Environ Monit Assess (2020) 192:33

https://doi.org/10.1007/s10661-019-7995-x

Risk assessment of an industrial wastewater treatment


and reclamation plant using the bow-tie method
Razieh Analouei & Masoud Taheriyoun &
Hamid Reza Safavi

Received: 21 November 2018 / Accepted: 26 November 2019


# Springer Nature Switzerland AG 2019

Abstract At present, wastewater reuse and recycling in processes to provide reclaimed water for different in-
water-stressed countries such as Iran has become a vital dustrial uses. Results showed a 41% risk of violation
option for better management of water scarcity. Howev- from the effluent standard limit in the MIC WWTP. In
er, despite the benefits of wastewater reuse, there is a addition, analyzing the risk factors revealed that the
probability of incomplete treatment of wastewater in human error had the largest contribution to the risk
accordance with the standards. Risk assessment of a calculation of the WWTP failure. In this regard, a num-
wastewater treatment plant is required in order to deter- ber of mitigation measures were proposed to improve
mine the causes and consequences of failure in the the reliability of the WWTP.
treatment system. Among various methods used for risk
assessment, the bow-tie (BT) approach is an efficient Keywords Risk assessment . Wastewater treatment
technique since it represents a failure event from causes plant . Bow-tie method . Reclaimed water
to effects. In this method, for a wastewater treatment
plant (WWTP), causes of an adverse event, including
the violation of the effluent water quality from the
Introduction
standard limit is studied using fault tree analysis
(FTA). Then, the impacts of these adverse events are
Nowadays, according to the problem of water shortage
classified in different scenarios by the use of event tree
in many regions, wastewater reuse has been consistently
analysis (ETA). In this study, the BT technique was
increasing across the planet. Water reuse can be consid-
applied to assess the risk of the WWTP of the
ered as part of a sustainable water management strategy
Moorchekhort industrial complex (MIC), located in
which reduces the exploitation of water resources and
the central part of Iran. The plant consists of two parts,
may contribute to solving water-related problems (Chen
including activated sludge and advanced treatment
et al. 2017; Hocaoglu 2017). Due to water scarcity in
Iran, especially in recent years, the use of treated waste-
R. Analouei : M. Taheriyoun (*) : H. Safavi water in industrial complexes has gained more attention.
Department of Civil Engineering, Isfahan University of It has helped reduce the cost of water supply and over-
Technology, Isfahan, 84156-83111, Iran
e-mail: taheriyoun@iut.ac.ir come the water shortage crisis in the region.
Despite all the benefits of wastewater reuse, there are
some concerns such as violation of the water quality
R. Analouei standard which may cause health risks and other adverse
e-mail: r_analooei@yahoo.com
impacts (Asano et al. 2007). Risk assessment is an
H. Safavi approach that can be applied to respond to these con-
e-mail: hsafavi@iut.ac.ir cerns in a wastewater treatment and reuse system. Risk
33 Page 2 of 16 Environ Monit Assess (2020) 192:33

has different definitions depending on the scientific Taheriyoun and Moradinezhad (2015) used FTA and
disciplines and applications. In this study, risk is con- the Monte Carlo simulation method to evaluate the
sidered as a combination of probability and conse- reliability of a WWTP. It was determined that the
quences of an adverse event. (ISO 2009; Ganoulis greatest contribution to the failure of the system was
2009). On the other hand, the concept of reliability is human error. In this regard, the climatic and mechanical
the probability that a system will perform a required factors and the sewer system problems were in the next
function without defects under the specified conditions ranks.
for a given period of time (Vose 2008). Recent studies in risk assessment of wastewater reuse
There are many methods for quantitative risk assess- have focused on the health impacts of reclaimed water
ment. The bow-tie (BT) model is one of the most com- including microbial risk assessment. Elgallal et al.
prehensive methods that provide a graphical representa- (2016) assessed the environmental and health risks
tion of the causes and consequences of one or several associated with the chemicals in the reclaimed water
events (CCPS 2018). The BT method is composed of used for irrigation based on the risk matrix method.
causal analysis which leads the top event to occur and They evaluated the impacts of heavy metals, salinity,
the safety barriers that reduce the consequences of the nutrients, suspended solids, toxic organics on soil, plant,
top event. The main advantage of the BT method is the human, surface water, and groundwater. Courault et al.
presentation of the causes and consequences of an un- (2017) applied a quantitative microbial risk assessment
desirable event at the same time. (QMRA) approach to assess the airborne enteric viruses
There are some methods used in the BT body such as emitted from the wastewater reused for irrigation. They
fault tree analysis (FTA), reliability block diagrams, and concluded that the model could aid the development of
influence diagrams for the casual analysis part and event safe water reuse policies for wastewater reuse. Further-
tree analysis (ETA), evacuation models, and conse- more, Amoueyan et al. (2017) performed QMRA to
quence models for the safety barrier part (Rausand and quantify the risk of microbial infection and compared
Hoyland 2004). In this study, a combination of FTA and the risks of different potable reuse systems. Similar
ETA is applied in the BT model in order to evaluate the studies of QMRA were carried out in assessment of
probability of an effluent standard violation and its bioaerosol impacts in wastewater treatment plants
consequences in a wastewater treatment plant (WWTP). (Carducci et al. 2018) and the risks of direct potable
FTA evaluates the causes of a failure event while ETA reuse (Soller et al. 2018).
represents its consequences. In fact, first, the causes of According to the literature, the BT method was most-
an undesirable event in the system are investigated using ly applied in the risk analysis of oil and gas facilities and
FTA. Then, the effects of this event are classified in it has not been used in the risk analysis of water and
different scenarios through ETA (Khakzad et al. 2012). wastewater treatment systems so far. Shahriar et al.
Limited studies have been carried out related to the (2012) studied the probability of failure of an oil and
risk assessment of water and wastewater treatment gas pipeline using fuzzy BT model. The main objective
systems until now. Lindhe et al. (2009) applied FTA of this research was to determine the social, environ-
for integrated and probabilistic risk analysis of a water mental, and economic consequences of pipeline failure.
supply system based on the Monte Carlo simulation The results were useful to prevent related accidents. In
method. The developed risk assessment model consisted another study, Thienen-Visser et al. (2014) applied the
of three parts of influent raw water, treatment plant, and BT model to evaluate the causes and effects of leakage
water distribution network. The results showed that the from the storage of gas oil in a salt cavern into the
probability of exceeding the target level was 0.84 ± 0.01 aquifer. They concluded that the risk of groundwater
with 95% confidence. Moreover, the greatest share of contamination was low due to the leakage and the
the system failure was related to the quality of influent human error was the major cause of accidents arising
raw water to the treatment plant. Beauchamp et al. from subsurface storage.
(2010) used the qualitative FTA to determine the risks According to the previous researches, none of them
of ultrafiltration (UF) membrane in pathogen removal. proposed a comprehensive risk analysis procedure con-
The results showed that FTA was an efficient way to sidering both causes and consequences simultaneously
identify the technical and operational hazards of a water for a wastewater treatment and reuse system. In most of
treatment plant. the related studies, FTA has been used for risk analysis
Environ Monit Assess (2020) 192:33 Page 3 of 16 33

while a combination of FTA and ETA in a BT body has tank, a bar screen, a grit chamber, an equalization tank,
not been applied so far. In the present study, the BT an upflow anaerobic baffled reactor (UABR), a moving
method is used to evaluate the risk of an undesirable bed biofilm reactor (MBBR), secondary sedimentation
event, including failure to meet the water quality stan- and chlorination. The advanced treatment part includes
dards for the reclaimed water. In this regard, the factors chemical pretreatment, sand filtration, ultrafiltration
of failure in a wastewater treatment system are priori- (UF), activated carbon, and reverse osmosis (RO).
tized and the most effective factors in the failure event The reclaimed water is used in cooling towers, in
are specified. Finally, the overall risk of the treatment boilers, and as wash water and process water in various
and reuse system is determined based on the required industries located in the MIC including textile, plastics
water quality for industrial use. In order to increase the and rubber, steel and iron, and food industries. Water
reliability of the system, control measures are presented quality requirements for the reclaimed water include
at the end. electric conductivity (EC) < 500 (μs/cm), turbidity < 1
NTU, and COD < 5 mg/L and pH in range 6–9 (DSSME
2010). The challenges associated with reaching this
quality stems from the probable failure in each of treat-
Case study ment units. The consequences of the failure include
sedimentation, fouling, corrosion, and biofilm forma-
The wastewater treatment plant (WWTP) of tion in the pipes and equipment of the industries.
Moorchekhort industrial complex (MIC) is located in
Isfahan province, Iran. This treatment plant with a ca-
pacity of 1000 m3/day is mainly composed of two parts.
The first part includes primary and secondary treatment Methodology
processes, and the second part consists of advanced
treatment processes to provide reusable water for indus- The bow-tie (BT) method is an integrated probabilistic
tries. A flow diagram of the plant is shown in Fig. 1. and graphical approach which represents an undesired
According to the flow diagram, the process chain of the state of the system by developing a logical relationship
first part includes an inlet pump station and emergency between the causes and consequences of an adverse

Fig. 1 The flow diagram of the MIC WWTP


33 Page 4 of 16 Environ Monit Assess (2020) 192:33

event (Beauchamp et al. 2010; Khakzad et al. 2013). In simultaneously while for the OR gate, the occurrence
this study, a combination of FT and ET has been used in of at least one input event is required )Ruijters and
the body of BT. In a failure event scenario, the relation- Stoelinga 2015).
ship between the event and all its probable causes is The FT is analyzed as both qualitative and quantita-
described using the fault tree (FT). Simultaneously, the tive models. In the qualitative analysis, the minimal cut
link between the failure event and its consequences can set (the minimum number of events that can cause the
be represented by the event tree (ET). In other words, top event) is determined using Boolean algebra. In the
the BT method integrates the FT and ET where the quantitative part, the probability of the top event is
center event represents the top event as shown in calculated in terms of the occurrence probability of the
Fig. 2. According to this figure, the FT and ET models primary events or in terms of the minimal cut
are bow-tied and the top event of FTA is connecting sets)Khakzad et al. 2011; Hu 2016). Assuming the basic
with the initiating event of ETA. This framework is events are independent, the AND gate in the Boolean
mainly useful for analyzing failure events since their algebra method is equivalent to the product of their
causes and consequences remain connected together. inputs as in Eq. (1) and the OR gate is calculated based
on Eq. (2) (Rausand and Hoyland 2004):
n
Fault tree analysis (FTA) PT ðAND gateÞ ¼ ∏ Pi ð1Þ
i¼1

FTA is a deductive approach to determine the potential


causes of an adverse event. This method is considered as
one of the practical and prospective tools for reliability n
and risk analysis. By applying FTA, the arborous form PT ðOR gateÞ ¼ 1− ∏ ð1−Pi Þ ð2Þ
i¼1
of a logical relationship between an undesired event and
its causes is built )Khakzad et al. 2011; Hu 2016). where PT represents the probability of failure at the
In Fig. 3, on the left side, an FT diagram of the BT output of the gate and Pi indicates the probability of
model is shown. FT components, which are symbolized input events. The importance factor which denotes the
in Fig. 3, include primary events (PE), intermediate significance or effectiveness of each primary event is
events (IE), and top event (TE). The top event indicates determined based on Eq. (3) (Vose 2008).
the major failure event in the system. An intermediate PðN Þ−PðN 0 Þ
event denotes a transitional state of the system that is IF ¼  100 ð3Þ
P ðN Þ
related directly or indirectly to the top event with a logic
gate (Mokhtari et al. 2011). The events are connected by where IF is the importance factor, P(N) is the probability
means of logic gates including OR and AND gates. For of the top event considering all basic events, and P(N0)
the AND gate, the input events must occur is the probability of the top event without the specified

Fig. 2 The schematic of the bow-tie method (adapted from Mokhtari et al. 2011)
Environ Monit Assess (2020) 192:33 Page 5 of 16 33

Fig. 3 A typical BT model including FT (left) and ET (right)

primary event [4]. In this study, the OPENFTA software the three parameters violates the standard limit accord-
provided by Formal Software Ltd. was used to evaluate ing to DSSME (2010). Since the three parameters main-
the risk of the MIC WWTP (Formal Software ly characterize the performance of WWTPs, also be-
Construction 2005). cause data for these parameters were readily available,
they were selected as the index for evaluating the failure
Data collection of the system. Moreover, these parameters can be rep-
resentative of the requirements for the advanced treat-
The available data records consisted of the effluent ment of wastewater after the secondary stage.
concentration of three parameters including BOD, According to the availability of the field data which
COD, and TSS. The data was measured during a 38- can be used to evaluate the performance of the system,
month period from April 2013 to June 2016. Table 1 the failure ratio (FR) is defined as the ratio of the number
shows information on the data collection including sam- of failure events to the total number of events based on
pling frequency, sampling method, analysis apparatus data records as presented in Eq. (4).
and method, detection limits, and measurement uncer-
NF
tainties of these parameters. FR ¼ ð4Þ
NT
Regarding the available data, the top event was de-
fined as the non-compliance with BOD, COD, or TSS where NF represents the number of records of the efflu-
standards. In fact, the failure occurs when at least one of ent water quality data violating the standard limit and NT

Table 1 Information on the data collection of the MIC WWTP

Parameter Sampling Sampling Analysis method Analysis apparatus Detection Measurement


(mg/L) frequency method limit uncertainty
(%)

COD Twice a week Grab APHA et al. (2017), 5220B COD reactor (45600-02) Hach 0.1 mg/L ±3
BOD Once a month Grab APHA et al. (2017), 5210B BOD meter (Hach BODTrak) 0.1 mg/L ±6
TSS Twice a week Grab APHA et al. (2017), 2540D Sartorius Entris 224-1S Bal- 0.1 mg/L ±4
ance
33 Page 6 of 16 Environ Monit Assess (2020) 192:33

is the total number of records. The FR is used to see if The questionnaires were provided based on the op-
the FTA results are in line with the available observa- eration and maintenance problems of different treatment
tions. In fact, it is considered for validation of the model units discussed in the valid references (Tchobanoglous
results. and Burton 2014; Qasim 1999) and finally edited by the
opinions of some experts. The probability of the basic
Event tree analysis (ETA) events was calculated based on the average values of the
scores (in the range of 1–100%) derived from the
ETA is an inductive technique for assessment of system questionnaires.
risk and reliability. This method is used to determine the In summary, the BT model is formed through the
consequences of an undesirable event in the system following steps:
(Gheorghe and Mock 1999; Gheorghe and Nicolet-
Monnier 1995). As shown on the right side of Fig. 3, 1. Understanding the system and how it operates to
an event tree (ET) diagram consists of an initiating event find out the relationship between system compo-
(TE), safety barriers (SB), and consequences (Ci). An nents and their interactions
initiating event can be a fault, error, undesirable event, 2. Definition of the top event in the system
or even a normal operating instruction of the system. It 3. The logical construction and development of the
is the same as the top event (TE) provided by the FT part FT structure, including the factors affecting the
of the BT model. creation of the top event
Safety barriers are the intermediate events of an ET in 4. Qualitative analysis of the FT model in order to
order to mitigate the harmful effects of the initiating determine the minimal cut sets
event. The order of the barriers, i.e., SB1, SB2, SB3, is 5. Determining the probability of the basic events by
based on their time of occurrence. The success or failure the experts’ opinions, valid references, and avail-
of each barrier results in different scenarios. able data
Therefore, the ET begins from the TE and continues 6. Quantitative analysis of the FT model and deter-
toward each branch to determine the occurrence proba- mining the probability of the top event
bility of each consequence. For example, the occurrence 7. Precise recognition of safety barriers in the ET of
probability of the consequence C1 in Fig. 3 is calculated the system
as in Eq. (5): (Rausand and Hoyland 2004) 8. Determining the order of safety barriers and build-
ing the ET
PðC1j saftey barriers; TE Þ 9. Determining the probability of success and failure
of the safety barriers based on the experts’ opin-
¼ PðTE∩SB1∩SB2∩SB3Þ ¼ ions and available data
10. Defining the possible consequences of each
¼ Pð TE Þ:P ðSB1jTEÞ:PðSB2jTE∩SB1Þ:P ð5Þ
branch in the form of scenarios (from the best to
ðSB3jTE∩SB1∩SB2Þ the worst case)
11. Calculating the probabilities of the consequences
where P(C1) is the probability of the consequence, C1, caused by the top event
P(TE) is the top event probability, and P(SBi) refers to 12. Calculating the overall risk of the system
the success and failure probability of each safety barrier
through the branches. According to the challenges associated with
reaching the expected water quality for reuse, in-
Expert elicitation cluding the dependency of successive treatment
units, the consequences of the top event are evalu-
The probability of the basic events was calculated based ated in different scenarios. The probabilities of the
on experts’ opinions. The experts included the manager consequence scenarios are analyzed sufficiently
and vice manager of the MIC WWTP, two operators of through the ETA with the aid of the safety barrier
the WWTP, the designer of the WWTP from a consult- concept. In this regard, both failure and non-failure
ing engineering company, and two faculties of the parts of the top event are analyzed in order to
chemical and environmental engineering field. interpret the results of different scenarios. Therefore,
Environ Monit Assess (2020) 192:33 Page 7 of 16 33

in order to calculate the overall risk of the system, Results and discussion
the failure and non-failure probabilities of the top
event obtained from the FT are analyzed separately FTA results
by the ET part of the BT model.
Finally, the sum of the failure probabilities of the In line with the process chain of the WWTP, the causal
consequences (Ci) in the ET model represents the over- relationship of the operation of each unit to the top event
all risk of the wastewater treatment system as in Eq. (6): (violation of effluent water quality from the standard
limit) was analyzed. The analysis was done based on the
literature, the available data, experts’ opinions, and the
plant operators’ experiences as discussed in the “Expert
R ¼ ∑P f ðC i Þ ð6Þ
elicitation” section.
The hierarchy of the factors resulting in the top event
occurrence was demonstrated in the form of the FT
where R is the risk of the system and Pf(Ci) is the failure diagram. Due to the numerous treatment units and in-
probabilities of the consequences obtained from the termediate events in the FT diagram, it was divided into
ETA. three parts as shown in Figs. 4, 5, and 6. In these figures,

Fig. 4 The fault tree diagram of the MIC WWTP (part 1)


33 Page 8 of 16 Environ Monit Assess (2020) 192:33

Fig. 5 The fault tree diagram of the MIC WWTP (part 2)

the symbol for the “AND” gate is “ ” and the symbol the operator error and lack of sufficient equipment ser-
for the “OR” gate is shown as “ ”. In addition, the vice occur simultaneously, then the failure in the aerobic
reactor takes place.
connection of each figure to the next part is shown by a
The failure in the anaerobic reactor (B5) as shown in
triangular symbol. In these figures, letter “O” stands for
Fig. 5 is dependent on one of the events including lack
basic events; “N” for the top event; and letters “A,” “B,”
of regular washing of anaerobic beds in UABR (C1),
“C,” and “D” are symbols representing the events from
improper temperature (C2), improper pH (C3), high
levels 1 to 4 respectively.
toxic entry (C4), and failure in the equalization tank
According to Fig. 4, intermediate events in level 1 are
(C5). Basic events include improper design (O8, O13),
connected to the top event by the “OR” gate. Thus,
operator error (O9, O10, O12, O14, O17), bad weather
effluent water quality violation may occur mainly due
conditions (O11), failure in the emergency reservoir
to the malfunction of the aerobic reactor (A1) or the
tank (O15), and lack of sufficient equipment service
secondary sedimentation tank (A2). Furthermore, the
(O16 and O18) that are connected with AND gate
malfunction of the aerobic reactor is dependent on the
pairwise. It should be noted that the bad weather condi-
occurrence of failure in one of the related operations
tions refer to the raining conditions in which the storm
including anaerobic reactor operation (B5), oxygen lev-
water infiltrates to the sewage network and raises the
el control (B4), return sludge pumping (B3), high toxic
WWTP influent flow rate.
entry (B2), and improper volume of moving bed plastic
The malfunction of the secondary sedimentation tank
media (B1). The basic events in Fig. 4 (O2–O7) are
(A2), as shown in Fig. 6, is related to the occurrence of
connected in pairs by the “AND” gate. For instance, if
the events connecting with the “OR” gate, including
Environ Monit Assess (2020) 192:33 Page 9 of 16 33

influent overloading (B6), sludge rising (B7), bulking Table 2 The probability of the basic events based on the average
scores derived from the experts’ opinions
(B8), and irregularly sludge discharge (B9).
Overloading is caused by the occurrence of inflow Basic Occurrence Basic Occurrence
solids or hydraulic shock loads. Moreover, improper events probability (%) events probability (%)
design (O23, O28, O30), operator error (O19, O21,
O1 1.5 O17 1
O24, O25, O29, O31, O32), high rate of inflow (O20,
O2 7 O18 7
O22), and lack of sufficient equipment service (O26) are
O3 4 O19 1
basic events in the diagram of Fig. 6. O4 6 O20 7
The probabilities of the basic events were calculated O5 5 O21 1.2
based on the experts’ opinions. The average values of O6 5 O22 8
the scores (in the range of 1–100%) derived from ques- O7 5 O23 9
tionnaires are presented in Table 2. O8 4 O24 8
The minimal cut sets of the MIC WWTP including O9 7 O25 6
first- and second-order type attained by Boolean algebra O10 1 O26 6
are shown in Table 3. The first-order type contains only O11 7 O27 6
one basic event while the second-order contains two O12 7 O28 7
basic events. For example, for the first-order type, if O13 1 O29 6
only O1 cut set (improper design of media in aeration O14 1 O30 5
tank) occurs, it will cause improper performance of the O15 1.5 O31 7
WWTP and, for the second-order cut set, simultaneous O16 1 O32 7
occurrence of O10–O11 (operator error and bad weather
conditions) causes the top event in the FT model.

Fig. 6 The fault tree diagram of the MIC WWTP (part 3)


33 Page 10 of 16 Environ Monit Assess (2020) 192:33

Table 3 The minimal cut sets of the FTA Table 4 The classification of the primary events and the impor-
tance of the risk factors
Cut set Minimal cut set
order Risk factors Primary events Importance
factor (IF)
1 O1, O18, O27, O28, O31, O32 (%)
2 O10 O11, O12 O13, O14 O15, O16 O17, O19 O20,
O21 O22 Operator error O2, O4, O6, O9, O10, O12, 55
O23 O24, O25 O26, O29 O30, O2 O3, O4 O5, O6 O14, O17, O19, O21, O24,
O7, O8 O9 O25, O27, O29, O31, O32
Improper design O1, O3, O8, O13, O15, O20, 25
O22, O23, O28, O30
Lack of sufficient O5, O7, O16, O18, O26 19.9
The probability of the top event for the WWTP was equipment
determined equal to 31% based on Eqs. (1) and (2) using service
OPENFTA software. The importance factor (IF) was Bad weather O11 0.2
condition
also calculated according to Eq. (3) for each basic event.
Figure 7 shows the basic events with the highest IF. As
seen in the figure, four events have the IF values of
22.4% including O18 (lack of sufficient equipment ser- results, the human error with IF = 55% has the highest
vice of the equalization tank in the anaerobic reactor), contribution to the overall risk in the system. It is worth
O28 (improper design for bulking prevention in the noting that 16 out of 32 basic events are included in the
secondary sedimentation), O31 (operator error for operator error which may be the reason that the human
bulking prevention in the secondary sedimentation), error got the highest IF. In addition, the improper design
and O32 (operator error related to irregular sludge dis- with IF = 25% and the lack of sufficient equipment
charge in the secondary sedimentation). service with IF = 19.9% are in the next priority. The
In order to classify the most effective risk factors in bad weather conditions are the least effective factor in
the WWTP system, the primary events were categorized the risk of the WWTP system.
into four groups as shown in Table 4. According to the

Fig. 7 The basic events with the highest IF


Environ Monit Assess (2020) 192:33 Page 11 of 16 33

Table 5 The statistics of the effluent concentrations of COD, BOD, and TSS

Parameter Total Min. (mg/L) Ave. Max. (mg/L) Standard Skewness Kurtosis Effluent
(mg/L) number (mg/ deviation standard
of data (NT) L) limit (mg/L)

COD 261 11 57 337 37 3.5 16.5 60


BOD 28 6 24 75 17 2.6 8.6 30
TSS 111 2 47 220 40 2.3 3.2 40

Validation of the FTA result using the field data were evaluated as the final consequences of the BT
model.
The statistics of the data including minimum, maxi- Regarding Fig. 10, scenario C1 occurs when all
mum, average, standard deviation, skewness, and kur- advanced treatment units work successfully. Conse-
tosis coefficients are shown in Table 5. In addition, the quently, the fouling, the corrosion, and the biofilm will
time series of the parameters are plotted as shown in not occur in the facilities of the industry. The probability
Fig. 8 and the probability distribution and box plot of the of this scenario in the BT model is 58.6% (= 58 + 0.6) as
data are presented in Fig. 9. The results show that the shown in Fig. 10. The C2 scenario occurs when no more
data do not follow a normal distribution. than 2 of 5 units of advanced treatment processes work
The FR was calculated based on the field data ac- successfully. As a result, the fouling, the corrosion, and
cording to Eq. (4), and it was obtained equal to the biofilm occur in the industrial facilities of the water
FR ¼ NN TF  100 ¼ 300
99
 100 ¼ 33%. Comparing with consumers in the long term. The probability of the
the risk value obtained from the FTA (31%), it is con- occurrence of this scenario in the model is 21.1%. The
cluded that the difference between the two values is C3 scenario occurs when at least 3 units of 5 advanced
within the acceptable range with an error difference of treatment units do not function properly. Therefore, in
the industrial facilities of the water consumer, the con-
33  100 ¼ 6%. Therefore, the results of the FT mod-
33−31

el are valid for the case study. sequences of the fouling, the corrosion, and the biofilm
will occur in the short term. The probability of this
scenario in the model is 20.3%. The results of the BT
ETA results and BT model model show that the risk in the overall WWTP system in
order to supply water for industrial uses is 41.4%. Thus,
By determining the risk of the main part of the waste- the system has a reliability of 58.6%.
water treatment plant, the BT model was prepared as According to the results, human error has the greatest
shown in Fig. 10. In this figure, the chemical pretreat- negative impact on the performance of the system with
ment, the sand filtration, the ultrafiltration, the activated the aim of providing safe water for the industrial facil-
carbon, and the reverse osmosis were safety barriers ities. As a result, it is necessary to determine mitigation
(intermediate events) of the ETA. For each barrier, the measures to increase the reliability of the wastewater
probability of success was placed in the upper branch treatment system. In this regard, the following measures
and the probability of the failure was in the lower are proposed:
branch. These probabilities were determined based on
the experts’ opinions and valid references for WWTP & Increasing the level of technical knowledge of op-
design and operation. erators and raising the labor force to improve the
According to the BT model in Fig. 10, the occurrence accuracy of surveys and equipment services, in or-
of 46 probable scenarios was found. Based on the cal- der to reduce the human error in different parts of the
culations of the ETA model and multiplying the proba- MIC WWTP
bility values of the branches of 46 scenarios, the overall & Using the online monitoring system which gives a
probability of each scenario was determined. According better understanding of the system failure with re-
to Table 6 and ETA results, scenarios C1, C2, and C3 spect to new data, also more precise detection and
33 Page 12 of 16 Environ Monit Assess (2020) 192:33

Fig. 8 The time series of the effluent concentration data. a COD, b BOD, c TSS
Environ Monit Assess (2020) 192:33 Page 13 of 16 33

Fig. 9 Probability distribution


with the normal curve and box
plot of the effluent concentration
data. a COD, b BOD, c TSS
33 Page 14 of 16 Environ Monit Assess (2020) 192:33

Fig. 10 The bow-tie diagram of the MIC WWTP

control of the entrance of chemicals and toxics to the probability of failure due to the lack of sufficient
biological treatment units equipment service
& Services and repairs to various parts of the system in & Equipping the laboratory of the MIC WWTP and
a regular and periodic manner to decrease the performing regular tests of various parameters in
Environ Monit Assess (2020) 192:33 Page 15 of 16 33

Table 6 The results of the scenarios In addition, the efforts of anonymous reviewers in preparing the
insightful comments, which greatly improved the paper, are kindly
Symbol of Scenarios Probability of acknowledged.
scenarios scenarios (%)

C1 Without fouling, corrosion, and 58.6


biofilm in the facilities of an
industry
C2 Creating fouling, corrosion, and 21.1 References
biofilm in the facilities of an
industry in the long run Amoueyan, E., Ahmad, S., Eisenberg, J. N., Pecson, B., & Gerrity,
C3 Creating fouling, corrosion, and 20.3 D. (2017). Quantifying pathogen risks associated with pota-
biofilm in the facilities of an ble reuse: a risk assessment case study for cryptosporidium.
industry in the short run
Water Research, 119, 252–266.
APHA, AWWA & WEF. (2017). Standard methods for the exam-
ination of wastewater (23th ed.). Washington: America
Public Health Association, American Water Works
accordance with the standards of industrial waste- Association, Water Environment Federation.
water (DSSME 2010). It decreases the measurement Asano, T., Burton, F., Leverenz, H., Tsuchihashi, R., &
Tchobanoglous, G., (2007). Water reuse: issues, technolo-
uncertainty which can help strengthen the analysis
gies, and applications. 10–13.
of the failure and validate the model results. Beauchamp, N., Lence, B., & Bouchard, C. (2010). Technical
hazard identification in water treatment using fault tree anal-
ysis. Canadian Journal of Civil Engineering, 897–906.
Carducci, A., Donzelli, G., Cioni, L., Federigi, I., Lombardi, R., &
Verani, M. (2018). Quantitative microbial risk assessment for
Conclusion workers exposed to bioaerosol in wastewater treatment plants
aimed at the choice and setup of safety measures.
In this study, the BT model was used to determine International Journal of Environmental Research and
the risk of an industrial wastewater treatment system Public Health, 15(7).
Center for Chemical Process Safety (CCPS). (2018). Bow ties in
in violating the effluent water quality parameters
risk management: a concept book for process safety. John
from the standard limits. The case study was the Wiley & Sons.
MIC WWTP located in Isfahan, Iran. The input data Chen, Z., Wu, Q., Wu, G., & Hu, H. Y. (2017). Centralized water
of the ET and FT models were obtained through the reuse system with multiple applications in urban areas: les-
experts’ opinions, the effluent concentration data of sons from China’s experience. Resources, Conservation and
Recycling, 117, 125–136.
the WWTP, and the valid references of the design
Courault, D., Albert, I., Perelle, S., Fraisse, A., Renault, P.,
and operation of the WWTP. Ultimately, the total Salemkour, A., & Amato, P. (2017). Assessment and risk
risk of the system was calculated equal to 41.4% by modeling of airborne enteric viruses emitted from wastewater
applying the BT model. Prioritizing the risk factors reused for irrigation. Science of the Total Environment, 592,
512–526.
resulting from the BT model in the main part of the
Deputy of Strategic supervision of the Ministry of Energy
WWTP was obtained as the human error, the im- (DSSME) (2010). Code no. 535, Environmental regulations
proper design, the lack of sufficient equipment ser- for the reuse of wastewater and wastewater. Bureau of the
vice, and bad weather conditions. Human error has Technical Management System of Engineering and Technical
the greatest impact on the improper performance of Standards for Water and Wastewater.
Elgallal, M., Fletcher, L., & Evans, B. (2016). Assessment of
the system. Finally, the mitigation measure for in-
potential risks associated with chemicals in wastewater used
creasing the system reliability was proposed. The for irrigation in arid and semiarid zones: a review.
results showed the capability of the BT model in Agricultural Water Management, 177, 419–431.
the improvement of WWTP operation and mainte- Formal Software Construction. (2005). Open FTA user manual
nance based on the systemic approach. ver. 1.0. Formal Software Construction (FSC) (pp. 5–83).
Wales: Ltd Cardiff.
Ganoulis, J. (2009). Risk analysis of water pollution (pp. 32–34).
Acknowledgments The authors would like to thank Dr. Seyed
John Wiley & Sons.
Alireza Momeni and Mrs. Mahnaz Heydari and Mrs. Hamideh
Gheorghe, A., & Mock, R. (1999). Risk engineering: bridging risk
Ebrahimi from the MIC WWTP for preparing the plant operation
analysis with stakeholders values. New York: Springer
data and filling the questioners and Eng. Hamidreza Oroomieh for
Science+Business Media.
sharing his experience about treatment plant design and operation.
33 Page 16 of 16 Environ Monit Assess (2020) 192:33

Gheorghe, A., & Nicolet-Monnier, M. (1995). Integrated regional Rausand, M., & Hoyland, A. (2004). System reliability theory:
risk assessment (Vol. II) Consequence Assessment of models, statistical methods, and applications (2nd ed.). New
Accidental Releases. Netherlands: Springer. Jersey: Wiley and Sons.
Hocaoglu, S. (2017). Evaluations of on-site wastewater reuse Ruijters, E., & Stoelinga, M. (2015). Fault tree analysis: a survey
alternatives for hotels through water balance. Resources, of the state-of-the-art in modeling, analysis and tools.
Conservation and Recycling, 122, 43–50. Computer Science Review, 15–16, 29–62.
Hu, Y. N. (2016). Research on the application of fault tree analysis Shahriar, A., Sadiq, R., & Tesfamariam, S. (2012). Risk analysis
for building fire safety of hotels. Procedia Engineering, 135, for oil & gas pipelines: a sustainability assessment approach
524–530. using fuzzy based bow-tie analysis. Journal of Loss
ISO/Guide 73 (2009). Risk management — vocabulary, p.2, avail- Prevention in the Process Industries, 25, 505–523.
able on, https://www.iso.org/obp/ui/#iso:std:iso:guide:73:ed- Soller, J. A., Eftim, S. E., & Nappier, S. P. (2018). Direct potable
1:v1:en. Accessed 15 Sept 2018. reuse microbial risk assessment methodology: sensitivity
Khakzad, N., Khan, F., & Amyotte, P. (2011). Safety analysis in analysis and application to state log credit allocations.
process facilities: comparison of fault tree and Bayesian Water Research, 128, 286–292.
network approaches, reliability engineering and system safe- Taheriyoun, M., & Moradinejad, S. (2015). Reliability analysis of
ty (Vol. 96, pp. 925–932). a wastewater treatment plant using fault tree analysis and
Khakzad, N., Khan, F., & Amyotte, P. (2012). Dynamic risk Monte Carlo simulation. Journal of Environ Monit Assess,
analysis using bow-tie approach. Reliability Engineering 187(4186), 1–13.
and System Safety., 104, 36–44. Tchobanoglous, G., & Burton, F. L. (2014). Wastewater engineer-
Khakzad, N., Khan, F., & Amyotte, P. (2013). Dynamic safety ing: treatment and resource recovery (15th ed.). New York:
analysis of process systems by mapping bow-tie into Metcalf & Eddy, McGraw-Hill Education.
Bayesian network. Process Safety and Environmental Thienen-Visser, K., Hendriks, D., Marsman, A., Nepveu, M.,
Protection, 91, 46–53. Groenenberg, R., Wildenborg, T., van Duijne, H., den
Lindhe, A., Rosén, L., Norberg, T., & Bergstedt, O. (2009). Fault Hartogh, M., & Pinkse, T. (2014). Bow-tie risk assessment
tree analysis for integrated and probabilistic risk analysis of combining causes and effects applied to gas oil storage in an
drinking water systems. Water Research, 43(6), 1641–1653. abandoned salt cavern. Engineering Geology, 168, 149–166.
Mokhtari, K., Ren, J., Roberts, C., & Wang, J. (2011). Application Vose, D. (2008). Risk analysis: a quantitative guide (pp. 11–12).
of a generic bow-tie based risk analysis framework on risk John Wiley & Sons.
management of sea ports and offshore terminals. Journal of
Hazardous Materials, 192(2), 465–475. Publisher’s note Springer Nature remains neutral with regard to
Qasim, S. R. (1999). Wastewater treatment plants: planning, jurisdictional claims in published maps and institutional