VAT 30/06/2010
skid (Methanol Injection), Pig trap, Extension Bucharest,
of steel structure Jacket 6 ; Sector 1
- PFS 7 – works of Engineering, Procurement,
Construction and Commissioning for
production separator Baker, Flare system
(flare ignition system, KO drum, pig trap,
chemical skid (wax inhibitor), chemical skid
(Methanol Injection), gas subsea pipeline PFS
6 – PFS 7, Extension of steel structure Jacket
7.
Distributed Control System Delta
Engineering, Procurement, Construction and
Commissioning, for installation of tools,
equipment, piping, instrumentation and
automation on offshore platforms:
Works of Engineering, Procurement, OMV Petrom SA,
Construction and Commissioning for : Calea Dorobantilor
22.114.603,32 LEI 03/2009
2. - Dismantling on PFS 3,6,7 and PFCP; Str., No. 239, without VAT 24/08/2010
- Emplacement of Control Room on PFS Bucharest,
3,6,7 and PFCP; Sector 1
- Installation of new DCS System on PFS
3,6,7 and PFCP;
- Installation of Microwave Radio System on
PFS 3,6,7 and PFCP;
- Pre-commissioning and Commissioning and
Training
LWO3 and LWO4 wells tie in
Engineering, Procurement, Construction and
Commissioning for Works for surface
facilities tie-in for L1, L3 and I4
- Engineering (Basic, Detail, Electrical
Heating and As-Build) ;
- Procurement (Bulk Material for Mechanical,
Electrical and Instrumentation, AUTOCON );
- Onshore fabrication (Production manifold for
3 wells, spool and suports);
- Offshore works
- Dismantling works (dismantling TX oil pump
and the a.c. ACF pump ; decommissioning of
old Baker burner support) ;
- Steel Structure (completion of the extension OMV Petrom SA,
bridges on the jacket 6B console, provided
Calea Dorobantilor
with protection panels against wind ;
3. extension deck +23000 mm ; rigid Str., No. 239,
consolidation deck +11500 mm in the MP4 Bucharest,
area ; build and install aligning systems for Sector 1
new wells leads LV03 & LV04) ;
- Mechanical works (installation of Production 3.481.648,36 LEI without 03/05/2009
manifold MP4, flow-lines for the new wells VAT 21/03/2011
and reconfiguration for some existing, links
between production manifolds MP3-MP4,
depressurizing and drainage lines, pressure
tests);
- Electrical and Instrumentation works
(Lighting System Installation, Install and
connect a new Wells Control Panel with 3
hydraulic circuits for 6 wells, installation of HI-
LOW pilots, Installation of Fire & Gas
detection system, Installation of New
AUTOCON, Electric Heating Installation) ;
- Pre-commissioning and Commissioning
Compressor Upgrade on PFS 6, 7 and 8
Engineering, Procurement, Construction and
Commissioning for Compressor Upgrade on
PFS 6, 7 and 8 :
Works of Engineering, Procurement,
Construction and Commissioning for : OMV Petrom SA,
- Engineering (Basic, Detail, Electrical Calea Dorobantilor 16/09/2009
6.555.240,81 LEI without
4. Heating and As-Build) ; Str., No. 239, VAT 29/11/2010
- Procurement (Bulk Material for Mechanical, Bucharest,
Electrical and Instrumentation, Compressor Sector 1
Suction Scrubbers, Ultrasonic Gas Flow
meter);
- Steel structure (Stiffening deck on PFS 6
and 7);
- Mechanical works on PFS 6,7 and 8
(installation of condensate vessel,
compressor suction scrubbers & tie-in,
ultrasonic gas flow meter);
- Electrical and Instrumentation works on PFS
6,7 and 8 (Installation of Fire System, AMC
for Compressor Suction Scrubbers and
measurement equipment system) ;
- Pre-commissioning and Commissioning
Works for surface facilities tie-in for L1,
L3 and I4
Engineering, Procurement, Construction and
Commissioning for Works for surface
facilities tie-in for L1, L3 and I4 :
- Engineering (Basic, Detail, Electrical
Heating and As-Build) ;
- Procurement (Bulk Material for Mechanical,
Electrical and Instrumentation, MEG Skid,
TEG Skid );
- Onshore fabrication (Production manifold for
6 wells, spool and supports); OMV Petrom SA,
- Offshore works Calea Dorobantilor 5.411.034,00 LEI without 08/07/2010
5.
- Temporary works (pipeline connections, Str., No. 239, VAT 12/10/2011
dismantling HI-LO-1 pcs and installing HI-LO- Bucharest, Sector 1
2 pcs);
- Mechanical works (installation of MEG
Skid, TEG Skid, Production manifold,
pipelines, pressure tests);
- Electrical and Instrumentation works
(Instrumentation & Electrical Cable
Installation, Installation of New AUTOCON,
impulse line installation, instrumentation and
power board installation, Electric Heating
Installation, Integration of SS) ;
Pre-commissioning and Commissioning
Surface installations for wells in gas-lift
to PFS 3 and PFS 6 –
Black Sea Stage II
Manufacture and installation of gas-lift vertical
distributor with two collectors for 4 wells
(L5,L9,L11,I7); Manufacture and installation of
gas-lift vertical distributor with two collectors
for 4 wells (I10,L01,L02,L04); Manufacture OMV Petrom SA,
and installation of gas-lift vertical distributor Calea Dorobantilor 5.260.000,00 LEI without 03/09/2008
6. with two collectors for 4 wells (I9,L12,L10,si
GL-flexible tubing); Manufacture and
Str., No. 239, VAT 22/10/2009
installation of technological lines; installation Bucharest, Sector 1
of measuring and monitoring of gas-lift
process parameters; manufacture of deck
extension at elevation +23; engineering,
material procurement, manufacture,
installation and commissioning for power
supply panel for submersible pumps and
crude oil transfer pumps; rehabilitation of drain
system from technological plant; modification
of LP mixing lines.
Low pressure gas compression on
platforms PFS 6, 7, 8 and cogeneration OMV Petrom SA,
on platforms PFS 6, 7 – Black Sea Calea Dorobantilor 08/2006
37.688.989,05 LEI
7. Installation of 3 pcs of compressors, one for Str., No. 239, without VAT 02/2008
each platform PFS 6, 7, 8 and installation of Bucharest,
2 pcs of cogeneration units on platforms
Sector 1
PFS 6 and PFS 7
Electrical heating for pipelines and
automation equipment on offshore OMV Petrom SA,
pipelines Calea Dorobantilor 12/10/2006
7.236.628,00 LEI without
8. Works of electrical heating for pipelines and Str., No. 239, VAT 26/05/2008
automation equipment on offshore platforms Bucharest,
PFSSU, PFCP, PFS 3, PFS 4, PFS 6, PFS 7,
Sector 1
PFS 8
OMV Petrom SA,
Well 317 Sinoe – Production Manifold Calea Dorobantilor 21/11/2008
2.306.000,00 LEI without
9. Manufacture and installation of production Str., No. 239, VAT 19/05/2009
manifold for 3 wells Bucharest,
Sector 1
Unmanned Pescarus Platform
Works of engineering, procurement,
fabrication and installation of
- Assembly J-tubes to PFC/C1-PFS-U
(protection submarine electrical cables
power and optic);
- Assembly protection panels J-tubes to
PFC/C1-PFS-U ;
- Assembly submarine electrical cables and
optic fiber between PFC/C1-PFS-U ;
- Assembly extensions at cotes +12.500 m
and +20.500 m on jacket PFS-U-West Side
; OMV Petrom SA,
- Installation of 6/0.4 KVA transformer ; Calea Dorobantilor 21/11/2006
39.570.086,00 LEI
10. - Installation of 0.4/0.23 KVA transformer ; Str., No. 239, without VAT 22/12/2011
- Installation of 6 KVA cell ; Bucharest,
- Installation of 10 cm water tank at
Sector 1
+16.500 m ;
- Installation of 5 tf crane ;
- Installation of subsea pumps ;
- Installation of instrumental-air compressor
;
- Installation of burners at cote +12.500 m ;
- Electrical heating ;
- Installation of subsea pipeline Ø 6” x 11
mm – L=9 Km ;
- Electrical and Instrumentation equipment
installation ;
- Pre-commissioning and Commissioning
Installation of subsea pipe between PFS6 OMV Petrom SA,
and PFS7 9.590.184,00 LEI without 09/08/2010
11. Works of engineering, procurement, Calea Dorobantilor VAT 07/12/2011
fabrication of subsea pipeline spools (3 pcs Str., No. 239,
x 1 Km) and risers (2 pcs), fabrication of Bucharest,
bridges for +9.000 m (2 pcs), launching to Sector 1
the sea of pipe spools and risers, assembly
of the spools and risers, recovery of floats
to the shore, dismantling works on
platforms, installation of bridges and
technological pipes on platforms
(PFS6&PFS7), mechanical, electrical and
instrumentation works on offshore platforms
(PFS6&PFS7), Pre-commissioning and
Commissioning.
Well G10 Surface Facilities tie-in on PFS
3 – ctr.no.8460014583 / 2011
Engineering, Procurement, Construction
and Commissioning, for installation of tools,
equipment, piping, instrumentation and
automation :
- Engineering services for mechancial, steel
constructions, electrical and instrumentation
works, electrical heating
- Procurement of materials/tools and
equipment;
- Manufacturing and installing of
technological pipelines
- Manufacturing and installing of steel
structures (decks, skids, flare supporting
structure);
- Manufacturing and installing of gas OMV Petrom SA,
manifold for 4 wells; Calea Dorobantilor 20/12/2011
4.114.132,09 EURO
12. - Installing of SOB separator on place and Str., No. 239, without VAT 07/2013
connecting to the plant; Bucharest,
- Installing of methanol skid on place and Sector 1
connecting to the plant;
- Installing of KO-DRUM skid on place and
connecting to the plant;
- Installing of flare system on place and
connecting to the plant;
- Electrical works (cable trays, cables,
lighting devices, electrical panels) ;
- Automation and instrumentation works
(cable trays, cables, instrumentation,
automation panels);
- Works of electrical heating for pipelines
and equipment (heating cables, thermal
insulations, panels for electrical heating);
- Procurement, installation and connection
of Well Control Panel;
- Upgrading of software for integration into
DCS.
Completion tie-in well 825 on PFS 6 – OMV Petrom SA,
ctr.no. 8460014595 / 2011 Calea Dorobantilor 20/12/2011
1,861,323.33 EURO
13. Engineering, Procurement, Construction
and Commissioning, for installation of tools, Str., No. 239, without VAT 07/2013
equipment, piping, instrumentation and Bucharest,
automation : Sector 1
- Engineering services for mechancial, steel
constructions, electrical and instrumentation
works, electrical heating
- Procurement of materials/tools and
equipment;
- Manufacturing and installing of
technological pipelines
- Manufacturing and installing of steel
structures (decks, skids, flare supporting
structure);
- Manufacturing and installing of production
manifold for 3 wells;
- Installing of Pig Receiver and connecting
to the plant on PFS 6;
- Installing of Pig Launcher and connecting
to the plant on PFS 7;
- Installing of KO-DRUM skid on place and
connecting to the plant;
- Installation of 6A-6B JACKET Deck -
North Side (+11.500) ;
- Installation of 6B JACKET Deck - East
Side (+8.500) ;
- Installation of 6A-6B JACKET Deck - North
Side (+9.000) ;
- Installation of 6B JACKET Deck - North
Side (+18.500) ;
- Installation of 6A JACKET Deck - North
Side (+22.500)
- Electrical works (cable trays, cables,
lighting devices, electrical panels) ;
- Automation and instrumentation works
(cable trays, cables, instrumentation,
automation panels);
- Works of electrical heating for pipelines
and equipment (heating cables, thermal
insulations, panels for electrical heating);
- Software Implementation.
9. OWNED EQUIPMENT AND TOOLS

Equipment, materials and associated services provided for performing the works
Description of the infrastructure:

Tool / Equipment / Plant Description Last Maintenance, Permits,


No of Year of
units manufacture
inspection reports / validity
(Type /model)
term, etc.
TYRED SHOVEL – KOMATSU PW 130-7K 1 2007
CRAWLER EXCAVATOR – KOMATSU PC210LC-8 1 2007
BULLDO-EXCAVATOR KOMATSU - WB93R-2 2 2005
BULLDO-EXCAVATOR KOMATSU - WB93R-5 2 2006
BULLDO-EXCAVATOR KOMATSU - WB93R-5 4 2007
BULLDOZER KOMATSU D41E 1 2007
MOTOR-CRANE CKD AD 30 1 2008
CRANE TELEMAC HT125 1 2000
CRANE TELEMAC HT125 1 2001
CRANE HYDROM 1 1987
CRANE HYDROM 1 1991
CRANE XCMG 2575 1 2008
CRANE RDK 300 1 1990
CRANE SIDE BOOM CATERPILLAR 8 2008
COMPACTOR WEBER WITH DRUM OF 500 MM 1 2008
COMPACTOR WEBER WITH DRUM OF 500 MM 1 2011
JOLT RAMMER MS680 1 2011
JOLT RAMMER MS680 1 2012
MOTOR-COMPRESSOR 7/51 Ingersoll 1 2012
MOTOR-COMPRESSOR 21/215 Ingersoll 1 2007
WELDING MACHINE MASTER 3500 MLS 6 2006
WELDING MACHINE MASTER 3500 MLS 11 2007
WELDING MACHINE MASTER 3500 MLS 12 2008
WELDING MACHINE MASTER 3500 MLS 10 2009
WELDING MACHINE MASTER 3500 MLS 1 2011
WELDING MACHINE WITH ARGON TYPE TRANSTIG 1700 2 2009
WELDING MACHINE WITH ARGON TYPE TRANSTIG 2500 1 2009
WELDING MACHINE WITH ARGON TYPE TRANSTIG 1750 2 2011
WELDING MACHINE INVERTOR 270 1 2011
WELDING MACHINE INVERTOR SX 1 2011
WELDING MACHINE INVERTTEC 400SX 1 2011
WELDING SOURCE TRANSTIG 1750 2 2012
INVERTER TRANSPOKET 1500 3 2010
GENERATOR SET 30 KVA 2 2008
GENERATOR SET GSL 42D 1 2008
GENERATOR SET GSW 45P 1 2012
GRINDER – MAKITA 39 2005
THREADER KIT SUPERTRONIC 1 2012
ELECTRICAL THREADER KIT 1 2010
TORQUE INDICATOR HANDLE WRENCH 1 2013
TORQUE INDICATOR HANDLE WRENCH 1 2012
ASPHALT AND CONCRETE CUTTING MACHINE – MJD400 2 2011
FLOOR CUTTING MACHINE CS451 1 2012
PAINTING PUMP 1 2011
ELECTRICAL FURNACE FOR DRYING ELECTRODES 2 2012
PNEUMATIC PICK HAMMER 1 2011
HULKING HAMMER GSH27 1 2011
HULKING HAMMER GSH27 1 2012
VIBRANT BEAM DYNAPAC 1 2011
CONCRETE POLISHER DYNAPAC 1 2008
VIBRATOR RACOON 2 2011
VIBRATOR RACOON AT39 1 2012
CONCRETE MIXER 350L/C 1 2011
CONCRETE MIXER 350L/C PRO 1 2012
PRESSURE TEST PUMP 1 2012
MANUAL PUMP MP350 1 2012
THEODOLITE T100 1 2009
THEODOLITE 1 2010
BALANCE LEVEL NA 724 1 2011
GAMMA-RAY DEVICE 1 2008
GAMMA-RAY DEVICE 1 2009
MAGNETIC YOKE 1 2009
ULTRASOUND FAULT DETECTOR 1 2002
ULTRASOUND FAULT DETECTOR 1 2006
THICKNESS MEASURING DEVICE 1 2004
ELCOMETER+WELL 1 2011
EARTH PLUG RESISTENCE MEASURING DEVICE-
1 2008 25.04.2014 / 2 YEARS
GEOTEST 2016
EARTH PLUG RESISTENCE MEASURING DEVICE-GEOHM
1 2008 25.04.2014 / 2 YEARS
40
DIGITAL GAUGE IBROSCAN 1 2012
DIGITAL GAUGE 1 2012
ANALOGIC MULTIMETER – MAVO 35 2 2010 24.04.2013 / 1 YEARS
MEGOHMETER – APP 3 1 2005 24.04.2013 / 2 YEARS
DIGITAL MEGOHMETER – MI 3103 1 2012 25.04.2012 / 2 YEARS
DIGITAL MULTIMETER – UT 201 3 2012 20.04.2012 / 2 YEARS
ANALOGIC VOLTAMETER – VAP 5 1 2005 25.04.2013 / 2 YEARS
DIGITAL MULTIMETER – DT 266 1 2013 20.04.2012 / 2 YEARS
MEGOHMETER – UT 513 1 2013 24.05.2013 / 2 YEARS
CABLE HOIST T532D 1 2011
MANUAL CHAIN HOIST 26 2012
MOTOR-TRACTOR MERCEDES – ACTROSS 2644 LS 1 2007
SEMI-TRAILER SR35 1 2005
MOTOR-TRACTOR IVECO EUROTEH 2 2007
SEMI-TRAILER SJ35 2 2002
MOTOR TIP LORRY MERCEDES – ATEGO 1522K 6 2006
MOTOR-TRACTOR MERCEDES AXOR 1840 LS 2 2007
SEMI-TRAILER SCHMITZ 2 2007
MOTOR TIP LORRY MERCEDES – ACTROS 3336 K 4 2007
AUTO-TRUCK MERCEDES – ATEGO 1522L 1 2007
AUTO-CONCRETE MIXER MERCEDES-ACTROS 2632B 1 2007
AUTO-CONCRETE MIXER MERCEDES- ACTROS 4141B 2 2008
CONCRETE PUMP MERCEDES 1 2007
MINIBUS MERCEDES 2 2007
MINIBUS MERCEDES 6 2008
MINIBUS MERCEDES 1 2009
MINIBUS MERCEDES 1 1010
MINIBUS MERCEDES 1 2012
MOTOR CAR OPEL 1+6 SEATS 1 2006
MOTOR CAR OPEL 1+6 SEATS 1 2007
UTILITY CAR FORD 1 2009
UTILITY CAR MERCEDES 1 2009
UTILITY CAR IVECO 1 2006
GAMMA MOBILE LAB – MAZDA 4X4 1 2006
NDT LAB 1 2007
CONCRETE STATION TYPE ORU-ONE DAY 1 2007
CEMENT BUNKER 2 2007
SAND BLASTING MACHINE 1 2007
SAND BLASTING MACHINE TYPE C200 E/M 1 2008
SAND BLASTING MACHINE 1 2009
SAND BLASTING MACHINE TYPE C200 E/M 2 2011
THERMAL TREATMENT STATION TYPE VAS 45-6 2 2011
MANUAL DEVICE FOR INSULATING STRIP 1 2011
WORKSHOP FOR STEEL MANUFACTURES AND
2 2006
CONCRETE PREFABS
OFFICE CARAVAN 2 2000
HOUSE TRAILER 5 2001
OFFICE TYPE CONTAINER 13 2010
OFFICE TYPE CONTAINER 2 2012

Motor vehicles and tools fleet Personnel transportation vehicles


10. LICENSED SOFTWARE SYSTEMS + 14. PROCESS LICENSES

Operating Systems: WINDOWS XP, WINDOWS VISTA, WINDOWS 7

Data base: MICROSOFT SQL 2003, MICROSOFT SQL 2005

Email: MICROSOFT EXCHANGE & MICROSOFT OFFICE OUTLOOK

Office Software Suite: MICROSOFT OFFICE

Internet Security Antivirus: ISA SERVER 2004, KASPERSKY ENDPOINT SECURITY 10

Enterprise Resource Planning: CHARISMA ERP & CHARISMA HR

Project planner: PRIMAVERA & DOCLIB

Engineering Software: AUTOCAD

Legislation: LEGIS STUDIO

Other programs: TIS-OFFICE


Buried pipeline installation

Horizontal drilling tool


Gas drying plant

Oil and gas terminal – OMV Petrom (location – Midia Navodari)


Gas compressors - OMV - Petrom

Manufacturing & loading of


offshore jacket
Overcrossing of Buzau river

Pedestrian bridge with pier Mamaia


Mild hydrocracking plant -
Rominserv S.A.
Offshore flare
Undercrossing of Danube – Black Sea Channel
Caraiman warehouse and mechanical workshop

You might also like