Qualification: SCAFFOLDING WORKS NC II (SUPPORTED TYPE SCAFFOLD)


Units of
 Erect and dismantle support type scaffold
Competency
 Handle, segregate and stack scaffolding
covered:
Instruction:
 Read each of the questions in the left-hand column of the chart.
 Place a check in the appropriate box opposite each question to indicate your
answer.

Can I? YES NO
 Use personal protective equipment (PPE) in accordance with
Rule 1080 of Occupational Safety and Health Standards
 Determine purpose of scaffolding with associated activities
 Observe and follow site rules and regulations in erecting scaffold
according to safety and health practices*
 Review, confirm and clarify work instruction and drawing
 Identify, use and maintain scaffold erection hand tools and
secures to prevent fall*
 Check and segregate tools and equipment in accordance to
industry practice
 Identify scaffold components in accordance to industry practice
 Understand types of supported scaffold and its capacity for the
necessary job requirement
 Check, identify and report obstructions and hazards in the job
site*
 Draw proposed sketches of modified scaffold in accordance to
site condition/project requirements *
 Establish and maintain communication and coordination with
other workers in accordance with job requirement
 Apply safety practices according to OSHS and other applicable
references
 Observe scaffolding plan/ drawing in compliance with work
instruction
 Secure perimeter with barriers and signage*
 Prepare site and foundation in accordance with OSHS
requirements

CONSCA218-0719 ver. 1.00 1


Scaffolding Works NC II (Supported Type Scaffold)
 Lay out plan as per design or manufacturer’s specification*
 Prepare footings in accordance with OSHS requirements, codes
of practice, manufacturer specifications and engineer's
instructions*
 Erect scaffold in accordance with OSHS and / or Department
Order (DO128-13) requirements and manufacturer specifications
or design by the structural engineer.*
 Install fall protection devices in accordance with job specification
and OSHS requirements*
 Visually inspect erected scaffold to check conformity using
checking tools and instruments in accordance with the given
instruction/ plan. *
 Identify and report faulty components to personnel in line with
company standard operating procedure
 Report scaffolding instability to personnel in line with company
safe operating procedures
 Dismantle scaffold using reverse procedure of erection by
lowering scaffold components in accordance to standard work
procedures*
 Clean, check, maintain and store tools and equipment *
 Move scaffolding components to specified location following
Occupational Safety and Health Standards (OSHS)
requirements and other applicable references*
 Clear work area in accordance with company rules and
regulations
 Store re-usable/ recyclable materials in accordance with
company rules and regulations
I agree to undertake assessment in the knowledge that information gathered will only
be used for professional development purposes and can only be accessed by
concerned assessment personnel and my manager/supervisor.

Candidate’s name and signature Date

CONSCA218-0719 ver. 1.00 2


Scaffolding Works NC II (Supported Type Scaffold)

You might also like