Professional Documents
Culture Documents
Work Experience:
Currently working as a Tech Lead at Company Name from July 2013 to Till Date.
Worked as an I.T Analyst at Company Name from October 2007 to July 2013.
Project Profile:
1.
Project GE GAMS process
Customer GE Oil & Gas
Description GE Oil & Gas provides a complete portfolio of value-added products,
services, and solutions for the oil and gas industry from wellhead to the
end-consumer. The services provided to the customer spans the entire
spectrum of customer needs, from initial plant and equipment setup to
product-life maintenance. The GE Oil & Gas Turbo machinery and
Global Services division is implementing Oracle Primavera P6 V7 to
meet their Project Planning and Portfolio Management needs.
Primavera is primary tool for project management which will define all
the activities of the project life cycle.GE Oil & Gas Primavera project
is implemented to automate the schedule and resource management for
Turbo machinery business and to replace the legacy planning tool
“Artemis”. There are more than 15+ interfaces between Primavera and
Oracle e-Business suite including ASCP, JOT, and GSC etc. Project
stakeholders comprise of GE Business Leader, Project Control
Manager, Pole Leaders, Project Managers and Resource Managers. The
role of the Primavera Techno-Functional Consultant was to develop,
standardize, document and implement the procedures and tools for
delivering all projects on time.
Roles & Responsibilities Currently working as a Techno functional Consultant for GE Primavera
Support at 2nd level Production Support. Implementing enhancement
request and monitoring Interfaces that interact with Primavera via Web
methods on a daily basis. Resolving Interface failure issues. A major
role in resolving maximum of the issues based on priorities before
resolution date in all the applications. Have done data fixes and code
fixes as per the client requirement. Worked as a single and key resource
for GE Global Services unit of GE.Review all deliverables and ensure
defect free delivery to client and customers. Handle user calls on a
daily basis. Helped the Pl/SQL development team to map the fields
between Primavera and Oracle e-Business suite. Helped the Java
development team in identifying the Primavera API to be used for the
respective interfaces.
Solution Environment Oracle Primavera, Primavera Java API, Core Java, Web methods.
Tools Eclipse
2.
Project UEnS
Customer Hindustan Unilever LTD
Description Hindustan Unilever Limited (HUL) is India's largest Fast Moving
Consumer Goods Company with a heritage of over 80 years in India.
HUL is a subsidiary of Unilever, one of the world’s leading suppliers
of fast moving consumer goods with strong local roots in more than
100 countries across the globe with annual sales of €49.8 billion.
Roles & Responsibilities Definition of Global standards including Enterprise Project Structure,
Organization Breakdown structure, Project Codes ,Activity Code, User
Defined Fields, Calendars and User profile definition. Helped the
Pl/SQL development team to map the fields between Primavera and
Agile and for reports. Define process to collate schedule information
from vendors, clients using different applications (i.e. Excel, Microsoft
Project etc.) Into P6 schedule. Create Scorecards/Dashboards to
monitor project schedule KPI’s (Key Performance
Indicators).Integration between Oracle BPM with Primavera P6 8.2 for
creating workflows in Primavera. Integrated Primavera with Excel
Sheets. Created custom web bridges that will synchronize the user
inputs data and uploaded excel sheets into Primavera. Created backend
automation using Java that will do formula based Rollups from the
project schedule to the projects.
Solution Environment Oracle Primavera, Core Java, SOA (BPM).
Tools JDeveloper
3.
Project King Abdulaziz City for Science and Technology (KACST)
Customer Saudi Arabia government
Description King Abdulaziz City for Science and Technology (KACST) is a
leading nonprofit government organization engaged in the development
of science, technology and innovation in the Kingdom of Saudi Arabia.
TCS role is to implement the Business Workflows and Enterprise
Resource Planning software package (ERP) and Oracle's Primavera
P6 Enterprise Project Portfolio Management to support KACST_s core
Science, Technology and Innovation (STI) processes and auxiliary
(HR, Finance, IT, Inventory Management, Project management)
function requirements.
Roles & Responsibilities Requirement analysis of Project Creation and execution, Preparing
solution design document for integration.
Developed the integration services between Oracle Projects and Oracle
Primavera using java API’s.
Developing the integration services between Internal Project
Management Custom portal application, Oracle HRMS, Oracle Projects
and Oracle Primavera using Oracle SOA (BPEL), Primavera
webservices, Application Integration Architecture (AIA).
Solution Environment Oracle Projects, Oracle Primavera, Core Java, SOA (BPEL), AIA.
Tools E-Business Suite, PL/SQL developer, JDeveloper
4.
Project National Employee Savings Trust
Customer NEST(National Employee Savings Trust UK)
Description NEST Corporation is the trustee body responsible for running NEST in
UK. It is a non-departmental public body that operates at arm's length
from government and is accountable to Parliament through the
Department for Work and Pensions (DWP).This is enterprise
application with new requirement with the BANCS Product.
This is a web based application developed in java/j2EE.Spring frame
work has been used with Oracle 10g database at back end.
The application is used by the client internally to organize, maintain
and keep track of different product variations in different countries.
Various business functionalities have been implemented.
Roles & Responsibilities Requirement Analysis, Coding, Unit testing, System integration testing.
Solution Environment XHTML, JAVA, JSF, Ajax, Spring framework, Oracle 10g database,
JBoss 5.1
Tools Eclipse IDE, PL/SQL Developer, and Clear case.
5.
Project Global Procurement System
Customer CGSL(Citigroup Services Ltd)
Description GPS is an effective, online procurement and asset management system
for IT and non IT assets. GPS has an improved Graphical User Interface
and provides a better control over the assets by maintaining a central
repository of assets. It has been conceptualized as a single integrated
system. It is a global system that enhances the end user experience and
reduces the procurement cycle time and vendor payment time.
Roles & Responsibilities I was in the role of technical team member in my module and my key
responsibilities were developing pages in JSF and resolving technical
issues. Requirement Analysis, Coding, Unit testing, System integration
testing.
Solution Environment BEA Web logic 9.2, Oracle 10g database, Java server faces, Core Java,
Oracle Apps
Tools BEA Workshop Studio 3.2.1, PL/SQL Developer, Visual SourceSafe.
6.
Project Ultimatix -Global Purchasing
Customer TCS Internal
Description Implementation of Oracle Apps Purchasing module – TCS Global
(includes India, Subsidiaries, Global branches)
TCSL has four purchasing groups (RAG, PAG, Admin and IPD)
responsible for making purchases. Every user group has its own process
for procurement and we customized the Oracle Application to cater the
requirement.
Roles & Responsibilities Handling Development, Maintenance, Implementation and Production
Support of Oracle Apps Purchasing Module.
My key responsibilities are: Worked as technical expertise in various
customizations of reports in JSP for all TCS Global (includes India,
Subsidiaries, and Global branches).Production Support (day to-day
activities)-Analysis, data fix, code fix, user training, co-ordination,
documentation. Maintaining the JSP reports of various formats as
HTML, PDF, Excel, CSV etc and doing enhancements. Involved in
process improvement of GPS-PO system -developed a scheduler to
automate the process of producing PO detail report.
Solution Environment Core Java, JSP ,Oracle 10g database, Oracle Apps 11.5.10.2
Tools JDeveloper 10g, PL/SQL Developer, Visual SourceSafe.
Personal Details: