Snag No Snag description Amount Unit Material Will be done by Price
1 No compressed gas preparation system has been presented; 2 The design documentation for the compressed gas preparation system was not provided; 2 Pcs 3 The executive documentation of the compressed gas preparation system is not provided; 4 The ACT of the manometric tightness test is not provided (there are leaks in the system); 2 Pcs Accessories Not provided. specifications, passports and certificates for products, materials and components, 5 manual for maintenance and operation of the system, 1 Pcs calibration / verification certificates for all measuring instruments; There is no fireproof base, excluding subsidence for a gas cylinder. 6 1 Pcs Steel, fireproof base Sigma Systems 300 AZN The height of the base should be at least 0.15-0.2 m from the ground; 7 There is no marking of the system (pipeline, elements). Sigma Systems 100 AZN