Professional Documents
Culture Documents
INJECTION
IN THE HOLE
4 4 TURRET
BOOM CONTROL
VALVE
BOOM
924 303 304
6 6
LS P2
4 4
4 4
6 6 CARRIER
103 104
100
TO COLLECTOR (660) C2 C1
4
PORT 7
4 4
80
Updated Change
Date Was before Pcs. Rev.
by not. Date
NOTICE! This document is the exclusive
DATE NAME 1 / 1
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2010-02-26 PME Hydraulic diagrams
311 RANGE DS SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2010-02-26 PME
INJECTION IN THE HOLE DWG NR 3-77018753-I
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED 2010-02-26 AG Hydrau Lyon POSITION ID-CODE 77018753